The specification outlines requirements for barred tees used in wet and sour gas transmission pipelines including materials, manufacturing, testing, inspection, packaging and documentation requirements.

The specification establishes minimum technical requirements for the manufacture and testing of barred tees to be used in natural gas transmission pipelines in Iran.

The specification covers material requirements, dimensional and mechanical property tests, non-destructive testing including ultrasonic and hydrostatic testing, and outlines acceptable test standards.

SPECIFICATION FOR BARRED TEE

PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.


IGAT 6 D PL ME SPC 0007 01 9 1

SPECIFICATION FOR BARRED TEE

FINAL
01 MK AN MM 89.10 -
APPROVED
00 IFR MK BM AN 89.06 -

PURPOSE OF
REV. PREPARED CHECKED APPROVED DATE REMARKS
ISSUE

DOCUMENT REVISION SHEET


- REVISED SHEETS ISSUED FOR
ONLY ATTACHED
- REVIEW
- APPROVAL
- ENTIRE DOCUMENT - QUOTATION
RE-ISSUED - PURCHASE
- COMMENT
- INFORMATION

- ENTIRE DOCUMENT

REVISED

SPECIFICATION FOR BARRED TEE



PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.
IGAT 6 D PL ME SPC 0007 01 9 2

00 01 02 REMARK 00 01 02 REMARK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

SPECIFICATION FOR BARRED TEE



PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.
IGAT 6 D PL ME SPC 0007 01 9 3

TABLE OF CONTENTS

1. INTRODUCTION.........................................................................................................4
2. SCOPE...........................................................................................................................4
3. DEFINITIONS..............................................................................................................4
4. CODES AND STANDARDS........................................................................................4
5. GENERAL REQUIRMENTS......................................................................................5
6. MATERIAL...................................................................................................................5
7. DESIGN AND MANUFACTURE...............................................................................6
8. INSPECTION AND TESTS.........................................................................................7
9. TEST CERTIFICATES................................................................................................8
10. MARKING, PACKING AND SHIPMENT................................................................8
11. GUARANTEE...............................................................................................................8
12. DOCUMENT.................................................................................................................9

SPECIFICATION FOR BARRED TEE



PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.
IGAT 6 D PL ME SPC 0007 01 9 4

1- Introduction
Iranian Gas Engineering & Development Company (I.G.E.D.C) has intended to perform gas
transmission pipeline and gas compressor stations for transferring of 110 MMSCMD of natural
gas to be fed from South Pars phases 22 ~ 24 from Assalouyeh to Bazargan.
Design of a new 56" gas transmission pipeline from Assalouyeh to Bazargan has been
described under this EPC Contract.
2- SCOPE
2-1 This specification covers the minimum requirements for process of manufacture,
materials, handling and transporting/shipping of barred tees for use in wet and sour
environments of transportation pipelines in the

2-2 Barred tees manufactured to this specification shall be suitable for natural gas
(sweet service).

2-3 All barred tees shall be suitable for both buried and above ground installation.

3- DEFINITIONS
Client: Iranian Gas Engineering & Development Company (IGEDC).
MC: Ghods Niroo Consulting Engineers.
CONSULTANT: Haraz Rah Consulting Engineers.
CONTRACTOR: Gharargah Khatam-AL-Anbia.Niroo Goostar Institute.

4- CODES AND STANDARDS


Standards

The latest edition of the following codes and standards shall be complied, unless
0 .otherwise specified
1
ASME B31.8 Gas Transmission and Distribution Piping Systems

API5L Specification for Line Pipe

ASME B 16.9 Factory-made Wrought Steel Butt Welding Fittings



SPECIFICATION FOR BARRED TEE



PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.
IGAT 6 D PL ME SPC 0007 01 9 5

MSS-SP-75(2004) Specification for High Test Wrought Butt welding


0 Fittings
1

ASTM A370 Methods and definitions for mechanical testing of steel products

0
Client Specifications
1
PLD-103 Specification for Reducing and Equal Tee

IGS- M-PL-022(Part 2) Butt Welding Ends , Low Alloy Steel Fittings For Use in High
Pressure Piping Size : from 16 to 56

5- GENERAL REQUIRMENTS
The Tee pieces design shall compatible with requirements which indicate bellow:

NPS 56 Barred-Tees for Sweet Service


Design Pressure 1400 psig
Hydrostatic Test Pressure 1.5 x D.P.
Max. operating Temperature 55 C
Minimum inside diameter of tees shall be 97.5 percent of nominal inside diameter of pipe.
0
1
6- MATERIAL
6-1 The material of the matching pipe shall be API 5L Grade X70

6-2 The material of tees shall be WPHY 70 and meet all of requirement which indicate in
clause 6 of MSS SP-75

:The carbon equivalent shall be calculated with the following formula


Mn Cr V Mo Ni Cu
CE C
6 5 15

SPECIFICATION FOR BARRED TEE



PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.
IGAT 6 D PL ME SPC 0007 01 9 6

6-3 The Supplier shall furnish material test certificates and chemical analysis report
giving the heat analysis of each heat of steel used in the manufacture of tees. This report
shall also list the tees numbers of those tees made from the heat of steel for final
certification and shipment. Tees shall be furnished in the heat treated condition. The
base material shall be normalized or quenched and tempered before welding and stress
relieved after. Details of the heat treatment performed shall be included in the Suppliers
test report.

6-4 All barred tees shall be stress relieved as per the provisions of MSS SP 75.

6-5 Tensile properties of the barred tees shall meet the requirements of MSS SP 75.

