Price Comparison For 220 KV CTT MC Tower

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Title: DOC. No. : EM EA GF CR FR 108 Rev No. : 1.

0
Compliance of Minutes of Meeting Date : 06.03.2015 Page No. : 1 of 1
Department: Document Type : ISO Clause Reference :

Control and Relay Panels Format 7.5.1

Subject : Minutes of meeting held between M/s.Siemens and M/s.KPTCL

Project Name : 220/66/11kV GIS Substation, ITI, Bangalore (11kV Extn Bays)

Customer : KEC International Limited , A/C of KPTCL

Siemens Ref. : 3005433233

Date : 10-Sep-2018
Submitted by :
Name Signature

Digitally signed by Gangwar Sushant

Sushant Singh Gangwar (Project Manager)


Gangwar Singh
DN: cn=Gangwar Sushant Singh,
o=Siemens,
Sushant Singh [email protected]
Date: 2018.09.20 14:24:34 +05'30'

Sr.
Description Complied Remarks
No.

SPARE:
Following Relays shall be provided as spare as per comments given in approved BOQ.
1 Noted and Confirmed.
1. 87.1 Line Differential relay
2. P546 GE Make

3.One relay test kit comprising of following equipment shall be supplied as per comments
given in approved BOQ.
2 a. 3sets relay tool kit. Noted and Confirmed.
b. 2 Nos.test plugs.
C. Test/Isolation Jack for Online Testing of Relays

Complied.
3 TVM Shall be with DLMS Protocol All meters are already supplied with
DLMS protocol.
DC changeover circuit has been
BCPU, TC Ckt, & 86.1 ckt for FDR2 shall be connected to Source-1, and BCPU, TC provided as per the already supplied
4 Ckt, 86.2 ckt for FDR-3 shall be connected to Source-2. DC changeover contact shall be Panels so as to maintain the similarity
provided for changeover in case of respective DC fail. between the panels.
Please accept the same.
CT ratio has been selected a per the
inputs given during detailed
5 As per site requirement CT ratio to be changed if required at site. engineering. Hence any changes in
CTR has to be discussed between
KEC and KPTCL.
ITI substation main substation package(220kV,66kV,11kV and SAS panels) are already
6 inspected and dispatched to site. So that new extension panels to be incorporated along Noted and Confirmed.
with SAS at site.

7 As build drawing to be send along with panel. Noted and Confirmed.

EM EA GF QM FR 004 - Template for Formats Rev. : 2.0, Dated : 12.12.2014

You might also like