RFP Udaipur
RFP Udaipur
RFP Udaipur
GEM/2023/B/4288339
Dated/ दनांक : 04-12-2023
1/6
Bid Details/ बड ववरण
(a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the
relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service
Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this
Policy./जेम क शत के अनुसार ईएमड छूट के इ छुक बडर को संबंिधत केटे गर के िलए बड के साथ वैध समिथत द तावेज़ तुत करने है ।
एमएसई केटे गर के अंतगत केवल व तुओं के िलए विनमाता तथा सेवाओं के िलए सेवा दाता ईएमड से छूट के पा ह। यापा रय को इस नीित के
दायरे से बाहर रखा गया है ।
(b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable./ईएमड और संपादन
जमानत रािश, जहां यह लागू होती है , लाभाथ के प म होनी चा हए।
Beneficiary/लाभाथ :
76-C, Sector 18, Gurugram 122015
Wapcos Limited, WAPCOS Limited, WAPCOS Limited, Ministry of Water Resources River Development and Ganga
2/6
Rejuvenation
(Wapcos Limited)
Splitting/ वभाजन
1. The minimum average annual financial turnover of the bidder during the last three years, ending on 31st
March of the previous financial year, should be as indicated above in the bid document. Documentary evidence in
the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant /
Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the
date of constitution / incorporation of the bidder is less than 3-year-old, the average turnover in respect of the
completed financial years after the date of constitution shall be taken into account for this criteria.
2. Years of Past Experience required: The bidder must have experience for number of years as indicated above in
bid document (ending month of March prior to the bid opening) of providing similar type of services to any
Central / State Govt Organization / PSU / Public Listed Company. Copies of relevant contracts / orders to be
uploaded along with bid in support of having provided services during each of the Financial year.
3. Purchase preference to Micro and Small Enterprises (MSEs): Purchase preference will be given to MSEs as
defined in Public Procurement Policy for Micro and Small Enterprises (MSEs) Order, 2012 dated 23.03.2012 issued
by Ministry of Micro, Small and Medium Enterprises and its subsequent Orders/Notifications issued by concerned
Ministry. If the bidder wants to avail the Purchase preference for services, the bidder must be the Service
provider of the offered Service. Relevant documentary evidence in this regard shall be uploaded along with the
bid in respect of the offered service. If L-1 is not an MSE and MSE Service Provider (s) has/have quoted price
within L-1+ 15% of margin of purchase preference /price band defined in relevant policy, then 100% order
quantity will be awarded to such MSE bidder subject to acceptance of L1 bid price.
OM_No.1_4_2021_PPD_dated_18.05.2023 for compliance of Concurrent application of Public Procurement Policy
for Micro and Small Enterprises Order, 2012 and Public Procurement (Preference to Make in India) Order, 2017.
4. Estimated Bid Value indicated above is being declared solely for the purpose of guidance on EMD amount and
for determining the Eligibility Criteria related to Turn Over, Past Performance and Project / Past Experience etc.
This has no relevance or bearing on the price to be quoted by the bidders and is also not going to have any
impact on bid participation. Also this is not going to be used as a criteria in determining reasonableness of
quoted prices which would be determined by the buyer based on its own assessment of reasonableness and
based on competitive prices received in Bid / RA process.
5. Past Experience of Similar Services: The bidder must have successfully executed/completed similar Services
over the last three years i.e. the current financial year and the last three financial years(ending month of March
prior to the bid opening): -
1. Three similar completed services costing not less than the amount equal to 40% (forty percent) of the
estimated cost; or
2. Two similar completed services costing not less than the amount equal to 50% (fifty percent) of the estimated
cost; or
3. One similar completed service costing not less than the amount equal to 80% (eighty percent) of the estimated
cost.
