A133-000-WA-MR- B PIPES-ALLOY STEEL 2
3211
6-44-0051 6 Technical notes for pipes. 16
6-78-0001 0 Specification for Quality Mgt. System Requirements from Bidders 26
6-78-0003 0 Specification for Documentation Requirement from Suppliers 35
A133-000-16-43- A ADDITIONAL TECHNICAL REQUIREMENTS 47
ATR-3211
Page 1 of 49
MATERIAL REQUISITION (TOP SHEET)
This drawing and design it covers are property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that it will not be reproduced, copied, exhibited nor used
Material to be delivered at (job site) CPCL, CHENNAI within the delivery period specified in the "Request For Quotation"
(RFQ).
Notes :
1. This page is a record of all the Revisions of this Requisition.
2. The nature of the Revision is briefly stated in the "Details" column below, the Requisition in its entirety shall be
considered for contractual purposes.
4. When revised pages only are issued, the revised pages shall form part of the original Requisition. The original
requisition alongwith the revised pages shall be considered in its entirety for contractual purposes.
5. Vendors are required to quote strictly as per technical specifications / notes stipulated in the material requisition. The
offers with deviations are likely to be summarily rejected.
This is a system generated approved document and does not require signature
EIL - 588 A - 216 x 279
REVISION
SR. NO DOCUMENT TITLE DOCUMENT NO.
NO. DATE
1 TECHNICAL NOTES FOR PIPES 6-44-0051 6 25/09/2014
2 INDICATIVE ITP FOR SEAMLESS AND A133-00-000-ITP-13A
WELDED PIPES
3 STANDARD SPECIFICATION FOR 44NC-4600-Q-0002-A4 0 13/04/2010
POSITIVE MATERIAL
except in the limited way and private use permitted by written consent given by the lender to the borrower for the intended use. EIL-1641-515 Rev.0 A4-210x297
IDENTIFICATION (PMI) AT
VENDOR'S WORK
4 SPECIFICATION FOR QUALITY 6-78-0001 0 04/06/2009
MANAGEMENT SYSTEM REQUIREMENTS
FROM BIDDERS
5 SPECIFICATION FOR DOCUMENTATION 6-78-0003 0 04/06/2009
REQUIREMENTS FROM SUPPLIERS
6 ADDITIONAL TECHNICAL A133-000-16-43-ATR- A 16/01/2015
RERQUIREMENTS 3211
EIL - 588 A - 216 x 279
Item Description: PIPE, B-36.10, ASTM A 335 GR.P9, BE, SEAMLESS, IBR
Item Description: PIPE, B-36.10, ASTM A 335 GR.P9, PE, SEAMLESS, IBR
Item Description: PIPE, B-36.10, ASTM A 691 GR5CR CL.42, BE, E.FS.W
Item Description: PIPE, B-36.10, ASTM A 691 GR9CR CL.42, BE, E.FS.W
except in the limited way and private use permitted by written consent given by the lender to the borrower for the intended use. EIL-1641-515 Rev.0 A4-210x297
Item Description: PIPE, B-36.10, ASTM A 691 GR9CR CL.42, BE, E.FS.W
With reference to the MR for PIPES (ALLOY STEEL) -A133-000-WA-MR-3211, following are the changes:
Sl. No. Document Document no. Document Added (A)/ Affected Contents
/Revised (R)
1. MATERIAL REQUISITION A133-000-WA-MR-3211 R A. Changes in MR attachment
1. Quantity changed for SR. No. 11, 14, 15, 38 & 39.
2. New items from SR. NO. 40 to 56 are added in the
revised MR.
Note: This Document is to be read in conjunction with the documents attached with Material Requisition.
