OptiX RTN 600 Web LCT Configuration Guide v0.1

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 40

OptiX RTN 600 Web LCT

Configuration Guide

10th November 2009

www.huawei.com
Rian Ikbal / 705966

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.


Contents

Introduction to Networks Management Systems

Introducing to Web LCT

Configuring Operation

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 2
Comprehensive Management System Solution

OSS or integrated
NMS Service
Integrated NMS & OSS CORBA management
layer
CORBA CORBA
iManager T2100
Network
iManager T2100
MML MML MML
management
layer
iManager T2000 iManager T2000 iManager T2000
iManager T2000 NE
LCT
Qx Qx Qx Qx management
layer

NE layer

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 3
Introduction to Management Systems

The orientation of each management system is as follows:


 iManager T2000 Web LCT
 The T2000 Web LCT realizes the local maintenance and equipment turn-up of
Huawei OptiX products.
 iManager T2000
 The iManager T2000 (T2000 for short) is a subnet management system (SNMS) f
or transport networks. The T2000 manages the full series of Huawei OptiX pr
oducts. The T2000 supports all functions of the NE layer and some of the ne
twork layer management functions.
 iManager T2100
 The iManager T2100 (T2100 for short) is a network-level management system t
hat uniformly manages the full series of Huawei OptiX products. It manages
large-scale optical transport networks in a uniform manner.
 iManager MDS
 The iManager MDS (MDS for short) is a business-level management system for
transport networks. It assists users to plan and simulate an optical transp
ort network.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 4
Contents

Introduction to Networks Management Systems

Introducing to Web LCT

Configuring Operation

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 5
T2000 Web LCT – Main Characteristics

The characteristics of the T2000 Web LCT are as foll


ows:
 Web-based solution
 Per-NE configuration and maintenance
 Access to a local NE through a LAN/RS 232
 Access to a remote NE through DCC
 Management of NEs of various types
 Concurrent login to a maximum of 32 NEs
 Integration with the T2000, T2100 or third-pa
rty management system

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 6
T2000 Web LCT – Function

The T2000 Web LCT provides the following NE-layer management functions:
 Service configuration (including PDH and SDH microwave services)
 Protection configuration (intermediate frequency protection, SNCP, LMS
P)
 Setting and query of the intermediate frequency attributes
 Setting and query of the radio frequency attributes
 Data services : support the 10M/100M fast Ethernet transparent transmi
ssion board EFT4 and L2 switching board EMS6
 Setting and viewing of alarms and performance data
 Communication and security

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 7
T2000 Web LCT – Application Scenario
Engineering Deployment

 The commissioning engineer installs the Web LCT on a PC. And the
n configuring and commissioning the local or remote NEs by using t
he Web LCT.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 8
Contents

Introduction to Networks Management Systems

Introducing to Web LCT

Configuring Operation

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 9
 Configuration Operation
 Managing NEs
 Configuring radio links
 Creating cross-connections of se
rvices
 Configuring the clock
 Configuring the orderwire
 Customizing the alarm management
solution
 Starting the monitoring of the N
E performance

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 10
Web LCT Configuration – Logging In to an NE

Step1 Double-click the T2000 Web LCT shortcut icon on the desktop to launch the T2000
Web LCT.

Step2 The User Login screen is displayed. Enter the user name and password. Click Login.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 11
Managing NEs – Creating an NE

Create an NE in one of the following two ways.

1. Click NE Search and specify the search criteria. Select the NE to be added to create a new
NE.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 12
Managing NEs – Creating an NE

2. Create an NE directly. Click the “Add NE” and Enter the information of the NE and
create the NE.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 13
Managing NEs – Logging In to an NE
 Step 1: In the NE List, select the target NE and click NE Login.Then, the
IE displays the NE Login dialog box.

• Step 2:Enter the User Name and the Password. Then, click OK.

•The Login Status of the NE in the NE List changes to Logged In.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 14
Managing NEs – Modifying the NE ID

Step 1 In the NE Explorer, choose Configuration > NE Attribute from the


Function Tree.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 15
Managing NEs – Modifying the NE ID

Step 2 Click Modify NE ID. The system displays the Modify NE ID dialog box.

Step 3 Set a new ID for the NE. Click OK.

Step 4 Click OK.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 16
Managing NEs – Modifying the NE IP

 Select the NE from the Object Tree in the NE Explore. Choose Comm
unication > Communication Parameters from the Function Tree.
 Set the IP.

 Click Apply.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 17
Managing NEs – Configuring Logical Boards
 Click the Slot Layout tab and click Add Logical Boards. Based on the slot layout, the NE
automatically configures the logical boards that are required but still not be configured for
certain physical boards.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 18
Managing NEs –Synchronizing the NE Time
 Ensure that the time zone and time on the Web LCT computer are correctly set.
 Select the NE from the Object Tree in the NE Explore. Choose Configuration > NE Time Localization
Management from the Function Tree.
 Correctly set the time zone and daylight saving time (DST) of the NE depending on the location of the NE.

 Click Apply.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 19
Managing NEs –Synchronizing the NE Time

 Select the NE from the Object Tree in the NE Explore. Choose Configuration > NE Time
Synchronization from the Function Tree.
 After the synchronization mode and relevant parameters are set, click Apply.

