KVS Metallurgical Labs Ra Bill-15

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 34

Megha Engineering & Infrastructures Ltd

Polavaram Hydro Electric Project (12 x 80MW)


Wo.No : MEIL/POLAVARAM/PHEP/3180/21-22/3792, 3792-A, DATE:18.03.2022 Date : 31.05.2023
Project code : 3180 Bill No : RA Bill - 15
Name of Contractor : KVS Metallurgical Labs Bill Period :01-05-2023 to 31-05-2023
Nature of work : Radiographic Test of MS Liners GST : 36APSPK1256P1Z6

Measurment up to date Deduct previous measurment Since last measurment


S.No Description of works Units Rate Remarks
Quantity Amount Quantity Amount Quantity Amount

Charges for conducting Radiographic test for the liner plate of penstocks by
Running
1 refering IS 1182 & IS 4853 and as per the instructions from Engineer in- 15 302,490.00 4,537,350 250,335.00 3,755,025 52,155.00 782,325
Inch
charge.(4" width)

Rental charges payable for establishing the Radiographic Test unit including
2 all the accessories,material,manpower with all leads and lifts.(For May- Monthly 28,000 14.43 404,040 13.43 376,040 1.00 28,000
2023)

Charges for conducting ultrasonic test for the liner joints of penstocks as per
Running
3 clause 4.1.2 of IS5878 (Part-VI) and as per the instructions from Engineer in- 25 734.76 18,369 0.00 - 734.76 18,369
meter
charge.(Non- Recordable)

Charges for conducting ultrasonic test for the liner joints of penstocks as per
4 clause 4.1.2 of IS5878 (Part-VI) and as per the instructions from Engineer in- Per Joint 1,750 46.00 80,500 0.00 - 46.00 80,500
charge.( Recordable)

5 To and Fro charges from Hyderabad to project site (PHEP) Per visit 2,500 4.00 10,000 0.00 - 4.00 10,000

Charges for Mobilization and demobilization for required Machinery,Man


6 LS 20,000 1.00 20,000 1.00 20,000 - -
power and Equipment.
Workdone Amount 5,070,259 4,151,065 919,194
IGST 18% 912,647 747,192 165,455
Gross Amount 5,982,906 4,898,257 1,084,649

Contractor Site Engineer Section Incharge Planning Engineer Stores DM-Planning Project Incharge
RT FILMS DETAILS ( 01.05.2023-31.05.2023)

No.of No.of No of accepted


Total no
SL.NO DATE OF RT FERRULE NO TUNNEL NO JOINT NO FILM SIZE Accepted Repaired films (after REMARKS
of Films
films films rectification)

1 5/1/2023 F-19&20 T-3 CS-01 4" X 15" 93 93


2 5/1/2023 F-19 T-3 LS-01 4" X 15" 8 8
3 5/1/2023 F-19 T-3 LS-02 4" X 15" 8 8
4 5/1/2023 F-19 T-3 LS-03 4" X 15" 8 8
5 5/1/2023 F-20 T-3 LS-01 4" X 15" 8 8
6 5/1/2023 F-20 T-3 LS-02 4" X 15" 8 8
7 5/1/2023 F-20 T-3 LS-03 4" X 15" 8 8
8 5/2/2023 F-11&12 T-2 CS-01 4" X 15" 89 4 4 97
9 5/2/2023 F-11 T-2 LS-01 4" X 15" 8 8
10 5/2/2023 F-11 T-2 LS-02 4" X 15" 8 8
11 5/2/2023 F-11 T-2 LS-03 4" X 15" 7 1 1 9
12 5/2/2023 F-12 T-2 LS-01 4" X 15" 7 1 1 9
13 5/2/2023 F-12 T-2 LS-02 4" X 15" 8 8
14 5/2/2023 F-12 T-2 LS-03 4" X 15" 7 1 1 9
15 5/3/2023 F-45&46 T-10 CS-01 4" X 15" 92 1 1 94
16 5/3/2023 F-45 T-10 LS-01 4" X 15" 8 8
17 5/3/2023 F-45 T-10 LS-02 4" X 15" 8 8
18 5/3/2023 F-45 T-10 LS-03 4" X 15" 8 8
19 5/3/2023 F-46 T-10 LS-01 4" X 15" 8 8
20 5/3/2023 F-46 T-10 LS-02 4" X 15" 8 8
21 5/3/2023 F-46 T-10 LS-03 4" X 15" 8 8
22 5/5/2023 F-19&20 T-4 CS-01 4" X 15" 80 13 13 106
23 5/5/2023 F-19 T-4 LS-01 4" X 15" 7 1 1 9
24 5/5/2023 F-19 T-4 LS-02 4" X 15" 6 2 2 10
25 5/5/2023 F-19 T-4 LS-03 4" X 15" 6 2 2 10
26 5/5/2023 F-20 T-4 LS-01 4" X 15" 7 1 1 9
27 5/5/2023 F-20 T-4 LS-02 4" X 15" 8 8
28 5/5/2023 F-20 T-4 LS-03 4" X 15" 6 2 2 10
29 5/6/2023 F-25&26 T-5 CS-01 4" X 15" 86 7 7 100
30 5/6/2023 F-25 T-5 LS-01 4" X 15" 8 8
31 5/6/2023 F-25 T-5 LS-02 4" X 15" 8 8
32 5/6/2023 F-25 T-5 LS-03 4" X 15" 8 8
33 5/6/2023 F-26 T-5 LS-01 4" X 15" 8 8
34 5/6/2023 F-26 T-5 LS-02 4" X 15" 8 8
35 5/6/2023 F-26 T-5 LS-03 4" X 15" 8 8
36 5/7/2023 F-51&52 T-7 CS-01 4" X 15" 89 4 4 97
37 5/7/2023 F-51 T-7 LS-01 4" X 15" 8 8
38 5/7/2023 F-51 T-7 LS-02 4" X 15" 8 8
39 5/7/2023 F-51 T-7 LS-03 4" X 15" 8 8
40 5/7/2023 F-52 T-7 LS-01 4" X 15" 6 2 2 10
41 5/7/2023 F-52 T-7 LS-02 4" X 15" 6 2 2 10
42 5/7/2023 F-52 T-7 LS-03 4" X 15" 5 3 3 11
43 5/9/2023 F-29&30 T-6 CS-01 4" X 15" 85 8 8 101
44 5/9/2023 F-29 T-6 LS-01 4" X 15" 6 2 2 10

768423397.xlsx Page 2 of 34 RT film summary-May 23


RT FILMS DETAILS ( 01.05.2023-31.05.2023)

No.of No.of No of accepted


Total no
SL.NO DATE OF RT FERRULE NO TUNNEL NO JOINT NO FILM SIZE Accepted Repaired films (after REMARKS
of Films
films films rectification)

45 5/9/2023 F-29 T-6 LS-02 4" X 15" 5 3 3 11


46 5/9/2023 F-29 T-6 LS-03 4" X 15" 5 3 3 11
47 5/9/2023 F-30 T-6 LS-01 4" X 15" 7 1 1 9
48 5/9/2023 F-30 T-6 LS-02 4" X 15" 8 8
49 5/9/2023 F-30 T-6 LS-03 4" X 15" 8 8
50 5/10/2023 F-23&24 T-6 CS-01 4" X 15" 83 10 10 103
51 5/10/2023 F-23 T-6 LS-01 4" X 15" 8 8
52 5/10/2023 F-23 T-6 LS-02 4" X 15" 8 8
53 5/10/2023 F-23 T-6 LS-03 4" X 15" 8 8
54 5/10/2023 F-24 T-6 LS-01 4" X 15" 8 8
55 5/10/2023 F-24 T-6 LS-02 4" X 15" 6 2 2 10
56 5/10/2023 F-24 T-6 LS-03 4" X 15" 7 1 1 9
57 5/11/2023 F-41&42 T-8 CS-01 4" X 15" 93 93
58 5/11/2023 F-41 T-8 LS-01 4" X 15" 8 8
59 5/11/2023 F-41 T-8 LS-02 4" X 15" 8 8
60 5/11/2023 F-41 T-8 LS-03 4" X 15" 8 8
61 5/11/2023 F-42 T-8 LS-01 4" X 15" 8 8
62 5/11/2023 F-42 T-8 LS-02 4" X 15" 8 8
63 5/11/2023 F-42 T-8 LS-03 4" X 15" 8 8
64 5/12/2023 F-43&44 T-10 CS-01 4" X 15" 93 93
65 5/12/2023 F-43 T-10 LS-01 4" X 15" 8 8
66 5/12/2023 F-43 T-10 LS-02 4" X 15" 8 8
67 5/12/2023 F-43 T-10 LS-03 4" X 15" 8 8
68 5/12/2023 F-44 T-10 LS-01 4" X 15" 8 8
69 5/12/2023 F-44 T-10 LS-02 4" X 15" 8 8
70 5/12/2023 F-44 T-10 LS-03 4" X 15" 8 8
71 5/13/2023 F-9&10 T-1 CS-01 4" X 15" 74 19 19 112
72 5/13/2023 F-9 T-1 LS-01 4" X 15" 6 2 2 10
73 5/13/2023 F-9 T-1 LS-02 4" X 15" 7 1 1 9
74 5/13/2023 F-9 T-1 LS-03 4" X 15" 6 2 2 10
75 5/13/2023 F-10 T-1 LS-01 4" X 15" 6 2 2 10
76 5/13/2023 F-10 T-1 LS-02 4" X 15" 7 1 1 9
77 5/13/2023 F-10 T-1 LS-03 4" X 15" 6 2 2 10
78 5/14/2023 F-27&28 T-6 CS-01 4" X 15" 93 93
79 5/14/2023 F-27 T-6 LS-01 4" X 15" 8 8
80 5/14/2023 F-27 T-6 LS-02 4" X 15" 8 8
81 5/14/2023 F-27 T-6 LS-03 4" X 15" 8 8
82 5/14/2023 F-28 T-6 LS-01 4" X 15" 8 8
83 5/14/2023 F-28 T-6 LS-02 4" X 15" 8 8
84 5/14/2023 F-28 T-6 LS-03 4" X 15" 8 8
85 5/15/2023 F-39&40 T-8 CS-01 4" X 15" 88 5 5 98
86 5/15/2023 F-39 T-8 LS-01 4" X 15" 6 2 2 10
87 5/15/2023 F-39 T-8 LS-02 4" X 15" 6 2 2 10
88 5/15/2023 F-39 T-8 LS-03 4" X 15" 8 8
89 5/15/2023 F-40 T-8 LS-01 4" X 15" 6 2 2 10
90 5/15/2023 F-40 T-8 LS-02 4" X 15" 7 1 1 9
91 5/15/2023 F-40 T-8 LS-03 4" X 15" 6 2 2 10