Page 6 of 49
APPENDIX - A
MICRO, MACRO
FERRITE CHECK IN WELD METAL
ADDITIONAL TEST SPECIMEN FOR MECHANICAL TESTING
Page 7 of 49
APPENDIX - A
15 H W X FINAL INSPECTION
VISUAL EXAMINATION
DIMENSION CHECK
VERIFICATION OF MARKING
COLOUR CODING
ENDS PROTECTION
REVIEW OF MANUFACTURERS TEST CERTIFICATE
Page 8 of 49
Page 1 of 7
LSTK-1 : COKER BLOCK : DELAYED COKER UNIT & LPG CFC TREATING UNITS
PART I
SECTION : 5
DOCUMENT NO : 44NC-4600-Q-0002-A4
Rev No. Issue Date Pages Rev Description Prepared Checked Approved
By By By
Page 9 of 49
Jacobs
CPCL CHENNAI INSPECTION, MONITORING PART-I
44NC - 4600 FOR LSTK CONTRACTOR SECTION-5
LSTK 1 COKER BLOCK Doc.No.44NC-4600-Q-0002-A4 Rev.0 Page 2 of 7
TABLE OF CONTENTS
1.0 SCOPE
2.0 DEFINITIONS
7.0 MARKING
8.0 ATTACHMENTS
Page 10 of 49
Jacobs
CPCL CHENNAI INSPECTION, MONITORING PART-I
44NC - 4600 FOR LSTK CONTRACTOR SECTION-5
LSTK 1 COKER BLOCK Doc.No.44NC-4600-Q-0002-A4 Rev.0 Page 3 of 7
1.0 SCOPE
1.1 This specification applies to the requirements for Positive Material Identification (PMI)
to be performed at vendors works on Metallic Alloy Materials procured either directly
by Vendor or indirectly through their sub-vendors. Any deviations from this
specification must be approved by Purchaser in the deviation / Waiver permit format.
This specification shall also be read in conjunction with positive material identification
at site.
1.2 This Specification covers the procedures and methodology to be adopted to assure
that the chemical composition of alloy material is consistent with the material
specification as specified in purchase documents using alloy analyser at the time of
final inspection before despatch.
1.3 The scope of this specification shall include but not limited to Positive Material
identification (PMI) to be performed on Alloy Piping Materials listed below :
However all grades of piping materials including stainless steel are subjected to PMI
verification / test after receipt at site.
2.0 DEFINITIONS
2.1 Vendor : Any supplier or manufacturers on whom an order is placed for supply of
referred piping items. This definition shall also include any sub-vendor or
manufacturers on whom a sub-order is placed by the vendor.
2.2 Inspection Lot : A group of items offered for Inspection covered under same size,
heat and heat treatment lot.
2.3 Alloy Material : Any metallic material (including welding filler materials) that contains
alloying elements such as chromium, nickel, molybdenum, vanadium, etc which are
intentionally added to enhance mechanical or physical properties and/or corrosion
resistance.
Page 11 of 49
Jacobs
CPCL CHENNAI INSPECTION, MONITORING PART-I
44NC - 4600 FOR LSTK CONTRACTOR SECTION-5
LSTK 1 COKER BLOCK Doc.No.44NC-4600-Q-0002-A4 Rev.0 Page 4 of 7
3.1 The Vendor shall submit a procedure of PMI to comply with the requirements of this
Specification. Approval of PMI procedure shall be obtained from Purchaser prior to
commencing manufacturer / inspection of product.
3.3 The Vendor shall identify all incoming alloy materials and maintain full traceability of
all alloy materials, including all off-cuts. Transfer of identification marks shall be
undertaken prior to cutting to ensure maintenance of identification on off-cuts.
3.4 The Vendor shall ensure that all materials are segregated and stored in separately
identified locations to prevent the mix-up of materials of different alloy specifications or
alloy material with carbon steel. Non-ferro-magnetic materials shall be segregated at
all times from ferro magnetic materials.
4.1 The Method used for PMI examination shall provide a quantitative determination of the
alloying elements like Cr, Mo, Ni, V in Alloy Steel items. For Non-Ferrous alloys
quantitative determination of appropriate alloying elements shall be verified.
4.2 Instruments or methods used for PMI examination shall be of those that will provide
quantitative, recordable, elemental composition results for positive identification of
alloying elements present.
4.3 The acceptable instrument for alloy analyser shall be either Portable X-ray
fluorescence or Optical Emission Spectro Analyser type capable of verifying the
percentage of alloy elements within specified range.
4.4 Chemical spot testing, magnets, alloy sorters and other methods using eddy current
methods are not acceptable for PMI examination.
4.5 The PMI instrument used shall have the sensitivity to detect the alloying elements in
the specified range.