7- DESIGN AND MANUFACTURE


7-1 Scrapper guided bars shall be provided to prevent entry of pigs/ spheres in branch
pipeline. Opening in branch pipeline through scrapper guided bars shall not be more
than 40% of the area of opening in the main pipeline. Material of bars shall be
A516gr70 & shall meet all of requirement which indicate in IPS-D-PI-149

7-2 Barred tees shall be suitable for the passage of all types of pipeline scraper and
inspection pigs on regular basis in without causing any damage to pig and scrapper
guided bars. Barred tee shall provide an unobstructed profile for pigging operations
in either direction.

7-3 Bars shall conform to material quality and manufacturing standards, and welding
compatibility to the main body of the tee.

7-4 Bars shall be of ample proportions and arranged in a configuration presenting an


acceptable streamline contour to gas flow and thus not induce vibration.

7-5 Bar edges on the run side of the tee shall be rounded and bars positioned so as to
contain the cups of a pig within the inner diameter of the run.

7-6 The bar ends shall be machined or ground to fit into the branch and welding shall be
a fillet weld completely encircling each bar. Bars of, welding shall not protrude into
the run of tee.

7-7 All butt weld ends shall be beveled as per ASME B16.9/ MSS SP 75 as applicable.

7-8 Repair by welding on parent metal of the barred tee is not allowed.

SPECIFICATION FOR BARRED TEE



PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.
IGAT 6 D PL ME SPC 0007 01 9 7

7-9 Shop welding shall conform to the ASME Boiler and pressure vessel Code, Sections
VIII and IX as applicable.

7-10 Welding procedures shall be qualified by the Supplier and shall include radiography,
macro and micro examination, hardness surveys and impact tests as detailed in the
applicable code.

7-11 Welder's performance tests shall be as specified in the ASME Code Section IX.
Macro and micro examinations, hardness surveys and impact tests are not required.

7-12 Inspection and nondestructive testing shall conform to the ASME Code Section IX.

7-13 Preheating, post heating and stress relieving requirements and procedures shall be
proposed by Supplier and agreed by the Client.

7-14 Number of bars and shop welding fabrication shall meet IPS-D-PI-149.

8- INSPECTION AND TESTS


8-1 The manufacturer shall perform all inspection and tests as per the
requirements of this specification and MSS SP 75 prior to shipment, at his
works. Such inspection and tests shall be, but not limited to, the following:

a) All barred tees shall be visually inspected.

b) Dimensional and tolerances check as per MSS SP 75.

c) Heat treatment as per MSS SP 75.

d) Chemical composition and mechanical properties shall be checked as per


relevant material standards and this specification, for each heat of steel used.

e) The non-destructive inspection shall be carried out as given below:


The full circumference of both ends of each bar tees after
beveling shall be ultrasonically tested for laminations over a length of 50
.mm from the end. No lamination is acceptable

f) Barred tees shall be subjected to hydrostatic test at a pressure equal to the test
Pressure.

SPECIFICATION FOR BARRED TEE



PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.
IGAT 6 D PL ME SPC 0007 01 9 8

g) Gauging pig shall be passed through each bar tees to demonstrate the
compliance to the out of roundness requirements.

8-2 Clients Inspector reserves the right to perform stage wise inspection and
witness tests on all tees as indicated in clause 6.1 at the Manufacturers shop,
prior to shipment.

8-3 Manufacturer shall give reasonable notice of time and shall provide
without charge reasonable access and facilities required for inspection, to the
Clients Inspector. Inspector and tests performed or witnessed by Clients
Inspector shall in no way relieve the Manufacturers obligation to perform the
required inspection and tests. Under no circumstances any action of the Clients
Inspector shall relieve the Manufacturer of his responsibility for the material and
quality of the production.

9- TEST CERTIFICATES
9-1 The Manufacturer shall submit the following Certificates:
a) Certificates of chemical analysis and mechanical tests, NDT, dimensional
inspection and hydrotest.
b) Certificates of heat treatments carried out as per specification.
c) Certificates of all other tests as required in this specification.

9-2 Only those barred tees which have been certified by Clients Inspector shall be
dispatched from Manufacturers shop.

10- MARKING, PACKING AND SHIPMENT


10-1 All barred tees shall be marked as per MSS SP 75.

10-2 All loose and foreign material i.e. rust, grease, etc. shall be removed from inside
and outside of the barred tees.

10-3 All the three ends of all barred tees shall be suitably protected to avoid any damage
during transit by means of metallic or high impact plastic bevel protectors.

10-4 A coat of antitrust paint shall be applied on the barred tees for protection during
transit and storage. Type of paint shall be as agreed upon with the Client.

10-5 Package shall be marked legibly with suitable marking ink to indicate the
following:

SPECIFICATION FOR BARRED TEE



PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.
IGAT 6 D PL ME SPC 0007 01 9 9

a) Order Number
b) Package Number
c) Manufacturers Name
d) Size (Inches) and wall thickness (mm) for both run pipe and branch pipe

11- GUARANTEE
Client will be reimbursed by Manufacturer for any barred tee furnished on this
order that fails under field hydrostatics test if such failure is caused by a defect in
the barred tee which is outside the acceptance limits of this specification. The
field hydrostatic test pressure will not exceed that value which will cause a
calculated hoop stress equivalent to 100% of specified minimum yield strength
.of the attached pipe

12- DOCUMENT
The Supplier shall furnish the Client with the followings and as specified in the
:purchase order (six series)
a) Certificate of shop inspection
b) Weld procedure
c) Certified reports giving chemical analysis and physical properties of steel
d) Stress relieves and heat treatment certificates
e) Nondestructive test certificates
f) Catalogs
g) Manufacturing certificate

You might also like