768423397.xlsx Page 3 of 34 RT film summary-May 23


RT FILMS DETAILS ( 01.05.2023-31.05.2023)

No.of No.of No of accepted


Total no
SL.NO DATE OF RT FERRULE NO TUNNEL NO JOINT NO FILM SIZE Accepted Repaired films (after REMARKS
of Films
films films rectification)

92 5/17/2023 F-17&18 T-3 CS-01 4" X 15" 83 10 10 103


93 5/17/2023 F-17 T-3 LS-01 4" X 15" 7 1 1 9
94 5/17/2023 F-17 T-3 LS-02 4" X 15" 8 8
95 5/17/2023 F-17 T-3 LS-03 4" X 15" 7 1 1 9
96 5/17/2023 F-18 T-3 LS-01 4" X 15" 7 1 1 9
97 5/17/2023 F-18 T-3 LS-02 4" X 15" 7 1 1 9
98 5/17/2023 F-18 T-3 LS-03 4" X 15" 7 1 1 9
99 5/19/2023 F-25&26 T-6 CS-01 4" X 15" 93 93
100 5/19/2023 F-25 T-6 LS-01 4" X 15" 8 8
101 5/19/2023 F-25 T-6 LS-02 4" X 15" 8 8
102 5/19/2023 F-25 T-6 LS-03 4" X 15" 8 8
103 5/19/2023 F-26 T-6 LS-01 4" X 15" 8 8
104 5/19/2023 F-26 T-6 LS-02 4" X 15" 8 8
105 5/19/2023 F-26 T-6 LS-03 4" X 15" 8 8
106 5/20/2023 F-6&7 T-2 CS-01 4" X 15" 90 3 3 96
107 5/21/2023 F-5&6 T-2 CS-01 4" X 15" 79 14 14 107
108 5/21/2023 F-7&8 T-2 CS-01 4" X 15" 80 13 13 106
109 5/22/2023 F-15&16 T-3 CS-01 4" X 15" 93 93
110 5/22/2023 F-15 T-3 LS-01 4" X 15" 8 8
111 5/22/2023 F-15 T-3 LS-02 4" X 15" 8 8
112 5/22/2023 F-15 T-3 LS-03 4" X 15" 8 8
113 5/22/2023 F-16 T-3 LS-01 4" X 15" 8 8
114 5/22/2023 F-16 T-3 LS-02 4" X 15" 8 8
115 5/22/2023 F-16 T-3 LS-03 4" X 15" 8 8
116 5/23/2023 F-43&44 T-9 CS-01 4" X 15" 66 27 27 120
117 5/23/2023 F-43 T-9 LS-01 4" X 15" 8 8
118 5/23/2023 F-43 T-9 LS-02 4" X 15" 8 8
119 5/23/2023 F-43 T-9 LS-03 4" X 15" 7 1 1 9
120 5/23/2023 F-44 T-9 LS-01 4" X 15" 7 1 1 9
121 5/23/2023 F-44 T-9 LS-02 4" X 15" 7 1 1 9
122 5/23/2023 F-44 T-9 LS-03 4" X 15" 8 8
123 5/24/2023 F-23&24 T-5 CS-01 4" X 15" 91 2 2 95
124 5/24/2023 F-23 T-5 LS-01 4" X 15" 8 8
125 5/24/2023 F-23 T-5 LS-02 4" X 15" 8 8
126 5/24/2023 F-23 T-5 LS-03 4" X 15" 8 8
127 5/24/2023 F-24 T-5 LS-01 4" X 15" 7 1 1 9
128 5/24/2023 F-24 T-5 LS-02 4" X 15" 8 8
129 5/24/2023 F-24 T-5 LS-03 4" X 15" 8 8
130 5/26/2023 F-3&4 T-2 CS-01 4" X 15" 93 93
131 5/26/2023 F-3 T-2 LS-01 4" X 15" 8 8
132 5/26/2023 F-3 T-2 LS-02 4" X 15" 8 8
133 5/26/2023 F-3 T-2 LS-03 4" X 15" 8 8
134 5/26/2023 F-4 T-2 LS-01 4" X 15" 4 4
135 5/26/2023 F-4 T-2 LS-02 4" X 15" 4 4
136 5/26/2023 F-4 T-2 LS-03 4" X 15" 4 4

768423397.xlsx Page 4 of 34 RT film summary-May 23


RT FILMS DETAILS ( 01.05.2023-31.05.2023)

No.of No.of No of accepted


Total no
SL.NO DATE OF RT FERRULE NO TUNNEL NO JOINT NO FILM SIZE Accepted Repaired films (after REMARKS
of Films
films films rectification)

137 5/27/2023 F-11&12 T-3 CS-01 4" X 15" 93 93


138 5/28/2023 F-11 T-3 LS-01 4" X 15" 8 8
139 5/28/2023 F-11 T-3 LS-02 4" X 15" 8 8
140 5/28/2023 F-11 T-3 LS-03 4" X 15" 8 8
141 5/28/2023 F-12 T-3 LS-01 4" X 15" 8 8
142 5/28/2023 F-12 T-3 LS-02 4" X 15" 8 8
143 5/28/2023 F-12 T-3 LS-03 4" X 15" 8 8
144 5/28/2023 F-5 T-2 LS-01 4" X 15" 2 2
145 5/28/2023 F-5 T-2 LS-02 4" X 15" 2 2
146 5/28/2023 F-5 T-2 LS-03 4" X 15" 4 4
147 5/28/2023 F-6 T-2 LS-01 4" X 15" 6 6
148 5/28/2023 F-6 T-2 LS-02 4" X 15" 4 4
149 5/28/2023 F-6 T-2 LS-03 4" X 15" 6 6
150 5/28/2023 F-7 T-2 LS-01 4" X 15" 6 6
151 5/28/2023 F-7 T-2 LS-02 4" X 15" 2 2 2 6
152 5/28/2023 F-7 T-2 LS-03 4" X 15" 6 6
153 5/28/2023 F-8 T-2 LS-01 4" X 15" 1 1 1 3
154 5/28/2023 F-8 T-2 LS-02 4" X 15" 2 2
155 5/28/2023 F-8 T-2 LS-03 4" X 15" 4 4
156 5/31/2023 F-9&10 T-2 CS-01 4" X 15" 93 93
157 5/31/2023 F-9 T-2 LS-01 4" X 15" 8 8
158 5/31/2023 F-9 T-2 LS-02 4" X 15" 8 8
159 5/31/2023 F-9 T-2 LS-03 4" X 15" 8 8
160 5/31/2023 F-10 T-2 LS-01 4" X 15" 8 8
161 5/31/2023 F-10 T-2 LS-02 4" X 15" 8 8
162 5/31/2023 F-10 T-2 LS-03 4" X 15" 8 8
Total no of films being billed in this RA Bill >>>>>>>>>>>> 3075 201 201 3477
Note:-
1. Total no of repair films for the month of May-2023 (in nos)-201
2. Total cost of Repaired films for the month of May- 2023 (in Rs) =201NosX15''XRs15=45225/-
3. Amount being debited from Peddineni sobhan babu RA-Bill for the month of May-2023 (in RS) =45225/-

Site Engineer Planning Section-incharge

768423397.xlsx Page 5 of 34 RT film summary-May 23


RT FILMS DETAILS ( 01.05.2023-31.05.2023)

