Ee Apt0 1 CC099

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

COPYRIGHT AND RIGHT OF REPRODUCTION OF THIS DRAWING OR ANY

PORTION THEREOF IS RESERVED BY THE ARCHITECTS

DM STAMP:

PLOT BOUNDARY
PLOT BOUNDARY
SLAB OPENING ABOVE
FOR MEP VENTILATION

VALVE CHAMBER(600x600x750) CAR PARK EXHAUST


REFER TO MEP HIGH LEVEL OPENING FOR FAN ROOM
WATER TANK
01-B-80
FFL -4.060
SUMP PIT FOR GREY
WATER(1000x1000x1500)
REFER TO MEP

SITE KEY PLAN:

UP TO GF
1:10 RATIO SLOPE RAMP
DOMESTIC WATER DOWN FROM GROUND FLOOR SP:02 FHU SAND TRAP(1500x750x2500mm)
100 DIA TANK DRAIN TANK SLAB OPENING ABOVE
TO BASEMENT
& OVER FLOW
01-B-74
TRAFFIC SPEED
HUMP TO DETAIL OIL INTERCEPTOR FOR MEP VENTILATION N
(1500x1500x2500mm)

EXPANSION JOINT
PUMP ROOM
01-B-73
B Q
PD PD PD PD PD

DOWN FROM
SSL -4.570 SSL/FFL -4.060 PA:06 SSL/FFL -4.060 SSL -4.060
DRAIN PIT(450x450x750) 100 DIA TANK DRAIN DOMESTIC WATER SSL/FFL -4.060
REFER TO MEP 1:10 RATIO SLOPE RAMP UP ROAD MARKING

GF
& OVER FLOW
TANK

4260
FROM BASEMENT TO "STRIAGHT/ LEFT" SUMP PIT REFER TO MEP ABOVE GROUND FLOOR
DRAIN PIT(450x450x750) 01-B-76 GROUND FLOOR ARROW '618' (1500x2000x2500mm) PHASE 2 PHASE 1
REFER TO MEP LINE OF BUILDING 03
UP
VALVE CHAMBER
(600X600X750) REFER TO MEP
FHC ABOVE GROUND FLOOR

B 3315 FFL -3.910 LINE OF BUILDING 03


SSL -4.060 3 4
EP EP STAIR B02-01 CAR PARK INTAKE CAR EXHAUST FAN
CAM-GF-4 01-B-79 ROOM EXISTING
FFL -4.060
FFL -3.910 2955 ELEC ROOM 01-B-91 APPROVED

B
SSL/FFL -4.060 01-B-82
SSL -4.060 CAM-GF-7 FFL -3.910 FFL -4.060

1520
FFL -4.060
2 1

SLAB OPENING ABOVE


C
FOR MEP VENTILATION

2160
FFL -3.910 STAIRCASE B03-01 FFL -4.060
01-B-72
01-B-78
SSL -4.060 01-B-81 LIFT B03-02 3510
EP EP
CAR PARK EXHAUST

4140
FHC TELE. ROOM

EXPANSION JOINT
FAN ROOM SLAB OPENING 01-B-83
RISER KEY PLAN : NTS
ABOVE GROUND FLOOR

B
LINE OF BUILDING 02
ABOVE FOR MEP STAIRCASE B03-02
EP VENTILATION RISER 01-B-90
FFL -3.910
LIFT B03-01 FIREMAN'S LIFT B03-03 SSL -4.060
GENERAL NOTES:

D
SSL/FFL -4.060 SSL/FFL -4.060 01-B-86 01-B-87 01-B-88
960 CAM-GF-11 CAM-GF-14
SSL/FFL -4.060 FHC
PD PD
PD PD EP
PLANT ROOM NOTES:
01-B-89
DRIVEWAY 1. THIS DRAWING IS THE COPYRIGHT OF PNC ARCHITECTS AND MUST
FFL -4.060
NOT BE RETAINED,COPIED OR USED WITHOUT THE CONSULTANTS
EP
LIFT LOBBY CONSENT.
FFL -4.059 2150 01-B-85
2. ALL STRUCTURAL, MEP, CIVIL AND LANDSCAPING QUERIES ARE TO BE
FFL -3.910 D