4.6 Each analyser must be calibrated according to the manufacturers specification at the
beginning and end of each shift. Instrument must be checked against known standard
for each alloy type to be inspected during the shift.
4.7 Certified samples with full traceability of known alloy materials shall be available for
use as a random spot check on the instrument calibration.
4.8 The surface to be examined shall be prepared by light grinding or abrasive paper and
solvent cleaner. Evidence of arc burn resulting from examination shall be removed by
light grinding or abrasive paper.
Page 12 of 49
Jacobs
CPCL CHENNAI INSPECTION, MONITORING PART-I
44NC - 4600 FOR LSTK CONTRACTOR SECTION-5
LSTK 1 COKER BLOCK Doc.No.44NC-4600-Q-0002-A4 Rev.0 Page 5 of 7
4.9 Alloy steel type joint gaskets shall only be inspected by using portable X-ray
fluorescence instrument.
4.10 Testing shall be done as per the procedures outlined by the manufactures of alloy
analyser being used. Modification of these procedures if any, must be approved by
Purchaser.
4.11 The persons performing PMI shall demonstrate their capabilities to the satisfaction of
Owner/PMC/Third Party Inspection Engineer. If the vendor has qualified operator in
his rolls, he may perform the examination. Otherwise PMI examination shall be sub
contracted to an independent testing agency.
4.12 Whenever materials, items and welds are identified as not meeting requirements by
the visiting engineer a rejection note shall be issued. The above shall be marked with
a red R pending resolution.
Following sampling plans shall be applicable for PMI examination of various alloy items.
The results of PMI examination shall be recorded in the PMI Report Form as enclosed with
this specification.
Page 13 of 49
Jacobs
CPCL CHENNAI INSPECTION, MONITORING PART-I
44NC - 4600 FOR LSTK CONTRACTOR SECTION-5
LSTK 1 COKER BLOCK Doc.No.44NC-4600-Q-0002-A4 Rev.0 Page 6 of 7
7.0 MARKING
7.1 All alloy materials tested by PMI shall be identified using either of the following
methods by indicating AV
a) Electro etching
b) A low stress stamp marking
c) Hologram Sticker
d) Vibro etching
e) Colour Coding
8.0 ATTACHMENTS
Page 14 of 49
Jacobs
CPCL CHENNAI INSPECTION, MONITORING PART-I
44NC - 4600 FOR LSTK CONTRACTOR SECTION-5
LSTK 1 COKER BLOCK Doc.No.44NC-4600-Q-0002-A4 Rev.0 Page 7 of 7
ATTACHMENT 8.1
TYPICAL POSITIVE MATERIAL IDENTIFICATION REPORT : ALLOY STEEL
Page .of .
BULK MATERIALS
Project : Client : Job No. :
Source Age
Instrument Type / ID
Source dt.
Last Service Date :
PMI Examination Approved by
Witnessed by
by : Vendor
Company
Page 15 of 49
STANDARD SPECIFICATION No.
ENGINEERS TECHNICAL NOTES FOR
5fg-ar I~-3
dg INDIA LIMITED PIPES 6-44-0051 Rev. 6
IA GoN of Indo Undeflakng)
Page 1 of 10
lebri ch iJA
TECHNICAL NOTES
FOR PIPES
Page 16 of 49
STANDARD SPECIFICATION No.
ENGINEERS TECHNICAL NOTES FOR
INDIA LIMITED PIPES 6-44-0051 Rev. 6
rivvottt.1.5trool, IA Govt ot Intha Undertalfing)
Page 2 of 10
Abbreviations:
Page 17 of 49
STANDARD SPECIFICATION No.
ENGINEERS TECHNICAL NOTES FOR
$;fgW 2154- INDIA LIMITED PIPES 6-44-0051 Rev. 6
1+fV7R rwnrt ,151,70541, IA Govl of lodia Undeftalong)
Page 3 of 10
CONTENTS
1.0 GENERAL 4
2.0 IBR PIPES 6
3.0 ACCEPTABLE DEVIATIONS 7
4.0 HYDROSTATIC TEST 7
5.0 MARKING AND DESPATCH 10
6.0 REFERENCES 10
Page 18 of 49
STANDARD SPECIFICATION No.
