Fuse Link Size

Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

Underground Electric Distribution Standards

SYSTEM PROTECTION
I. FUSE COORDINATION
I.1. GENERAL I.1.1. The purpose of protective coordination is to provide isolation of a fault as close to the fault as possible so that a minimum of customers will be affected. The workhorse of the JEA protection scheme is the fuse. By following the fuse tables given in this section, the fuse closest to a fault will melt first providing proper coordination and fault isolation. I.1.2. The fuse tables are divided into three major groups: I.1.2.1. GROUP A Lateral Fusing This shows the required fuses for the fusing of laterals and sub-laterals. Tables for overhead and underground laterals behind substation breakers and reclosers are given for each system voltage. I.1.2.2. GROUP B: Equipment Protection Fusing This provides the fuse sizes for the protection of transformers and capacitors. I.1.2.3. GROUP C: Fuse Coordination This has various tables for coordinating one type of fuse link behind another type of fuse link. I.1.3. In order to maintain a properly functioning fuse coordination system, the fuse tables presented in this section must be followed in both system design and maintenance. I.1.4. If an installed fuse will not hold the connected load and a larger fuse is installed, the party installing the larger size fuse shall notify the USC System Analysis Process of (1) the location, (2) the old fuse size, and (3) the new fuse size. I.1.5. If a fuse is replaced with a different size fuse because the required size was not available, the party installing the different size fuse shall notify the Systems Operation Control Center so the proper size fuse can be reinstalled.

Revised: July 1, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 1 of 14

Underground Electric Distribution Standards


II. GROUP A: LATERAL FUSING
II.1. GENERAL COMMENTS II.1.1. Overhead Laterals on Private Property: II.1.1.1. Fuse the lateral at the road with the correct size lateral fuse if the lateral meets ANY of the following conditions: II.1.1.1.1. More than one transformer is served. II.1.1.1.2. The lateral is longer than two spans. II.1.1.1.3. The transformer pole cannot be seen from the cutout at the road. II.1.1.1.4. Trees could cause outage problems. II.1.1.2. Fuse the lateral at the road with the correct size transformer fuse if the lateral meets ALL of the following conditions: II.1.1.2.1. Only one transformer is served. II.1.1.2.2. The lateral is two spans or less in length. II.1.1.2.3. The transformer pole can be seen from the cutout at the road. II.1.1.2.4. Trees will not cause any outage problems. II.1.2. Underground Laterals: II.1.2.1. Fuse the lateral at the tap with the correct size lateral fuse if the lateral meets ANY of the following conditions: II.1.2.1.1. The tap occurs in an underground fusing cabinet. II.1.2.1.2. The transformer served is equipped with bay-o-net fuses. II.1.2.1.3. More than one transformer is served. II.1.2.1.4. There are provisions for extending the lateral. II.1.2.2. Fuse the lateral at the tap with the correct size transformer fuse if the lateral meets ALL of the following conditions: II.1.2.2.1. The fused tap consists of overhead cutout(s). II.1.2.2.2. The transformer served is not equipped with bay-o-net fuses. II.1.2.2.3. Only one transformer is served. II.1.2.2.4. The lateral is a radial without provisions for extension. FUSING BEHIND SECTIONALIZERS: Sectionalizers do not have time-current characteristics and therefore do not affect coordination between a fuse and an upstream breaker or recloser. When selecting fuses behind a sectionalizer, the presence of the sectionalizer should be ignored.

II.2.