920
REFERRED TO THE RELEVANT CONSULTANTS DRAWINGS,
SSL -4.060
EP SPECIFICATIONS AND DETAILS.

D
EP FFL -3.910
SSL -4.060 FFL -3.910 3. ALL DESIGN AND CONSTRUCTION TO COMPLY WITH APPLICABLE
EP SSL -4.060 REGULATIONS AND LOCAL AUTHORITY REQUIREMENTS.

D
CAM-GF-10
CAM-GF-12 4. CONTRACTORS AND SUBCONTRACTORS ARE TO CHECK ALL
CAR PARK
DIMENSIONS AND LEVELS ON THE BUILDING SITE BEFORE COMMENCING
FFL -3.910 WITH ANY WORK.
SSL -4.060
5. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS &
SPECIFICATIONS TO BE BROUGHT TO THE ATTENTION OF THE
CONSULTANT AND ARCHITECTS PRIOR TO ANY WORK BEING STARTED

EP 6. ONLY FIGURED DIMENSIONS TO BE FOLLOWED - SCALED DIMENSIONS


FHC
OFF DRAWINGS WILL NOT BE PERMITTED.
EP EP FHC
ABOVE GROUND FLOOR
ABOVE GROUND FLOOR 7. CONTRACTOR TO SUBMIT COORDINATED SHOP DRAWINGS FOR
LINE OF BUILDING 03 LINE OF BUILDING 03
E ENGINEER'S APPROVAL PRIOR TO COMMENCEMENT OF WORK AT SITE.

ROAD MARKINGS SUMP PIT REFER TO MEP


KEY/ADDITIONAL NOTES:

EXPANSION JOINT
GIVE WAY-S2 (1500x2000x2500mm)

OIL INTERCEPTOR PD PD
IES NOTE: CCTV + INTRUSION + ACCESS CONTROL
PD PD PD PD
TRAFFIC SPEED (1500x1500x2500mm) SSL/FFL -4.060
EP PD HUMP TO DETAIL PA:06 1. CCTV + ALARM + ACS COMPONENTS LOCATIONS ARE
PD
ROAD MARKING "LEFT" SSL/FFL -4.060 INDICATIVE ON THE DRAWINGS APPROXIMATELY.
SAND TRAP ARROW '615' FFL -3.910 PA:06
EP EP SSL/FFL -4.060 (1500x750x2500mm) 2. EXACT LOCATIONS AND HEIGHTS SHALL BE
SSL -4.060 ROAD MARKING
"LEFT/ RIGHT" ARROW '619' DETERMINED WITH THE CONTRACTOR ON SITE
FHC FFL -3.910 FFL -3.910 DEPENDING THE BUILDING LOCATION , DECORATION,
SSL -4.060 SSL -4.060
INTERIOR DESIGN AND ANY OTHER SERVICES APPLIANCE
/ COMPONENTS.
3. THE SITE COORDINATION WITH THE CONTRACTOR
F IS ESSENTIAL TO REMEDY ANY OBSTRUCTION TO
SSL/FFL -4.060

EXPANSION JOINT
CAMERA VIEW FIELD AS PER DUBAI LAW 24/2008
REQUIREMENT AND ANY INTERFERENCE CAUSED
EP BY EMI TO THE ELECTRONIC SECURITY COMPONENTS.
ABOVE GROUND FLOOR

4. THIS DESIGN WILL BE INVALID INCASE OF ANY


LINE OF BUILDING 02

EP EP FHC CHANGES IN THE ARCHITECTURAL OR LAW


REQUIREMENT
5. LOW LIGHT LEVEL AREAS ARE RECOMMENDED TO BE
SSL/FFL -4.060 SSL/FFL -4.060 COVERED WITH IR OR NIGHT VISION CAMERAS
PA:06A
ROAD MARKING "LEFT"
SP:02 ARROW '616'
TRAFFIC SPEED
HUMP TO DETAIL CCTV CAMERA SCHEDULE

