DM STAMP:
PLOT BOUNDARY
PLOT BOUNDARY
SLAB OPENING ABOVE
FOR MEP VENTILATION
UP TO GF
1:10 RATIO SLOPE RAMP
DOMESTIC WATER DOWN FROM GROUND FLOOR SP:02 FHU SAND TRAP(1500x750x2500mm)
100 DIA TANK DRAIN TANK SLAB OPENING ABOVE
TO BASEMENT
& OVER FLOW
01-B-74
TRAFFIC SPEED
HUMP TO DETAIL OIL INTERCEPTOR FOR MEP VENTILATION N
(1500x1500x2500mm)
EXPANSION JOINT
PUMP ROOM
01-B-73
B Q
PD PD PD PD PD
DOWN FROM
SSL -4.570 SSL/FFL -4.060 PA:06 SSL/FFL -4.060 SSL -4.060
DRAIN PIT(450x450x750) 100 DIA TANK DRAIN DOMESTIC WATER SSL/FFL -4.060
REFER TO MEP 1:10 RATIO SLOPE RAMP UP ROAD MARKING
GF
& OVER FLOW
TANK
4260
FROM BASEMENT TO "STRIAGHT/ LEFT" SUMP PIT REFER TO MEP ABOVE GROUND FLOOR
DRAIN PIT(450x450x750) 01-B-76 GROUND FLOOR ARROW '618' (1500x2000x2500mm) PHASE 2 PHASE 1
REFER TO MEP LINE OF BUILDING 03
UP
VALVE CHAMBER
(600X600X750) REFER TO MEP
FHC ABOVE GROUND FLOOR
B
SSL/FFL -4.060 01-B-82
SSL -4.060 CAM-GF-7 FFL -3.910 FFL -4.060
1520
FFL -4.060
2 1
2160
FFL -3.910 STAIRCASE B03-01 FFL -4.060
01-B-72
01-B-78
SSL -4.060 01-B-81 LIFT B03-02 3510
EP EP
CAR PARK EXHAUST
4140
FHC TELE. ROOM
EXPANSION JOINT
FAN ROOM SLAB OPENING 01-B-83
RISER KEY PLAN : NTS
ABOVE GROUND FLOOR
B
LINE OF BUILDING 02
ABOVE FOR MEP STAIRCASE B03-02
EP VENTILATION RISER 01-B-90
FFL -3.910
LIFT B03-01 FIREMAN'S LIFT B03-03 SSL -4.060
GENERAL NOTES:
D
SSL/FFL -4.060 SSL/FFL -4.060 01-B-86 01-B-87 01-B-88
960 CAM-GF-11 CAM-GF-14
SSL/FFL -4.060 FHC
PD PD
PD PD EP
PLANT ROOM NOTES:
01-B-89
DRIVEWAY 1. THIS DRAWING IS THE COPYRIGHT OF PNC ARCHITECTS AND MUST
FFL -4.060
NOT BE RETAINED,COPIED OR USED WITHOUT THE CONSULTANTS
EP
LIFT LOBBY CONSENT.
FFL -4.059 2150 01-B-85
2. ALL STRUCTURAL, MEP, CIVIL AND LANDSCAPING QUERIES ARE TO BE
FFL -3.910 D
920
REFERRED TO THE RELEVANT CONSULTANTS DRAWINGS,
SSL -4.060
EP SPECIFICATIONS AND DETAILS.
D
EP FFL -3.910
SSL -4.060 FFL -3.910 3. ALL DESIGN AND CONSTRUCTION TO COMPLY WITH APPLICABLE
EP SSL -4.060 REGULATIONS AND LOCAL AUTHORITY REQUIREMENTS.
D
CAM-GF-10
CAM-GF-12 4. CONTRACTORS AND SUBCONTRACTORS ARE TO CHECK ALL
CAR PARK
DIMENSIONS AND LEVELS ON THE BUILDING SITE BEFORE COMMENCING
FFL -3.910 WITH ANY WORK.
