(a)WATERFALL MODEL
(b)V-MODEL
(c)PROTOTYPE MODEL
(d)RAD MODEL
(e)INCREMENTAL MODEL
(f)SPIRAL MODEL
3.CONCLUSION
4.REFERENCE
TheWaterfallModel The waterfall model is believed to have been the first process model which was introduced and widely followed in software engineering. The innovation was that the first time software engineering was devided into separate phases. When I did my first programs in PL/1 and RPG in the early 1970's there was no awareness of splitting up software development into different phases. Programs were very small, the requirements only a few and after punching a pile of cards the program was done and could be tested by inserting it into the card reader and observing what it did. As programs became bigger the need for a better requirements phase, some more thoughts on the design, etc. were needed. Programmers found it more and more difficult to keep an abstract of the program in their mind and transfer it into code. Also the thought of having a separate testing phase performed by dedicated testers evolved. The different phases of software engineering were identified and simply cascaded in each other, allowing for loops in case it was found in a subsequent phase that the previous phase was not done properly.
The
phases
of
"The
Waterfall
Model"
are:
Requirement Analysis & Definition: All requirements of the system which has to be developed are collected in this step. Like in other process models requirements are split up in functional requiremetns and constraints which the system has to fulfill. Requirements have to be collected by analyzing the needs of the end user(s) and checking them for validity and the possibility to implement them. The aim is to generate a Requirements Specification Document which is used as an input for the next phase of the model. System Design: The system has to be properly designed before any implementation is started. This involves an architectural design which defines and describes the main blocks and components of the system, their interfaces and interactions. By this the needed hardware is defined and the software is split up in its components. E.g. this involves the definition or selection of a computer platform, an operating system, other peripheral hardware, etc. The software components have to be defined to meet the end user requirements and to meet the need of possible scalability of the system. The aim of this phase is to generate a System Architecture Document this serves as an input for the software design phase of the development, but also as an input for hardware design or selection activities. Usually in this phase various documents are generated, one for each discipline, so that the software usually will receive a software architecture document. Software Design: Based on the system architecture which defines the main software blocks the software design will break them further down into code modules. The interfaces and interactions of the modules are described, as well as their functional contents. All necessary system states like startup, shutdown, error conditions and diagnostic modes have to be considered and the activity and behaviour of the software has to be defined. The output of this phase is a Software Design Document which is the base of the following implemetnation work. Coding: Based on the software design document the work is aiming to set up the defined modules or units and actual coding is started. The system is first developed in smaller portions called units. They are able to stand alone from an functional aspect and are integrated later on to form the complete software package. Software Integration & Verification: Each unit is developed independently and can be tested for its functionality. This is the so called Unit Testing. It simply verifies if the modules or units to check if they meet their specifications. This involves functional tests at the interfaces of the modules, but also more detailed tests which consider the inner structure of the software modules. During integration the units which are developed and tested for their functionalities are brought together. The modules are integrated into a complete system and tested to check if all modules cooperate as expected. System Verification: After successfully integration including the related tests the complete system has to be tested against its initial requirements. This will include the orignal hardware and environment, whereas the previous integration and testing phase may still be performed in a different environment or on a test bench.
Operation & Maintenance: The system is handed over to the customer and will be used the first time by him. Naturally the customer will check if his requirements were implemetned as expected but he will also validate if the correct requirements have been set up in the beginning. In case there are changes necessary it has to be fixed to make the system usable or to make it comply to the customer wishes. In most of the "Waterfall Model" descriptions this phase is extended to a never ending phase of "Operations & Maintenance". All the problems which did not arise during the previous phases will be solved in this last phase. The weekness of the Waterfall Model is at hand:
It is very important to gather all possible requirements during the first phase of requirements collection and analysis. If not all requirements are obtained at once the subsequent phases will suffer from it. Reality is cruel. Usually only a part of the requirements is known at the beginning and a good deal will be gathered during the complete development time. Iterations are only meant to happen within the same phase or at best from the start of the subsequent phase back to the previous phase. If the process is kept according to the school book this tends to shift the solution of problems into later phases which eventually results in a bad system design. Instead of solving the root causes the tendency is to patch problems with inadequate measures. There may be a very big "Maintenance" phase at the end. The process only allows for a single run through the waterfall. Eventually this could be only a first sample phase which means that the further development is squeezed into the last never ending maintenance phase and virtually run without a proper process.