No.of
SL.NO DATE OF RT FERRULE NO TUNNEL NO JOINT NO FILM SIZE Accepted
films

1 5/1/2023 F-19&20 T-3 CS-01 4" X 15" 93


2 5/1/2023 F-19 T-3 LS-01 4" X 15" 8
3 5/1/2023 F-19 T-3 LS-02 4" X 15" 8
4 5/1/2023 F-19 T-3 LS-03 4" X 15" 8
5 5/1/2023 F-20 T-3 LS-01 4" X 15" 8
6 5/1/2023 F-20 T-3 LS-02 4" X 15" 8
7 5/1/2023 F-20 T-3 LS-03 4" X 15" 8
8 5/2/2023 F-11&12 T-2 CS-01 4" X 15" 89
9 5/2/2023 F-11 T-2 LS-01 4" X 15" 8
10 5/2/2023 F-11 T-2 LS-02 4" X 15" 8
11 5/2/2023 F-11 T-2 LS-03 4" X 15" 7
12 5/2/2023 F-12 T-2 LS-01 4" X 15" 7
13 5/2/2023 F-12 T-2 LS-02 4" X 15" 8
14 5/2/2023 F-12 T-2 LS-03 4" X 15" 7
15 5/3/2023 F-45&46 T-10 CS-01 4" X 15" 92
16 5/3/2023 F-45 T-10 LS-01 4" X 15" 8
17 5/3/2023 F-45 T-10 LS-02 4" X 15" 8
18 5/3/2023 F-45 T-10 LS-03 4" X 15" 8
19 5/3/2023 F-46 T-10 LS-01 4" X 15" 8
20 5/3/2023 F-46 T-10 LS-02 4" X 15" 8
21 5/3/2023 F-46 T-10 LS-03 4" X 15" 8
22 5/5/2023 F-19&20 T-4 CS-01 4" X 15" 80
23 5/5/2023 F-19 T-4 LS-01 4" X 15" 7
24 5/5/2023 F-19 T-4 LS-02 4" X 15" 6
25 5/5/2023 F-19 T-4 LS-03 4" X 15" 6
26 5/5/2023 F-20 T-4 LS-01 4" X 15" 7
27 5/5/2023 F-20 T-4 LS-02 4" X 15" 8
28 5/5/2023 F-20 T-4 LS-03 4" X 15" 6
29 5/6/2023 F-25&26 T-5 CS-01 4" X 15" 86
30 5/6/2023 F-25 T-5 LS-01 4" X 15" 8
31 5/6/2023 F-25 T-5 LS-02 4" X 15" 8
32 5/6/2023 F-25 T-5 LS-03 4" X 15" 8
33 5/6/2023 F-26 T-5 LS-01 4" X 15" 8
34 5/6/2023 F-26 T-5 LS-02 4" X 15" 8
35 5/6/2023 F-26 T-5 LS-03 4" X 15" 8
36 5/7/2023 F-51&52 T-7 CS-01 4" X 15" 89
37 5/7/2023 F-51 T-7 LS-01 4" X 15" 8
38 5/7/2023 F-51 T-7 LS-02 4" X 15" 8
39 5/7/2023 F-51 T-7 LS-03 4" X 15" 8
40 5/7/2023 F-52 T-7 LS-01 4" X 15" 6
41 5/7/2023 F-52 T-7 LS-02 4" X 15" 6
42 5/7/2023 F-52 T-7 LS-03 4" X 15" 5
43 5/9/2023 F-29&30 T-6 CS-01 4" X 15" 85
44 5/9/2023 F-29 T-6 LS-01 4" X 15" 6
45 5/9/2023 F-29 T-6 LS-02 4" X 15" 5
46 5/9/2023 F-29 T-6 LS-03 4" X 15" 5
47 5/9/2023 F-30 T-6 LS-01 4" X 15" 7
48 5/9/2023 F-30 T-6 LS-02 4" X 15" 8
49 5/9/2023 F-30 T-6 LS-03 4" X 15" 8
50 5/10/2023 F-23&24 T-6 CS-01 4" X 15" 83
51 5/10/2023 F-23 T-6 LS-01 4" X 15" 8
52 5/10/2023 F-23 T-6 LS-02 4" X 15" 8
53 5/10/2023 F-23 T-6 LS-03 4" X 15" 8
54 5/10/2023 F-24 T-6 LS-01 4" X 15" 8
55 5/10/2023 F-24 T-6 LS-02 4" X 15" 6
56 5/10/2023 F-24 T-6 LS-03 4" X 15" 7
57 5/11/2023 F-41&42 T-8 CS-01 4" X 15" 93
58 5/11/2023 F-41 T-8 LS-01 4" X 15" 8
59 5/11/2023 F-41 T-8 LS-02 4" X 15" 8
60 5/11/2023 F-41 T-8 LS-03 4" X 15" 8
61 5/11/2023 F-42 T-8 LS-01 4" X 15" 8
62 5/11/2023 F-42 T-8 LS-02 4" X 15" 8
63 5/11/2023 F-42 T-8 LS-03 4" X 15" 8
64 5/12/2023 F-43&44 T-10 CS-01 4" X 15" 93
65 5/12/2023 F-43 T-10 LS-01 4" X 15" 8
66 5/12/2023 F-43 T-10 LS-02 4" X 15" 8
67 5/12/2023 F-43 T-10 LS-03 4" X 15" 8
68 5/12/2023 F-44 T-10 LS-01 4" X 15" 8
69 5/12/2023 F-44 T-10 LS-02 4" X 15" 8
70 5/12/2023 F-44 T-10 LS-03 4" X 15" 8
71 5/13/2023 F-9&10 T-1 CS-01 4" X 15" 74
72 5/13/2023 F-9 T-1 LS-01 4" X 15" 6
73 5/13/2023 F-9 T-1 LS-02 4" X 15" 7
74 5/13/2023 F-9 T-1 LS-03 4" X 15" 6
75 5/13/2023 F-10 T-1 LS-01 4" X 15" 6
76 5/13/2023 F-10 T-1 LS-02 4" X 15" 7
72 5/13/2023 F-10 T-1 LS-03 4" X 15" 6
73 5/14/2023 F-27&28 T-6 CS-01 4" X 15" 93
74 5/14/2023 F-27 T-6 LS-01 4" X 15" 8
75 5/14/2023 F-27 T-6 LS-02 4" X 15" 8
76 5/14/2023 F-27 T-6 LS-03 4" X 15" 8
77 5/14/2023 F-28 T-6 LS-01 4" X 15" 8
78 5/14/2023 F-28 T-6 LS-02 4" X 15" 8
79 5/14/2023 F-28 T-6 LS-03 4" X 15" 8
80 5/15/2023 F-39&40 T-8 CS-01 4" X 15" 88
81 5/15/2023 F-39 T-8 LS-01 4" X 15" 6
82 5/15/2023 F-39 T-8 LS-02 4" X 15" 6
83 5/15/2023 F-39 T-8 LS-03 4" X 15" 8
84 5/15/2023 F-40 T-8 LS-01 4" X 15" 6
85 5/15/2023 F-40 T-8 LS-02 4" X 15" 7
86 5/15/2023 F-40 T-8 LS-03 4" X 15" 6
87 5/17/2023 F-17&18 T-3 CS-01 4" X 15" 83
88 5/17/2023 F-17 T-3 LS-01 4" X 15" 7
89 5/17/2023 F-17 T-3 LS-02 4" X 15" 8
90 5/17/2023 F-17 T-3 LS-03 4" X 15" 7
91 5/17/2023 F-18 T-3 LS-01 4" X 15" 7
92 5/17/2023 F-18 T-3 LS-02 4" X 15" 7
93 5/17/2023 F-18 T-3 LS-03 4" X 15" 7
94 5/19/2023 F-25&26 T-6 CS-01 4" X 15" 93
95 5/19/2023 F-25 T-6 LS-01 4" X 15" 8
96 5/19/2023 F-25 T-6 LS-02 4" X 15" 8
97 5/19/2023 F-25 T-6 LS-03 4" X 15" 8
98 5/19/2023 F-26 T-6 LS-01 4" X 15" 8
99 5/19/2023 F-26 T-6 LS-02 4" X 15" 8
100 5/19/2023 F-26 T-6 LS-03 4" X 15" 8
101 5/20/2023 F-6&7 T-2 CS-01 4" X 15" 90
114 5/21/2023 F-5&6 T-2 CS-01 4" X 15" 79
115 5/21/2023 F-7&8 T-2 CS-01 4" X 15" 80
116 5/22/2023 F-15&16 T-3 CS-01 4" X 15" 93
117 5/22/2023 F-15 T-3 LS-01 4" X 15" 8
118 5/22/2023 F-15 T-3 LS-02 4" X 15" 8
119 5/22/2023 F-15 T-3 LS-03 4" X 15" 8
120 5/22/2023 F-16 T-3 LS-01 4" X 15" 8
121 5/22/2023 F-16 T-3 LS-02 4" X 15" 8
122 5/22/2023 F-16 T-3 LS-03 4" X 15" 8
123 5/23/2023 F-43&44 T-9 CS-01 4" X 15" 66
124 5/23/2023 F-43 T-9 LS-01 4" X 15" 8
125 5/23/2023 F-43 T-9 LS-02 4" X 15" 8
126 5/23/2023 F-43 T-9 LS-03 4" X 15" 7
127 5/23/2023 F-44 T-9 LS-01 4" X 15" 7
128 5/23/2023 F-44 T-9 LS-02 4" X 15" 7
129 5/23/2023 F-44 T-9 LS-03 4" X 15" 8
130 5/24/2023 F-23&24 T-5 CS-01 4" X 15" 91
131 5/24/2023 F-23 T-5 LS-01 4" X 15" 8
132 5/24/2023 F-23 T-5 LS-02 4" X 15" 8
133 5/24/2023 F-23 T-5 LS-03 4" X 15" 8
134 5/24/2023 F-24 T-5 LS-01 4" X 15" 7
135 5/24/2023 F-24 T-5 LS-02 4" X 15" 8
136 5/24/2023 F-24 T-5 LS-03 4" X 15" 8
137 5/26/2023 F-3&4 T-2 CS-01 4" X 15" 93
138 5/26/2023 F-3 T-2 LS-01 4" X 15" 8
139 5/26/2023 F-3 T-2 LS-02 4" X 15" 8
140 5/26/2023 F-3 T-2 LS-03 4" X 15" 8
141 5/26/2023 F-4 T-2 LS-01 4" X 15" 4
142 5/26/2023 F-4 T-2 LS-02 4" X 15" 4
143 5/26/2023 F-4 T-2 LS-03 4" X 15" 4
144 5/27/2023 F-11&12 T-3 CS-01 4" X 15" 93
145 5/28/2023 F-11 T-3 LS-01 4" X 15" 8
146 5/28/2023 F-11 T-3 LS-02 4" X 15" 8
147 5/28/2023 F-11 T-3 LS-03 4" X 15" 8
148 5/28/2023 F-12 T-3 LS-01 4" X 15" 8
149 5/28/2023 F-12 T-3 LS-02 4" X 15" 8
150 5/28/2023 F-12 T-3 LS-03 4" X 15" 8
151 5/28/2023 F-5 T-2 LS-01 4" X 15" 2
152 5/28/2023 F-5 T-2 LS-02 4" X 15" 2
153 5/28/2023 F-5 T-2 LS-03 4" X 15" 4
154 5/28/2023 F-6 T-2 LS-01 4" X 15" 6
155 5/28/2023 F-6 T-2 LS-02 4" X 15" 4
156 5/28/2023 F-6 T-2 LS-03 4" X 15" 6
157 5/28/2023 F-7 T-2 LS-01 4" X 15" 6
158 5/28/2023 F-7 T-2 LS-02 4" X 15" 2
159 5/28/2023 F-7 T-2 LS-03 4" X 15" 6
160 5/28/2023 F-8 T-2 LS-01 4" X 15" 1
161 5/28/2023 F-8 T-2 LS-02 4" X 15" 2
162 5/28/2023 F-8 T-2 LS-03 4" X 15" 4
163 5/31/2023 F-9&10 T-2 CS-01 4" X 15" 93
164 5/31/2023 F-9 T-2 LS-01 4" X 15" 8
165 5/31/2023 F-9 T-2 LS-02 4" X 15" 8
166 5/31/2023 F-9 T-2 LS-03 4" X 15" 8
167 5/31/2023 F-10 T-2 LS-01 4" X 15" 8
168 5/31/2023 F-10 T-2 LS-02 4" X 15" 8
169 5/31/2023 F-10 T-2 LS-03 4" X 15" 8
Total no of films being billed in this RA Bill >>>>>>>>>>>> 3075
Note:1 Number of repair films for the month of May1 to May31 201
023)
No of
accepted
No.of
films Total no
Repaired REMARKS
(after of Films
films
rectificati
on)

