Gigabit AP Installation
and Commissioning
Guide
.......................................................................
D001115-B02
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Required equipment
To perform the configuration steps in this section, you will need:
• IDU-PI-60W, part of the Installer Kit
• Ethermet switch (see below)
• 2 x straight-through CAT-5 Ethernet cables
.................................................................................................................................
15
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
IDU-PI-60W
X
Ethernet switch
Installation Device
running
VSInstall v2
1 Connect a straight-through Ethernet cable between the OUT port on the IDU-PI-60W and the RJ45 connector
on the underside of the ODU.
2 Connect a straight-through Ethernet cable between the IN port on the IDU-PI-60W and the Ethernet switch.
3 Connect a straight-through Ethernet cable from the Ethernet switch to the Ethernet port on the
Installation Laptop PC.
.................................................................................................................................
16
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
– If you choose not to load the default configuration, VS Install Tool V3 only performs the upgrade procedure,
and assumes there is already a saved config file on the ODU.
– If there is no previously saved config file, you will see an error message, and the complete upgrade/config
procedure will be followed.
3 Browse to the file containing the VectaStar software release (vectastar-N.x.y-z-cpe.zip) you want to install
and click Open:
.................................................................................................................................
17
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
After about 20-30 seconds you will see some messages in the VS Install Tool V3 window:
Once the upgrade process has completed, VS Install Tool V3 will automatically start the configuration process.
.................................................................................................................................
18
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Configuration steps
The steps that you follow in this section depend on the type of ODU connected.
3 If you selected GbitAP as the ODU-type, go straight to Complete the configuration on page 21.
Set up channelisation
2 Click Next and:
– Click in the Downstream Freq field and enter the downstream frequency in kHz
– Press Tab; the Upstream frequency will be filled in automatically
– Press Tab and select a channel bandwidth from the drop-down menu
.................................................................................................................................
19
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Parameter Description
Hostname A name used to represent this ODU in the EMS applications (such as vsodu).
IP address Local IP Address of the AP; the default is 192.168.1.1
Netmask Usually 255.255.255.0.
Gateway Gateway IP address.
Syslog IP address IP address of the computer to which syslog messages are sent.
VLAN ID For use with tagged traffic networks; enter the integer value for the VLAN tag. Use in
conjunction with the interface field.
SNMP community Clear text string used for SNMP authentication (default is public).
Note: If you change the ODU’s IP address or password, VS Install Tool V3 automatically remembers the new
details for the remainder of this session (i.e. while the Installation Laptop PC is still physically connected).
2 Make a note of any changes you make (especially Hostname and IP address).
2 Make a note of the password; without it, users will not be able to manage the ODU.
.................................................................................................................................
20
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
.................................................................................................................................
21
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
3 Click Next and follow the steps in Configuration steps on page 19.
.................................................................................................................................
22
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
.................................................................................................................................
Overview
This chapter explains how to install VectaStar Gigabit ODUs (VSG ODU-S and VSG ODU) ODU-S ODU
for all frequencies and polarisations.
Make sure you have read and understood the information in Safety notices on page 4.
You will also need to refer to the model-specific antenna installation instructions, supplied in
the antenna box.
H
V
Note: Only use the minimum length of cable necessary when installing a VectaStar Gigabit ODU. Excess cable
should be trimmed rather than leaving coils of cable.
In extreme environmental conditions, or for additional protection, installers may wish to consider placing ODU
cabling in a suitable outdoor duct.
Carrying/lashing ODUs
VectaStar ODUs have both a carry handle and one or more lashing points.
Caution: If you need to lash rope to an ODU to lift it, only use the correct lashing point (the small circular hole as
indicated below). Do not lash to the carry handle, as it is not designed for this purpose.
ODU-S ODU
.................................................................................................................................
23
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
• VSG ODU – Polarisation is controlled by the polarisation twister on the ODU; see the diagram below, and
follow the instructions on page 25 if you need to change the ODU polarisation.
V
10
.
V V V V V
5G
H
Hz
28
Hz
Hz
26GHz
AP
AP
.5 G G
GH
10 26 28
z
H H
AP
H
AP
H
H H
horiz. horiz. horiz.
10
10
26
28
5G
V
5G 26GHz GH
28
Hz
.
Hz Hz z
GH
z
z
.................................................................................................................................
24
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
To convert a VSG ODU from its default vertical polarisation to horizontal polarisation:
1 Undo the four M4x20 bolts in the RF adapter.
2 Lift out the RF adapter (keep the bolts in place)
3 Remove the ‘O’ ring from the recessed groove on the face plate, rub a small amount of silicone grease onto it,
and replace it.