SSL -4.060
5. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS &
SPECIFICATIONS TO BE BROUGHT TO THE ATTENTION OF THE
CONSULTANT AND ARCHITECTS PRIOR TO ANY WORK BEING STARTED
EXPANSION JOINT
GIVE WAY-S2 (1500x2000x2500mm)
OIL INTERCEPTOR PD PD
IES NOTE: CCTV + INTRUSION + ACCESS CONTROL
PD PD PD PD
TRAFFIC SPEED (1500x1500x2500mm) SSL/FFL -4.060
EP PD HUMP TO DETAIL PA:06 1. CCTV + ALARM + ACS COMPONENTS LOCATIONS ARE
PD
ROAD MARKING "LEFT" SSL/FFL -4.060 INDICATIVE ON THE DRAWINGS APPROXIMATELY.
SAND TRAP ARROW '615' FFL -3.910 PA:06
EP EP SSL/FFL -4.060 (1500x750x2500mm) 2. EXACT LOCATIONS AND HEIGHTS SHALL BE
SSL -4.060 ROAD MARKING
"LEFT/ RIGHT" ARROW '619' DETERMINED WITH THE CONTRACTOR ON SITE
FHC FFL -3.910 FFL -3.910 DEPENDING THE BUILDING LOCATION , DECORATION,
SSL -4.060 SSL -4.060
INTERIOR DESIGN AND ANY OTHER SERVICES APPLIANCE
/ COMPONENTS.
3. THE SITE COORDINATION WITH THE CONTRACTOR
F IS ESSENTIAL TO REMEDY ANY OBSTRUCTION TO
SSL/FFL -4.060
EXPANSION JOINT
CAMERA VIEW FIELD AS PER DUBAI LAW 24/2008
REQUIREMENT AND ANY INTERFERENCE CAUSED
EP BY EMI TO THE ELECTRONIC SECURITY COMPONENTS.
ABOVE GROUND FLOOR
PD PD PD PD PD PD
EP
G D 08
SSL/FFL -4.060 SP:02 SSL/FFL -4.060
EP SSL/FFL -4.060
TRAFFIC SPEED
HUMP TO DETAIL
B 06
PA:06
ROAD MARKING
"STRIAGHT/ RIGHT"
ARROW '617'
L 00
ROAD MARKINGS
PD PD GIVE WAY-S2
EP N 00
EP UP TO GF DOWN FROM GF
W 00
EXPANSION JOINT
H
TOTAL CAMERAS 14
MAINTAINENCE
STORE
01-B-63 EP MTR EP
FFL -4.060 FFL -4.060
SUMP PIT FOR GREY
01-B-71
WATER
(1500x2000x2500mm)
EP
ISSUED FOR CONSTRUCTION
EXPANSION JOINT EXPANSION JOINT EXPANSION JOINT
EXPANSION JOINT EXPANSION JOINT
FHC
BMS ROOM PA:06
OIL INTERCEPTOR
01-B-70
FFL -4.060
SP:01 ROAD MARKING
"STRAIGHT" ARROW
SP:02
TRAFFIC SPEED
ROAD MARKINGS THE RELATIVE ±0.000M PROJECT
GIVE WAY-S2
(1500x1500x2500mm) CORNER RUBBER
GUARD
'614'
HUMP TO DETAIL
LEVEL IS EQUAL TO ±3.461m (DMD)
490
SAND TRAP
REFER TO MEP 1690 PD PD PD PD PD PD
(1500x750x2500mm)
SSL/FFL -4.060 SP:02 SSL/FFL -4.060
J REVISIONS:
1685
D
FFL -4.060 TC
CAM-GF-1 CAM-GF-3 0 23/02/17 ISSUED FOR CONSTRUCTION PNCA
925 B
FHC 1 24/02/17 TC ISSUED FOR CONSTRUCTION PNCA
LIFT LOBBY LIFT B02-02 CAM-GF-5
01-B-68 01-B-66 2 03/05/18 TC ISSUED FOR CONSTRUCTION PNCA
FFL -3.910
SSL -4.060
170
01-B-69
STAIR B02-03
PD FFL -3.910
FIREMAN'S PD 01-B-50 SSL -4.060
115 ELEC ROOM
CAM-GF-2 LIFT B02-03 01-B-51
D
01-B-65 2175
FFL -4.060
CAM-GF-9 D
2155
SSL -4.060 TELE ROOM B02 -02
