Prashant Kumar CV

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

Prashant Kumar

E-mail: - [email protected]
Contact no.: - 7003210072

Career Objective:- To explore myself in terms of abilities and experience to achieve goal of the company and
be part of organization’s success.

Experience Total 14 years’ experience and having good exposure in 2G, 3G & 4G (BSS O&M,Project,
OHS,SAFETY of sites and Transmission,KPI improvement throughput testing ,Improving coverage and quality of Network
, LTE Architecture, Interfaces, Protocol, MIMO, OFDM, S1 & X2 Interfaces, ENodeB, Bandwidth Provisioning . Looking after
all transmission equipment (ceragon IP10,IP20) based on IP & VLAN. LAG Protection implementation

Professional Experience

 Currently Working In EGIL(NR Switch) for Verizon(USA),Now On ATT as Ran Engineer


 Working in Nokia Networks as 2G,3G & 4G Cluster in charge for BHARTI Airtel from 12th JUNE 2013 till
11Jan 2020
 Working in ZTE Telecom India Pvt.Ltd. as Cluster Lead for Bharti Airtel LTE MS & project in Kolkata till
11th June 2013
 Worked with ZTE Telecom India Pvt.Ltd. as Cluster Lead for Reliance Communications Project
 Worked in Wireless T.T Info Services Ltd (Viom Networks) as Cluster Head for Tripura & Meghalaya
based in Shillong from 10th October 2008 to 13th Nov 2010.
 Worked as FM Engineer in Leaseforcee (Ericsson), for Tripura Airtel Project from 2nd July 2007 to 9th
October2008.
 Worked as Trainee Engineer in Ericsson India Pvt Ltd from Jan 2007 to June 2007.

Present Job Profile EGIL – Verizon Now on ATT July 2021-till Present

 RETs configuration on Site after Antenna change.


 Radio Swap & Scripting to RRU 8843 & RRU 4449
 Changing of MIMO & Power Configuration for the Radio
 VSWR & RSSI troubleshooting
 Site certification of the Sites
 Making Script for Radio swap & RETS configuration
 5g Radio creation & Rilink creation
 Resolving fiber loss at the sites
 Working on Baseband 6648 & 6630

1
Previous Job Profile-Nokia Networks(Bharti & Vodafone MS)-12th June 2013 to 11th Jan 2020

 Responsible for I&C of Ericsson BTS equipment like DUW, DUG, Baseband5212,
Baseband5216 and TCU
 Responsible for I&C of NOKIA BTS equipment like ULTRA, FLEXI, MR and FSMF.

 Responsible for I&C of Transmission Equipment like Ceragon IP-10, ip-20, NEC, Huawei

 RTN905-910-950A, 1500R and SDH link, Flexi Hybrid, FIU, Tejas MUX, ECI BG20

 & 30, XDM40, XDM100

 Looking after Airtel LTE handover from ZTE to NSN


 Daily follow up of handover related issues with ZTE
 Responsible for handling 450 eNodeB performance
 Analysis for SCFT report & cluster report
 Field data analysis for meeting committed KPIs including coverage, throughput, latency.
 Ultra, Metro& Flexi BTS commissioning, integration, and Software related troubleshooting.
 BTS Hardware related troubleshooting.
 NOKIA Transmission (RRI, E1T1, and FIU) equipment configuring, PCM routing, planning and
corresponding troubleshooting.
 Fault identification and rectification of Link down cases.
 Defining protection for using Metro Hub.
 Preliminary activity of Tejas MUX.
 TRX addition, reconfiguring of Ultra BTS and splitting and segmentation of Flexi BTS.
 BSC logging and monitoring site status.
 Working on total IP based network for Bharti Kolkata.