3/6
Last 3 years average business revenue from consulting:As per Tender document
Number of projects completed in India having similar scope & size of proposed project under
hiring:As per Tender document
Scope Of work:1701696029.pdf
Profile of Consultants:1701696032.pdf
Pre-qualifications Criteria:1701696037.pdf
Payment Terms:1701696039.pdf
This Bid is based on Least Cost Method Based Evaluation (LCS). The technical qualification
parameters are:-
Parameter Name Max Marks Min Marks Evaluation Document Seller Document Required
Specification Values
Core
Consulting Hiring of Agency for Providing Manpower Infrastructure Logistics Technical Support for the
Category/ works in Distt Udaipur Division Rural District Udaipur Distt Pratapgarh Pratapgarh division
Stream Package1
Consultant's
DPR,RFP Preparation & Bid Process Management , Project Management
Profile
Proof of Concept
No
(POC) Required
Deployment of
Consultants/Reso Hybrid(As specified in scope of work)
urce
Addon(s)/एडऑन
4/6
Consignees/Reporting Officer/परे षती/ रपो टग अिधकार
Consignee
S.No./ . Reporting/Officer/ Additional
To be set as
परे षती/ रपो टग Address/पता Requirement/अित र
सं. 1
आव यकता
अिधकार
122015,Plot No 76C,
1 Sudhanshu Goyal Institutional Area, Sector 18, 1 N/A
Gurugram
Buyer Added Bid Specific Terms and Conditions/ े ता ारा जोड़ गई बड क वशेष शत
1. Generic
OPTION CLAUSE: The buyer can increase or decrease the contract quantity or contract duration up to 25
percent at the time of issue of the contract. However, once the contract is issued, contract quantity or
contract duration can only be increased up to 25 percent. Bidders are bound to accept the revised
quantity or duration
Disclaimer/अ वीकरण
The additional terms and conditions have been incorporated by the Buyer after approval of the Competent
Authority in Buyer Organization, whereby Buyer organization is solely responsible for the impact of these clauses
on the bidding process, its outcome, and consequences thereof including any eccentricity / restriction arising in
the bidding process due to these ATCs and due to modification of technical specifications and / or terms and
conditions governing the bid. Any clause(s) incorporated by the Buyer regarding following shall be treated as
null and void and would not be considered as part of bid:-
1. Definition of Class I and Class II suppliers in the bid not in line with the extant Order / Office Memorandum
issued by DPIIT in this regard.
2. Seeking EMD submission from bidder(s), including via Additional Terms & Conditions, in contravention to
exemption provided to such sellers under GeM GTC.
3. Publishing Custom / BOQ bids for items for which regular GeM categories are available without any
Category item bunched with it.
4. Creating BoQ bid for single item.
5. Mentioning specific Brand or Make or Model or Manufacturer or Dealer name.
6. Mandating submission of documents in physical form as a pre-requisite to qualify bidders.
7. Floating / creation of work contracts as Custom Bids in Services.
8. Seeking sample with bid or approval of samples during bid evaluation process.
9. Mandating foreign / international certifications even in case of existence of Indian Standards without
specifying equivalent Indian Certification / standards.
10. Seeking experience from specific organization / department / institute only or from foreign / export
experience.
11. Creating bid for items from irrelevant categories.
12. Incorporating any clause against the MSME policy and Preference to Make in India Policy.
13. Reference of conditions published on any external site or reference to external documents/clauses.
14. Asking for any Tender fee / Bid Participation fee / Auction fee in case of Bids / Forward Auction, as the
case may be.
Further, if any seller has any objection/grievance against these additional clauses or otherwise on any aspect of
this bid, they can raise their representation against the same by using the Representation window provided in
the bid details field in Seller dashboard after logging in as a seller within 4 days of bid publication on GeM. Buyer
is duty bound to reply to all such representations and would not be allowed to open bids if he fails to reply to
5/6
such representations.
This Bid is governed by the General Terms and Conditions/सामा य िनयम और शत, conditons stipulated in Bid and
Service Level Agreement specific to this Service as provided in the Marketplace. However in case if any condition
specified in General Terms and Conditions/सामा य िनयम और शत is contradicted by the conditions stipulated in
Service Level Agreement, then it will over ride the conditions in the General Terms and Conditions.