TheVModel A further development of the waterfall model issued into the so called "V-Model". If you look at it closely the individual steps of the process are almost the same as in the waterfall model. Therefore I will not describe the individual steps again, because the description of the waterfall steps may substitute this. However, there is on big difference. Instead of going down the waterfall in a linear way the process steps are bent upwards at the coding phase, to form the typical V shape. The reason for this is that for each of the design phases it was found that there is a counterpart in the testing phases which correlate to each other.
The time in which the V-model evolved was also the time in which software testing techniques were defined and various kinds of testing were clearly separated from each other. This new empasis on software testing (of course along with improvements and new techniques in requirements engineering and design) led to the evolution of the waterfall model into the V-model. The tests are derived directly from their design or requirements counterparts. This made it possible to verify each of the design steps individually due to this correlation.
Another idea evolved which was the traceability down the left side of the V. This means that the requirements have to be traced into the design of the system, thus verifying that they are implemented completely and correctly. Another feature can be observed when you compare the waterfall model to the V-model. The "Operation & Maintenance" phase was replaced in later versions of the V-model with the validation of requirements. This means that not only the correct implementation of requirements has to be checked but also if the requirements are correct. In case there is the need of an update of the requirements and subsequently the design and coding, etc. there are two options. Either this has to be treated like in the waterfall model in a never ending maintenance phase, or in going over to another V-cycle. The earlier versions of V-models used the first option. For later versions a series of subsequent V-cycles was defined, as shown in the below diagram:
This idea also correlated with the established sample phases for products as it is present in many industries. One of the cascaded V-cycles became the V-cycle of a sample phase. In addition to this the V-cycles were tailored. This means that in earlier sample phases not all the intermediate work products and process step were established in their full beauty but it was simply reduced to what makes sense. By these measures the V-model became a usable process model. It does not consider every detail and possibility but evaluated over a multitude of projects in various industries it proved its usability.
The
Spiral
Model
The process begins at the center position. From there it moves clockwise in traversals. Each traversal of the spiral usually results in a deliverable. It is not clearly defined what this deliverable is. This changes from traversal to traversal. For example, the first traversals may result in a requirement specification. The second will result in a prototype, and the next one will result in another prototype or sample of a product, until the last traversal leads to a product which is suitable to be sold. Consequently the related activities and their documentation will also mature towards the outer traversals. E.g. a formal design and testing session would be placed into the last traversal.
There are different instances of this model so far I saw it with 3 to 6 task regions. The above picture shows 4 task regions.
The planning task - to define resources, responsibilities, milestones and schedules. The goal determination task - to define the requirements and constraints for the product and define possible alternatives. The risk analysis task - to assess both technical and management risks. The engineering task - to design and implement one or more prototypes or samples of the application.
The most outstanding distinction between the spiral model and other software models is the explicit risk evaluation task. Although risk management is part of the other processes as well, it does not have an own representation in the process model. For other models the risk assessment is a sub-task e.g. of the overall planning and management. Further there are no fixed phases for requirements specification, design or testing in the spiral model. Prototyping may be used to find and define requirements. This may then be followed by "normal" phases as they can be found in other process models to handle design and testing. ADVANTAGES: The advantages of the spiral model are that it reflects the development approach in many industries much better than the other process models do. It uses a stepwise approach which e.g. goes hand in hand with the habit of maintaining a number of hardware sample phases in cases where the product to be produced is not only software for a given environment, but also contains the development of hardware. This way the developers and the customer can understand and react much better to risks in the evolutionary process. By having an iterative process which reduces formalisms and omittable activities in the earlier phases the use of resources is optimized. Further, any risks should be detected much earlier than in other process models and measures can be taken to handle them. DISADVANTAGES: The disadvantages of the spiral model are that the risk assessment is rigidliy anchored in the process. First of all it demands risk-assessment expertise to perform this task and secondly in some cases the risk assessment may not be necessary in this detail. For completely new products the risk assessment makes sense. But I dare to say that the risks for programming yet another book keeping package are well known and do not need a big assessment phase. Also if you think of the multitude of carry over projects in many industries i.e. applying an already developed product to the needs of a new customer by small changes, the risks are not a subject generating big headaches. Generally speaking the spiral model is not much esteemed and not much used, although it has many advantaged and could have even more if the risk assessment phases would be tailored down to the necessary amount.