Previous Job Profile-(Bharti 4G MS Kolkata )

Role Cluster Lead (Zte India Pvt Ltd)


 Coverage KPI Optimization.
 RF Drive test and optimization of Network.
 Improving coverage and quality of Network.
 Making SCFT & Cluster & Different Kind of Testing Reports.
 Successfully completed TCP & UDP Testing.
 Creating script file using BCT tool for site configuration (XML File).
 Work with ZTE’s NETNUMEN Software for Fault & Configuration Management
 Cluster Lead for Kolkata Handling more than 856 sites
 Trouble shooting of critical faults in the network and resolving them in the given timeline.
 Site Monitoring and alarm handling
 Throughput testing of all the sites of Kolkata by my Team
 Good understanding of signaling in LTE system & utilizes the same for resolving typical issue.
 L2/L3 Layer architecture (MAC, RLC, PDCP, RRC)
 Conducting AT of all the sites handed over by project
 Coordinating with different vendors for site timely restoration.
 Troubleshooting & rectification of alarms in E NodeB
 Resolving customer complaints.

2
Previous Job Profile-RComm -3G Project

Role Cluster Lead (Zte India Pvt Ltd)

 Swapped 200 sites in Mizoram from Alcatel BTS to ZTE BTS


 Integration of RNC, BSC ,NODE B & BTS sites
 Worked in SDR 8800,8900, & V3 BTS of ZTE
 Up gradation from 3E1 to 4E1 of Iub interface
 Providing E1 to the sites
 Conducting stability test for E-1 using BER Meter
 VSWR testing of feeder cable with Anritsu & Bird site masters
 Conducting AT with projects personnel for BSC & BTS

Previous Job Profile - Wireless TT Info Services Ltd-10th OCT 2008 to 13th Nov 2010

Role Cluster Head (Wireless TT Info Services Ltd) now (Viom Networks)

 Negotiating with owners to acquire site according to Latitude & Longitude given by planning team
 Cooperating with legal team for preparing documents.
 Corresponding with governmental organization to get permission for installation of sites.
 Coordinating with legal Dep. for checking documents of leases
 Performing the quality audits, preventive maintenance, and acceptance test for the sites.
 Envisaging the infra requirements for network expansion.
 Co-ordination with vendors.
 Operation and maintenance of the zone and technical support to field staffs.
 Ensuring network availability up to 99.9% in my cluster.

Previous Job Profile - BSS Airtel Project-2nd July 2007 – 9th Oct 2008

Role FM Engg (BSS Airtel Project)

 CP & APG backup of BSC and RBSC


 Cluster Head for Agartala Handling RBSC and all the sites in Agartala.
 To define A-ter for all nodes( BSC & RBSC)
 Site Monitoring and alarm handling.
 Verifying & testing tributary for E-1 on DXX
 Commissioning & maintenance of Mini Link-E, High cap & Traffic node
 Conducting stability test for E-1 using BER Meter
 Software upgreadation for transmission
 Troubleshooting & rectification of alarms in MINILINK & BTS
 Troubleshooting & rectification of all Transmission Equipment in Network

Software & Tool Handle

Winfoil for access Ericsson BSC & RBSC


MINILINK Service manager for Mini-Link
OMT (Operation & Maintenance Tool) for Ericsson BTS
VSWR Meter, BER Meter, Power Meter, Multimeter
Key Skill

 Transmission equipments commissioning (Mini Link-E, High cap, Traffic node)


 Commissioning & integration of ADM (DXX 6310, AXX9100 & AXX9200)
 Commissioning of GSM BTS RBS 2000 family(ERICSSON)
 Operation & maintenance of network element
 Troubleshooting the problems arising in the network
 Acceptance Test (AT) FOR MICROWAVE

3
Educational Qualification

 B.Tech Degree in Electronics & Communication from Sikkim Manipal Institute of Health Medical &
Technological Sciences (SMUHMTS) ,Majitar,Ranpo East Sikkim in 2007.
 HSC from Holy Mission Higher Secondary School
 SSC from Patna Central School

Personal Details

Name Prashant Kumar


Passport No Z5912164
Date of Birth 09/11/1985.
Marital Status Married
Permanent Address S/o Vijay Kumar Choudhary
South Raghunath Tola, Road No-39
Anishabad, Patna, (Bihar)

You might also like