Revised: March16, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 2 of 14

Underground Electric Distribution Standards


III. GROUP A: LATERAL FUSING -- 15.2/26.4KV DISTRIBUTION SYSTEM
III.1. NOTES: III.1.1. In the event that the tap off the main line fuse or sublateral fuse does not provide adequate current carrying capacity, notify the USC System Analysis Process. III.1.2. A * denotes single phase hydraulic reclosers taken over as part of Okefenokee takeover and are being temporarily used on JEAs system. For coordination purposes, ignore the existence of these reclosers. III.1.3. TABLE 3: III.1.3.1. The fuse size listed in this table is only for a tap off the main line feeder. The first sublateral fuse (Overhead) will be half or the next smaller standard size that JEA has in stock. For example: If a tap off the main line is a 65T fuse, then the first sublateral fuse will be a 30T, and the second sublateral fuse will be a 15T. See Table 1, Group C, for the first sublateral and second sublateral fuse off a cable pole. TABLE 1: OVERHEAD LATERAL & CABLE POLE FUSING (T-LINK) 26.4 kV System Behind Station Breaker CONDUCTOR SIZE 1/0 AL. or 2 CU. or 2 AL. 4 CU. 4 AL. OR 6 CU. or Smaller CABLE POLE 1/0 AL. CABLE or Smaller TABLE 2: TAP OFF MAIN LINE 100T 80T 65T 100T 1ST SUB-LATERAL FUSE 50T 40T 30T SIZE PER TABLE 1 GROUP C - (1) 2ND SUB-LATERAL FUSE 25T 20T 15T SIZE PER TABLE 1 GROUP C - (1)

UNDERGROUND LATERAL FUSING (E-LINK) 26.4 kV System Behind Station Breaker TAP OFF MAIN LINE 150E 1ST SUB-LATERAL FUSE 100E 2ND SUB-LATERAL FUSE 50E

CABLE SIZE 1/0 AL. OR SMALLER

Revised: July 1, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 3 of 14

Underground Electric Distribution Standards


TABLE 3: OVERHEAD LATERAL & CABLE POLE FUSING (T-LINK) 26.4 kV System Behind Recloser TAP OFF MAIN LINE
CONDUCTOR 1/0 AL., 2 AL., 2 CU.
80T 80T UNASSIGNED UNASSIGNED 100T 100T 100T 80T 80T UNASSIGNED 80T 100T 80T 100T 100T 80T 100T 100T 80T 80T 80T 100T 100T 100T UNASSIGNED 100T 100T 100T 50T 50T 50T 25T * TEMPORARY 65T 65T 30T 25T 25T 25T * TEMPORARY * TEMPORARY * TEMPORARY 25T 65T 65T

RECLOSER NUMBER
R-1 R-2 R-3 R-4 R-5 R-6 R-7 R-8 R-9 R-10 R-11 R-12 R-13 R-14 R-15 R-16 R-17 R-18 R-19 R-20 R-21 R-22 R-23 R-24 R-25 R-26 R-27 R-28 R-29 R-30 R-31 R-32 R-33 R-34 R-35 R-36 R-37 R-38 R-39 R-40 R-41 R-42 R-43 R-44 R-45

CONDUCTOR 4 CU.
80T 80T

CONDUCTOR 4 AL., 6 CU.


65T 65T

CABLE POLE 1/0 AL. OR SMALLER


80T 80T

80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 80T 50T 50T 50T 25T 65T 65T 30T 25T 25T 25T

65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 65T 50T 50T 50T 25T 65T 65T 30T 25T 25T 25T

100T 100T 100T 80T 80T 80T 100T 80T 100T 100T 80T 100T 100T 80T 80T 80T 100T 100T 100T 100T 100T 100T 50T 50T 50T 25T 65T 65T 30T 25T 25T 25T

25T 65T 65T

25T 65T 65T

25T 65T 65T

Revised: March16, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 4 of 14

Underground Electric Distribution Standards


TABLE 3: OVERHEAD LATERAL & CABLE POLE FUSING (T-LINK) 26.4 kV System Behind Recloser
TAP OFF MAIN LINE
100E 100E UNASSIGNED UNASSIGNED 150E 150E 150E 100E 100E UNASSIGNED 100E 150E 100E 150E 150E 100E 150E 150E 100E 100E 100E 150E 150E 150E UNASSIGNED 150E 150E 150E 50E 50E 50E 40E * TEMPORARY 100E 100E 50E 40E 40E 40E * TEMPORARY * TEMPORARY * TEMPORARY 40E 80E 80E