PD PD PD PD PD PD
EP

G D 08
SSL/FFL -4.060 SP:02 SSL/FFL -4.060
EP SSL/FFL -4.060
TRAFFIC SPEED
HUMP TO DETAIL
B 06
PA:06
ROAD MARKING
"STRIAGHT/ RIGHT"
ARROW '617'
L 00
ROAD MARKINGS
PD PD GIVE WAY-S2

EP N 00
EP UP TO GF DOWN FROM GF

W 00

EXPANSION JOINT
H
TOTAL CAMERAS 14
MAINTAINENCE
STORE
01-B-63 EP MTR EP
FFL -4.060 FFL -4.060
SUMP PIT FOR GREY
01-B-71
WATER
(1500x2000x2500mm)
EP
ISSUED FOR CONSTRUCTION
EXPANSION JOINT EXPANSION JOINT EXPANSION JOINT
EXPANSION JOINT EXPANSION JOINT
FHC
BMS ROOM PA:06

OIL INTERCEPTOR
01-B-70
FFL -4.060
SP:01 ROAD MARKING
"STRAIGHT" ARROW
SP:02
TRAFFIC SPEED
ROAD MARKINGS THE RELATIVE ±0.000M PROJECT
GIVE WAY-S2
(1500x1500x2500mm) CORNER RUBBER
GUARD
'614'
HUMP TO DETAIL
LEVEL IS EQUAL TO ±3.461m (DMD)
490

SAND TRAP
REFER TO MEP 1690 PD PD PD PD PD PD
(1500x750x2500mm)
SSL/FFL -4.060 SP:02 SSL/FFL -4.060
J REVISIONS:
1685
D

EP FHC CENTRAL BATTERY


2240

LIFT B02-01 TRAFFIC SPEED SSL/FFL -4.060


01-B-67 ROOM HUMP TO DETAIL ABOVE GROUND FLOOR RESP.
PA:06 LINE OF BUILDING 02 NO. DATE BY DESCRIPTION CONSULT
D

FFL -4.060 TC
CAM-GF-1 CAM-GF-3 0 23/02/17 ISSUED FOR CONSTRUCTION PNCA
925 B
FHC 1 24/02/17 TC ISSUED FOR CONSTRUCTION PNCA
LIFT LOBBY LIFT B02-02 CAM-GF-5
01-B-68 01-B-66 2 03/05/18 TC ISSUED FOR CONSTRUCTION PNCA
FFL -3.910
SSL -4.060
170
01-B-69
STAIR B02-03
PD FFL -3.910
FIREMAN'S PD 01-B-50 SSL -4.060
115 ELEC ROOM
CAM-GF-2 LIFT B02-03 01-B-51
D
01-B-65 2175
FFL -4.060
CAM-GF-9 D

EP FFL -3.910 STAIR


2565

2155
SSL -4.060 TELE ROOM B02 -02
ABOVE GROUND FLOOR

LIFT LOBBY
LINE OF BUILDING 02

01-B-59 01-B-62 01-B-52


ABOVE GROUND FLOOR

EP
LINE OF BUILDING 02

FFL -4.060 TELE ROOM FFL -3.910


SSL -4.060
01-B-48
FFL -3.910 K

1040
1045

1295 CAM-GF-8 SSL -4.060


B

CAM-GF-6 COMBINED FIRE &

B
830 CAM-GF-13 MAINTAINENCE DOMESTIC WATER
ELEC ROOM MAINTAINENCE 01-B-44
MAINTAINENCE 01-B-64 MAINTAINENCE
EP STORE TANK
STORE LIFT B02-04 LIFT B02-05 FIREMAN'S 01-B-43
STORE
STORE 01-B-61 01-B-49 FFL -3.910
01-B-47 01-B-46 LIFT B02-06 FFL -4.060
01-B-58 01-B-45 3520
FFL -4.060
01-B-60
FFL -4.060
FFL -4.060 SSL -4.060
CLIENT:
EP