4 Clean the mating surfaces thoroughly with dry cloths or tissues; ensure the aperture is completely clear of any
silicone grease.
5 Lift out the polarisation twister, flip it over (one face has an ‘H’ engraved on it, the other has a ‘V’) and replace
it. Two locating pins ensure the polarisation twister fits in the correct rotational orientation. Ensure that the
orientation matches the views on page 24.
6 Rotate the RF adapter 90° to set the new polarisation and replace it on the polarisation twister (two posts on
the twister ensure it will only fit in the correct orientation). Ensure that the orientation matches the views on
page 24.
7 Replace and tighten the four M4x20 bolts.
.................................................................................................................................
25
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Silicone grease is needed to fully waterproof the ODU-to-antenna coupling. However, you must avoid getting any
silicone grease into the RF aperture.
1 Put a very small amount of silicone grease around any ‘O’ rings:
Note: If you remove and refit the antenna, you’ll need to re-grease the ‘O’ ring, but clean the mating surfaces
thoroughly with dry cloths or tissues; ensure the aperture is completely clear of any silicone grease.
2 If fitted, remove yellow plastic dust cap from the RF aperture on the ODU.
3 If you have not already done so, remove any protective tape from the waveguide apertures.
4 (ODU-S only) Ensure you are installing with the correct polarisation, as detailed on any site-specific installation
instructions:
horizontal vertical
5 Offer up the ODU to the antenna, aligning the four retaining clips.
ODU-S ODU
6 Gently push the ODU onto the antenna RF adaptor. Take care not to damage the ‘O’ ring.
If you rotate the ODU slightly as you do this, you will feel the flat edge inside the polarisation twister mate with
the corresponding flat edge on the antenna’s RF adapter. Do not use excessive force; incompatible
polarisations will damage the units.
7 Secure the ODU by fastening the four retaining clips.
8 Thread a security cable, or large cable ties, through the holes in the ends of the retaining clips, to prevent the
clips coming undone.
.................................................................................................................................
26
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
1 Loosen the four Azimuth Lock bolts and perform an azimuth alignment. Retighten the Azimuth Lock bolts.
2 Loosen the two Antenna Mounting bolts slightly and perform an elevation alignment. Re-tighten the Antenna
Mounting bolts.
3 Check azimuth alignment, and perform fine adjustment if necessary.
4 Check elevation alignment, and perform fine adjustment if necessary.
.................................................................................................................................
27
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Required equipment
To perform the configuration steps in this section, you will need:
• IDU-PI-60W, part of the Installer Kit
• Ethermet switch (see below)
• 2 x straight-through CAT-5 Ethernet cables
.................................................................................................................................
15
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
IDU-PI-60W
X
Ethernet switch
Installation Device
running
VSInstall v2
1 Connect a straight-through Ethernet cable between the OUT port on the IDU-PI-60W and the RJ45 connector
on the underside of the ODU.
2 Connect a straight-through Ethernet cable between the IN port on the IDU-PI-60W and the Ethernet switch.
3 Connect a straight-through Ethernet cable from the Ethernet switch to the Ethernet port on the
Installation Laptop PC.
.................................................................................................................................
16
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
– If you choose not to load the default configuration, VS Install Tool V3 only performs the upgrade procedure,
and assumes there is already a saved config file on the ODU.
– If there is no previously saved config file, you will see an error message, and the complete upgrade/config
procedure will be followed.
3 Browse to the file containing the VectaStar software release (vectastar-N.x.y-z-cpe.zip) you want to install
and click Open:
.................................................................................................................................
17
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
After about 20-30 seconds you will see some messages in the VS Install Tool V3 window:
Once the upgrade process has completed, VS Install Tool V3 will automatically start the configuration process.
.................................................................................................................................
18
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Configuration steps
The steps that you follow in this section depend on the type of ODU connected.
3 If you selected GbitAP as the ODU-type, go straight to Complete the configuration on page 21.
Set up channelisation
2 Click Next and:
– Click in the Downstream Freq field and enter the downstream frequency in kHz
– Press Tab; the Upstream frequency will be filled in automatically
– Press Tab and select a channel bandwidth from the drop-down menu
.................................................................................................................................
19
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Parameter Description
Hostname A name used to represent this ODU in the EMS applications (such as vsodu).
IP address Local IP Address of the AP; the default is 192.168.1.1
Netmask Usually 255.255.255.0.
Gateway Gateway IP address.
Syslog IP address IP address of the computer to which syslog messages are sent.
VLAN ID For use with tagged traffic networks; enter the integer value for the VLAN tag. Use in
conjunction with the interface field.
SNMP community Clear text string used for SNMP authentication (default is public).