RECLOSER NUMBER
R-1 R-2 R-3 R-4 R-5 R-6 R-7 R-8 R-9 R-10 R-11 R-12 R-13 R-14 R-15 R-16 R-17 R-18 R-19 R-20 R-21 R-22 R-23 R-24 R-25 R-26 R-27 R-28 R-29 R-30 R-31 R-32 R-33 R-34 R-35 R-36 R-37 R-38 R-39 R-40 R-41 R-42 R-43 R-44 R-45

1ST SUBLATERAL
50E 50E

2ND SUBLATERAL
25E 25E

100E 100E 100E 50E 50E 50E 100E 50E 100E 100E 50E 100E 100E 50E 50E 50E 100E 100E 100E 100E 100E 100E 25E 25E 25E 20E 50E 50E 25E 20E 20E 20E

50E 50E 50E 25E 25E 25E 50E 25E 50E 50E 25E 50E 50E 25E 25E 25E 50E 50E 50E 50E 50E 50E 15E 15E 15E 15E 25E 25E 15E 15E 15E 15E

20E 50E 50E

15E 25E 25E

Revised: July 1, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 5 of 14

Underground Electric Distribution Standards

IV.

GROUP B: EQUIPMENT PROTECTION FUSING


TABLE 1: LINE CAPACITOR BANK FUSING SYSTEM VOLTAGE 2.4/4.16 kV 25T 50T 100T

3-PHASE BANK KVAR 150 300 600 1200 TABLE 2:

SYSTEM VOLTAGE 15.2/26.4 kV


15T 25T

TRANSFORMER FUSING -- 15.2/26.4 K


FUSE LINKS OVERHEAD (1) FULL LOAD AMPS .33 .66 .99 1.65 2.47 3.29 4.93 6.58 10.98 16.45 1.64 3.28 4.92 6.56 10.94 16.40 21.87 32.80 54.67 82.00 JEA ITEM ID FUS OH 019 FUS OH 020 FUS OH 021 FUS OH 022 FUS OH 023 FUS OH 024 FUS OH 026 FUS OH 027 FUS OH 028 FUS OH 029 CHANCE TYPE 0.4 SF 0.7 SF 1.0 SF 1.6 SF 2.1 SF 3.1 SF 5.2 SF 7.0 SF 10.4 SF 14 SF KEARNEY TYPE 1/2 X 1X 1-1/2 X 2-1/2 X 3-1/2 X 4X 7X 10 X 15 X 25 KS COOPER TYPE 25 S BAY-O-NET FUSES UNDERGROUND RTE JEA TYP ITEM ID E FUS UG 021 C3 FUS UG 022 C5 FUS UG 022 C5 FUS UG 023 C8 FUS UG 023 C8 FUS UG 024 C10 FUS UG 021 C3 FUS UG 022 C5 FUS UG 022 C5 FUS UG 023 C8 FUS UG 024 C10 FUS UG 024 C10 FUS UG 024 C10 FUS UG 025 C12 FUS UG 026 C14 FUS UG 048 C17

TRANSFORMER KVA 1-PHASE OH/UG 5 10 15 25 37.5 50 75 100 167 250 KVA 3 PHASE PADS 75 150 225 300 500 750 1000 1500 2500 3750

(1) FUSE LINKS Overhead applies to pole mounted transformers as well as padmounted transformers not equipped with BAY-O-NET fuses that are fused at the cable pole. See Group A General Comments on underground laterals.

Revised: March16, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 6 of 14

Underground Electric Distribution Standards


TABLE 3: TRANSFORMER FUSING -- 7.6/13.2 kV
FUSE LINKS - OVERHEAD (1) JEA ITEM ID FUS OH 020 FUS OH 022 FUS OH 023 FUS OH 024 FUS OH 026 FUS OH 027 FUS OH 028 FUS OH 029 FUS OH 030 FUS OH 031 FUS OH 032 FUS OH 033 CHANCE TYPE 0.7 SF 1.6 SF 2.1 SF 3.1 SF 5.2 SF 7.0 SF 10.4 SF 14 SF 21 SF 32 SF 46 SF 100 MS KEARNEY TYPE 1X 2-1/2 X 3-1/2 X 4X 7X 10 X 15 X 25 KS 30 KS 50 KS 65 KS 100 KS COOPER TYPE 25 S 30 S 50 S 65 S 100 S BAY-O-NET FUSES RTE JEA TYP ITEM ID E FUS UG 023 C8 FUS UG 023 C8 FUS UG 024 C10 FUS UG 024 C10 FUS UG 025 C12 FUS UG 025 C12 FUS UG 026 C14

