Simplified CHSP Template
Simplified CHSP Template
Simplified CHSP Template
a. specific name of project: Proposed Interior Fit- Out For ATC REMI CAFE
b. Address/ location:_Unit 2 Medical City Stall The Medical City Clark Global City Clarkfield
Pampanga.
g. estimated start date of (execution of the project) construction: Dec. 15, 2019
I/We ZFZS CONSTRUCTION am/are committed to organize a CSH Committee at the project site to
act as a policy making body of the project on all issues pertaining to safety and health.
3.2 Functions of CSH Committee shall include but are not limited to the following:
Plans, develops and oversees the accident prevention programs for the
construction project;
Communicate safety and health concerns and information to management and staf
personnel;
b. Project Coordinator
Ensures that all workers under his supervision understand safety responsibility.
Ensures that proper use of PPE
Acts without delay in addressing all hazards and unsafe conditions or actions within the
scope of their area of responsibility.
Holds toolbox safety meeting with the workers.
c. Worker
Consistently observes work conditions, operation, equipment and tools for the purpose
of accident prevention.
Complies with all the regulations as well as safe work practices and safety rules.
Uses all necessary personal protective safety equipment and other safe working
practices.
Corrects any unsafe practices within the scope of work operations and reports any unsafe
conditions.
Attend all committee/toolbox meetings.
Safety shoes - will be used for general works and to be worn at all times on the site.
Safety helmet – all workers must wear an approved safety helmet while on the
construction site.
Safety gloves - to be worn wherever possible for hand protection
Safety goggles/Face shield – protection against flying objects from doing work such as
chipping, grinding, cutting, drilling works and alike.
Safety belt/harness – to be used whenever working at height.
Others (specify depending on the nature of work and hazard identified)
The owner/employer will provide the following basic first-aid kit and health care medicines
and facilities for workers in the site: Safetyman/safety officer is mandated to carry the kit at all times while
within the perimeters of the jobsite.
The kit or boxes will contain at least compress and triangular bandages, sterile gauge,
antiseptic, adhesive and forceps, a tourniquets, blunt-end scissors and splint.
The doctor or nurse assigned at the emergency site clinic shall be responsible to fully orient the
safety staf and concerned security guards on the proper usage of the contents of the kit.
10.0 Working Hour & Break Time (Indicate the maximum number of work hours per day).
1. Ensure that the construction wastes are segregated from that of domestic waste.
2. All domestic wastes are to be collected on a daily basis.
3. Construction debris (broken hollow blocks, spoiled concrete, loose concrete, etc)
should be taken out on the staging area.
4. Oil spills and spoiled greases should be wrapping in the black garbage bag and will
be properly disposed.
5. Application of good housekeeping.
a) Barricades
b) Platforms
c) Guardrails
d) Safety signages
14.0 Penalties/Sanctions – as a matter of policy and to ensure that the safety and health rules specified
herein are complied with, the owner recommended the following sanctions/penalties for any violations of CSH
program.
__________________________ ___________________
Name of Project Owner Date
Signature over Printed Name
________________________
Name of Person who will supervise the project Date
Signature over Printed Name