Note: If you change the ODU’s IP address or password, VS Install Tool V3 automatically remembers the new
details for the remainder of this session (i.e. while the Installation Laptop PC is still physically connected).
2 Make a note of any changes you make (especially Hostname and IP address).
2 Make a note of the password; without it, users will not be able to manage the ODU.
.................................................................................................................................
20
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
.................................................................................................................................
21
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
3 Click Next and follow the steps in Configuration steps on page 19.
.................................................................................................................................
22
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
.................................................................................................................................
Overview
This chapter explains how to install VectaStar Gigabit ODUs (VSG ODU-S and VSG ODU) ODU-S ODU
for all frequencies and polarisations.
Make sure you have read and understood the information in Safety notices on page 4.
You will also need to refer to the model-specific antenna installation instructions, supplied in
the antenna box.
H
V
Note: Only use the minimum length of cable necessary when installing a VectaStar Gigabit ODU. Excess cable
should be trimmed rather than leaving coils of cable.
In extreme environmental conditions, or for additional protection, installers may wish to consider placing ODU
cabling in a suitable outdoor duct.
Carrying/lashing ODUs
VectaStar ODUs have both a carry handle and one or more lashing points.
Caution: If you need to lash rope to an ODU to lift it, only use the correct lashing point (the small circular hole as
indicated below). Do not lash to the carry handle, as it is not designed for this purpose.
ODU-S ODU
.................................................................................................................................
23
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
• VSG ODU – Polarisation is controlled by the polarisation twister on the ODU; see the diagram below, and
follow the instructions on page 25 if you need to change the ODU polarisation.
V
10
.
V V V V V
5G
H
Hz
28
Hz
Hz
26GHz
AP
AP
.5 G G
GH
10 26 28
z
H H
AP
H
AP
H
H H
horiz. horiz. horiz.
10
10
26
28
5G
V
5G 26GHz GH
28
Hz
.
Hz Hz z
GH
z
z
.................................................................................................................................
24
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
To convert a VSG ODU from its default vertical polarisation to horizontal polarisation:
1 Undo the four M4x20 bolts in the RF adapter.
2 Lift out the RF adapter (keep the bolts in place)
3 Remove the ‘O’ ring from the recessed groove on the face plate, rub a small amount of silicone grease onto it,
and replace it.
4 Clean the mating surfaces thoroughly with dry cloths or tissues; ensure the aperture is completely clear of any
silicone grease.
5 Lift out the polarisation twister, flip it over (one face has an ‘H’ engraved on it, the other has a ‘V’) and replace
it. Two locating pins ensure the polarisation twister fits in the correct rotational orientation. Ensure that the
orientation matches the views on page 24.
6 Rotate the RF adapter 90° to set the new polarisation and replace it on the polarisation twister (two posts on
the twister ensure it will only fit in the correct orientation). Ensure that the orientation matches the views on
page 24.
7 Replace and tighten the four M4x20 bolts.
.................................................................................................................................
25
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Silicone grease is needed to fully waterproof the ODU-to-antenna coupling. However, you must avoid getting any
silicone grease into the RF aperture.
1 Put a very small amount of silicone grease around any ‘O’ rings:
Note: If you remove and refit the antenna, you’ll need to re-grease the ‘O’ ring, but clean the mating surfaces
thoroughly with dry cloths or tissues; ensure the aperture is completely clear of any silicone grease.
2 If fitted, remove yellow plastic dust cap from the RF aperture on the ODU.
3 If you have not already done so, remove any protective tape from the waveguide apertures.
4 (ODU-S only) Ensure you are installing with the correct polarisation, as detailed on any site-specific installation
instructions:
horizontal vertical
5 Offer up the ODU to the antenna, aligning the four retaining clips.
ODU-S ODU
6 Gently push the ODU onto the antenna RF adaptor. Take care not to damage the ‘O’ ring.
If you rotate the ODU slightly as you do this, you will feel the flat edge inside the polarisation twister mate with
the corresponding flat edge on the antenna’s RF adapter. Do not use excessive force; incompatible
polarisations will damage the units.
7 Secure the ODU by fastening the four retaining clips.
8 Thread a security cable, or large cable ties, through the holes in the ends of the retaining clips, to prevent the
clips coming undone.
.................................................................................................................................
26
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
1 Loosen the four Azimuth Lock bolts and perform an azimuth alignment. Retighten the Azimuth Lock bolts.
2 Loosen the two Antenna Mounting bolts slightly and perform an elevation alignment. Re-tighten the Antenna
Mounting bolts.