93
8
8
8
8
8
8
4 4 97
8
8
1 1 9
1 1 9
8
1 1 9
1 1 94
8
8
8
8
8
8
13 13 106
1 1 9
2 2 10
2 2 10
1 1 9
8
2 2 10
7 7 100
8
8
8
8
8
8
4 4 97
8
8
8
2 2 10
2 2 10
3 3 11
8 8 101
2 2 10
3 3 11
3 3 11
1 1 9
8
8
10 10 103
8
8
8
8
2 2 10
1 1 9
93
8
8
8
8
8
8
93
8
8
8
8
8
8
19 19 112
2 2 10
1 1 9
2 2 10
2 2 10
1 1 9
2 2 10
93
8
8
8
8
8
8
5 5 98
2 2 10
2 2 10
8
2 2 10
1 1 9
2 2 10
10 10 103
1 1 9
8
1 1 9
1 1 9
1 1 9
1 1 9
93
8
8
8
8
8
8
3 3 96
14 14 107
13 13 106
93
8
8
8
8
8
8
27 27 120
8
8
1 1 9
1 1 9
1 1 9
8
2 2 95
8
8
8
1 1 9
8
8
93
8
8
8
4
4
4
93
8
8
8
8
8
8
2
2
4
6
4
6
6
2 2 6
6
1 1 3
2
4
93
8
8
8
8
8
8
201 201 3477 52155
Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

1 T-01 F-52 24 - 23 1 1 25 - - - - 25 -
Normal
2 T-01 F-51 24 - 24 - - 24 - - - - 24 -
ferrule
3 T-01 F-51 & 52 - 93 84 9 9 102 - - - - 102 -
4 T-01 F-50 8 - 8 - - 8 - - - - 8 -
5 T-01 F-49 16 - 16 - - 16 - - - - 16 -
6 T-01 F-48 18 - 18 - - 18 - - - - 18 -
7 T-01 Bend-01 F-47 8 - 8 - - 8 - - - - 8 -
8 T-01 F- 50 & 49 - 93 93 - - 93 - - - - 93 -
9 T-01 F- 49 & 48 - 93 93 - - 93 - - - - 93 -
10 T-01 F- 48 & 47 - 93 93 - - 93 - - - - 93 -
11 -- NA SAMPLE 1 - 1 - - 1 - - - - 1 -
12 T-01 F-45 24 - 24 - - 24 - - - - 24 -
Normal
13 T-01 F-46 18 - 18 - - 18 - - - - 18 -
ferrule
14 T-01 F-45 & 46 - 93 93 - - 93 - - - - 93 -
15 T-01 F-43 24 - 6 18 18 42 - - - - 42 -
Normal
16 T-01 F-44 24 - 8 16 16 40 - - - - 40 -
ferrule
17 T-01 F-43 & 44 - 93 80 13 13 106 - - - - 106 -
18 -- NA SAMPLE -01 2 - 2 - - 2 - - - - 2 -
19 -- NA SAMPLE -02 2 - 2 - - 2 - - - - 2 -
20 -- NA SAMPLE (F-43 & 44) 2 - 2 - - 2 - - - - 2 -
21 T-02 F-48 17 - 14 3 3 20 - - - - 20 -
22 T-02 F-49 17 - 17 - - 17 - - - - 17 -
23 T-02 F-50 8 - 8 - - 8 - - - - 8 -
24 T-02 Bend-01 F-47 8 - 8 - - 8 - - - - 8 -
25 T-02 F-47 & 48 - 93 93 - - 93 - - - - 93 -
26 T-02 F-48 & 49 - 93 93 - - 93 - - - - 93 -
27 T-02 F-49 & 50 - 93 93 - - 93 - - - - 93 -
28 T-01 F-39 24 - 8 16 16 40 - - - - 40 -
Normal
29 T-01 F-40 24 - 8 16 16 40 - - - - 40 -
ferrule
30 T-01 F- 39 & 40 - 93 88 5 5 98 - - - - 98 -

RT summary up to May-23 Page 14 of 34 768423397.xlsx


Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

31 T-02 F-52 24 - 24 - - 24 - - - - 24 -
Normal
32 T-02 F-51 24 - 24 - - 24 - - - - 24 -
ferrule
33 T-02 F-51 & 52 - 93 93 - - 93 - - - - 93 -
34 T-01 F-37 24 - 24 - - 24 - - - - 24 -
Normal
35 T-01 F-38 24 - 16 8 8 32 - - - - 32 -
ferrule
36 T-01 F-37 & 38 - 93 93 - - 93 - - - - 93 -
37 NA NA WQT-8 to WQT-16 19 - 17 2 - 19 - - - - 19 -
38 NA NA WQT-17 2 - 2 - - 2 - - - - 2 -
39 T-03 F-51 24 - 24 - - 24 - - - - 24 -
Normal
40 T-03 F-52 24 - 24 - - 24 - - - - 24 -
ferrule
41 T-03 F-51 & 52 - 93 93 - - 93 - - - - 93 -
42 T-03 F-47 8 - 8 - - 8 - - - - 8 -
43 T-03 F-48 17 - 17 - - 17 - - - - 17 -
44 T-03 F-49 17 - 17 - - 17 - - - - 17 -
45 T-03 Bend-01 F-50 8 - 8 - - 8 - - - - 8 -
46 T-03 F-47 & 48 - 93 93 - - 93 - - - - 93 -
47 T-03 F-49 & 50 - 93 93 - - 93 - - - - 93 -
48 T-03 F-48 & 49 - 93 93 - - 93 - - - - 93 -
49 T-02 F-45 24 - 24 - - 24 - - - - 24 -
Normal
50 T-02 F-46 24 - 24 - - 24 - - - - 24 -
ferrule
51 T-02 F-45 & 46 - 93 93 - - 93 - - - - 93 -
52 T-01 F-41 24 - 24 - - 24 - - - - 24 -
Normal
53 T-01 F-42 24 - 24 - - 24 - - - - 24 -
ferrule
54 T-01 F-41 & 42 - 93 86 7 7 100 - - - - 100 -
55 T-02 F-43 24 - 24 - - 24 - - - - 24 -
Normal
56 T-02 F-44 24 - 24 - - 24 - - - - 24 -
ferrule
57 T-02 F-43 & 44 - 93 93 - - 93 - - - - 93 -
58 T-03 F-45 24 - 24 - - 24 - - - - 24 -
Normal
59 T-03 F-46 24 - 24 - - 24 - - - - 24 -
ferrule
60 T-03 F-45 & 46 - 93 93 - - 93 - - - - 93 -