RAD MODEL:
Rapid application development is a software development methodology, which involves iterative development and the construction of prototypes. It is a merger of various structured techniques, especially the data driven Information Engineering with prototyping techniques to accelerate software systems development Advantages of the RAD methodology: 1. Flexible and adaptable to changes. 2. Prototyping applications gives users a tangible description from which to judge whether critical system requirements are being met by the system. Report output can be compared with existing reports. Data entry forms can be reviewed for completeness of all fields, navigation, data access (drop down lists,checkboxes, radio buttons, etc.). 3. RAD generally incorporates short development cycles - users see the RAD product quickly. 4. RAD involves user participation thereby increasing chances of early user community acceptance. 5. RAD realizes an overall reduction in project risk. 6. Pareto's 80 - 20 Rule usually results in reducing the costs to create a custom system. Disadvantages of RAD methodology: 1. Unknown cost of product. As mentioned above, this problem can be alleviated by the customer agreeing to a limited amount of rework in the RAD process. 2. It may be difficult for many important users to commit the time required for success of the RAD process.
PROTOTYPE MODEL:
Overview The original purpose of a prototype is to allow users of the software to evaluate developers' proposals for the design of the eventual product by actually trying them out, rather than having to interpret and evaluate the design based on descriptions. Prototyping can also be used by end users to describe and prove requirements that developers have not considered, and that can be a key factor in the commercial relationship between developers and their clients.[1] Interaction design in particular makes heavy use of prototyping with that goal. This process is in contrast with the 1960s and 1970s monolithic development cycle of building the entire program first and then working out any inconsistencies between design and implementation, which led to higher software costs and poor estimates of time and cost.[citation needed]The monolithic approach has been dubbed the "Slaying the (software) Dragon" technique, since it assumes that the software designer and developer is a single hero who has to slay the entire dragon alone. Prototyping can also avoid the great expense and difficulty of changing a finished software product. Outline of the prototyping process The process of prototyping involves the following steps 1. Identify basic requirements Determine basic requirements including the input and output information desired. Details, such as security, can typically be ignored. 2. Develop Initial Prototype
The initial prototype is developed that includes only user interfaces. (See Horizontal Prototype, below) 3. Review The customers, including end-users, examine the prototype and provide feedback on additions or changes. 4. Revise and Enhance the Prototype Using the feedback both the specifications and the prototype can be improved. Negotiation about what is within the scope of the contract/product may be necessary. If changes are introduced then a repeat of steps #3 and #4 may be needed. Types of prototyping Software prototyping has many variants. However, all the methods are in some way based on two major types of prototyping: Throwaway Prototyping and Evolutionary Prototyping. Throwaway prototyping Also called close-ended prototyping. Throwaway or Rapid Prototyping refers to the creation of a model that will eventually be discarded rather than becoming part of the final delivered software. After preliminary requirements gathering is accomplished, a simple working model of the system is constructed to visually show the users what their requirements may look like when they are implemented into a finished system. Rapid Prototyping involved creating a working model of various parts of the system at a very early stage, after a relatively short investigation. The method used in building it is usually quite informal, the most important factor being the speed with which the model is provided. The model then becomes the starting point from which users can re-examine their expectations and clarify their requirements. When this has been achieved, the prototype model is 'thrown away', and the system is formally developed based on the identified requirements. The most obvious reason for using Throwaway Prototyping is that it can be done quickly. If the users can get quick feedback on their requirements, they may be able to refine them early in the development of the software. Making changes early in the development lifecycle is extremely cost effective since there is nothing at that point to redo. If a project is changed after a considerable work has been done then small changes could require large efforts to implement since software systems have many dependencies. Speed is crucial in implementing a throwaway prototype, since with a limited budget of time and money little can be expended on a prototype that will be discarded. Another strength of Throwaway Prototyping is its ability to construct interfaces that the users can test. The user interface is what the user sees as the system, and by seeing it in front of them, it is much easier to grasp how the system will work.
