The document outlines various waterproofing works for different areas of a construction project, including:
1) Basement floors and retaining walls will be waterproofed using a crystallization or membrane method to a total area of 8215 sqm.
2) Terraces will be waterproofed using a cement-based integral treatment with brush coating and 80mm screed concrete over an area of 2754 sqm.
3) Toilets, balconies, and utility areas will be waterproofed using a cement-based integral treatment with brush coating and brick filling over a total area of approximately 830 sqm across various levels.
4) A podium slab and sump tank
The document outlines various waterproofing works for different areas of a construction project, including:
1) Basement floors and retaining walls will be waterproofed using a crystallization or membrane method to a total area of 8215 sqm.
2) Terraces will be waterproofed using a cement-based integral treatment with brush coating and 80mm screed concrete over an area of 2754 sqm.
3) Toilets, balconies, and utility areas will be waterproofed using a cement-based integral treatment with brush coating and brick filling over a total area of approximately 830 sqm across various levels.
4) A podium slab and sump tank
The document outlines various waterproofing works for different areas of a construction project, including:
1) Basement floors and retaining walls will be waterproofed using a crystallization or membrane method to a total area of 8215 sqm.
2) Terraces will be waterproofed using a cement-based integral treatment with brush coating and 80mm screed concrete over an area of 2754 sqm.
3) Toilets, balconies, and utility areas will be waterproofed using a cement-based integral treatment with brush coating and brick filling over a total area of approximately 830 sqm across various levels.
4) A podium slab and sump tank
The document outlines various waterproofing works for different areas of a construction project, including:
1) Basement floors and retaining walls will be waterproofed using a crystallization or membrane method to a total area of 8215 sqm.
2) Terraces will be waterproofed using a cement-based integral treatment with brush coating and 80mm screed concrete over an area of 2754 sqm.
3) Toilets, balconies, and utility areas will be waterproofed using a cement-based integral treatment with brush coating and brick filling over a total area of approximately 830 sqm across various levels.
4) A podium slab and sump tank
Download as XLSX, PDF, TXT or read online from Scribd
Download as xlsx, pdf, or txt
You are on page 1of 2
The following is the item for waterproofing
14 WATERPROOFING WORKS Based on finishing schedule -specification will change accordingly
14.1 BASEMENT AND RETAINING WALLS
Providing & laying appoved waterproofing by crystallisation method (xypex/equi) to Basement floor and retaining walls waterproofing by membrane waterproofing method as per the manufacturer's specifications etc. complete.[ Crystalline water proofing with covering of 15 mm thick cement finished plaster to all extrnal RCC wall at basement level,toilets, pantry, canteen area, inside OHT]
Sqm 8215
14.2 TERRACE WATERPROOFING
Providing and laying integral cement based waterproofing treatment with brush bond coating and 80mm thick average screed concrete above, including preparation of surface as required for treatment of roofs, terraces etc., as detailed in the technical specification Note: Plan area shall be the mode of measurement (Contractor should read and understand the technical specification before quoting)
Sqm 2754
14.3 SUNKEN AREA - TOILETS/Balconies
Providing waterproofing for the Toilets/Balconies and utility area by using integral cement based waterproofing treatment with brush bond coating and broken brick bat filling where ever specified along with screed of 50mm thick above, including preparation of surface as required for treatment as detailed in the technical specification Note: Plan area shall be the mode of measurement (Contractor should read and understand the technical specification before quoting)
Providing waterproofing for podium by following methods as per the specifications listed below with a minimum guarantee period of 10 years and Testing of treatment as per the requirements as detailed in the technical specification 9.5.(Contractor should read and understand the technical specification before quoting) Above Sump tank & step
Sqm 12
14.5 OHWT , SUMP TANK ,STP Tanks & UG Tanks - INTERNAL
Providing waterproofing by Surface method INTERNALLY by following methods with min. 10 years guarantee. Sqm 363.42 Providing waterproofing by Surface method INTERNALLY by using integral cement based waterproofing treatment with brush bond coating along with 20 - 25mm thick water proofing plastering for vertical surface and 50 mm screed concrete above horizontal surface and as detailed in the technical specification 9.3.(Contractor should read and understand the technical specification before quoting)