RT summary up to May-23 Page 15 of 34 768423397.xlsx


Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

61 T-02 F-41 24 - - 24 24 48 - - - - 48 -
Normal
62 T-02 F-42 24 - 24 - - 24 - - - - 24 -
ferrule
63 T-02 F-41 & 42 - 93 93 - - 93 - - - - 93 -
64 T1 F-35 24 - 24 - - 24 - - - - 24 -
Normal
65 T1 F-36 24 - 24 - - 24 - - - - 24 -
ferrule
66 T1 F-35&36 - 93 93 - - 93 - - - - 93 -
67 T4 F-51 24 - 24 - - 24 - - - - 24 -
Normal
68 T4 F-52 24 - 24 - - 24 - - - - 24 -
ferrule
69 T4 F-51&52 - 93 93 - - 93 - - - - 93 -
70 T3 F-43 24 - 24 - - 24 - - - - 24 -
Normal
71 T3 F-44 24 - 24 - - 24 - - - - 24 -
ferrule
72 T3 F-43&44 - 93 93 - - 93 - - - - 93 -
73 T2 F-39 24 - 24 - - 24 - - - - 24 -
Normal
74 T2 F-40 24 - 24 - - 24 - - - - 24 -
ferrule
75 T2 F-39&40 - 93 93 - - 93 - - - - 93 -
76 T2 F-37 24 - 24 - - 24 - - - - 24 -
Normal
77 T2 F-38 24 - 23 1 1 25 - - - - 25 -
ferrule
78 T2 F-37&38 - 93 93 - - 93 - - - - 93 -
79 T3 F-41 24 - 24 - - 24 - - - - 24 -
Normal
80 T3 F-42 24 - 24 - - 24 - - - - 24 -
ferrule
81 T3 F-41&42 - 93 93 - - 93 - - - - 93 -
82 T2 F-35 24 - 24 - - 24 - - - - 24 -
Normal
83 T2 F-36 24 - 24 - - 24 - - - - 24 -
ferrule
84 T2 F-35&36 - 93 93 - - 93 - - - - 93 -
85 T2 F-33 24 - 24 - - 24 - - - - 24 -
Normal
86 T2 F-34 24 - 24 - - 24 - - - - 24 -
ferrule
87 T2 F-33&34 - 93 93 - - 93 - - - - 93 -
88 NA NA WQT-19 2 1 1 2 - - - - 2 -
89 T3 F-39 24 - 24 24 - - - - 24 -
Normal
90 T3 F-40 24 - 24 24 - - - - 24 -
ferrule
91 T3 F-39&40 - 93 93 93 - - - - 93 -
RT summary up to May-23 Page 16 of 34 768423397.xlsx
Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

92 T5 F-51 24 - 24 24 - - - - 24 -
Normal
93 T5 F-52 24 - 22 2 2 26 - - - - 26 -
ferrule
94 T5 F-51&52 - 93 93 93 - - - - 93 -
95 T6 F-51 24 - 24 24 - - - - 24 -
Normal
96 T6 F-52 24 - 24 24 - - - - 24 -
ferrule
97 T6 F-51&52 - 93 93 93 - - - - 93 -
98 T3 F-35 24 - 24 24 - - - - 24 -
Normal
99 T3 F-36 24 - 24 24 - - - - 24 -
ferrule
100 T3 F-35&36 - 93 93 93 - - - - 93 -
101 T3 F-37 24 - 20 4 4 28 - - - - 28 -
Normal
102 T3 F-38 24 - 21 3 3 27 - - - - 27 -
ferrule
103 T3 F-37&38 - 93 75 18 18 111 - - - - 111 -
104 T4 F-47 8 - 8 - - 8 - - - - 8 -

105 T4 F-48 17 - 17 - - 17 - - - - 17 -

106 T4 F-49 17 - 17 - - 17 - - - - 17 -

107 T4 Bend-01 F-50 8 - 8 - - 8 - - - - 8 -

108 T4 F-47&48 - 93 93 - - 93 - - - - 93 -

109 T4 F-48&49 - 93 93 - - 93 - - - - 93 -

110 T4 F-49&50 - 93 93 - - 93 - - - - 93 -

111 T1 F-33 24 - 24 - - 24 - - - - 24 -
Normal
112 T1 F-34 24 - 24 - - 24 - - - - 24 -
ferrule
113 T1 F-33&34 - 93 93 - - 93 - - - - 93 -

114 T3 F-33 24 - 24 - - 24 - - - - 24 -
Normal
115 T3 F-34 24 - 24 - - 24 - - - - 24 -
ferrule
116 T3 F-33&34 - 93 93 - - 93 - - - - 93 -

117 T5 F-45 24 - 24 - - 24 - - - - 24 -
Normal
118 T5 F-46 24 - 24 - - 24 - - - - 24 -
ferrule
119 T5 F-45&46 - 93 93 - - 93 - - - - 93 -

RT summary up to May-23 Page 17 of 34 768423397.xlsx


Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

120 T4 F-45 24 - 24 - - 24 - - - - 24 -
Normal
121 T4 F-46 24 - 24 - - 24 - - - - 24 -
ferrule
122 T4 F-45&46 - 93 93 - - 93 - - - - 93 -

123 T5 F-47 8 - 8 - - 8 - - - - 8 -

124 T5 F-48 16 - 16 - - 16 - - - - 16 -
Bend-01
125 T5 F-49 16 - 16 - - 16 - - - - 16 -

126 T5 F-50 8 - 8 - - 8 - - - - 8 -

127 T5 F-47&48 - 93 93 - - 93 - - - - 93 -

128 T5 Bend-01 F-48&49 - 93 93 - - 93 - - - - 93 -

129 T5 F-49&50 - 93 93 - - 93 - - - - 93 -
130 T1 F-31 24 - 23 1 1 25 - - - - 25 -
Normal
131 T1 F-32 24 - 24 - - 24 - - - - 24 -
ferrule
132 T1 F-31&32 - 93 93 - - 93 - - - - 93 -
133 T6 F-45 24 - 24 - - 24 - - - - 24 -
Normal
134 T6 F-46 24 - 24 - - 24 - - - - 24 -
ferrule
135 T6 F-45&46 - 93 93 - - 93 - - - - 93 -
136 T4 F-43 24 - 23 1 1 25 - - - - 25 -
Normal
137 T4 F-44 24 - 24 - - 24 - - - - 24 -
ferrule
138 T4 F-43&444 - 93 93 - - 93 - - - - 93 -
139 T6 F-47 8 8 - - 8 - - - - 8 -
140 T6 F-48 16 16 - - 16 - - - - 16 -
141 T6 F-49 16 16 - - 16 - - - - 16 -
142 T6 Bend-01 F-50 8 8 - - 8 - - - - 8 -
143 T6 F-47&48 - 93 93 - - 93 - - - - 93 -
144 T6 F-48&49 - 93 70 23 23 116 - - - - 116 -
145 T6 F-49&50 - 93 87 6 6 99 - - - - 99 -
146 WQT-20 2 2 2 - - - - 2 -
147 NA WQT-21 2 2 2 - - - - 2 -
148 WQT-22 2 2 2 - - - - 2 -

RT summary up to May-23 Page 18 of 34 768423397.xlsx


Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

149 WQT-01 (E&M) 2 2 2 - - - - 2 -


150 NA WQT-02 (E&M) 2 2 2 - - - - 2 -
151 WQT-03 (E&M) 2 2 2 - - - - 2 -
152 T5 F-43 24 - 22 2 2 26 - - - - 26 -
Normal
153 T5 F-44 24 - 20 4 4 28 - - - - 28 -
ferrule
154 T5 F-43&44 - 93 87 6 6 99 - - - - 99 -
155 T4 F-41 24 - 24 24 - - - - 24 -
Normal
156 T4 F-42 24 - 22 2 2 26 - - - - 26 -
ferrule
157 T4 F-41&42 - 93 93 - - 93 - - - - 93 -
158 T2 F-31 24 - 24 - - 24 - - - - 24 -
Normal
159 T2 F-32 24 - 24 - - 24 - - - - 24 -
ferrule
160 T2 F-31&32 - 93 93 - - 93 - - - - 93 -
161 T5 F-41 24 - 24 - - 24 - - - - 24 -
Normal
162 T5 F-42 24 - 24 - - 24 - - - - 24 -
ferrule
163 T5 F-41&42 - 93 93 - - 93 - - - - 93 -
164 T4 F-39 24 - 24 - - 24 - - - - 24 -
Normal
165 T4 F-40 24 - 24 - - 24 - - - - 24 -
ferrule
166 T4 F-39&40 - 93 93 - - 93 - - - - 93 -
167 T1 F-29 24 - 24 - - 24 - - - - 24 -
Normal
168 T1 F-30 24 - 24 - - 24 - - - - 24 -
ferrule
169 T1 F-29&30 - 93 93 - - 93 - - - - 93 -
170 T2 F-29 24 - 24 - - 24 - - - - 24 -
Normal
171 T2 F-30 24 - 24 - - 24 - - - - 24 -
ferrule
172 T2 F-29&30 - 93 93 - - 93 - - - - 93 -
173 2 - 2 - - 2 - - - - 2 - PSB
174 2 - 2 - - 2 - - - - 2 - PSB
175 2 - 2 - - 2 - - - - 2 - JKT
176 2 - 2 - - 2 - - - - 2 - JKT
NA NA
177 2 - 2 - - 2 - - - - 2 - JKT
WQT-23 To WQT-
178 2 - 2 - - 2 - - - - 2 - JKT
33
179 2 - 2 - - 2 - - - - 2 - PSB
RT summary up to May-23 Page 19 of 34 768423397.xlsx
Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel
NA Type
NA of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule
WQT-23 To WQT-
33