In terms of GeM GTC clause 26 regarding Restrictions on procurement from a bidder of a country which shares a land border with India, any bidder from a country which
shares a land border with India will be eligible to bid in this tender only if the bidder is registered with the Competent Authority. While participating in bid, Bidder has to
undertake compliance of this and any false declaration and non-compliance of this would be a ground for immediate termination of the contract and further legal action
in accordance with the laws./ जेम क सामा य शत के खंड 26 के संदभ म भारत के साथ भूिम सीमा साझा करने वाले दे श के बडर से खर द
पर ितबंध के संबंध म भारत के साथ भूिम सीमा साझा करने वाले दे श का कोई भी बडर इस िन वदा म बड दे ने के िलए तभी पा होगा
जब वह बड दे ने वाला स म ािधकार के पास पंजीकृ त हो। बड म भाग लेते समय बडर को इसका अनुपालन करना होगा और कोई भी
गलत घोषणा कए जाने व इसका अनुपालन न करने पर अनुबंध को त काल समा करने और कानून के अनुसार आगे क कानूनी कारवाई
का आधार होगा।
6/6
Tender Document
December 2023
TABLE OF CONTENT
TECHNICAL BID
SECTION PARTICULAR
NOTICE INVITING TENDER
SECTION I INSTRUCTIONS TO BIDDERS
SECTION II SELECTION AND QUALIFYING CRITERIA & GENERAL CONDITIONS
SECTION III FORMS
LETTER OF TRANSMITTAL
FORM A: FINANCIAL INFORMATION
FORM B: STATEMENT OF SIMILAR WORKS
FORM C: STRUCTURE & ORGANISATION
FORM D: NON-BLACKLISTING / DEBARMENT CERTIFICATE
FORM E: UNDERSTANDING THE PROJECT SITE
FORM F: NO DEVIATION CERTIFICATE
FORM G: INTEGRITY PACT
FORM H: FORMAT FOR LITIGATION HISTORY, LIQUIDATED DAMAGES,
DISQUALIFICATION
FORM I: DETAILS OF TECHNICAL PERONNEL PROPOSED WITH BIO-DATA
FORM J: BANKER’S CERTIFICATE (SOLVENCY) FROM THE BANK
SECTION IV ANNEXURES
ANNEXURE-I: BANK GUARANTEE FORMAT FOR EMD
ANNEXURE-II: PERFORMANCE SECURITY
SECTION -V FINANCIAL BID
ANNEXURE - A FORM OF QUOTATION
ANNEXURE - B BILL OF QUANTITIES (BOQ) AND SCHEDULE OF PRICE
The tender document has to be downloaded from above specified website only. Bidders are advised
to visit above specified website regularly for updates/ Amendments/ Corrigendum, if any. The
Updates/Corrigendum/Addendum shall be followed up to submission of tender and it will be the
part of tender. The full details about the work, specifications, terms and conditions shall be
available in the Tender Document. The tender document has to be submitted online on GEM
Portal (https://gem.gov.in/).
The purpose of this NIT is to provide with information to interested parties to assist the preparation
of their bid. While WAPCOS Limited has taken due care in the preparation of the information
contained herein, and believe it to be complete and accurate, neither it nor any of its authorities or
agencies nor any of its respective officers, employees, agents or advisors give any warranty or make
any representations, expressed or implied as to the completeness or accuracy of the information
contained in this document or any information which may be provided in association with it.
Further, WAPCOS Limited does not claim that the information is exhaustive. Respondents to this NIT
are required to make their own inquiries and will be required to confirm, in writing, that they have
done so and they did not rely solely on the information in NIT. WAPCOS Limited is not responsible
if no due diligence is performed by the bidders.
IMPORTANT POINTS
i. Joint Ventures / Associations may be allowed. The number of JV partner is restricted to one only.
i.e. (Lead + 1 JV)
ii. All Bidders are hereby cautioned that Bids containing any deviation or reservation as
described in Clauses of “Instructions to Bidders” shall be considered as non-responsive and shall
be summarily rejected.
iii. WAPCOS Ltd. reserves the right to accept or reject any or all bids without assigning any
reasons. No Bidder shall have any cause of action or claim against the WAPCOS Ltd for rejection
of his Bid and will not be bound to accept the lowest or any other tender.
iv. No reimbursement of cost of any type or on any account will be paid to persons or entities
submitting their Bid.
v. All information submitted in response to this NIT shall be the property of WAPCOS Limited
and it shall be free to use the concept of the same at its will.
vi. It is hereby declared that WAPCOS is committed to follow the principle of transparency, equity
and competitiveness in public procurement.
vii. Inviting Tender (NIT) is an invitation to offer made on the condition that the Bidder will sign the
integrity Agreement, which is an integral part of tender/bid documents, failing which the
tenderer/bidder will stand disqualified from the tendering process and the bid of the bidder
would be summarily rejected. This declaration shall form part and parcel of the Integrity
Agreement and signing of the same shall be deemed as acceptance and signing of the Integrity
Agreement on behalf of the WAPCOS.