TRANSFORMER KVA FULL KVA 3 PHASE LOAD 1 PHASE PADS AMPS 5 .66 10 1.31 15 1.97 25 3.28 37.5 4.92 50 150 6.56 75 225 9.84 100 300 13.12 167 500 21.92 250 750 32.80 333 1000 43.70 500 1500 65.60

(1) FUSE LINKS Overhead applies to pole mounted transformers as well as padmounted transformers not equipped with BAY-O-NET fuses that are fused at the cable pole. See Group A general comments on underground laterals. TABLE 4: TRANSFORMER FUSING -- 2.4/4.16kV
TRANSFORMER FULL KVA LOAD 1 PHASE AMPS 3 1.25 5 2.08 7.5 3.13 10 4.17 15 6.25 25 10.42 37.5 15.60 50 20.80 75 31.30 100 41.70 167 69.60 250 104.00 333 139.00 500 208.00 FUSE LINKS - OVERHEAD JEA ITEM ID FUS OH 022 FUS OH 023 FUS OH 024 FUS OH 025 FUS OH 027 FUS OH 028 FUS OH 029 FUS OH 030 FUS OH 031 FUS OH 032 FUS OH 033 FUS OH 034 FUS OH 035 FUS OH 036 CHANCE TYPE 1.6 SF 2.1 SF 3.1 SF 4.2 SF 7.0 SF 10.4 SF 14 SF 21 SF 32 SF 46 SF 100 MS 125 MS 150 MS 200 MS KEARNEY TYPE 2-1/2 X 3-1/2 X 4X 5-1/2 X 10 X 15 X 25 KS 30 KS 50 KS 65 KS 100 KS 125 KS 150 KS 200 KS COOPER TYPE -----25 S 30 S 50 S 65 S 100 S 125 S 150 S 200 S

Revised: July 1, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 7 of 14

Underground Electric Distribution Standards


V. GROUP C: FUSE COORDINATION
TABLE 1: LATERAL FUSING OFF OF FUSED OVERHEAD LATERALS

PROTECTING FUSE E-LINK (3-PHASE) NX-LINK (1-PHASE) T-LINK

100T 80 50 50

80T 65 40 40

65T 50 30 30

PROTECTED FUSE (T-LINK) 50T 40T 40 30 25 20 25 20

30T 25 12 12

25T 20 12 12

20T 15 10 10

TABLE 2: LATERAL FUSING OFF OF FUSED UNDERGROUND LATERALS

PROTECTING FUSE E-LINK (3-PHASE) NX-LINK (1-PHASE) T-LINK

150E 100 65 80

100E 50 30 40

80E 50 25 30

PROTECTED FUSE (E-LINK) 65E 50E 40E 40 25 20 25 20 12 25 20 15

30E 20 12 12

25E 15 10 10

20E 15 10 8

Revised: March16, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 8 of 14

Underground Electric Distribution Standards

UVF4

THREE PHASE FUSING ASSEMBLY LIVE FRONT

DIMENSIONS: h 55 W 43 F 56-3/4 D 59-3/4 ITEM FUSAS001 LOCPA001 QTY 1 2 DESCRIPTION FUSE ASSEMBLY, PADMOUNT THREE PHASE IN / OUT PADLOCK, BRASS 1-3/4 IN. SHANK OPENING

NOTE: Plate CBLX to install cable support unistruts.