180 2 - 2 - - 2 - - - - 2 - JKT
181 2 - 2 - - 2 - - - - 2 - JKT
182 NA NA 2 - 2 - - 2 - - - - 2 - JKT
183 2 - 2 - - 2 - - - - 2 - JKT
184 2 - 2 - - 2 - - - - 2 -
185 2 - 0 2 - 2 - - - - 2 -
186 WQT-04 To WQT- 2 - 2 - - 2 - - - - 2 - E&M (DT elbow liner
NA NA
187 09 (E&M) 2 - 2 - - 2 - - - - 2 - works)

188 2 - 2 - - 2 - - - - 2 -
189 2 - 0 2 - 2 - - - - 2 -
190 T4 F-37 24 - 24 - - 24 - - - - 24 -
Normal
191 T4 F-38 24 - 24 - - 24 - - - - 24 -
ferrule
192 T4 F-37&38 - 93 93 - - 93 - - - - 93 -
193 T5 F-39 24 - 22 2 2 26 - - - - 26
Normal
194 T5 F-40 24 - 23 1 1 25 - - - - 25
ferrule
195 T5 F-39&40 - 93 93 - - 93 - - - - 93
196 T1 F-27 24 - 24 - - 24 - - - - 24
Normal
197 T1 F-28 24 - 24 - - 24 - - - - 24
ferrule
198 T1 F-27&28 - 93 90 3 3 96 - - - - 96
199 T6 F-43 24 - 24 - - 24 - - - - 24
Normal
200 T6 F-44 24 - 24 - - 24 - - - - 24
ferrule
201 T6 F-43&44 - 93 90 3 3 96 - - - - 96
202 T5 F-37 24 - 24 - - 24 - - - - 24
Normal
203 T5 F-38 24 - 24 - - 24 - - - - 24
ferrule
204 T5 F-37&38 - 93 92 1 1 94 - - - - 94
205 T2 F-27 24 - 24 - - 24 - - - - 24
Normal
206 T2 F-28 24 - 24 - - 24 - - - - 24
ferrule
207 T2 F-27&28 - 93 91 2 2 95 - - - - 95
208 T4 F-35 24 - 24 - - 24 - - - - 24
Normal
209 T4 F-36 24 - 24 - - 24 - - - - 24
ferrule
210 T4 F-35&36 - 93 92 1 1 94 - - - - 94
RT summary up to May-23 Page 20 of 34 768423397.xlsx
Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

211 T1 F-25 24 - 24 - - 24 - - - - 24
Normal
212 T1 F-26 24 - 24 - - 24 - - - - 24
ferrule
213 T1 F-25&26 - 93 92 1 1 94 - - - - 94
214 T4 F-33 24 - 23 1 1 25 - - - - 25
Normal
215 T4 F-34 24 - 24 - - 24 - - - - 24
ferrule
216 T4 F-33&34 - 93 89 4 4 97 - - - - 97
217 T6 F-41 24 - 24 - - 24 - - - - 24
Normal
218 T6 F-42 24 - 22 3 3 28 - - - - 28 1 film 2 times repair
ferrule
219 T6 F-41&42 - 93 80 18 18 116 - - - - 116 5 Film 2 times repair
220 T8 F-51 24 - 24 - - 24 - - - - 24
Normal
221 T8 F-52 24 - 24 - - 24 - - - - 24
ferrule
222 T8 F-51&52 - 93 88 5 5 98 - - - - 98
223 T3 F-31 24 - 24 - - 24 - - - - 24
Normal
224 T3 F-32 24 - 22 2 2 26 - - - - 26
ferrule
225 T3 F-31&32 - 93 90 3 3 96 - - - - 96
226 NA NA WQT-47 2 - 2 - - 2 - - - - 2 PSB
227 NA NA WQT-48 2 - 2 - - 2 - - - - 2 PSB
228 NA NA WQT-49 2 - 2 - - 2 - - - - 2 PSB
229 NA NA WQT- 55 2 - 2 - - 2 - - - - 2
230 T4 F29 24 - 22 2 2 26 - - - - 26
Normal
231 T4 F30 24 - 23 1 1 25 - - - - 25
ferrule
232 T4 F29&30 - 93 87 6 6 99 - - - - 99
233 T1 F23 24 - 20 4 4 28 - - - - 28
Normal
234 T1 F24 24 - 24 - - 24 - - - - 24
ferrule
235 T1 F23&24 - 93 92 1 1 94 - - - - 94
236 T5 F35 24 - 19 5 5 29 - - - - 29
Normal
237 T5 F36 24 - 23 1 1 25 - - - - 25
ferrule
238 T5 F35&36 - 93 86 7 7 100 - - - - 100
239 T4 F31 24 - 22 2 2 26 - - - - 26
Normal
240 T4 F32 24 - 24 - - 24 - - - - 24
ferrule
241 T4 F31&32 - 93 87 6 6 99 - - - - 99
RT summary up to May-23 Page 21 of 34 768423397.xlsx
Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

242 T9 F51 24 - 24 - - 24 - - - - 24
Normal
243 T9 F52 24 - 22 2 2 26 - - - - 26
ferrule
244 T9 F51&52 - 93 88 5 5 98 - - - - 98
245 T3 F29 24 - 23 1 1 25 - - - - 25
Normal
246 T3 F30 24 - 24 - - 24 - - - - 24
ferrule
247 T3 F29&30 - 93 89 4 4 97 - - - - 97
248 T6 F39 24 - 24 - - 24 - - - - 24
Normal
249 T6 F40 24 - 8 16 16 40 - - - - 40
ferrule
250 T6 F39&40 - 93 87 6 6 99 - - - - 99
251 T2 F25 24 - 24 - - 24 - - - - 24
Normal
252 T2 F26 24 - 24 - - 24 - - - - 24
ferrule
253 T2 F25&26 - 93 87 6 6 99 - - - - 99
254 T1 F21 24 - 23 1 1 25 - - - - 25
Normal
255 T1 F22 24 - 24 - - 24 - - - - 24
ferrule
256 T1 F21&22 - 93 89 4 4 97 - - - - 97
257 T5 F33 24 - 24 - - 24 - - - - 24
Normal
258 T5 F34 24 - 24 - - 24 - - - - 24
ferrule
259 T5 F33&34 - 93 93 - - 93 - - - - 93
260 T6 F37 24 24 - - 24 - - - - 24
Normal
261 T6 F38 24 24 - - 24 - - - - 24
ferrule
262 T6 F37&38 - 93 93 - - 93 - - - - 93
263 T10 F-47 8 - 8 - - 8 - - - - 8
264 T10 F-48 16 - 16 - - 16 - - - - 16
Bend-01
265 T10 F-49 16 - 16 - - 16 - - - - 16
266 T10 F-50 8 - 8 - - 8 - - - - 8
267 T10 F-47&48 - 93 92 1 1 94 - - - - 94
268 T10 Bend-01 F-48&49 - 93 93 - - 93 - - - - 93
269 T10 F-49&50 - 93 92 1 1 94 - - - - 94
270 T2 F23 24 18 6 6 30 - - - - 30
Normal
271 T2 F24 24 11 13 13 37 - - - - 37
ferrule
272 T2 F23&24 - 93 79 14 14 107 - - - - 107
RT summary up to May-23 Page 22 of 34 768423397.xlsx
Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

273 T3 F27 24 23 1 1 25 - - - - 25
Normal
274 T3 F28 24 24 - - 24 - - - - 24
ferrule
275 T3 F27&28 - 93 90 3 3 96 - - - - 96
276 T4 F27 24 19 5 5 29 - - - - 29
Normal
277 T4 F28 24 23 1 1 25 - - - - 25
ferrule
278 T4 F27&28 - 93 89 4 4 97 - - - - 97
279 T1 F19 24 21 3 3 27 - - - - 27
Normal
280 T1 F20 24 22 2 2 26 - - - - 26
ferrule
281 T1 F19&20 - 93 85 8 8 101 - - - - 101
282 T5 F31 24 21 3 3 27 - - - - 27
Normal
283 T5 F32 24 22 2 2 26 - - - - 26
ferrule
284 T5 F31&32 - 93 75 18 18 111 - - - - 111
285 T10 F51 24 24 - - 24 - - - - 24
Normal
286 T10 F52 24 24 - - 24 - - - - 24
ferrule
287 T10 F51&52 - 93 88 5 5 98 - - - - 98
288 T6 F35 24 22 2 2 26 - - - - 26
Normal
289 T6 F36 24 22 2 2 26 - - - - 26
ferrule
290 T6 F35&36 - 93 84 9 9 102 - - - - 102
291 T2 F21 24 23 2 2 27 - - - - 27 1 Film 2 times repairs
Normal
292 T2 F22 24 23 2 2 27 - - - - 27 1 Film 2 times repairs
ferrule
293 T2 F21&22 - 93 92 2 2 96 - - - - 96 1 Film 2 times repairs
294 T3 F25 24 24 - - 24 - - - - 24
Normal
295 T3 F26 24 24 - - 24 - - - - 24
ferrule
296 T3 F25&26 - 93 92 1 1 94 - - - - 94
297 T8 F45 24 - 22 2 2 26 - - - - 26
Normal
298 T8 F46 24 - 23 1 1 25 - - - - 25
ferrule
299 T8 F45&46 - 93 75 18 18 111 - - - - 111
300 T4 F25 24 - 24 - 24 - - - - 24
Normal
301 T4 F26 24 - 22 2 2 26 - - - - 26
ferrule
302 T4 F25&26 - 93 81 12 12 105 - - - - 105