SECTION-I
INSTRUCTION TO BIDDER
SECTION-I
INSTRUCTION TO BIDDER
1.1 INTRODUCTION
This Part of the Bidding Documents i.e. Instructions to the bidder provides the information
necessary for bidders to submit responsive bids, opening and evaluation and process for award
of contract. If any information provided in this document has conflict with the provision of
general conditions, than the later shall prevail.
The Bidder, in his own interest is requested to read very carefully these instructions and the
terms & conditions as incorporated in all parts of tender document along with all
amendments/ corrigendum’s / addendums before filling the Bid form. Submission of the Bid
shall be deemed to be the conclusive proof of the fact that the Bidder had acquainted himself
and is in agreement with all the instructions, terms & conditions governing the specification,
unless otherwise specifically indicated/ commented by him in his Bid.
The Sellers/ Agency shall follow the link for reading the training module for GEM Participation
as follows:
TENDER DOCUMENTS
The tender documents are as stated below and should be read in conjunction with any
corrigendum/modification issued on these documents:
Notice Inviting Tender (NIT)
Instructions to Bidders (ITB)
Annexures for Bid Submission
The Bidder is expected to examine carefully the contents of all the above documents. Failure
to comply with the requirement of the Bid submission will be at the Bidder’s own risk. Bids
which are not substantially responsive to the requirement of the bidding document shall be
rejected.
PREPARATION OF BIDS
1) Bidder should take into account any corrigendum published on the tender document
before submitting their bids.
2) Please go through the tender advertisement and the tender document carefully to
understand the documents required to be submitted as part of the bid. Please note the
number of covers in which the bid documents have to be submitted, the number of
documents - including the names and content of each of the document that need to be
submitted. Any deviations from these may lead to rejection of the bid.
3) The bidder, in advance, should get ready the bid documents to be submitted as indicated
in the tender document / schedule and generally, they can be in PDF / XLS / RAR / DWF/JPG
formats.
Technical Bid
The Technical bid may be declared non-responsive / invalid, if the Bid is not accompanied by
the requisite documents as stipulated in ITB of Bid document. The Technical Bid should not
contain any financial information related to Financial Bid. The technical bid shall contain:
Documentary evidence of having deposited the cost of bid document and EMD as per NIT.
Signed & scanned copy of all duly filled Forms as per clause 3.0 of Section-II and Annexures as
per clause 7 of ITB and other requirements mentioned elsewhere in the Tender document.
Financial Bid
The Financial Bid shall not include any Commercial or Technical conditions/ information.
Financial offers shall be submitted as per prescribed format given in Section - V: Financial Bid
of Bid document. Financial Bid shall be uploaded through GEM Portal of Government of India.
Assistance To Bidders
Any queries relating to the tender document and the terms and conditions contained
therein should be addressed to the Tender Inviting Authority for a tender or the
relevant contact person indicated in the tender.
Any queries relating to the process of online bid submission or queries relating to GeM
Portal in general may be directed to the 24x7 GeM Portal Helpdesk.
Bid Submission
The entire bid-submission would be online process through ETS. Broad outline of submissions
are as follows:
Technical Bid (Envelope-I of the Tender Document)
Financial Bid (Envelope-II of the Tender Document)
tender.
3 EARNEST MONEY DEPOSIT (EMD)
1. An EMD in the form of an Insurance Surety Bonds, Account Payee Demand Draft, Fixed
Deposit Receipt, Banker’s cheque, Bank Guarantee from scheduled/ nationalized/
commercial banks or payment online in an acceptable form, safeguarding the purchaser’s
interest in all respects of the value as specified in the “NIT” may be submitted in favour of
“WAPCOS Limited” payable at New Delhi / Gurugram. Such EMD shall be fully exempted
for bidders with MSME certification for micro & small enterprises only.
2. The Bank Guarantee should be valid for 180 days from bid opening date. The hard copy of
the original instrument in respect of EMD must be submitted at the address as mentioned
in NIT as a part of Technical Bid on or before bid opening date and time as specified. Bid
will not be accepted if original payment instrument against the submitted bid are not
reached by the specified date and time.
3. Bids not accompanied with EMD shall be rejected as non-responsive.
4. The EMD of the unsuccessful bidders would be returned within 30 days of signing of the
contract with the successful bidder.