3 Check azimuth alignment, and perform fine adjustment if necessary.
4 Check elevation alignment, and perform fine adjustment if necessary.
.................................................................................................................................
27
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Note: Only use the minimum length of cable necessary when installing a VectaStar Gigabit ODU. Excess cable
should be trimmed rather than leaving coils of cable.
For a fibre-based ODU, you will need to make up the required length of 2-core cable, including any LP-APs, and
terminate the ODU end using the supplied Souriau UTS connector.
To ODU
SOURIAU connector
(rear view)
1 2
1 0V “Return” (BRN)
SM fibre optional
2 n/c
secondary
outdoor LP-AP
3 –48V (BLU)
2-core
–48V DC
outdoor grade
at least 2.5mm2
(14AWG) LP-AP (if required)
BRN
indoor outdoor BLU
IMPORTANT!
to –48V If fitted, primary LP-AP must be
installed on grounded wall plate,
as close as possible to point of ingress
.................................................................................................................................
28
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Caution: Be sure to follow these instructions carefully, to avoid twisting and breaking the 2-core connections
inside the Souriau connector.
Note: If you prefer to assemble the 2-core connector in the warehouse, CBNL can supply a blanking plug
(MEC1179) to use in step 7 in place of the ODU.
(a) plug
(d) ‘O’ seal (standard or reducing)
3mm/9mm reducing
4 Insert the cut end of the 2-core power cable through the backshell nut, the standard or reducing ‘O’ seal, and
the backshell body.
5 Strip and prepare the 2-core cable as shown (note, if your 2-core cable has a shield/screen, leave it the same
length as the other two cores); strip 15mm of the outer covering:
15mm
.................................................................................................................................
29
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
6 Referring to the diagram below, connect the 2-core cable to the rear of the plug (a) using a small flat-bladed
screwdriver. If your 2-core cable has a shield/screen, connect it to the earth terminal.
Note: The earth terminal has a slightly raised wall.
Note: Take care not to remove the grub screws completely from the terminals; they are extremely difficult to
get back in!
1 0V “Return” (BRN)
2 n/c
3 –48V (BLU)
Screen (if fitted)
7 Use the coupling nut to attach the plug only (not the backshell body) to the power connector on the underside
of the ODU.
.................................................................................................................................
30
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
8 Screw the backshell body to the plug; this is easy with the plug already attached to the ODU. Hand tighten it
as far as you can. At this stage, with no backshell nut fitted, the cable should not rotate at all as you tighten
the backshell.
no nut fitted
9 Important: Now undo the coupling nut to remove the plug/backshell assembly from the ODU connector.
10 Slide the standard or reducing ‘O’ seal along the cable, into the rear of the backshell body.
11 Screw the backshell nut onto the backshell body. (Important: Stop tightening if the cable starts to turn
too.)This will cause the ‘O’ seal to grip the cable, but should not cause the cable to twist inside the plug.
12 Use a digital multimeter to perform continuity checks between pin 3 and the Earth pin, and pin 3 and pin 1, on
the contacts on the face of the plug. They should both be open circuit.
13 If either of the continuity checks results in a short circuit, perform the steps above in reverse to dismantle the
connector and check the connections.
14 Use the coupling nut to lock the completed connector to the ODU.
.................................................................................................................................
31
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Notes
• All connections at the ODU are rated to IP67. As an additional safeguard against water ingress over time,
CBNL recommends the use of self-amalgamating tape in line with local practice, on all external cable
connectors and joiners. Suitable tape is available from most suppliers of installation components.
• Where extreme climatic conditions are found, CBNL recommends the use of a flexible cable protection conduit
for the external cabling to the ODU.
• Only use the minimum length of cable necessary when installing a VectaStar Gigabit ODU. Excess cable
should be trimmed rather than leaving coils of cable.
8
1 W/ORN
1 2 ORN optional secondary LP-GE
3 W/GRN
4 BLU
5 W/BLU CAT-5E outdoor grade
6 GRN
7 W/BRN
LP-GE
8 BRN
check seal is
in place
to indoor equip.
CAT-5E cable
under cable clamps
Cable diameter:
IMPORTANT! min. 0.18” (4.6mm)
If fitted, primary LP-GE must be CAT-5E CAT-5E max. 0.35” (8.9mm)
installed on grounded wall plate,
as close as possible to point
of ingress
.................................................................................................................................
32
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
12 Push the cable in until the cores go into the correct channels within the connector. If the
cores have been cut to the correct length, they should fit to the end of the connector, and you should be able to
see the ends of the cores.
Note: The drain wire must make contact with the metal shroud of the RJ-45 connector.