RT summary up to May-23 Page 23 of 34 768423397.xlsx


Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

303 T1 F17 24 - 21 3 3 27 - - - - 27
Normal
304 T1 F18 24 - 24 - - 24 - - - - 24
ferrule
305 T1 F17&18 - 93 87 6 6 99 - - - - 99
306 T5 F29 24 - 18 6 6 30 - - - - 30
Normal
307 T5 F30 24 - 18 6 6 30 - - - - 30
ferrule
308 T5 F29&30 - 93 75 18 18 111 - - - - 111
309 T6 F33 24 - 20 4 4 28 - - - - 28
Normal
310 T6 F34 24 - 20 4 4 28 - - - - 28
ferrule
311 T6 F33&34 - 93 87 6 6 99 - - - - 99
312 T2 F19 24 - 24 - - 24 - - - - 24
Normal
313 T2 F20 24 - 24 - - 24 - - - - 24
ferrule
314 T2 F19&20 - 93 78 15 15 108 - - - - 108
315 T3 F23 24 - 23 1 1 25 - - - - 25
Normal
316 T3 F24 24 - 24 - - 24 - - - - 24
ferrule
317 T3 F23&24 - 93 77 16 16 109 - - - - 109
318 T8 F-47 8 - 8 - - 8 - - - - 8
319 T8 F-48 16 - 15 1 1 17 - - - - 17
320 T8 F-49 16 - 16 - - 16 - - - - 16
321 T8 Bend-01 F-50 8 - 8 - - 8 - - - - 8
322 T8 F-47&48 - 93 86 7 7 100 - - - - 100
323 T8 F-48&49 - 93 81 12 12 105 - - - - 105
324 T8 F-49&50 - 93 87 6 6 99 - - - - 99
325 T4 F23 24 - 22 2 2 26 - - - - 26
Normal
326 T4 F24 24 - 24 - - 24 - - - - 24
ferrule
327 T4 F23&24 - 93 89 4 4 97 - - - - 97
328 T3 F21 24 - 21 3 3 27 - - - - 27
Normal
329 T3 F22 24 - 22 2 2 26 - - - - 26
ferrule
330 T3 F21&22 - 93 73 20 20 113 - - - - 113
331 T1 F15 24 - 24 - - 24 - - - - 24
Normal
332 T1 F16 24 - 24 - - 24 - - - - 24
ferrule
333 T1 F15&16 - 93 93 - - 93 - - - - 93
RT summary up to May-23 Page 24 of 34 768423397.xlsx
Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

334 T9 F-47 8 - 7 1 1 9 - - - - 9
335 T9 F-48 16 - 16 - - 16 - - - - 16
336 T9 F-49 16 - 10 4 4 18 - - - - 18
337 T9 Bend-01 F-50 8 - 8 - - 8 - - - - 8
338 T9 F-47&48 - 93 91 2 2 95 - - - - 95
339 T9 F-48&49 - 93 93 - - 93 - - - - 93
340 T9 F-49&50 - 93 58 35 35 128 - - - - 128
341 T2 F17 24 - 22 2 2 26 - - - - 26
Normal
342 T2 F18 24 - 24 - - 24 - - - - 24
ferrule
343 T2 F17&18 - 93 75 18 18 111 - - - - 111
344 T1 F13 24 - 21 3 3 27 - - - - 27
Normal
345 T1 F14 24 - 22 2 2 26 - - - - 26
ferrule
346 T1 F13&14 - 93 89 4 4 97 - - - - 97
347 T5 F27 24 - 22 2 2 26 - - - - 26
Normal
348 T5 F28 24 - 24 - - 24 - - - - 24
ferrule
349 T5 F27&28 - 93 88 5 5 98 - - - - 98
350 T1 F11 24 - 24 - - 24 - - - - 24
Normal
351 T1 F12 24 - 24 - - 24 - - - - 24
ferrule
352 T1 F11&12 - 93 93 - - 93 - - - - 93
353 T2 F15 24 - 24 - - 24 - - - - 24
Normal
354 T2 F16 24 - 24 - - 24 - - - - 24
ferrule
355 T2 F15&16 - 93 82 11 11 104 - - - - 104
356 T8 F43 24 - 23 1 1 25 - - - - 25
Normal
357 T8 F44 24 - 22 2 2 26 - - - - 26
ferrule
358 T8 F43&44 - 93 84 9 9 102 - - - - 102
359 T2 F13 24 - 24 - - 24 - - - - 24
Normal
360 T2 F14 24 - 24 - - 24 - - - - 24
ferrule
361 T2 F13&14 - 93 93 - - 93 - - - - 93
362 T6 F31 24 - 24 - - 24 - - - - 24
Normal
363 T6 F32 24 - 24 - - 24 - - - - 24
ferrule
364 T6 F31&32 - 93 79 14 14 107 - - - - 107
RT summary up to May-23 Page 25 of 34 768423397.xlsx
Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

365 T4 F21 24 - 24 - - 24 - - - - 24
Normal
366 T4 F22 24 - 24 - - 24 - - - - 24
ferrule
367 T4 F21&22 - 93 93 - - 93 - - - - 93
368 T9 F45 24 - 24 - - 24 - - - - 24
Normal
369 T9 F46 24 - 24 - - 24 - - - - 24
ferrule
370 T9 F45&46 - 93 66 27 27 120 - - - - 120
371 NA NA WQT-50/3G 2 - 2 - - 2 - - - - 2
372 NA NA WQT-51/3G 2 - 2 - - 2 - - - - 2
373 NA NA WQT-52/3G 2 - 2 - - 2 - - - - 2
374 NA NA WQT-53/3G 2 - 2 - - 2 - - - - 2
P Sobhan babu
375 NA NA WQT-54/3G 2 - 2 - - 2 - - - - 2
376 NA NA WQT-34 2 - 2 - - 2 - - - - 2
377 NA NA WQT-35 2 - 2 - - 2 - - - - 2
378 NA NA WQT-41 2 - 2 - - 2 - - - - 2
379 NA NA WQT-56 3G 2 - 2 - - 2 - - - - 2
380 NA NA WQT-56/4G 2 - 2 - - 2 - - - - 2
SR Fabricators
381 NA NA WQT-57/3G 2 - 2 - - 2 - - - - 2
382 NA NA WQT-57/4G 2 - 2 - - 2 - - - - 2
383 NA NA WQT-58/3G 2 - 2 - - 2 - - - - 2
384 NA NA WQT-58/4G 2 - 2 - - 2 - - - - 2
385 NA NA WQT-59/3G 2 - 2 - - 2 - - - - 2
SSS balagi
386 NA NA WQT-59/4G 2 - 2 - - 2 - - - - 2
387 NA NA WQT-60/3G 2 - 2 - - 2 - - - - 2
388 NA NA WQT-60/4G 2 - 2 - - 2 - - - - 2
389 NA NA WQT-36 2 - 2 - - 2 - - - - 2
390 NA NA WQT-37 2 - 2 - - 2 - - - - 2
391 NA NA WQT-38 2 - 2 - - 2 - - - - 2
392 NA NA WQT-39 2 - 2 - - 2 - - - - 2
393 NA NA WQT-40 2 - 2 - - 2 - - - - 2 DK enterprises
394 NA NA WQT-43 2 - 2 - - 2 - - - - 2

RT summary up to May-23 Page 26 of 34 768423397.xlsx


Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

DK enterprises

395 NA NA WQT-44 2 - 2 - - 2 - - - - 2
396 NA NA WQT-45 2 - 2 - - 2 - - - - 2
397 NA NA WQT-46 2 - 2 - - 2 - - - - 2
May-23