Revised: July 1, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 9 of 14

Underground Electric Distribution Standards

UVF5 * _

CABLE FAULT INDICATOR

PLATE UVF5*1/0-1 UVF5-1000 UVF5*1000/3 UVF5*1/0M

ITEM ID INDCF004 INDCF012 INDCF012 INDCF004

QTY 1 1 1 1

TRIP 280AMP 840AMP 840AMP 400AMP

RESET 1.0AMP 3.0AMP 3.0AMP MANUAL

MAXIMUM CABLE DIAMETER 2.0 2.2 2.0 1.3

APPLICATION 1 PHASE 1/0AWG 1 PHASE 1000/350KCM 3 PHASE 1000KCM 1 PHASE 1/0AWG

NOTES: 1. All automatic reset fault indicators have a 32 second inrush restraint time delay and a 7.5 min. reset time delay. 2. Fault indicators are to be installed as follows: a. Preferred: Install fault indicator below the terminator stress cone and above the concentric neutral basket. Fault indicator core must be under the drain wire. b. Alternate: Install fault indicator over the concentric neutral basket where the neutrals are bent back and bound.

Revised: March16, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 10 of 14

Underground Electric Distribution Standards

UVF6 UWF6 URF6

ELBOW ARRESTOR

NOTE: Plate UVF6 for 26.4 kV, UWF6 for 13.2 kV, and URF6 for 4.16 kV ITEM ARREL--BUSWI001 COBCO028 QTY 1 1 5 DESCRIPTION ARRESTOR, ELBOW, METAL OXIDE VARRISTER BUSHING, PLUG INSERT 25KV LOADBREAKER 200 AMP CONDUCTOR, BARE CU, #4AWG SOL SOFT DRAW

Revised: July 1, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 11 of 14

Underground Electric Distribution Standards

UVF7

SECTIONALIZER ARRESTER TRANSFORMER

ITEM ARREL001 COBCO028 CNNVG003 RECPA004

QTY 2 3 2 1

DESCRIPTION ARRESTER, ELBOW METAL OXIDE VARRISTER CONDUCTOR, BARE CU, #4AWG SOL SOFT DRAW CONNECTOR, SPLIT BOLT 2 - 1/0 CU RECEPTACLE, FEED THRU 25KV LOADBREAK

Revised: March16, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 12 of 14

Underground Electric Distribution Standards

UVF8

THREE PHASE LIGHTNING ARRESTER CABINET

ITEM ARREL001 BOLMS017 CLATG001 CLAHL001 COBCO029 ENCOD004 LOCPA001 RECPA004 WASSF003

QTY 6 4 5 6 20 1 1 6 4

DESCRIPTION ARRESTER, ELBOW METAL OXIDE VARRISTER BOLT, MACHINE SQ. HEAD 5/8 X 8 IN. CONNECTOR, TRANSFORMER TANK GROUND CLAMP, HOTLINE #6 SOL. - 1/0 STR. CONDUCTOR, BARE CU, #2AWG SOL HARD DRAW ENCLOSURE, THREE PHASE JUNCTION/ ARRESTER PADLOCK, ALL BRASS 1 - 3/4 IN SHANK OPENING RECEPTACLE, FEED THRU 25KV LOADBREAKER WASHER, SQ. FLAT FOR 5/8 OR 3/4 IN. BOLT

Revised: July 1, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 13 of 14

Underground Electric Distribution Standards

UVF9

SINGLE PHASE JUNCTION ENCLOSURE

NOTES: 1. Enclosure comes equipped with two (2) parking stand mounting plates and one (1) universal junction module mounting plate. 2. Itemize the accessories you wish to mount in the enclosure. EXAMPLES: FEED-THRU BUSHING I.RECPA004 3 POINT JUNCTION MODULE I.JUNL0XXX 4 POINT JUNCTION MODULE I.JUNL0XXX 3. Use pad plate UPD1 * ITEM ENCOD007 LOCPA001 ANCSD001 RECPA004 QTY 1 1 4 1 DESCRIPTION ENCLOSURE, SINGLE PHASE JUNCTION PADLOCK, ALL BRASS 1 - 3/4 IN SHANK OPENING ANCHOR, CONCRETE BUSHING, FEED-THRU

Revised: March16, 2011

Revised By: SGL

Approved By: RHS

SYSTEM PROTECTION
VI. 3. - Page 14 of 14