REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS


AND HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY

RECOMMENDING APPROVAL:

HEAD ARCHITECTURAL SECTION DATE

APPROVED:

BUILDING OFFICIAL DATE

RECOMMENDING APPROVAL:
PLAN PLAN PLAN S PLAN PLAN
4.00 3.55 3.11 3.55
3.11 0.22 3.55 0.22
0.22 3.55 0.22 0.22 2.67 2.67 LAND USE & ZONING

0.22
0.22 4.00 0.22

0.22
APPROVED:
0.22

0.22

0.22
HEAD DATE
SCHEDULE OF DOORS
MARK QUANTITY DOOR TYPE FINISHES LOCATION
D1 1 METAL DOOR PAINTED (DARK BROWN) LIVING AREA RECOMMENDING APPROVAL:

D2 5 FLUSH DOOR PAINTED (DARK BROWN) MASTER BEDROOM, BEDROOM 1, SERVICE AREA
D3 2 PVC FLUSH DOOR BROWN COLOR TOILET AND BATH
9.33

6MM THK. GLASS (BROZE) ON

9.33

9.33

9.33
S D4
D5
3
1
SLIDING GLASS DOOR

METAL DOOR
POWDER COATED ALUM. (WHITE)

PAINTED (DARK BROWN)


LIVING AREA, T & B, BEDROOM 2
DINING
LINE AND GRADE
APPROVED:

HEAD DATE

1 DOOR SCHEDULE
S-4 SCALE 1:105 METERS
RECOMMENDING APPROVAL:
FIN. FLOOR LINE FIN. FLOOR LINE
ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION
D4
D1 D2 D3 D5
ARCHITECTURAL
APPROVED:

HEAD DATE

RECOMMENDING APPROVAL:

STRUCTURAL
APPROVED:
INTERIOR INTERIOR INTERIOR INTERIOR

HEAD DATE
S
PLAN PLAN PLAN PLAN

RECOMMENDING APPROVAL:
5.33 0.44 0.33 2.67 0.33 0.44

0.44 0.33 0.33 0.44 4.33


0.44
0.44 0.33
0.33 0.33

0.33 0.33

0.33 0.33
0.67

SANITARY
0.67

0.11
0.11
0.11

0.11 SCHEDULE OF WINDOWS


2.67

2.66

4.33
4.33

MARK QUANTITY WINDOW TYPE FINISHES LOCATION APPROVED:


0.44 0.33

W1 7 SLIDING WINDOW 6MM THK. GLASS (BROZE) ON POWDER COATED ALUM. (WHITE) LIVING AREA, MASTER BEDROOM, BEDROOM 1, DINING
0.33 0.33
5.33

5.33

5.33

HEAD DATE
W2 5 JALOUPLUS WINDOW 6MM THK. GLASS (BROZE) ON POWDER COATED ALUM. (WHITE) MASTER BEDROOM, BEDROOM 1, 2F T & B, LIVING, KITCHEN
0.33

0.11
S
1.33

W3 1 JALOUPLUS WINDOW 6MM THK. GLASS (BROZE) ON POWDER COATED ALUM. (WHITE) 1F TOILET AND BATH
2.67

W4 1 JALOUPLUS WINDOW 6MM THK. GLASS (BROZE) ON POWDER COATED ALUM. (WHITE) 2F TOILET AND BATH
2.67 RECOMMENDING APPROVAL:
0.33

0.33
9.33

9.33

9.44

2.67
WINDOW SCHEDULE
0.33

0.33

0.33
6.66

2
6.77

ELECTRICAL
5.33

S-4 SCALE 1:115 METERS


4.00

4.00

5.33 2.67
APPROVED:

FIN. FLOOR LINE FIN. FLOOR LINE FIN. FLOOR LINE HEAD DATE
FIN. FLOOR LINE

W1 ELEVATION W2 ELEVATION W3 ELEVATION


W4 ELEVATION RECOMMENDING APPROVAL:

MECHANICAL
APPROVED:

HEAD DATE

FROM THE OFFICE OF: REG. NO: 14329 PROJECT TITLE: OWNER: SHEET CONTENTS SHEET NO:

PTR: MR. CARLOS S. GAINSAN & FOR PERMIT AS SHOWN

KHYLA B. GAINSAN
PALINPINON, VALENCIA
ISSUED ON:
ISSUED AT:
09/03/2023
DGTE CITY
A PROPOSED TWO STOREY RESIDENTIAL BUILDING
DUMAGUETE-PALINPINON RD, PALINPINON, VALENCIA
MRS. ROWENA B. GAINSAN
DUMAGUETE-PALINPINON RD, PALINPINON, VALENCIA
DATE: SEPTEMBER 2023
A01
TIN: 143-787-143 DRAWN BY: KHYLA B. GAINSAN 1 8