ENGINEERS TECHNICAL NOTES FOR
2f5le'g INDIA LIMITED
IA Govl ol lnaia Undertakog)
PIPES 6-44-0051 Rev. 6
Page 4 of 10
1.0 GENERAL
1.1 A11 pipes and their dimensions, tolerances, chemical composition, physical properties, heat
treatment, hydrostatic test and other testing and marking requirements shall conform to the
latest codes and standards specified in the material requisition (MR). Supplier shall strictly
comply with MR/PR stipulations and no deviations shall be permitted. Post Order
Concession/Deviation Permit 5-0000-0180-F1 as mentioned in Cl. 5.18 of Specification for
Quality Management System Requirements from Bidders (6-78-0001) is not applicable.
1.2 Testing
1.2.1 Test reports shall be supplied for all mandatory tests as per the applicable material
specifications. Test reports shall also be furnished for any supplementary tests as specified in
the MR & Clauses 1.10 & 1.11.
1.2.2 Material test certificates (physical property, chemical composition & heat treatment report)
shall also be furnished for the pipes supplied.
1.2.3 PMI shall be performed as per the scope and procedures as defined in the spec for PMI at
Supplier's Works (6-81-0001).
1.2.4 Refer to specification nos. 6-81-0002 and 6-81-0003 for Inspection & Test plans for welded
pipes and seamless pipes respectively.
1.3.2 A11 longitudinally welded pipes should employ only automatic welding.
1.4 Pipe shall be supplied in single or double random length of 4 to 7 and 7 to 14 meters
respectively.
1.5 a. Seamless and E.R.W. pipes shall not have any circumferential seam joint in a random
length. However, in case of E.FS.W pipe, in one random length one welded
circumferential seam of same quality as longitudinal weld is permitted. This weld
shall be at least 2.5 m from either end. The longitudinal seams of the two portions
shall be staggered by 90. Single random length in such cases shall be 5 to 7 m.
b. Unless otherwise mentioned in the respective material code, E.FS.W pipes < 36" shall
not have more than one longitudinal seam joint and E.FS.W pipes 36" shall not
have more than two longitudinal seam joints.
1.6 Pipe with screwed ends shall have NPT external taper pipe threads conforming to
ASME/ANSI B1.20.1 up to 1.5" NB & IS 554 for 2" to 6" NB.
Page 19 of 49
STANDARD SPECIFICATION No.
ENGINEERS TECHNICAL NOTES FOR
INDIA LIMITED PIPES 6-44-0051 Rev. 6
wlrrT t,vcrtV ItISOIstt ) IA Govt ol Intlia Gott000k,o9)
Page 5 of 10
1.7 Pipe with beveled ends shall be in accordance with ASME B16.25. Weld contours shall be as
follows:
Up to 10 mm Figure 4
Alloy Steel,
Stainless Steel & > 10 mm & Up to 25 mm Figure 5 Type A
Low Temp. Carbon Steel
> 25 mm Figure 6 Type A
1.8 Galvanized pipes shall be coated with zinc by hot dip process conforming to IS 4736 / ASTM
A 153.
1.9 All austenitic stainless steel pipes shall be supplied in solution annealed condition. All types
of 321 or 347 stainless steel pipes shall be in a stabilized heat treated condition. Stabilizing
heat treatment shall be carried out subsequent to the normal solution annealing. Soaking time
& holding temp. for stabilizing heat treatment shall be 4 hrs & 900C respectively.
1.10.1 For all austenitic stainless steel pipes inter-granular corrosion test shall have to be conducted
as per following:
ASTM A262 Practice "B" with acceptance criteria of "60 mils/year (max.)".
OR
ASTM A262 Practice E with acceptance criteria of no cracks at 20X magnification and
microstructure to be observed at 250X magnification shall ensure the absence of any cracks/
fissures. When testing is conducted as per practice 'E' photograph of microstructure shall be
submitted for record.
1.10.2 When specifically asked for in MR for high temperature application of some grades of
austenitic stainless steel (eg.SS 309, 310, 316, 316H etc.) ASTM A262 Practice "C" with
acceptance criteria of "15 mils/year (max.)" shall have to be conducted.
1.10.3 For the IGC test as described in 1.10.1 & 1.10.2, two sets of samples shall be drawn from each
solution annealing lot; one set corresponding to highest carbon content and the other set
corresponding to the highest pipe thickness.