 Set the Synchronization Starting Time and click Apply.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 20
Contents
 Configuration Operation
 Managing NEs
 Configuring radio links
 Creating cross-connections of se
rvices
 Configuring the orderwire
 Customizing the alarm management
solution
 Starting the monitoring of the N
E performance

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 21
Creating IF 1+1 Protection

 Select the NE from the Object Tree in the NE Explorer. Choose Configuration > Link
Configuration from the Function Tree. Click the IF 1+1 Protection tab.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 22
Creating IF 1+1 Protection

 Click New. The system displays the Create IF 1+1 Protection dialog box. Set the

parameters of the IF 1+1 protection group. Click OK.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 23
Creating IF 1+1 Protection
 IF 1+1 protection support external external switching operation. The external switching
priority from the highest to the lowest is Clear switching, Lockout switching, Forced
switching, Manual switching.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 24
Configuring the IF/ODU Information of a Radio Link
 Select the NE from the Object Tree in the NE Explore. Choose Configuration > Link Configuration
from the Function Tree. Click IF/ODU Configuration. Click an IF board or ODU. Then, the system
displays the IF/ODU information of the radio link to which the IF board belongs. Set the corresponding
IF information of the radio link. Click Apply. Set the corresponding ODU information of the radio link.
Click Apply.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 25
Configuring the Parameters of IF Ports

 Select the IF board from the Object Tree in the NE Explore. Choose Configuration > IF
Interface from the Function Tree. Click the IF Attributes tab. Here can set the working
mode, link ID, IF port loopback, 2M bit/s wayside service.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 26
Configuring the Parameters of IF Ports

 Click the ATPC Attributes tab. Set each parameter for the ATPC attributes. The ATPC Enable
status, ATPC Upper Threshold, ATPC Lower Threshold, ATPC Adjustment can be configured here.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 27
Configuring the Parameters of ODU Ports

 Select the ODU from the Object Tree in the NE Explore. Choose Configuration > ODU
Interface from the Function Tree. Click the Radio Frequency Attributes tab. Configure
the transmit frequency and T/R spacing. Click Apply.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 28
Configuring the Parameters of ODU Ports

 Click the Power Attributes tab. Configure the transmit power of the ODU.

 Click the Advanced Attributes tab. Set Configure Transmission Status.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 29
Contents
 Configuration Operation
 Managing NEs
 Configuring radio links
 Creating cross-connections of servi
ces
 Configuring the orderwire
 Customizing the alarm management so
lution
 Starting the monitoring of the NE p
erformance

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 30
Creating Cross-Connections of Point-to-Point
Services
 In a cross-connection of point-to-point services, one service source corresponds to one
service sink. This operation is applicable to VC12, VC3, and VC4 SNCP services.


Procedure
 Select the NE from the Object Tree in the NE Explore. Choose Configuration > Cross-
Connection Configuration from the Function Tree.

Note: Click Scheme to change the VC-12 timeslot numbering scheme used for the cross-
connections

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 31
Creating Cross-Connections of Point-to-Point
Services

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 32
Creating Cross-Connections of Point-to-Point
Services

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 33
Contents
 Configuration Operation
 Managing NEs
 Configuring radio links
 Creating cross-connections of servi
ces
 Configuring the orderwire
 Customizing the alarm management so
lution
 Starting the monitoring of the NE p
erformance

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 34
Configuring the Orderwire

 Select the NE from the Object Tree in the NE Explore. Choose Configuratio
n > Orderwire from the Function Tree. Click the General tab. Configure th
e orderwire information.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 35
Browse Alarms

 By using the Web LCT, you can browse the current and history alarms, the reporting status
of alarms for an NE and boards, and abnormal events.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 36
Adjusting the Alarm Management Function
Adjust the alarm management function of a board or port according to the service
availability, thus improving the alarm monitoring efficiency.
The common alarm management functions as list:

Alarm Management Navigation Path Major Application


Function
Reversing alarms Select the board from the Obj Used to reverse the
ect Tree in the NE Explore. Choose alarms of certain ports
Alarm > Alarm Reversion from the Fu for which the service is
nction Tree. unavailable
Suppressing alarms Select the board from the Object Tr Used to suppress the
ee in the NE Explore. Choose Alarm alarms that need not be
> Alarm Suppression from the Functi handled
on Tree.
Setting the bit error Select the board from the Object Tr Used to adjust the alarm
alarm threshold ee in the NE Explore. Choose Alarm threshold, depending on
> QoS Alarm > Bit Error Alarm Thres the sensitivity of the
hold from the Function Tree. service to bit errors

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 37
Starting the Monitoring of the NE Performance
 Select the NE from the Object Tree in the NE Explore. Choose Performance > NE Performance
Monitor Time from the Function Tree.
 Set the performance monitoring parameters according to the requirements. Normally, enable the
15-minute and the 24-hour performance monitoring at the same time

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 38
Browse Performance
 You can browse the current and history performance data, UAT events, threshold
crossings, and performance monitoring status. You can set the performance
threshold and reset a board registry.

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page 39
Thank You
www.huawei.com

www.huawei.com

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.