13 Place the RJ45 connector into the crimp tool and crimp it.
14 Trim the drain wire so it does not protrude from the RJ45 connector.
15 Visually inspect the termination to ensure all the wires have been crimped in the connector.
16 IMPORTANT! Align the RJ45 connector’s locking tab with the wide slot on the front of the
depress tab and slide
cable gland. RJ45 connector back
17 IMPORTANT! Depress the RJ45 locking tab and gently pull the CAT-5E cable so that the into recess in
RJ45 connector fits into the plug assembly. This is essential for proper connection to the ODU plug assembly
later on (and means you will not hear the usual audible click when you make that RJ45
connection).
18 While still holding the CAT-5E cable (to ensure the RJ45 connector remains properly seated
in the plug assembly), tighten the rear retainer onto the main body.
.................................................................................................................................
33
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
2-core
2-core fibre fibre
Warning: Observe safety precautions when working with fibre cables and devices.
1 If fitted, unscrew the dust covers from the connectors on the underside of the ODU.
2 Unscrew the dust cover from the end of the fibre cable run.
3 Clean the ends of the SM fibre using wipes and compressed air.
4 Make the 2-core and fibre connections. Be sure to twist the coupling nuts (not the backshells) until they lock
into place.
.................................................................................................................................
34
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
CAT-5e
CAT-5e
1 Unscrew the dust cover from the CAT-5e connector on the underside of the ODU.
2 Making sure the RJ45 locking tab remains properly seated in the cable gland, screw the CAT-5e data cable
gland into the connector on the underside of the ODU.
Caution: Ensure the RJ45 connector remains properly seated in the weather-proof cable gland. The RJ45
connector will not make an audible click when you fit the cable gland; this is normal. Do not be tempted to push
the RJ45 connector out of the cable gland and connect it before fitting the cable gland; this will cause an
improper connection and force the internal RJ45 socket back inside the body of the ODU by a few millimetres.
See page 35.
If there is a problem
If you do not follow the above instructions exactly, the internal RJ45 socket can be pushed a few millimeters inside
the ODU (it is pushed by the RJ45 connector on the end of the CAT-5e cable as you tighten up the cable gland).
To correct this:
1 Loosen (but do not completely remove) the cable gland’s rear retainer.
2 Unscrew and remove the main body of the cable gland from the ODU, but leave the RJ45/CAT-5e cable
connected to the ODU.
3 Gently pull on the CAT-5e cable until you feel the internal socket move back to its correct position.
4 Remove the RJ45/CAT-5e cable from the ODU.
5 IMPORTANT! Align the RJ45 connector’s locking tab with the wide slot on the front of the
depress tab and slide
cable gland. RJ45 connector back
6 IMPORTANT! Depress the RJ45 locking tab and gently pull the CAT-5E cable so that the into recess in
RJ45 connector fits into the plug assembly. This is essential for proper connection to the ODU plug assembly
(and means you will not hear the usual audible click when you make that RJ45 connection).
7 While still holding the CAT-5E cable (to ensure the RJ45 connector remains properly seated
in the plug assembly), tighten the rear retainer onto the main body.
8 Making sure the RJ45 locking tab remains properly seated in the cable gland, screw the cable
gland into the connector on the underside of the ODU.
.................................................................................................................................
35
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
.................................................................................................................................
Overview
This chapter explains how to power a VectaStar Gigabit AP/ZFS and make any indoor connections.
You will need:
• (–48V DC 2-core power)
– IDU-PSU-70W or
– in-building –48V DC supply
• (CAT-5 power)
– IDU-GPI or
– IDU-PI-60W
• Mains cable (UK or EU):
– PSU-ML-EU: EU (2-pin) mains lead for 110/240VAC to –48V DC Power Supply Unit
– PSU-ML-UK: UK (3-pin) mains lead for 110/240VAC to –48V DC Power Supply Unit
– PSU-ML-DK: Danish 3-pin Type K (Section 107-2-D1) mains lead for 110/240VAC to –48V DC units
– PSU-ML-US: US 3-pin Type B (NEMA 5–15) mains lead for 110/240VAC to –48V DC units
– PSU-ML-RSA: South Africa 3-pin Type M (SABS 164) mains lead for 110/240VAC to –48V DC units
– PSU-ML-IN: India 3-pin Type D (BS 546 / IA6A3) mains lead for 110/240VAC to –48V DC units
• Data connection and management network connections; this requires an infrastructure switch, with:
– Trunk ports (fibre and copper) to ZFS, configured to carry VLAN-tagged management and data traffic
– Trunk ports (fibre and copper) to backhaul network, configured to carry VLAN-tagged management and
data traffic
– Copper RJ45 Access port for local management (this should be a member of the management VLAN and
be untagged) that allows you to check ZFS operation
Precautions
Make sure you have read and understood the information in Safety notices on page 4.