All welded pipes indicated as `CRY0' & `LT' in MR shall be impact tested per requirement
& acceptance criteria of ASME B31.3. The impact test temperature shall be -196C & -45C
for stainless steel and carbon steel respectively unless specifically mentioned otherwise in
MR.
1.12.1 Pipes under "NACE" category and those designated as "HIC1" shall meet the requirements
given in NACE MR-0103 unless mentioned otherwise.
1.12.2 Pipes made from plates and designated as "HIC1" shall meet the HIC requirements of EIL
specification 6-79-0013 unless mentioned otherwise.
Page 20 of 49
STANDARD SPECIFICATION No.
`51
1 ENGINEEFZS TECHNICAL NOTES FOR
5fga 02-eg INDIA LIMITED PIPES 6-44-0051 Rev. 6
1.11UR ertcnt ,TR,1-4.1) Ift Govt of UnciertaNingf
Page 6 of 10
1.13 Specified heat treatment for carbon steel and alloy steel and solution annealing for stainless
steel pipes shall be carried out after weld repairs. Number of weld repairs at the same spot
shall be restricted to maximum two by approved repair procedure.
1.14 For black or galvanized pipes to IS 1239, the minimum percentage of elongation shall be
20%.
1.15 All 1Cr-V2Mo and 11/4Cr-1/4Mo seamless pipes shall be normalised and tempered.
1.16 For all welded alloy steel pipes with mandatory requirement of heat treatment and
radiography, radiography shall be performed after heat treatment.
1.17 For Hydrogen service pipes following special requirements shall also be met:
1.17.1 All carbon steel pipes having wall thickness 9.53 mm (0.375") and above shall be normalised.
Cold drawn pipes shall be normalised after the final cold draw pass for all thicknesses.
1.17.2 All alloy steel (Cr-Mo) pipes shall be normalised and tempered. The normalising and
tempering shall be a separate heating operation and not a part of the hot forming operation.
The maximum room temperature tensile strength shall be 100,000 psig.
1.17.3 For carbon steel Pipes, hardness of weld and HAZ shall be 200 BHN (max.). For alloy steel
Pipes, hardness of weld and HAZ shall be 225 BHN (max.).
1.17.4 For all austenitic stainless steels, the weld deposit shall be checked for ferrite content. A
Ferrite No.(FN) not less than 3% and not more than 10% is required to avoid sigma phase
embrittlement during heat treatment. FN shall be determined by Ferritescope prior to post
weld heat treatment.
1.17.5 For all Carbon steel and Alloy steel pipes with wall thickness over 20mm, Charpy-V Notch
impact testing shall be carried out in accordance with paragraph UG-84 of ASME Section
VIII, Div-1 for weld metal and base metal from the thickest item per heat of material and per
heat treating batch. Impact test specimen shall be in complete heat treated condition and
accordance with ASTM A370. Impact energies at 0Celsius shall average greater than 27J (20
ft-lb) per set of three specimens, with a minimum of 19J (15 ft-lb).
1.18 For dual grades of SS where specified, chemical composition and mechanical properties of
both grades specified shall be ensured.
2.1.1 Pipes under purview of IBR shall be accompanied with IBR certificate original in Form III-A
duly approved and countersigned by IBR authority/local authority empowered by the Central
Boiler Board of India(Photocopy of the original certificate duly attested by the local boiler
inspector where the supplier is located is the minimum requirement for acceptance) or Form
III-D [for well known pipe manufacturers as per IBR] signed by Manufacturer's authorized
representative. Well known pipe manufacturers, as recognized by IBR, shall submit a duly
attested copy of Form XVI-G along with Form
2.1.2 For materials 11/4Cr - V2Mo (ASTM A335 Gr.P11 / A691 Gr.11/4Cr), 21/4Cr - 1Mo (ASTM
A335 Gr.P22 / A691 Gr.21/4Cr) & 9Cr -1Mo-V (A335 Gr.P91/A691 Gr.91), Form III-A
approved by IBR shall include the tabulation of Et, Sc & Sr values for the entire temperature
range given below. Et, Sc & Sr values shall be such that throughout the temperature range
Page 21 of 49
STANDARD SPECIFICATION No.