FFL SSL/FFL -4.060


PLOT BOUNDARY

SSL/FFL -4.060
SP:02 ROAD MARKINGS
SAND TRAP(1500x750x2500mm)
TRAFFIC SPEED TRAFFIC SPEED GIVE WAY - S2
HUMP TO DETAIL HUMP TO DETAIL SOBHA SAPPHIRE BUILDING,
OIL INTERCEPTOR 13TH FLOOR , AL KHAIL ROAD,
(1500x1500x2500mm)
CHANNEL DRAIN BUSINESS BAY, DUBAI
PD

SSL/FFL -4.060
PD PD

SSL/FFL -4.060
PD PD

SSL/FFL -4.060
PD
L investments UNITED ARAB EMIRATES
P.O. BOX 125245 T: +971 4 4238064
SUMP PIT REFER TO MEP
ABOVE GROUND FLOOR
LINE OF BUILDING 02

(1500x2000x2500mm)
EP AC CONDENSATION FHC
ROOM
01-B-56 PD
CONSULTANT:
SSL/FFL -4.060
SERVICE STORE
01-B-55
FHC
FFL -4.060
SSL/FFL -4.060 FIRE PUMP
HEADER FIRE PUMP ROOM 1
ROOM 01-B-02
01-B-42 FFL -4.060
FFL -4.060 SOBHA SAPPHIRE BUILDING,
ABOVE GROUND FLOOR 8TH FLOOR , AL KHAIL ROAD,
ABOVE GROUND FLOOR ABOVE GROUND FLOOR
BUSINESS BAY, DUBAI
architects
ACCESS TO
PA:06 FHC
LINE OF BUILDING 02 LINE OF BUILDING 02 LINE OF BUILDING 02 LEVEL BELOW UNITED ARAB EMIRATES
P.O. BOX 122960 T: +971 4 4238054
UP M

CAR PARK INTAKE


FFL -4.060
PROJECT:
01-B-03

SOBHA HARTLAND
PA:06 SAND TRAP
ROAD MARKINGS
GIVE WAY-S2
GREENS - PHASE II
(1500x750x2750mm)
ROAD MARKING
"STRIAGHT/ LEFT"
SSL/FFL -4.060
PLOT NO. 347-3283
EXPANSION JOINT

ARROW '618'
OIL INTERCEPTOR AL MERKADH,
PD PD
(1500x1500x2750mm)
PD PD PD PD PD
N DUBAI,
UNITED ARAB EMIRATES
SSL/FFL -4.060 SP:02 SSL/FFL -4.060 SP:02
TRAFFIC SPEED TRAFFIC SPEED
SUMP PIT REFER TO MEP HUMP TO DETAIL HUMP TO DETAIL
(1500x2000x2750mm)
FHC FHC

DRAWING TITLE:
CAR PARK INTAKE
01-B-54
SSL -4.060 CAR PARK EXHAUST
CAR PARK EXHAUST
FAN ROOM
FAN ROOM
01-B-41
01-B-53
SSL -4.060 FFL -4.060 PHASE 02
BASEMENT FLOOR PLAN
P CCTV SYSTEM
SLAB OPENING ABOVE
SLAB OPENING ABOVE PLOT BOUNDARY FOR MEP VENTILATION
FOR MEP VENTILATION SLAB OPENING ABOVE
FOR MEP VENTILATION PLOT BOUNDARY
SCALE: SHEET DRAWN CHECK APPROVED
SIZE: BY: BY: BY:

1:100 A0 TC SA AA IFC
Drawing number:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 DWG STAGE:

15010-EE-APT0-1-CC099
CONTRACTOR SHOULD PROVIDE EXPANSION JOINT IN
ALL SERVICES AS PER LOCATION IN STRUCTURAL SERVICES. DM number: REV: 2

You might also like