Always ensure that any earthing straps are connected first, to avoid accidentally damaging equipment.
Warnings
• For a first-time installation, all connections must be made with units powered off. If connections are made to
units when powered on (e.g. network connection), ESD precautions must be undertaken when making the
connections, to ensure that no electrostatic discharge is possible.
• ESD precautions must be taken when handling, connecting or disconnecting cables at indoor equipment.
Note: For details of power cable requirements, and connector types and wiring instructions, please see Cables
and connectors on page 51.
.................................................................................................................................
36
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
GigE SM fibre
–48V DC 2-core
> 2.5mm2 (14AWG)
IDU-PSU-70W
LP-AP
110/220V AC
PSU-ML-*
terminal block
UPS –48V DC
B
LP-AP
A or B
to core network
* region-specific mains lead
Notes
• Mount the IDU-PSU-70W on a vertical wall, as close as possible to the point of entry of the 2-core cable from
the ODU. It should also be close to a suitable power-outlet.
• The IDU-PSU-70W should be connected to the supply via a current limiting device such as a breaker.
• 2-core cable must be > 2.5mm2(or 14AWG) UV-protected, outdoor grade, voltage rating > 300V
.................................................................................................................................
37
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Note: If wall mounting the IDU-GPI, mount on a vertical wall, as close as possible to the point of entry of the
Ethernet cable from the ODU.
IDU-PSU-70W
110/220V AC
LP-GE
PSU-ML-*
2-way plug
A
UPS –48V DC
CAT-5e
or
CAT-6 <= 80m
2-way plug
B
LP-GE
A or B
first active
network
element
.................................................................................................................................
38
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Mounting IDU-GPIs
The IDU-GPI can be wall mounted or rack mounted. If rack-mounted, you can mount up to four IDU-GPIs in a
single rack space.
Wall mounting
To wall mount an IDU-GPI, you need to change the orientation of the mounting plates:
1 Remove the cross-head screws that fix the mounting plates to the unit.
2 Rotate the mounting plates by 90 degrees and refit, as shown (so that the IDU-GPI lies flat against the wall
with its connectors uppermost).
3 Offer the IDU-GPI up to the wall and mark the position of the screw holes in the mounting plates.
4 Drill two holes at the marked positions.
5 Using appropriate wall fixings, place the IDU-GPI in position and screw into place.
1 Fit a rack mounting plate to the left or right side of the unit as appropriate (you can fit a unit to either side of a
rack, or fit two units into the same 1U space).
2 Fix the unit into the rack using standard 19-inch rack fixings.
.................................................................................................................................
39
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Earthing IDU-GPIs
Note: The IDU-GPI must be permanently connected to protective earth, using a green-and-yellow insulation
coloured cable with a minimum cross sectional area of 1.5mm2.
The lefthand IDU-GPI earthing studs are fitted with a crimp connector. To earth an IDU-GPI:
1 Crimp a 1.5mm2 (or 16AWG) or larger earthing cable into the lefthand earth connector.
2 Ensure the lefthand nut is fully tightened onto the stud and washer.
3 Ensure the nut on the righthand stud remains fully tightened (even though it is not used as an earthing point)
4 Connect the other end of the earthing cable to a suitable earth.
.................................................................................................................................
40
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Powering an IDU-GPI
Pin/terminal Connection
– Black core (–48V)
0V
+ White core (0V)
(white)
–48V
(black)
.................................................................................................................................
41
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
LP-GE
110/220V AC
PSU-ML-*
CAT-5e
2xLP-GE <= 50m or
CAT-6
1xLP-GE <= 60m
IDU-PI-60W
LP-GE
OUT IN
first active
network
element
Note: Mount the IDU-PI-60W on a vertical wall, as close as possible to the point of entry of the CAT-5e cable
from the ODU. It should also be close to a suitable power-outlet.
.................................................................................................................................
42
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Fibre Gigabit AP
Warning: Observe safety precautions when working with fibre cables and devices.
Cat-5 Gigabit AP
1 Connect a straight-through Ethernet cable from the IN port of the IDU-PI-60W to a copper trunk port on the
infrastructure switch.
.................................................................................................................................
43
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
.................................................................................................................................
Overview
This chapter explains how to provide lightning protection for ODU power cables (CAT-5e or 2-core):
• LP-GE: lightning protection on CAT-5e cables
• LP-AP: lightning protection on 2-core power cables
Installing an LP-GE
Overview
The LP-GE is a CAT-5e in-line device which is used where only a CAT-5e connection to the ODU is needed. One
LP-GE should be placed adjacent to the wall ingress. Additional LP-GEs may be used along the CAT-5e cable as
needed.
