Biomedical Hospital Equipment
Biomedical Hospital Equipment
Biomedical Hospital Equipment
2017
Additional information pertaining to the management of medical equipment can also be found in the
Clinical Engineering User’s Resource guide located on the above website.
1. The hospital solicits input from individuals who operate and service equipment when it selects and
acquires medical equipment.
Clinical Engineering provides guidance and direction in the selection of medical equipment through
active involvement in the Duke University Health System capital process. Clinical Engineering also
works with department managers and Procurement Services to assist in the selection and purchase of
non-capital medical equipment. During this process, input is solicited from individuals who operate
equipment. Clinical Engineering works with departments to provide average life expectancy,
inventory, and information on equipment that has had extensive repairs or is no longer supported by
the manufacturer. Duke University Health System also subscribes to MD Buyline research agency
specializing in medical equipment. This service provides valuable research and comparative tools for
use in requesting medical equipment.
Clinical Engineering assists in the incoming inspection process and acts as a resource to the hospital’s
education department to ensure users are trained prior to the use of the equipment.
3. The hospital identifies high-risk medical equipment on the inventory for which there is a risk of serious
injury or death to a patient or staff member should the equipment fail.
All equipment is evaluated at the time of entry into the medical equipment database using a risk
ranking system. The scoring to determine high risk is comprised of a score for equipment function, a
score for clinical application and a score for infection control risk. If the total score is greater than or
equal to 13, then equipment is identified in the database system as high risk. All equipment with
scores totaling less than 13 are considered routine (non-high risk).
4. The hospital identifies the activities and associated frequencies, in writing, for maintaining, inspecting,
and testing all medical equipment on the inventory. These activities and associated frequencies are in
accordance with manufacturers’ recommendations or with strategies of an alternative equipment
maintenance (AEM) program.
Note: The strategies of an AEM program must not reduce the safety of equipment and must be based
on accepted standards of practice. *
Footnote *: An example of standards for a medical equipment program is the American National
Standards Institute/Association for the Advancement of Medical Instrumentation handbook
ANSI/AAMI EQ56: 2013, Recommended Practice for a Medical Equipment Management Program.
All equipment included in the medical equipment management program will receive scheduled
maintenance and testing based on manufacturer’s recommendations unless otherwise identified for
inclusion into the alternative equipment maintenance (AEM) program. The record of this schedule
will be included in our database management system. Items included in the AEM will be
recommended by Clinical Engineering and be based on records provided by the hospital’s
contractors, information made public by nationally recognized sources, or records of the hospital’s
experience over time. Items recommended for inclusion to the AEM will be approved by the
Environment of Care committee.
5. The hospital’s activities and frequencies for inspecting, testing, and maintaining the following items
must be in accordance with manufacturer’s recommendations:
• Equipment subject to federal or state law or Medicare Conditions of Participation in which
inspecting, testing, and maintaining must be in accordance with the manufacturer’s
recommendations, or otherwise establishes more stringent requirements
• Medical laser devices
• Imaging and radiologic equipment (whether used for diagnostic or therapeutic purposes)
• New medical equipment with insufficient maintenance history to support the use of
alternative maintenance strategies
DUHS will also follow manufacturer’s recommendation for items that have been designated as high-
risk.
6. A qualified individual(s) uses written criteria to support the determination whether it is safe to permit
medical equipment to be maintained in an alternate manner that includes the following:
• How the equipment is used, including the seriousness and prevalence of harm during normal
use
• Likely consequences of equipment failure or malfunction, including seriousness of and
prevalence of harm
• Availability of alternative or back-up equipment in the event that equipment fails or
malfunctions
• Incident history of identical or similar equipment
• Maintenance requirements of the equipment
The DUHS clinical engineering leadership developed a methodology, based on the above criteria, for
the identification of equipment to be included in the alternative equipment maintenance (AEM)
program. This methodology was approved by Safety or EOC Committee at each entity. Clinical
Engineering leadership will be able to demonstrate the qualifications to make recommendations
based on formal education, certification and relevant work experience.
7. The hospital identifies medical equipment on its inventory that is included in an alternative equipment
maintenance program.
DUHS Clinical Engineering will designate in its medical equipment database all items that have been
recommended and approved by the Environment of Care committee for inclusion into the AEM
program.
8. The hospital monitors and reports all incidents in which medical equipment is suspected in or
attributed to the death, serious injury, or serious illness of any individual, as required by the Safe
Medical Device Act of 1990.
The Director of Risk Management will have the overall responsibility of implementing and managing
the hospital’s medical device reporting program. This includes establishing and maintaining a
hospital-wide system for documenting medical device incidents, reviewing and analyzing all
reportable incidents, and completing and submitting appropriate reports to outside agencies.
Following an incident, DUHS personnel will attend to the injured patient or employee as appropriate
and sequester all equipment involved in the incident including accessories, packaging, etc. DUHS
personnel will report the incident to their immediate supervisor and notify Risk Management.
The Safety Reporting System (SRS) is available for reporting medical device issues.
http://vmw-rlrapp2/RL6_Prod/Homecenter/Client/Login.aspx
Clinical Engineering will assist Risk Management in conducting an investigation, evaluating the safety
of the device, and determining whether the device should be impounded, repaired, further
investigated, or returned to service. A summary of significant incidents will be reported to the
appropriate committee on at least a quarterly basis by Patient Safety/ Risk Management.
9. The hospital has written procedures to follow when medical equipment fails, including using
emergency clinical interventions and back-up equipment.