ABOVE GROUND FLOOR
LIFT LOBBY
LINE OF BUILDING 02
EP
LINE OF BUILDING 02
1040
1045
B
830 CAM-GF-13 MAINTAINENCE DOMESTIC WATER
ELEC ROOM MAINTAINENCE 01-B-44
MAINTAINENCE 01-B-64 MAINTAINENCE
EP STORE TANK
STORE LIFT B02-04 LIFT B02-05 FIREMAN'S 01-B-43
STORE
STORE 01-B-61 01-B-49 FFL -3.910
01-B-47 01-B-46 LIFT B02-06 FFL -4.060
01-B-58 01-B-45 3520
FFL -4.060
01-B-60
FFL -4.060
FFL -4.060 SSL -4.060
CLIENT:
EP
SSL/FFL -4.060
SP:02 ROAD MARKINGS
SAND TRAP(1500x750x2500mm)
TRAFFIC SPEED TRAFFIC SPEED GIVE WAY - S2
HUMP TO DETAIL HUMP TO DETAIL SOBHA SAPPHIRE BUILDING,
OIL INTERCEPTOR 13TH FLOOR , AL KHAIL ROAD,
(1500x1500x2500mm)
CHANNEL DRAIN BUSINESS BAY, DUBAI
PD
SSL/FFL -4.060
PD PD
SSL/FFL -4.060
PD PD
SSL/FFL -4.060
PD
L investments UNITED ARAB EMIRATES
P.O. BOX 125245 T: +971 4 4238064
SUMP PIT REFER TO MEP
ABOVE GROUND FLOOR
LINE OF BUILDING 02
(1500x2000x2500mm)
EP AC CONDENSATION FHC
ROOM
01-B-56 PD
CONSULTANT:
SSL/FFL -4.060
SERVICE STORE
01-B-55
FHC
FFL -4.060
SSL/FFL -4.060 FIRE PUMP
HEADER FIRE PUMP ROOM 1
ROOM 01-B-02
01-B-42 FFL -4.060
FFL -4.060 SOBHA SAPPHIRE BUILDING,
ABOVE GROUND FLOOR 8TH FLOOR , AL KHAIL ROAD,
ABOVE GROUND FLOOR ABOVE GROUND FLOOR
BUSINESS BAY, DUBAI
architects
ACCESS TO
PA:06 FHC
LINE OF BUILDING 02 LINE OF BUILDING 02 LINE OF BUILDING 02 LEVEL BELOW UNITED ARAB EMIRATES
P.O. BOX 122960 T: +971 4 4238054
UP M
SOBHA HARTLAND
PA:06 SAND TRAP
ROAD MARKINGS
GIVE WAY-S2
GREENS - PHASE II
(1500x750x2750mm)
ROAD MARKING
"STRIAGHT/ LEFT"
SSL/FFL -4.060
PLOT NO. 347-3283
EXPANSION JOINT
ARROW '618'
OIL INTERCEPTOR AL MERKADH,
PD PD
(1500x1500x2750mm)
PD PD PD PD PD
N DUBAI,
UNITED ARAB EMIRATES
SSL/FFL -4.060 SP:02 SSL/FFL -4.060 SP:02
TRAFFIC SPEED TRAFFIC SPEED
SUMP PIT REFER TO MEP HUMP TO DETAIL HUMP TO DETAIL
(1500x2000x2750mm)
FHC FHC
DRAWING TITLE:
CAR PARK INTAKE
01-B-54
SSL -4.060 CAR PARK EXHAUST
CAR PARK EXHAUST
FAN ROOM
FAN ROOM
01-B-41
01-B-53
SSL -4.060 FFL -4.060 PHASE 02
BASEMENT FLOOR PLAN
P CCTV SYSTEM
SLAB OPENING ABOVE
SLAB OPENING ABOVE PLOT BOUNDARY FOR MEP VENTILATION
FOR MEP VENTILATION SLAB OPENING ABOVE
FOR MEP VENTILATION PLOT BOUNDARY
SCALE: SHEET DRAWN CHECK APPROVED
SIZE: BY: BY: BY:
1:100 A0 TC SA AA IFC
Drawing number:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 DWG STAGE:
15010-EE-APT0-1-CC099
CONTRACTOR SHOULD PROVIDE EXPANSION JOINT IN
ALL SERVICES AS PER LOCATION IN STRUCTURAL SERVICES. DM number: REV: 2