1. Design the prototype 2. User experiences/uses the prototype, specifies new requirements 3. Repeat if necessary 4. Write the final requirements 5. Develop the real products Evolutionary prototyping Evolutionary Prototyping (also known as breadboard prototyping) is quite different from Throwaway Prototyping. The main goal when using Evolutionary Prototyping is to build a very robust prototype in a structured manner and constantly refine it. "The reason for this is that the Evolutionary prototype, when built, forms the heart of the new system, and the improvements and further requirements will be built. When developing a system using Evolutionary Prototyping, the system is continually refined and rebuilt. "evolutionary prototyping acknowledges that we do not understand all the requirements and builds only those that are well understood." This technique allows the development team to add features, or make changes that couldn't be conceived during the requirements and design phase. For a system to be useful, it must evolve through use in its intended operational environment. A product is never "done;" it is always maturing as the usage environment changeswe often try to define a system using our most familiar frame of reference---where we are now. We make assumptions about the way business will be conducted and the technology base on which the business will be implemented. A plan is enacted to develop the capability, and, sooner or later, something resembling the envisioned system is delivered. Evolutionary Prototypes have an advantage over Throwaway Prototypes in that they are functional systems. Although they may not have all the features the users have planned, they may be used on an interim basis until the final system is delivered. "It is not unusual within a prototyping environment for the user to put an initial prototype to practical use while waiting for a more developed versionThe user may decide that a 'flawed' system is better than no system at all."[7] In Evolutionary Prototyping, developers can focus themselves to develop parts of the system that they understand instead of working on developing a whole system. Incremental prototyping The final product is built as separate prototypes. At the end the separate prototypes are merged in an overall design.
Extreme prototyping Extreme Prototyping as a development process is used especially for developing web applications. Basically, it breaks down web development into three phases, each one based on the preceding one. The first phase is a static prototype that consists mainly of HTML pages. In the second phase, the screens are programmed and fully functional using a simulated services layer. In the third phase the services are implemented. The process is called Extreme Prototyping to draw attention to the second phase of the process, where a fully functional UI is developed with very little regard to the services other than their contract. Advantages of prototyping There are many advantages to using prototyping in software development some tangible, some abstract. Reduced time and costs: Prototyping can improve the quality of requirements and specifications provided to developers. Because changes cost exponentially more to implement as they are detected later in development, the early determination of what the user really wants can result in faster and less expensive software. Improved and increased user involvement: Prototyping requires user involvement and allows them to see and interact with a prototype allowing them to provide better and more complete feedback and specifications.The presence of the prototype being examined by the user prevents many misunderstandings and miscommunications that occur when each side believe the other understands what they said. Since users know the problem domain better than anyone on the development team does, increased interaction can result in final product that has greater tangible and intangible quality. The final product is more likely to satisfy the users desire for look, feel and performance. Disadvantages of prototyping Using, or perhaps misusing, prototyping can also have disadvantages. Insufficient analysis: The focus on a limited prototype can distract developers from properly analyzing the complete project. This can lead to overlooking better solutions, preparation of incomplete specifications or the conversion of limited prototypes into poorly engineered final projects that are hard to maintain. Further, since a prototype is limited in functionality it may not scale well if the prototype is used as the basis of a final deliverable, which may not be noticed if developers are too focused on building a prototype as a model. User confusion of prototype and finished system: Users can begin to think that a prototype, intended to be thrown away, is actually a final system that merely needs to be finished or polished. (They are, for example, often unaware of the effort needed to add error-checking and security features which a prototype may not have.) This can lead
