0580 m24 Ms 32 (Provisional)
0580 m24 Ms 32 (Provisional)
0580 m24 Ms 32 (Provisional)
Mathematics 0580/32
MARK SCHEME
[Turn over
0580/32 Qualification - Mark Scheme March 2024
PRE-STANDARDISATION
1(c) 11 1
1(d)(i) acute 1
1(d)(ii) 37 1
Angles on a straight line add 1 Angles [on a straight] line [add to] 180
to 180 allow sum for add or [are] 180
1(d)(iii) 32 1
Page 9 of 17
0580/32 Qualification - Mark Scheme March 2024
PRE-STANDARDISATION
2(b) 65 3 5 2
M2 for 39 × 3 oe Consider SC1 for use of 5
3 39 soi by 13
or M1 for 39 is equivalent to 5 or for 3
2(c)(i) A straight line through (0,0) and 2 see overlay for tolerance
(100,22) B1 for a straight line drawn through the minimum length full width or height of grid
origin
or for 2 correct points plotted
2(c)(ii) 4.55 or 4.545… 1 6
4
11
Page 10 of 17
0580/32 Qualification - Mark Scheme March 2024
PRE-STANDARDISATION
2(d) 56500, 56600 or 56540 to 3 M2 for 𝜋 × 1.52 ×8×1000 oe 18000π implies M2 (not 3 marks as context)
56560…. or 𝜋 × 1502 ×800÷1000 oe
or M1 for 𝜋 × 1.52 ×8 oe 18π (56.5to 56.6) or 18000000π implies M1
or 𝜋 × 1502 ×800 oe
3.142=56556
or B1 for final answer figs 565 to 566 π=56548
3.14=56520
If 0 scored, SC1: 22/7=56571
for their volume in m3 ×1000
or for their volume in cm3 ÷1000
or for stating clearly 1m3=1000l
or 1000cm3=1l
Page 11 of 17
0580/32 Qualification - Mark Scheme March 2024
PRE-STANDARDISATION
3(a) Correct triangle drawn with 2 B1 for correct triangle drawn with For 2 or 1 mark, arcs must be intersecting
construction arcs. incorrect or no arcs
or for 2 correct arcs drawn
If 0 scored, SC1 for reversed triangle
with arcs.
3(b)(i) G 1
3(b)(ii) F 1
6.582 to 6.583 A1
360
3(c)(iii) M2 M1 for 180 − 2 × 62 oe 56
180−2×62
Page 12 of 17
0580/32 Qualification - Mark Scheme March 2024
PRE-STANDARDISATION
4(a)(i) 3 1
4(a)(ii) 11 1
58
cao
4(a)(iii) Completely correct bar chart 4 B3 for a bar height 8 drawn for
Wednesday or a bar height 12 drawn for
Friday.
or
58−3−4−4−16−11 soi by 4 or 8 or12
M2 for 2+3
× 𝑘 oe
𝑘 = 1,2 or 3
or
soi by 20
M1 for 58 − 3 − 4 − 4 − 16 − 11 oe
4(a)(iv) Saturday 1
4(b) 528 2 4
M1 for 550 × (1 − 100) oe
or B1 for 22
4(c) positive 1 ignore embellishments
Page 13 of 17
0580/32 Qualification - Mark Scheme March 2024
PRE-STANDARDISATION
5(a)(ii) Completely correct curve 4 B3FT for 7 or 8 correctly plotted points tolerance half a square accuracy
or daylight above y=13
B2FT for 5 or 6 correctly plotted points
or
B1FT for 3 or 4 correctly plotted points
5(a)(iii)(a) 𝑥 = 2.5 oe 1
5(a)(iii)(b) 13 1
5(b) 9 1
Page 14 of 17
0580/32 Qualification - Mark Scheme March 2024
PRE-STANDARDISATION
Page 15 of 17
0580/32 Qualification - Mark Scheme March 2024
PRE-STANDARDISATION
7(b)(i) −6 1
Page 16 of 17
0580/32 Qualification - Mark Scheme March 2024
PRE-STANDARDISATION
8(b)(ii) 123 1 B1FT for their n(F∪V) B1FT only available if a number placed in each
of the 3 circle parts of diagram
Page 17 of 17