Work on Progress,
Lightning
Quotation received and
Protection On 12/06/2017:
Factory has to design finalised. Work will start
System (LPS) Not Corrected.
Lightning Protection after some civil works
drawing is On 26/09/2017:
System (LPS) for the whole over roof hopefully after
2 unavailable. 3 MONTHS Not Corrected. They 06/02/2017 In Progress
factory. Once LPS 30.09.2017. We have
Again, installed had completed LPS
designing is finished, applied for a loan
system is drawing but installation
installation must be done. regarding this job. Work
inadequate and was not started yet.
will be initiated as soon
improper.
as we get the loan
Page 1 of 9
ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (2nd)
On 12/06/2017:
Insulation resistant test of Not Corrected.
Insulation all the cables must be Insulation test not done
resistance test of performed once every 2 for all power cables.
5 2 MONTHS 10/09/2016 In Progress
electrical cable is years cycle and recorded On 26/09/2017:
not performed. (this must require a Not Corrected. Need to
complete power shut off). preform for whole
factory.
On 12/06/2017:
Thermography survey must Not Corrected.
Thermography be done at least twice in a Thermography report is
6 scanning report is year; and this survey must 2 MONTHS outdated. 10/09/2016 Done on 21.09.2017 Corrected
unavailable. be recorded for On 26/09/2017:
maintenance work. Corrected.
On 12/06/2017:
Not Corrected.
Hot spots have In Progress. Hopefully
Hot spots must be removed On 26/09/2017:
7 been observed at 1 MONTH 06/12/2016 will be done on In Progress
as soon as possible. Not Corrected. Hot
some points. 31.10.2017
spots found at several
point.
Cables passing
through Cables passing through
wall/floor slab permanent wall/floor slab
On 12/06/2017:
are not protected must be protected. Floor to 90% Done. Will be
Not Corrected.
10 and passed floor openings shall be 2 MONTHS 15/11/2016 completed within In Progress
On 26/09/2017:
through the sealed by proper type 30.09.2017
Not Corrected.
concrete wall at materials (consult with fire
the entry/exit expert).
point(s).
Flexible PVC
Power and signal cable for
pipe is used to On 12/06/2017:
boilers shall be distributed
12 cover power and 1 MONTH Corrected. 07/09/2016 Done, 07.09.2016 Corrected
using proper type insulator
signal cable for
or steel flexible pipe.
boiler.
Multiple cables
(came from On 12/06/2017:
different Each electrical circuit must Not Corrected. 95% Done. Will be done
14 electrical circuits) be terminated at single 1 MONTH On 26/09/2017: 28/12/2016 hopefully within In Progress
terminated at MCB/MCCB terminals. Not Corrected. 15.10.2017
MCCB terminals
and Bus bar.
New Finding:
Cable tray is Proper sized cable tray
overloaded with must be installed; a
On 26/09/2017:
22 excessive cables; perforated one is better and 2 Months 20/08/2017 Done on 05.09.17 Corrected
Corrected.
eventually top 20-25% space in cable
cover has no tray/duct shall be kept free.
effectiveness.
New Finding:
Inadequate At least 1.07 meter (or
working space equal to the width of
around (or in board/panel, whichever is
On 26/09/2017:
23 front of) higher) working clearance 2 Months 20/08/2017 In Progress
Not Corrected.
board/panels and must be maintained in front
access to the of each electrical
board/panels is board/panel
obstacles
New Finding:
Indicator lights Indicator lights should be
95% Done. Will be done
are mounted connected by control On 26/09/2017:
24 1 Month 20/07/2017 hopefully within In Progress
without device such as rated fuse or Not Corrected.
15.10.2017
disconnecting MCB.
device.
New Finding:
Wiring among
different floors A cable ladder must be
using used; if it is routed through
flexible/rigid outside wall, either the
26 1 MONTH 20/11/2017
PVC pipe- this cable ladder must be
arrangement does covered or a cable duct
not have any must be used
support for
cables