them to expect the prototype to accurately model the performance of the final system when this is not the intent of the developers. Users can also become attached to features that were included in a prototype for consideration and then removed from the specification for a final system. If users are able to require all proposed features be included in the final system this can lead to conflict. Developer misunderstanding of user objectives: Developers may assume that users share their objectives (e.g. to deliver core functionality on time and within budget), without understanding wider commercial issues. For example, user representatives attending Enterprise software(e.g. PeopleSoft) events may have seen demonstrations of "transaction auditing" (where changes are logged and displayed in a difference grid view) without being told that this feature demands additional coding and often requires more hardware to handle extra database accesses. Users might believe they can demand auditing on every field, whereas developers might think this is feature creep because they have made assumptions about the extent of user requirements. If the developer has committed delivery before the user requirements were reviewed, developers are between a rock and a hard place, particularly if user management derives some advantage from their failure to implement requirements. Developer attachment to prototype: Developers can also become attached to prototypes they have spent a great deal of effort producing; this can lead to problems like attempting to convert a limited prototype into a final system when it does not have an appropriate underlying architecture. (This may suggest that throwaway prototyping, rather than evolutionary prototyping, should be used.) Excessive development time of the prototype: A key property to prototyping is the fact that it is supposed to be done quickly. If the developers lose sight of this fact, they very well may try to develop a prototype that is too complex. When the prototype is thrown away the precisely developed requirements that it provides may not yield a sufficient increase in productivity to make up for the time spent developing the prototype. Users can become stuck in debates over details of the prototype, holding up the development team and delaying the final product. Expense of implementing prototyping: the start up costs for building a development team focused on prototyping may be high. Many companies have development methodologies in place, and changing them can mean retraining, retooling, or both. Many companies tend to just jump into the prototyping without bothering to retrain their workers as much as they should.
INCREMENTAL MODEL:
The Incremental model combines elements of the linear sequential model with the iterative philosophy of the prototyping. This model has been explicitly designed to accommodate a product that evolves over time. When an incremental model is used, the first increment is often a core product. The core product is used by the customer or undergoes a detailed review. As a result of use and/or evaluation a plan is developed for the next increment. The plan addresses the modification to the core product to better meet the needs of the customer and delivery of additional features and functionality. Software is constructed in a step-by-step manner. While a software product is being developed, each step adds to what has already been completed. The incremental Model is an evolution of the waterfall model, where the waterfall model is incrementally applied. The series of releases is referred to as increments, with each increment providing more functionality to the customers. After the first increment, a core product is delivered, which can already be used by the customer. Based on customer feedback, a plan is developed for the next increments, and modifications are made accordingly. This process continues, with increments being delivered until the complete product is delivered. The incremental philosophy is also used in the agile process model.
Incremental model is an evolution of waterfall model. The product is designed, implemented, integrated an popular model software evolution used many commercial software Incremental software development model may be applicable to projects where: functionality
Advantages 1.After every iteration any faulty piece software can be identified easily as very few changes are done after every iteration. 2.It is easier to test and debug as testing and debugging can be performed after each iteration. 3.This model does not affect anyone's business values because they provide core of the software which customer needs,which will indeed help that person to keep run his business. 4.After establishing an overall architecture,system is developed and delivered in increments. Disadvantages 1.If the requirements intially were thought to be stable but at later stages are realized to be unstable then the increments have to be withdrawn and have to be reworked. 2.Resulting cost may exceed the cost of the organization. 3.Problems may arise related to system architecture.
CONCLUSION:
(a)Provides comprehensive overview of s/w process engineering system. (b)Combine both process and infrastructure element. (c)Give improvement effort. (d)Develop the project.