ENGINEERS TECHNICAL NOTES FOR
$R-ar 22-eg
1.177, rrmrr an s~
INDIA LIMITED
IA Govt ot India Undertalfingt
PIPES 6-44-0051 Rev. 6
Page 7 of 10
E,/ 1.5
Sr / 1.5 SA
Sc
where ,
SA (psi)
Temp(F)
500 600 650 700 750 800 850 900 950 1000 1050 1100
Material
A335 Gr.P11 17200 16700 16200 15600 15200 15000 14500 12800 9300 6300 4200 2800
A691 Gr.11/4Cr 18900 18300 18000 17600 17300 16800 16300 15000 9900 6300 4200 2800
A335 Gr.P22 /
17900 17900 17900 17900 17900 17800 14500 12800 10800 7800 5100 3200
A691 Gr.21/4Cr
A335 Gr.P91/
28100 27700 27300 26700 25900 24900 23700 22300 20700 18000 14000 10300
A691 Gr.91
Note : SA values shall be as per the latest edition prevai ing.
2.2 For carbon steel pipes under IBR the chemical composition shall conform to the following:
The chemical composition as indicated in this clause is not applicable for pipes other than IBR
services.
3.2 Pipes of Grades SS317 of corresponding material are acceptable in place of Grades SS316 or
SS316(2.5 Mo min.).
3.3 Pipes of Grades SS317L of corresponding material are acceptable in place of Grades SS316L
or SS316L(2.5Mo min.).
3.4 Seamless pipes are acceptable in place of welded pipes except in the case of welded
SS321/SS321H pipes with nominal thickness greater than 9.53mm.
Page 22 of 49
STANDARD SPECIFICATION No.
~_le7 ENGINEERS TECHNICAL NOTES FOR
e5 INDIA LIMITED
IA Govt of Incha Undertalting)
PIPES 6-44-0051 Rev. 6
Page 8 of 10
a) Carbon Steel
Page 23 of 49
STANDARD SPECIFICATION No.
ENGINEERS TECHNICAL NOTES FOR
0141
-eg INDIA LIMITED
IA Govt of Indo UnclertaNngt
PIPES 6-44-0051 Rev. 6
Page 9 of 10
The hydrostatic test pressure in kg/cm2 for the following materials shall be as given
below :
Material Gr.1 :ASTM A312 TP 304 / 304H / 316 / 316H / 321 / 347 welded.
Material Gr.2 :ASTM A312 TP 304L / 316L welded.
Size Pipe Schedule : 10S Pipe Schedule : 40S Pipe Schedule : 80S
Material Material Material Material Material Material
Gr. 1 Gr.2 Gr.1 Gr.2 Gr.1 Gr.2
2" 100 80 155 130 230 190
IS 3589 IS 3589
4.3 Hydrostatic pressure testing shall be performed using iron free water, which is clean and free
of silt. Maximum chloride content in water for hydrostatic testing for SS piping shall be 50
ppm.
Format No. 8-00-0001-F1 Rev. 0 Copyright EIL All rights reserved
Page 24 of 49
STANDARD SPECIFICATION No.
ENGINEERS TECHNICAL NOTES FOR
OrcRes
1
.1,P+,,
M11 J457,01/
INDIA LIMITED
IA GoN ol India UnclettaMing)
PIPES 6-44-0051 Rev. 6
Page 10 of 10
5.1 All pipes shall be marked in accordance with the applicable codes, standards and
specifications. In addition the purchase order number, the item code & special conditions like
"IBR", "CRY0", "NACE", "H2" etc. shall also be marked.
5.2 Pipes under "IBR","CRY0", "NACE" & "H2" shall be painted with one circumferential
stripe of colour red, light purple brown, canary yellow & white respectively for easy
identification. Width of stripe shall be 12mm for pipe sizes lens than 3" and 25mm for pipes
3" and above.
5.3 Paint or ink for marking shall not contain any harmful metal or metallic salts such as zinc, lead
or copper which cause corrosive attack on heating.
5.4 Pipes shall be dry, clean and free from moisture, dirt and loose foreign materials of any kind.
5.6 Rust preventive used on machined surfaces to be welded shall be easily removable with a
petroleum solvent and the same shall not be harmful to welding.