5. Format of the EMD in the form of Bank Guarantee is mentioned is Annexure I.
6. The bank details of WAPCOS Limited for submission of EMD are as follows:
Account Number – 193502000000290
A/c Holder – WAPCOS Limited
Bank Name – Indian Overseas Bank
Branch name: NHB, Gurugram
IFSC code: IOBA0001935
Forfeiture of EMD
The entire EMD shall be forfeited by WAPCOS Limited in the following events:
1. If the Bidder varies or modifies its proposal in a manner not acceptable to the tender
inviting authority (TIA) after opening of Bid during the validity period or any extension
thereof.
2. If the Bidder tries to influence the evaluation process or canvassing of any kind.
3. If the Bidder/s selected as ‘Service Provider/s’ chose to withdraw the Bid before the
finalization process (failure to arrive at consensus by both the parties shall not be construed
as withdrawal of Bid by the Bidder).
4 COST OF BIDDING
The Bidder shall bear all costs associated with the preparation & submission of the Bid as well
as costs associated for facilitating the evaluation. WAPCOS Ltd shall in no case be responsible
or liable for these costs, regardless of the conduct or outcome of the bidding process.
5 LANGUAGE OF BID
The Bid and all related correspondence and documents relating to the Project shall be in
English language only. Supporting documents and printed literature furnished by the Bidder
may be in another language provided they are accompanied by an accurate English translation
which shall be certified by a qualified translator. Any material that is submitted in a language
other than English and which is not accompanied by an accurate English translation will not be
considered.
6 CURRENCY OF BID
Bid prices shall be quoted in Indian Rupees only.
Tender submitted by tenderer shall remain valid for acceptance as mentioned in NIT from the
date set for submission of the tender. The tenderer shall not be entitled within the said period
to revoke or cancel or vary the tender given or any item thereof, without the consent of
WAPCOS Limited. In case tenderer revokes, cancels, or varies his tender in any manner without
the consent of WAPCOS Limited, within this period, his earnest money will be forfeited.
7 ANNEXURES
The successful Bidder shall submit the following documents and follow the guidelines as per
“Section of Annexures” mentioned in tender document.
Annexure- I :- BANK GUARANTEE FORMAT FOR EMD
Annexure- II :- PERFORMANCE SECURITY
WAPCOS Limited reserves the right to reject any or all the bids or to cancel the Tender, without
assigning any reason(s) whatsoever.
For & on behalf
of WAPCOS Ltd
SECTION- II
SELECTION AND QUALIFYING CRITERIA & GENERAL CONDITIONS
Eligibility Criteria:
a) The value of the work of one similar work of 80% of
estimated tendered value during the last 7 years.
or
b) The value of the work of two similar works of 50% of
estimated tendered value during the last 7 years.
or
c) The value of the work of three similar works of 40% of the
estimated tendered Value during the last 7 years.
No information relating to financial terms of services should be included in the technical bid.
Bids are to be submitted to determine that the bidder has a full comprehension of the
tendered work. Where a bidder technical submittal is found non - compliant with the
requirement of work, it may be rejected. This process is to assure that only technical
acceptable bids are considered for the tendered work.
NOTES:
Bidders who full fill the above requirements shall only be qualified for technical evaluation.
Non-fulfilment of any of the above requirements by any bidder will automatically lead to its
technical disqualification. Therefore, bidders are requested to make sure that they submit all
the relevant papers which meet all the above mentioned requirements.
NOTE: All above two envelopes shall be submitted in one single envelope clearly labeled as
“Technical Qualification Documents for Offline Submission” for the Work (Write Name of
Work/Project as mentioned in NIT) along with Details of Bidders Address, Phone, E-mail on
Envelope.
The quoted rates/amounts shall be deemed to be firm throughout the project till the
completion of work and shall not be subject to any adjustment due to increase in price of
materials, utilities, taxes, duties etc. or any other input for performance of work and the
contract.
The contract may be extended, according to the direction of Project Authority, in this case
also, the rate quoted by the bidder remains firm and no escalation shall be applicable for
extension. Therefore, it is advised to Agency to quote the Percentage rate accordingly.
Do not submit any Financial bid information at the time of submission of offline submission
of technical bid otherwise it will lead to rejection of bid.
The financial proposal is to be filled by bidder in the Form Annexure-B of Tender Document.