398 T3 F19 24 - - - - - 24 - - 24 24

Normal
399 T3 ferrule F20 24 - - - - - 24 - - 24 24

400 T3 F19&20 - 93 - - - - 93 - - 93 93

401 T2 F11 24 - - - - - 23 1 1 25 25

Normal
402 T2 ferrule F12 24 - - - - - 22 2 2 26 26

403 T2 F11&12 - 93 - - - - 89 4 4 97 97

404 T10 F45 24 - - - - - 24 - - 24 24

Normal
405 T10 ferrule F46 24 - - - - - 24 - - 24 24

406 T10 F45&46 - 93 - - - - 92 1 1 94 94

407 T4 F19 24 - - - - - 19 5 5 29 29

Normal
408 T4 ferrule F20 24 - - - - - 21 3 3 27 27

409 T4 F19&20 - 93 - - - - 80 13 13 106 106

410 T5 F25 24 - - - - - 24 - - 24 24

Normal
411 T5 ferrule F26 24 - - - - - 24 - - 24 24

412 T5 F25&26 - 93 - - - - 86 7 7 100 100

RT summary up to May-23 Page 27 of 34 768423397.xlsx


Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

413 T7 F51 24 - - - - - 24 - - 24 24

Normal
414 T7 ferrule F52 24 - - - - - 17 7 7 31 31

415 T7 F51&52 - 93 - - - - 89 4 4 97 97

416 T6 F29 24 - - - - - 16 8 8 32 32

Normal
417 T6 ferrule F30 24 - - - - - 23 1 1 25 25

418 T6 F29&30 - 93 - - - - 85 8 8 101 101

419 T6 F23 24 - - - - - 24 - - 24 24

Normal
420 T6 ferrule F24 24 - - - - - 21 3 3 27 27

421 T6 F23&24 - 93 - - - - 83 10 10 103 103

422 T8 F41 24 - - - - - 24 - - 24 24

Normal
423 T8 ferrule F42 24 - - - - - 24 - - 24 24

424 T8 F41&42 - 93 - - - - 93 - - 93 93

425 T10 F43 24 - - - - - 24 - - 24 24

Normal
426 T10 ferrule F44 24 - - - - - 24 - - 24 24

427 T10 F43&44 - 93 - - - - 93 - - 93 93

428 T1 F9 24 - - - - - 19 5 5 29 29

Normal
429 T1 ferrule F10 24 - - - - - 19 5 5 29 29

430 T1 F9&10 - 93 - - - - 74 19 19 112 112

RT summary up to May-23 Page 28 of 34 768423397.xlsx


Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

431 T6 F9 24 - - - - - 24 - - 24 24

Normal
432 T6 ferrule F10 24 - - - - - 24 - - 24 24

433 T6 F9&10 - 93 - - - - 93 - - 93 93

434 T8 F39 24 - - - - - 20 4 4 28 28

Normal
435 T8 ferrule F40 24 - - - - - 19 5 5 29 29

436 T8 F39&40 - 93 - - - - 88 5 5 98 98

437 T3 F17 24 - - - - - 22 2 2 26 26

Normal
438 T3 ferrule F18 24 - - - - - 21 3 3 27 27

439 T3 F17&18 - 93 - - - - 83 10 10 103 103

440 T6 F25 24 - - - - - 24 - - 24 24

Normal
441 T6 ferrule F26 24 - - - - - 24 - - 24 24

442 T6 F25&26 - 93 - - - - 93 - - 93 93

443 T2 F-5 8 - - - - - 8 - - 8 8

444 T2 F-6 16 - - - - - 16 - - 16 16

445 T2 F-7 16 - - - - - 14 2 2 18 18

446 T2 Bend-02 F-8 8 - - - - - 7 1 1 9 9

447 T2 F-5&6 - 93 - - - - 79 14 14 107 107

RT summary up to May-23 Page 29 of 34 768423397.xlsx


Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Bend-02
Ferrule

448 T2 F-6&7 - 93 - - - - 90 3 3 96 96

449 T2 F-7&8 - 93 - - - - 80 13 13 106 106

450 T3 F15 24 - - - - - 24 - - 24 24

Normal
451 T3 ferrule F16 24 - - - - - 24 - - 24 24

452 T3 F15&16 - 93 - - - - 93 - - 93 93

453 T9 F43 24 - - - - - 23 1 1 25 25

Normal
454 T9 ferrule F44 24 - - - - - 22 2 2 26 26

455 T9 F43&44 - 93 - - - - 66 27 27 120 120

456 T5 F23 24 - - - - - 24 - - 24 24

Normal
457 T5 ferrule F24 24 - - - - - 23 1 1 25 25

458 T5 F23&24 - 93 - - - - 91 2 2 95 95

459 T2 F3 24 - - - - - 24 - - 24 24

Normal
460 T2 ferrule F4 24 - - - - - 12 - - 12 12

461 T2 F3&4 - 93 - - - - 93 - - 93 93

462 T3 F11 24 - - - - - 24 - - 24 24

Normal
463 T3 ferrule F12 24 - - - - - 24 - - 24 24

464 T3 F11&12 - 93 - - - - 93 - - 93 93

RT summary up to May-23 Page 30 of 34 768423397.xlsx


Summary of Claimed RA Bills.

Total No. of Films


RA-01 to RA-15 RA-16 (May-2023)

Total no of films
billed uptodate

conducted RT
Balance no of
films to be
films billed in
conduct Re-RT

conduct Re-RT

this RA BILL
Repair films

Repair films
attended and

attended and
films billed
Total no of

Total no of
(no of films)

(no of films)
Repair films

Repair films
C-Seam
L-Seam

Accepted

Accepted
Tunnel Type of
Sl. No Ferrule no. Remarks

Films

Films
no Ferrule

465 T2 F9 24 - - - - - 24 - - 24 24

Normal
466 T2 ferrule F10 24 - - - - - 24 - - 24 24

467 T2 F9&10 - 93 - - - - 93 - - 93 93

TOTAL 4,940 10,974 15,142 779 768 16,689 3,075 201 201 3,477 16,689

Note:-

1. Total no of repair films for the month of May-2023 (in nos)-201

2. Total cost of Repaired films for the month of May- 2023 (in Rs) =201NosX15''XRs15=45225/-

3. Amount being debited from Peddineni sobhan babu RA-Bill for the month of May-2023 (in RS) =45225/-

Site Engineer Planning Section-Incharge

RT summary up to May-23 Page 31 of 34 768423397.xlsx


ULTRASONIC TEST DETAILS RECORDABLE ( 10-5-2023 TO 31-05-2023) RA-015

SL.NO DATE OF UT TUNNEL NO SEGMENT JOINTS NO Nos of joint REMARKS

1 T-06 S8 & S9 1
15.05.2023
2 T-02 S16 & S17 1

3 T-03 S13 & S14 1

4 T-05 S10 & S11 1


16.05.2023
5 T-08 S2 & S3 1

6 T-10 S1 & S2 1
7 T-01 S16 & S17 1
8 T-04 S12 & S13, 1
17.05.2023
9 T-02 S17 & S18 1

10 T-03 S12 & S13 1

Total no of joints billed upto this RA Bill(With Recordable UT) 10

Total no of joints billed upto Previous RA Bill(With Recordable UT) -

Total No of Joint billed in this RA Bill (With Recordable UT) 10 RM

Site engineer Section-Incharge


ULTRASONIC TEST DETAILS RECORDABLE ( UP TO 31-05-2023) RA-015

SL.NO DATE OF UT TUNNEL NO SEGMENT JOINTS NO Nos of joint REMARKS

1 T-02 S8 & S9, S9 & S10, 2

2 T-01 S11 & S12, S10 & S11 2

3 T-03 S5 & S6, S6 & S7, S7 & S8 3


01.02.2023
4 T-05 S6 & S7 1

5 T-06 S2 & S3 1

6 T-04 S6 & S7, S7 & S8 2


7 T-02 S11 & S12, S12 & S13, S13 & 14 3
8 T-04 S9 & S10, 1

9 T-03 S9 & S10, S10 & S11 2

10 T-05 S7 & S8, S8 & S9 2


31.03.2023
11 T-04 S9 & S10, S10 & S11 2

12 T-01 S13 & S14, S14 & S15 2

13 T-06 S3 & S4, S4 & S5,S6 & S7 3

14 T-05 S5 & S6, S6 & S7 2

15 T-06 S7 & S8 1

16 T-04 S11 & S12 1

17 T-02 S14 & S15 1

18 11.04.2023 T-01 S15 & S16 1

19 T-08 S1 & S2 1

20 T-05 S4 & S5, S9 & S10 2

21 T-03 S11 & S12 1

22 T-06 S8 & S9 1
15.05.2023
23 T-02 S16 & S17 1

24 T-03 S13 & S14 1

25 T-05 S10 & S11 1


16.05.2023
26 T-08 S2 & S3 1

27 T-10 S1 & S2 1
28 T-01 S16 & S17 1
29 T-04 S12 & S13, 1
17.05.2023
30 T-02 S17 & S18 1

31 T-03 S12 & S13 1

Total no of joints billed upto this RA Bill (With Recordable UT) 46 No.s

Total no of joints billed upto Previous RA Bill (With Recordable UT) -

Total No of Joint billed in this RA Bill (With Recordable UT) 46 No.s

Site engineer Section-Incharge Planning


ULTRASONIC TEST DETAILS NON-RECORDABLE ( UP TO 10-05-2023) RA-015

QUANTITY IN
SL.NO DATE OF UT TUNNEL NO SEGMENT JOINTS NO Nos of joint LENGTH IN M REMARKS
RM

1 19.07.2022 T-01 S1 & S2 1 28.26 28.26

2 12.10.2022 T-02 S2 & S3 1 28.26 28.26

3 13.10.2022 T-03 S1 & S2 1 28.26 28.26

4 18.11.2022 T-01 S4 & S5, S5 & S6 2 28.26 56.52

5 T-04 S1 & S2 1 28.26 28.26


19.11.2022
6 T-02 S4 & S5, S5 & S6 2 28.26 56.52

8 T-03 S2 & S3 1 28.26 28.26


01.12.2022
9 T-04 S2 & S3 1 28.26 28.26

10 02.12.2022 T-05 S1 & S2 1 28.26 28.26

12 03.12.2022 T-02 S1 & S2, S3 & S4 2 28.26 56.52

13 T-01 S7 & S8 1 28.26 28.26


16.12.2022
14 T-02 S7 & S8 1 28.26 28.26

15 17.12.2022 T-01 S8 & S9 1 28.26 28.26

17 T-01 S3 & S4, S6 & S7 2 28.26 56.52


17.12.2022
18 T-02 S6 & S7 1 28.26 28.26 240000

19 T-03 S3 & S4, S4 & S5 2 28.26 56.52


11.01.2023
20 T-04 S3 & S4 1 28.26 28.26

21 12.01.2023 T-04 S4 & S5, S5 & S6 2 28.26 56.52

22 T-01 S9 & S10 1 28.26 28.26


13.01.2023
23 T-01 S2 & S3 1 28.26 28.26

Total 26 734.76

Total Length of being billed in this RA Bill= (in RM) 734.76