KWH Calculation 1
KWH Calculation 1
KWH Calculation 1
MOULD
85psi
95psi
100hp 30hp CASTING
108psi P1-7 bar ON Office Lobby
95psi
ROBOT
72.5psi 80psi
85psi Prodution
Area 70psi
Prodution PCM 50hp
Area
OFF
60psi
KILN 75psi
BLAST
SPRAY
70psi
LPG
NG TNB
Current Supply Main
Requirement Entrance
Formula used :
Min Max Target P1 P2 P(kW)=√3 x PF x I(A) x VL-L(V) / 1000
Before 51.8kw 75kw 7.5bar 7 bar 8 bar Voltage 415 V
96.7A 132A Running amp 64.1 Amp
Cost/mth(RM) 7,156.34 9,768.74 Power Factor 0.9
Now 34.3kw 57.5kw 7bar 7 bar 7.5 bar Root 3 1.732
64.1A 99.4A Power consumed (varies from actual reading taken @ compressor panel) 41.46642 kW/h
Cost/mth(RM) 4,743.76 7,356.10 Operating hours (est) 10 hrs
Est. % Savings 33% 25% provided the 50hp compressor is shut down Operating days(est) 26 days
Total monthly kwh consumed 10,781.27 kwh
Price per kWh (MYR) 0.44
Estimated Monthly Energy Cost (MYR) 4,743.76