About
A passionate machine learning practitioner with more than 16 years of experience…
Articles by Ben
Activity
-
Thought for the Day: If the first thing we do when we want to use "AI" is to log into someone else's computer in the cloud, as individuals we've…
Thought for the Day: If the first thing we do when we want to use "AI" is to log into someone else's computer in the cloud, as individuals we've…
Liked by Ben Caldwell
-
It was great spending time with the team at Inductive Automation Australia this week. We ran in-depth sessions on cloud computing, networking, and…
It was great spending time with the team at Inductive Automation Australia this week. We ran in-depth sessions on cloud computing, networking, and…
Liked by Ben Caldwell
-
I am incredibly proud to have led a phenomenal Nukon project team and for us to win the Ag-Tech and Digital Award at the Wine Industry Impact Awards…
I am incredibly proud to have led a phenomenal Nukon project team and for us to win the Ag-Tech and Digital Award at the Wine Industry Impact Awards…
Liked by Ben Caldwell
Experience
Education
-
The University of Western Australia
-
Using evolutionary computation techniques to learn state machines from black box systems.
-
-
Licenses & Certifications
Projects
-
Mundaring WTP and Pumpstations
- Present
The Mundaring Water Treatment Plant is a A$300m public private partnership (PPP) project being undertaken in Mundaring, a residential district located approximately 21 miles east of Perth, in Western Australia.
The project provided a secure, long-term water supply for the Wheatbelt and Goldfields regions of the state while the eastern metropolitan hill suburbs also benefited from the project.
The plant has an ultimate capacity of about 240,000 cubic meters a day, but will…The Mundaring Water Treatment Plant is a A$300m public private partnership (PPP) project being undertaken in Mundaring, a residential district located approximately 21 miles east of Perth, in Western Australia.
The project provided a secure, long-term water supply for the Wheatbelt and Goldfields regions of the state while the eastern metropolitan hill suburbs also benefited from the project.
The plant has an ultimate capacity of about 240,000 cubic meters a day, but will initially be outfitted for 165,000 cubic meters each day.
BlochTech Engineering was contracted to provide the electrical cabinet design and fabrication for the 50+ control cabinets, and the control system design, supply, development, installation, and commissioning.Other creators -
Southern Seawater Desalination Plant
-
In May 2007, the WA Government announced that a new desalination plant, the Southern Seawater Desalination Plant (SSDP), near Binningup in the Shire of Harvey would be the next major water source for WA.
Following an extensive two year approvals period and two year construction period, the first stage of the plant was officially opened in September 2011.
The $950m plant was designed to be constructed in two stages, both capable of producing 50 billion litres (gigalitres) of fresh…In May 2007, the WA Government announced that a new desalination plant, the Southern Seawater Desalination Plant (SSDP), near Binningup in the Shire of Harvey would be the next major water source for WA.
Following an extensive two year approvals period and two year construction period, the first stage of the plant was officially opened in September 2011.
The $950m plant was designed to be constructed in two stages, both capable of producing 50 billion litres (gigalitres) of fresh drinking water per year.
BlochTech Engineering was selected as the system integrator to design, develop, and integrate the Siemens PCS7 control system at the plant.Other creators -
Perth Seawater Desalination Plant
-
The $350m Perth Seawater Desalination Plant, Australia's first plant to provide desalinated seawater for large scale public consumption, was completed in late 2006 to produce up to 45 billion litres (gigalitres) of fresh drinking water per year.
Construction was undertaken by an alliance between the Water Corporation and Degremont, a French-based world operator in water treatment and desalination, and Multiplex, a large Australian construction company. The plant is owned by the…The $350m Perth Seawater Desalination Plant, Australia's first plant to provide desalinated seawater for large scale public consumption, was completed in late 2006 to produce up to 45 billion litres (gigalitres) of fresh drinking water per year.
Construction was undertaken by an alliance between the Water Corporation and Degremont, a French-based world operator in water treatment and desalination, and Multiplex, a large Australian construction company. The plant is owned by the Corporation which operates it jointly with Degremont.Other creators -
Buzwagi Gold Processing Plant (Barrick Gold - Tanzania, East Africa)
-
More activity by Ben
-
Meet one of the world's most elusive birds. 🐦 You might have heard the news that the largest known population of the Night Parrot (Pezoporus…
Meet one of the world's most elusive birds. 🐦 You might have heard the news that the largest known population of the Night Parrot (Pezoporus…
Liked by Ben Caldwell
-
Nukon is proud to have been involved in a ground-breaking collaboration to move the industry further towards decarbonisation. Working in…
Nukon is proud to have been involved in a ground-breaking collaboration to move the industry further towards decarbonisation. Working in…
Liked by Ben Caldwell
Other similar profiles
Explore collaborative articles
We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.
Explore MoreOthers named Ben Caldwell in Australia
-
Ben Caldwell
-
Ben Caldwell
Partner, Planning Government Infrastructure and Environment at Colin Biggers & Paisley
-
Ben Caldwell
Assistant Director - Attorney General's Department
-
Ben Caldwell
Student at Australian Industry Trade College
20 others named Ben Caldwell in Australia are on LinkedIn
See others named Ben Caldwell