5.7 Both ends of the pipe shall be protected with the following material:
5.8 Pipes may be provided with plastic push-fit type end caps/ steel caps without belt wire.
5.9 Steel end protectors to be used on galvanized pipes shall be galvanized. Plastic caps can also
be used as end protectors for galvanised pipe ends.
6.0 REFERENCES
6.1 6-81-0001: Specification for Positive Material Identification (PMI) at Supplier's Works.
6.4 6-79-0013: Material requirements for carbon steel components used in sour service for
petroleum refinery environments
Page 25 of 49
Page 26 of 49
Page 27 of 49
Page 28 of 49
Page 29 of 49
Page 30 of 49
Page 31 of 49
Page 32 of 49
Page 33 of 49
Page 34 of 49
Page 35 of 49
Page 36 of 49
Page 37 of 49
Page 38 of 49
Page 39 of 49
Page 40 of 49
Page 41 of 49
Page 42 of 49
Page 43 of 49
Page 44 of 49
Page 45 of 49
Page 46 of 49
DOCUMENT No.
ADDITIONAL TECHNICAL A133-000-16-43-ATR-3211
REQUIREMENTS Rev. A
Page 1 of 2
ADDITIONAL TECHNICAL
REQUIREMENTS
(FOR PIPES)
Format No.
PageEIL471641-1924
of 49 Rev. 1 Copyright EIL All rights reserved
DOCUMENT No.
ADDITIONAL TECHNICAL A133-000-16-43-ATR-3211
REQUIREMENTS Rev. A
Page 2 of 3
2. Bidder shall furnish quotations only for those items, for which he can supply
strictly as per MR specifications and for which he is approved by EIL/Owner.
3. No technical details of any nature shall be included in the offer. If the offer
contains any technical deviation or clarification or stipulates any technical
specifications (even if in line with the MR requirements), the offer shall be
summarily rejected.
4. The submission of prices by the Bidder shall be construed to mean that he has
confirmed compliance with all technical specifications of the corresponding
item(s).
5. Bidders shall ensure compliance to all the attachments listed in the list of
attachment sheet of the MR, A133-000-WA-MR-3211.
7. For pipes under NACE category Hardness shall be below BH No. 200 for CS
material and Carbon equivalent (CE) shall be limited to 0.43.
8. For Items Specified with requirements of LUM1, shall meet the requirements
of NACE specified in MR-0103 and Sulphur content in the material is to be
restricted to 0.01% (max). Hardness shall be below BH No. 200 for CS
material. Carbon equivalent (CE) shall be limited to 0.43.
9. Items specified with requirements of UOP1 shall meet both the requirements
of NACE specified in MR-0103 and Indian Boiler Regulations. Sulphur
Content in the material is to be restricted to 0.01% (max). Hardness shall be
below BH No. 200 for CS material. Carbon equivalent (CE) shall be limited to
0.43.
10. Items specified with requirements of HIBR shall meet both the requirements
of Hydrogen service (as per clause 1.17 of Technical Notes for Pipes) and
Indian Boiler Regulations (Clause 2.0 of Technical Notes for Pipes).
11. Refer Clause 5.1 of Technical notes for pipes (6-44-0051), in addition to the
services mentioned in this clause, the pipes under LUM1 & HIC1 shall be
painted in sky blue stripes & light orange stripes respectively. Pipes under
UOP1 shall be painted in dual stripes of Red and Sky blue. Pipes under
HIBR service shall be painted in dual stripes of Red and Sea Green.
Format No.
PageEIL481641-1924
of 49 Rev. 1 Copyright EIL All rights reserved
DOCUMENT No.
ADDITIONAL TECHNICAL A133-000-16-43-ATR-3211
REQUIREMENTS Rev. A
Page 3 of 3
12. Clause 5.5 of Technical notes for pipes (6-44-0051), shall be read as below:
Pipes shall be protected from rust, corrosion and mechanical damage during
transportation, shipment and storage.
13. The attachment no. 6.1, 6.2 and 6.3 specified in Clause 6.0 of Technical notes
for pipes (6-44-0051) to be ignored and replaces as following:
Format No.
PageEIL491641-1924
of 49 Rev. 1 Copyright EIL All rights reserved