Test Your Understanding - SE

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

5/12/2021 Test Your Understanding: Attempt review

 Chennasamudram Harsha .

 Dashboard / Software Engineering Concepts / Introduction to Agile Technologies / Test Your Understanding

Started on Saturday, 8 May 2021, 11:17 PM


State Finished
Completed on Saturday, 8 May 2021, 11:20 PM
Time taken 2 mins 46 secs
Marks 4.00/5.00
Grade 80.00 out of 100.00
Feedback Congratulations!! You have passed by securing more than 80%

Question Collaborative and co-operative approach among all the stake holders is important. This is a feature of the _______________
1 Agile Methodology
Incorrect

Mark 0.00 out of


1.00
Select one:
a. Dynamic system development method, 

b. Scrum

c. Lean Software Development 

Your answer is incorrect.

Collaborative and co-operative approach among all the stake holders is given importance in Dynamic system development
method

The correct answer is: Dynamic system development method, 

https://accenturelearning.tekstac.com/2021/mod/quiz/review.php?attempt=638044&cmid=1086 1/3
5/12/2021 Test Your Understanding: Attempt review

Question Match the phases and objectives of Dynamic System Development Method  Chennasamudram Harsha .
2
Correct
Design and build
Mark 1.00 out of Product is developed in iterations 
1.00

Implementation phase 
Delivers the tested system along with the documentation to the end users 

Business study 
Analyzing the process and the users who are a part of it and their needs 

Feasibility study 
Assess cost, time and technical factors 

Functional model 
Studying the business processes and converting these business process into model 

Your answer is correct.

Feasibility study - Assess cost, time and technical factors

Business study - Analyzing the process and the users who are a part of it and their needs
Functional model - Studying the business processes and converting these business process into functional model

Design and build - Product is developed in iterations

Implementation phase - Delivers the tested system along with the documentation to the end users

The correct answer is: Design and build → Product is developed in iterations, Implementation phase  → Delivers the tested
system along with the documentation to the end users,
Business study  → Analyzing the process and the users who are a part of it and their needs,
Feasibility study  → Assess cost, time and technical factors,
Functional model  → Studying the business processes and converting these business process into model

Question Arrange the phases of Feature Driven Development


3
Correct
 Develop overall Model
Mark 1.00 out of
1.00
 Build a Features List

 Plan by Feature

 Design by Feature

 Build by Feature

Your answer is correct.


1.Develop overall Model

2. Build a Features List

3. Plan by Feature

4. Design by Feature 
5. Build by Feature
 

https://accenturelearning.tekstac.com/2021/mod/quiz/review.php?attempt=638044&cmid=1086 2/3
5/12/2021 Test Your Understanding: Attempt review

Question Match the principles and objectives of Lean Software Development  Chennasamudram Harsha .
4
Correct Defer commitment 
Make decisions even at the last possible moment 
Mark 1.00 out of
1.00

Create knowledge 
Learn and share with others and empower self 

Deliver fast  Deliver smaller increments of the product in short intervals 

Build  in quality
Quality assurance through out the project development 

Eliminate waste 
Unnecessary work 

Your answer is correct.


Eliminate waste - Unnecessary work.

Build  in quality - Quality assurance should be integrated through out the project development.

Create knowledge  - Learn and share knowledge with others and empower self.

Defer commitment - Make decisions even at the last possible moment.

Deliver fast - Deliver smaller increments of the product in short intervals.

The correct answer is: Defer commitment  → Make decisions even at the last possible moment,
Create knowledge  → Learn and share with others and empower self, Deliver fast  → Deliver smaller increments of the
product in short intervals,
Build  in quality → Quality assurance through out the project development,
Eliminate waste  → Unnecessary work

Question Match the roles and responsibilities of the scrum agile methodology
5
Correct Scrum
Mark 1.00 out of master Coordinator responsible for controlling , handling discussions, communications and removing any barrier or problems d
1.00

Product
owner  Client/Customer

Team
Programmer, a designer, a tester or an architect
Member 

Your answer is correct.

Product owner is  the client/customer.

Scrum master acts as the coordinator  responsible for controlling , handling discussions, communications and  removing
any barrier or problems during the scrum process.

Team Member can be either a programmer, a designer, a tester or an architect.

The correct answer is: Scrum master → Coordinator responsible for controlling , handling discussions, communications
and removing any barrier or problems during the scrum process, Product owner  → Client/Customer, Team Member  →
Programmer, a designer, a tester or an architect

https://accenturelearning.tekstac.com/2021/mod/quiz/review.php?attempt=638044&cmid=1086 3/3

You might also like