Emergency clinical interventions that are necessary if a piece of medical equipment fails are
established by the equipment-using department. Should a piece of medical equipment malfunction
or fail, hospital staff should first ensure the safety of the patient, remove the piece of equipment
from service, label it, and notify Clinical Engineering through one of the methods listed below. The
user establishes when and how to perform emergency clinical interventions when medical equipment
fails. Backup equipment is available for many types of equipment within the user department,
through loaners or spares maintained by Clinical Engineering or through such departments as:
The Clinical Engineering department is staffed 8:00 AM - 4:30 PM Monday through Friday at Duke
University Hospital and the Duke PDCs and DPCs7:00 AM- 3:30 PM at Duke Raleigh Hospital and Duke
Regional Hospital and the Clinical Labs. Emergency coverage is provided on a 24 hour, seven-day-a-
week basis, for the hospitals, through use of on-call pagers. Users of medical equipment have several
different methods of obtaining repair services. Users may notify Clinical Engineering of the need for
service during regular rounds performed by the Clinical Engineering department, by calling the main
shop phone number, by bringing the piece of equipment to the Clinical Engineering department, by
entering a request on the Clinical Engineering web portal- include website link, or by calling the on-
call pager.
The Clinical Equipment User’s Resource Guide contains valuable information specific to equipment
backup and can be found at: https://intranet.dh.duke.edu/dhts/coo/clinical-
eng/SitePages/Home.aspx
1. Before initial use and after major repairs or upgrades of medical equipment on the medical equipment
inventory, the hospital performs safety, operational, and functional checks.
Clinical Engineering is notified by Procurement Services, Materials Management, or user departments
when equipment is received into the hospital. Clinical Engineering performs an initial inspection
including testing of clinical alarms and an electrical safety inspection (where applicable) in accordance
with all applicable policies and procedures before initial use. Information from these inspections are
electronically documented and entered into the equipment management database. Clinical
Engineering also performs safety, operational, and functional checks after major repairs or upgrades
and these records are also maintained in the equipment management database. (Exception- patient
owned and rental equipment)
Use of patient-owned medical devices are discouraged from use and effort should be made to
substitute a Duke owned equivalent. If this is not possible, then the caregiver will get the patient to
fill out a Non-Duke owned medical equipment release form. An inspection will be performed by the
caregiver and the form will be scanned into the medical record. This form includes data on device,
manufacturer, model, and serial number.
Rental equipment- if a rental vendor has been reviewed and approved by the Environment of Care
committee as meeting all standards of our medical equipment management program, then they may
bring in rental equipment directly to the unit and the caregiver will ensure the rental equipment has a
valid PM sticker. If they have not been approved, then Clinical Engineering must be notified and
complete the initial inspection. A listing of approved rental vendors can be found on the Clinical
Engineering website in the User Resource Guide: https://intranet.dh.duke.edu/dhts/coo/clinical-
eng/SitePages/Home.aspx
2. The hospital inspects, tests, and maintains all high-risk equipment. These activities are documented.
Clinical Engineering documents all work performed on all high-risk equipment included in the medical
equipment inventory plan in accordance with all applicable policies and procedures. Information
included on the work order includes at a minimum: the asset ID (CE# or serial number), a description
of problem, the department, technician performing the work, a description of the repair,
maintenance action, and the time spent on the action. Scheduled maintenance for high-risk medical
equipment will have a 100% completion rate which includes documented In Clinical Use and Shipped
to Vendor status.
3. The hospital inspects, tests, and maintains non-high risk equipment identified on the medical
equipment inventory. These activities are documented.
Clinical Engineering documents all work performed on routine (non -high-risk) equipment included in
the medical equipment inventory plan in accordance with all applicable policies and procedures.
Information included on the work order includes at a minimum: the asset ID (CE# or serial number), a
description of problem, the department, technician performing the work, a description of the repair
or maintenance action, and the time spent on the action. Scheduled maintenance for routine (non
high-risk) medical equipment in the AEM program will have a 100% completion rate which includes
documented In Clinical Use and Shipped to Vendor status.
4. The hospital conducts performance testing of and maintains all sterilizers. These activities are
documented.
Central Sterile or Sterile Processing documents performance testing or biological cultures on all
sterilizers used. This information is reported at their committee meetings. Engineering and
Operations provides maintenance support on sterilizers at Duke University Hospital, the PDCs and
Duke Regional Hospital. Clinical Engineering provides maintenance support on sterilizers at Duke
Raleigh Hospital.
5. The hospital performs equipment maintenance and chemical and biological testing of water used in
hemodialysis. These activities are documented.
Chemical testing of dialysis RO product water is performed at least annually. Biological and LAL
testing of RO systems are completed monthly. Each machine has biological testing performed on a
scheduled basis. Results are reported to the applicable Quality Improvement, Infection Control or
Safety / Environment of Care Committee. At a minimum, corrective action will be taken for any value
outside of AAMI limits.
6. Qualified hospital staff inspects, test and calibrate nuclear medicine equipment annually. The dates of
these activities are documented.
Qualified staff coordinates the inspection, testing and calibration of nuclear medicine equipment.
Clinical Engineering is responsible for coordinating inspection, testing and calibration of Nuclear
Medicine Cameras. Ancillary and test equipment is the responsibility of the facilities Nuclear
Medicine Department.
V. Performance Improvement Standards
Clinical Engineering is responsible for identification of performance improvement indicators, which is
based on priorities identified by the department, users of medical equipment, and the appropriate Safety
or Environment of Care Committee. The Safety or Environment of Care Committee has the responsibility
for approving the monitors and thresholds on an annual basis. All PI activity and quality indicators are
reported at least quarterly to the Safety or Environment of Care Committee. This information is provided
to the Governing Body through the routine reporting channels. All elements of the PI program are subject
to change at any time based on Institutional experience, regulatory change, or administrative input.