Note: All equipment must be installed within the building cone of protection.
This chapter explains how to install and mount an LP-GE to provide lightning protection for the CAT-5e Ethernet
cable on a VectaStar Gigabit ODU.
The use of LP-GEs is optional. However, CBNL recommends the use of at least one LP-GE at the building ingress
point in regions where lightning is considered a threat. Additional protection can be provided by adding LP-GEs in
the cable run as required.
Before commencing work on site, the installer should consult the site design document which should indicate the
number and location of any LP-GEs to be installed. The site design document should also indicate how the LP-GEs
are to be mounted.
ODU
LP-GE (optional)
CAT-5e/CAT-6
outdoor LP-GE
earth
points indoor
.................................................................................................................................
44
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Cautions
• The LP-GE earthing point must always be connected to a suitable earth using a minimum size of 8.5mm2 (or
8AWG) braid, to ensure proper lightning protection. The maximum length of braid is 3' (0.91m).
• The LP-GE must be mounted vertically, with the CAT-5e cables exiting from the bottom of the unit, to prevent
water ingress.
• All VectaStar equipment should be installed within a lightning protection zone.
Note: Any earth drain wire or braided shield must make contact with the metal shell of the RJ45 connector.
1 Using a large flat-bladed screwdriver, remove the two screws securing the LP-GE lid.
2 Using a cross-head screwdriver, loosen (but do not remove) the two cable clamps.
3 Insert the terminated CAT-5e cables into the RJ45 sockets inside the LP-GE. It does not matter which cable is
connected to which socket: the unit is bi-directional.
4 Ensure that the CAT-5e cables pass through the cable clamps.
5 Tighten the cable clamps.
6 Replace the LP-GE lid and secure using the two screws.
.................................................................................................................................
45
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Caution: The LP-GE must be mounted vertically, with the CAT-5e cables exiting from the bottom of the
unit, to prevent water ingress.
Do not overtighten
Caution: Do not overtighten the U-bolt fixings or you will break the lugs
.................................................................................................................................
46
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
1 Crimp one end of an earthing strap into the supplied ring connector.
2 Using the supplied bolt attach the earthing strap to one of the two marked earth points on the unit, ensuring
the supplied star washer is between the crimped ring connector and the unit.
3 Attach the other end of the earthing strap to a suitable earth point.
.................................................................................................................................
47
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Installing an LP-AP
Overview
This section describes how to install an LP-AP as part of a power cable run. The diagram below shows an
exploded view of an LP-AP. Note that there are two sets of connectors:
• Those on the lefthand side are for connecting 2-core cable to indoor equipment (that will be protected)
• Those on the righthand side are for connecting 2-core cable to outdoor equipment (that is susceptible to
lightning strikes)
earthing post
waterproof
cable grommet
protected unprotected
(to indoor equipment) (from outdoor equipment)
Cautions
• You can not use an LP-AP on a CPE system, as the CAT-5 cable carries signal and power. The LP-AP is only
designed to extend and protect power cables, not dual power+signal cables
• All VectaStar equipment should be installed within a lightning protection zone.
.................................................................................................................................
48
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Caution: Never drill extra mounting holes in the external case of the LP-AP; this will compromise the
weatherproof seal. Never over-tighten the plastic retaining screws for the LP-AP top cover. Always use a 1 x 5.5
mm flat-bladed screwdriver when removing or replacing the top cover – smaller or larger blades will damage the
screws, and may make it impossible to remove them.
CAUTION!!
Always fit an LP-AP vertically, Do NOT drill holes or remove knock-outs;
with gland side facing down and This will compromise the weatherproof seal
drip loops on all cables and void your warranty
Note: Always fit an LP-AP onto a vertical wall, aligned horizontally, with gland side facing down and drip loops on
all cables.
Mounting on a pole
To mount on a pole, CBNL recommends that you screw the LP-AP case to a galvanised plate (using the exterior
fixing holes to maintain weather-proofing) and then mount the galvanised plate on the pole (e.g. using fixing clamps
or cable ties).
Follow the instructions in the previous section to gain access to the exterior fixing holes.
.................................................................................................................................
49
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
3 Replace the flat washer, shake proof washer, then the M5 nut. Tighten the M5 nut.
weatherproof washer
shakeproof washers
M5 nut
Note: The plastic washer next to the LP-AP case creates the weatherproof seal. This washer must always be
held tight by the inner M5 nut.
4 Attach the other end of the earthing strap to a suitable earth point.
.................................................................................................................................