After that, same filled Annexure-B, will be uploaded by bidder at the submission of
Financial/Price Bid.
7.1 The bidder shall fill in rates and prices for all the items of the schedule of works. The rates
should be inclusive of all applicable taxes & duties, if any, and also inclusive of applicable
GST.
7.2 The quoted price shall include, but not be limited to, the following activities:
- All the survey works in the field, office work, including preparation of maps/ drawings/
sketches to the scales and extent indicated in the letter of acceptance, provision of skilled
personnel, provision and maintenance of instruments and accessories, carry forward of
temporary bench marks, stay at the project site, TA & DA of employees, provision of suitable
labour etc;
- GEM Transaction Charges as per latest GEM Revenue Policy shall be Payable by the user
directly to GeM for Acceptance of Work Order.
- Restricting or stopping traffic of persons and vehicles near instruments or in sightlines during
instrument observations.
- Taking all necessary safety precautions;
- Clearing sight lines by removal of bushes and scrub.
- Access to the project site
- Making of temporary paths for movement of equipment’s etc.
- Any stoppage of works due to any unforeseen reason.
7.3 The Percentage rate should include all taxes & duties, calibration, insurance, transportation
etc. (including applicable GST) and nothing extra will be paid over and above the contract
price as specified in Annexure-A/B.
7.4 Income tax and all other taxes, levies, impositions, deductions, charges, fees and similar
assessments whatsoever imposed, assessed, levied or collected by the State Government and
the Government of India or any subdivision thereof or any tax authority therein upon the
contractor (Successful bidder to whom the work is awarded by WAPCOS) and his staff, shall
be paid and/ or borne by the Bidder and WAPCOS shall perform duty of deduction from
Bidder’s payments whenever required by law.
7.5 Any conditional bid shall be rejected.
10.1 TECHNICAL
The first stage of technical evaluation will be based on clause 3.0: Qualifying criteria. The
agencies qualifying under clause 3.0 above are only considered for further technical evaluation.
Technical Evaluation of the bids would be carried out on broad parameters as given below:
The evaluation of the tender shall depend upon the technical strength of the Bidder, the
qualification & experience of the staff deployed, the turnover of the company, the nature of the
projects executed of the similar type etc. The Bidder shall be awarded points for each criterion
mentioned below. The weightage of each criterion is also shown against it. The financial bid shall
be opened only of those contractor(s) whose basic qualification criteria is meeting as per clause
3.0 above and whose weightage in technical evaluation criteria will be 80 points or more on
100-point scale. The bidder has to provide inputs to meet the evaluation criteria as given below.
Sufficient data/documents need to be enclosed for technical evaluation.
Criteria at Sr. no A, B & C can be jointly fulfilled by Lead and JV Firm (if any).
WAPCOS reserves the right to reject the Bid under any of the following circumstances:
Shortfall Documents
WAPCOS may ask the Bidder for submission of additional documents, if required. These
documents shall not be relating to Original data submitted by bidder / submission of
EMD/Solvency Certificate. Request for documents and the response shall be in writing and no
changes in the prices of the Bid shall be sought, offered or permitted. No modification of the
Bid and any form of communication with WAPCOS or submission of any additional documents,
not specifically asked for by WAPCOS, will be allowed and even when submitted, they will not
be considered by WAPCOS.
WAPCOS Ltd reserves the right to accept or reject any Bid and to annul the TENDER DOCUMENT
process and reject all such bids at any time prior to award of contract, without thereby incurring
any liability to the affected applicant(s) or any obligation to inform the affected applicants(s) of
the grounds for such decision. The TIA reserves the right to reject incomplete or incorrect bids.
Evaluation Committee shall open the financial Bid of the technically qualified Bidders in the
presence of the Bidders/their authorized representative, who choose to attend, at the
scheduled date and time.
The rates quoted by the Bidder shall be rounded to two decimal places. The decimal places
in excess of two will be discarded during evaluation. The evaluation Committee shall correct
arithmetic errors, if any and sign the same. If any discrepancy is found between the amount
in figures and the amount in words, the amount in words shall prevail.
If a tenderer quotes nil rates, the tender shall be treated as invalid and will not be
considered as lowest tenderer.
All the financial Bids shall then be ranked according to the financial Bid in increasing order
with the bidder quoting the least amount ranked L1, bidder quoting next higher figure as L2
and so on.
