NEKTOR ENGINEERS & PROJECT

CONSULTANTS
PRILIMINARY QUANTITY SHEET
Project Name : Takshashila Crest
Project Description : Unbonded PT Slab-1 at Lower Ground Floor Roof Slab

Number Of Tendon/Duct Total Length


Tendent Marking
Strands Length (m) (m)
1 11 17.63 193.93
2 5 15.72 78.60
3 4 22.47 89.88
4 8 6.4 51.20
5 12 24.74 296.88
6 10 20.6 206.00
7 8 6.8 54.40
8 6 16.68 100.08
9 5 41.12 205.60
10 3 22.97 68.91
11 2 31.72 63.44
12 3 21.17 63.51
13 5 16.41 82.05
14 5 20.8 104.00
15 5 18.41 92.05
16 6 40.40 242.40
17 6 18.10 108.60
18 6 14.15 84.90
19 6 30.16 180.96
20 3 8.84 26.52
21 4 8.92 35.68

877.75 123 meters 2429.59


PT Slab Area Nos of Tendon extra meters 73.80
total meters 2503.39
kg 1940.13
kg/sq.m 2.21
kg/sq.ft 0.67
NEKTOR ENGINEERS & PROJECT
CONSULTANTS
PRILIMINARY QUANTITY SHEET
Project Name : Jigarbhai SBR Commercial
Project Description : Bonded PT System in PT Beams at Basement-1
Roof Slab lvel
Number Of Tendon/Duct Total Length
Sr NO
Strands Length (m) (m)
1 14 35.124 491.736
2 28 10.204 285.712
3 19 16.271 309.149
4 14 12.298 172.172
5 14 19.123 267.722
6 14 14.106 197.484
7 7 28.817 201.719
8 28 29.751 833.028
9 14 10.502 147.028
10 19 12.194 231.686
11 76 7.156 543.856
12 7 10.204 71.428
13 14 10.781 150.934
172.30 268 meters 3903.65

TOTAL BEAM Nos of Tendon extra meters 160.8


LENGTH

total meters 4064.45


kg 3162.15
kg/m 18.35
kg/ft 5.59