50
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
.................................................................................................................................
Overview
This chapter explains how to terminate various cables and connectors, as well as providing information on –48V
power supplies and minimum recommended specifications.
Note: All cables and connectors should be sourced from CBNL where possible.
CAT-5e cables
All CAT-5e connections between indoor and outdoor units are wired as straight-through cables.
CBNL ODU RJ45 connectors support CAT-5e cable diameters in the range 4.6mm to 7.9mm.
Cable lengths, where specified, are based on the following assumptions:
• All outdoor cabling must be solid-core
• All indoor cabling is flexible, multi-stranded
• Cabling is CAT-5e. If you want to use CAT-6 cabling:
– You must use shielded cable
– You must be able to source RJ45 connectors that are compatible with the RJ45 connectors on CBNL
equipment
– Cable core size must be at least 24AWG.
.................................................................................................................................
51
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
2-core cables
1 2
1 0V “Return” (BRN)
2 n/c
3 –48V (BLU)
Screen (if fitted)
Warning: All units requiring a nominal –48V DC supply must be supplied via a
–48V DC safety extra-low voltage (SELV) supply in accordance with IEC 60950-1:2001. Additionally the Power
Supply Unit shall withstand surges in accordance with EN 60065:2001 Cl. 10.1 or an equivalent.
The supply used for the unit shall be in accordance with ETSI EN 300 132-2.
.................................................................................................................................
52
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Parameter Value
Max current 15A
Cable type 20A 2.5mm2 (or 14AWG) minimum, voltage rating >300V
Fusing 20A
CAT-5 power
CODU installations will use only 4 cores for power.
Parameter Value
Cable type 4-pair 0.25mm2 (or 24AWG) cable e.g. CAT-5:
8 wires in total, terminatable with RJ45 connector
Installation temp. Not less than 0°C.
2-core power
Parameter Value
Cable type 2.5mm2 (or 14AWG) minimum, UV-protected outdoor grade, voltage
rating >300V
Note: Larger cable sizes may be required to allow longer cable runs. Contact CBNL for more detailed
requirements.
.................................................................................................................................
53
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
.................................................................................................................................
IDU-GPI
This section lists the possible states of the LEDs on the IDU-GPI.
If the green POWER LED is blinking, the yellow STATUS LED indicates fault status:
.................................................................................................................................
54
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
IDU-PI-60W
This section lists the possible states of the LEDs on the IDU-PI-60W.
CONNECT FAULT ON
LED operation
a. Note that the IDU-PI-60W will only deliver power once a device with the appropriate electrical characteristics (in this
case a VectaStar Gigabit ODU) is connected.
.................................................................................................................................
55
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Glossary
.................................................................................................................................
.................................................................................................................................
56
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
.................................................................................................................................
57
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Tx Transmit
UPS Uninterruptible Power Supply
US UpStream
UTP Unshielded Twisted Pair
VAR Value-Added Reseller
VBR Variable Bit Rate
VC Virtual Circuit
VCI Virtual Circuit Identifier
VCO Voltage-Controlled Oscillator
VID VLAN ID
VLAN Virtual Local Area Network
VNMS VectaStar NMS Server
VPN Virtual Private Network
ZFS Zero-Footprint Sector
ZFT Zero-Footprint Terminal
.................................................................................................................................
58
VectaStar Gigabit AP Installation and Commissioning Guide D001115-B02
.................................................................................................................................
Index
.................................................................................................................................
Numerics O
2-core ODU
ODU power : 53 CAT-5 connections : 51
connect earthing strap : 27
default IP address : 20
A power cables : 53
align tools required : 48
AP : 14 weight : 5
AP
configuring and aligning : 14 P
PDU
B power cable : 53
BS power
recommendations : 36 –48V supply requirements : 52
minimum power cable
recommendations : 53
C ODU cables : 53
cable
minimum recommendations : 53 S
CAT-5 straight-through Ethernet cable : 51
ODU connections : 51
ODU power : 53 support web site : 11, 13
CODU
connect earthing strap : 27 T
configure
AP : 14 tools required
ODU installation : 48
D Z
default IP address : 20
ZFS mode : 14
E
earthing
LP-CODU : 49
LP-GE : 47
earthing strap
connecting : 27
ENV 50166-2 : 4
Ethernet
crossover cable : 51
straight-through cable : 51
I
install
LP-AP : 48
LP-GE : 44
installation
recommended locations for BS indoor
equip. : 36
IP address
default : 20
L
LED
status indications : 54
LP-AP
installing : 48
LP-CODU
earthing : 49
LP-GE : 44
earthing : 47
installing : 44
.................................................................................................................................
59