Ac Ground Floor
Ac Ground Floor
Ac Ground Floor
CO N
CONTRACTOR TO INSURE THAT ALL
DIMENSION HAS CORRECTED BEFORE
START THE CONSTRUCTION AT SITE. THIS
DRAWING IS NOT TO BE SCALED.
(04) STATED DIMENSIONS ONLY ARE TO BE
CONSIDERED.
(05) ANY DISCREPANCIES ARE TO BE
BROUGHT TO THE ATTENTION OF THE
Setback
ARCHITECT AND RESOLVED BEFORE
Setback
COMMENCEMENT OF ANY WORK.
(06) ALL MATERIAL TO BE APPROVED BY
4.50
4.50
ARCHITECT/ ENGINEER.
BULK WASTE (07) CONTRACTOR SHOULD SUBMIT THE SHOP
COLLECTION DRAWING FOR APPROVAL BEFORE
STARTING ANY JOB.
(08) HOSE REEL CABINET DOOR LEAF IN
CLEAR GLASS & STAINLESS STEEL FRAME
Setback Setback TO CIVIL DEFENSE AND CONSULTANTS
4.50 4.50 APPROVAL. ALL PARTITIONS SHALL BE
LIGHT WEIGHT BLOCKS ,
33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 (09) DENSITY OF BLOCKS SHOULD NOT
EXCEED 750Kg/m3 ALL EXTERNAL WALLS
SHALL BE 8'' THK. WITH THE
(10) FOLLOWING CONST 3'' THK. WALL + 2'' THK.
INSULATION + 3'' THK. WALL FOR ALL
FLOORS
(11) ALL TOILETS & BATHS WITH OUT OTS.
SHALL HAVE MECH. VENT. AS PER ASHRAE
(12) COPY RIGHT FOR THESE
PLANS,SKETCHES, DRAWINGS,GRAPHIC
14
34
68 PARKING LOTS
SPEED HUMP
TAKE INTO LEGAL ACTION.
13
35
1 1
2 2
61 60 59 58 57 56 55 54 53
ELE. MTR
PUMP ROOM
1
12
36
M
SAFETY BARRIER SAFETY BARRIER SAFETY BARRIER SAFETY BARRIER
11
37
Watch Man
52
PANTRY
M
10
38
11
12
14
15
17
18
20
20
16
19
13
Bath
W.M
WC
W.M
W.M
M
LIFT LIFT
09
39
Shower
Slope
10
1
1
Shower
Slope
PANTRY PANTRY PANTRY
rewohS
Shower
epolS
Slope
BATH
SECONDARY
ENTRANCE
Store M SLOPE 1:12
W.M. BATH BATH LENGTH : 3.60 M
1
CCTV
FHC
06 05 04
40
08
M
M M
M M
ENTRANCE O.T.S
62
M M M M M
07 08 01 02 03 SPEED HUMP
W.M
SAFETY BARRIER GARBAGE
07
PMUH DEEPS
rewohS
rewohS
Shower
Shower
epolS
epolS
Slope
Slope
PANTRY
W.M
W.M
W.M
W.M
epolS
06
MAIN ENTRANCE rewohS
BATH
64
M
ETS. ROOM Wooden Strip Partition Wooden Strip Partition Wooden Strip Partition Wooden Strip Partition
LENGTH : 3.60 M
05
1 STUDIO STUDIO STUDIO STUDIO STUDIO
02 02 CONSULTANT :
2 01 01
1
04
M
SAFETY BARRIER
03
Mr. YAHYA IBRAHIM
L.V. ROOM
SPEED HUMP
SPEED HUMP
Setback Setback
02
4.50 4.50 DUBAI RB-58
41 42 43 44 45 46 47 48 49 50 51
PROPOSED RESI . BUILDING (G+4) +
01
SUBSTATION BLOCK
Setback
Setback
6.00
6.00
SUBSTATION
GROUND FLOOR PLAN
EXIT ENTRY HVAC LAYOUT
Rising Arm Barrier Rising Arm Barrier
Proposed
PRMS
PRMS RM.
1
B-447