The work will be awarded to L1 bidder accordingly.
If the financial bids of lowest two bidders are equal, then the tender will be treated as
cancelled and shall be re-tendered as per the WAPCOS rules.
11.1 The work (contract) will be awarded to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and would be on Least Cost Basis i.e. the
bidder quoting the lowest financial bid would be awarded the work.
11.2 The total time period of the contract shall be 24 months from the date of signing of the
contract. However, the contract may be extended for a period of twelve (12) months or
further as per the need of the Mission on mutual consent and on same terms and conditions
of the Contract Agreement. Also it may be extended as per the client requirement on the
same terms & conditions. The time duration for each scheme shall be considered as per the
scheme wise work orders issued by the client from time to time.
The tender included Various Water Supply Schemes under Jal Jeevan Mission in Distt.
Udaipur (Division Rural District Udaipur) & Distt Pratapgarh (Pratapgarh division) (Package-
1). The Project cost of the schemes is Rs. 459.79 Crores.
11.3 Not-withstanding clause 11.1 as above the employer reserves the right to accept or reject
any bid and to annul the bidding process and reject all bids, at any time prior to award of
contract, without thereby incurring any liability to the affected bidder(s) or any obligations
to inform the bidder or bidder(s) of the ground of the employer action.
12.1 Time of Completion: The total time period of the contract shall be 24 months from the date
of signing of the contract. However, the contract may be extended for a period of twelve
(12) months or further as per the need of the Mission on mutual consent and on same terms
and conditions of the Contract Agreement. Also it may be extended as per the client
requirement on the same terms & conditions. The time duration for each scheme shall be
considered as per the scheme wise work orders issued by the client from time to time.
12.2 The bidder shall mobilize the required manpower as mentioned in the ToR / Scope of Work
within 5 days from issue of Letter of Award.
12.3 The required machineries are to be deployed at Project Site as per the project requirements
12.4 Time for completion is the essence of the contract and no relaxation of any account shall be
entertained. Progress of work shall be monitored on weekly basis.
12.5 The Bidder shall open offices at respective Project Sites as per the client/WAPCOS
requirements.
12.6 The bidder shall provide the vehicle to the WAPCOS Officials for inspection of sites.
12.7 The bidder shall submit the reports/maps in hard copies as well as soft copies in scanned as
well as editable formats.
13.1 A performance security guarantee of 3% of the total value of contract shall be submitted by
the Bidder (successful bidder i.e. lead firm) within 10 working days on award of the works
in the form of Bank guarantee in the specified format.
13.2 Successful tenderer shall unconditionally accept the LOA/LOI within 3 days from the receipt
of LOA/LOI, failing which the award of work may be liable to be cancelled.
13.3 Performance guarantee may be furnished in the form of Account Payee Demand Draft, Fixed
Deposit Receipt, Banker’s cheque, Bank Guarantee from
scheduled/nationalized/commercial banks or online payment in an acceptable form,
safeguarding the purchaser’s interest in all respects.
13.4 Performance guarantee shall remain valid for a period of sixty days beyond the date of
completion of all contractual obligations of the bidder, including operation and / or
maintenance and defect liability period, if any or one month from the date of release of final
payment whichever is later. Since there may be separate timelines for completion for
separate work orders to be issued from time to time, the validity period of each PBG shall
be specified accordingly.
The Bank Guarantee (Performance BG or any other) shall be submitted such that WAPCOS
shall seek the confirmation of submitted Bank Guarantee through SFMS as per detail given
below:
Indian Overseas Bank
NHB Gurugram, Branch Code: 1935
IFSC Code: IOBA0001935
Beneficiary: WAPCOS Limited”
Acknowledgement Number so generated may be provided along with the BG’s.
The Performance Guarantee shall be refunded to the Agency after 60 days of the successful
completion of all activities as per the scope of the work.
B) SECURITY DEPOSIT
Security Deposit of 2.5% (Two Point Five Percent only) of Contract value will be deducted in
each RA bill and will be paid after release of final payment.
14.0 VARIATION
It may be noted that the Schemes has been given in the schedule / ToR / Scope of Work has
been estimated as realistically as possible. However, the works/schemes/projects may be
increased or decreased depending upon the work orders received from the client from time
to time.
No change in the quoted rate shall be allowed due to changes in the quantities of works / No.
of Schemes / Project Cost, actually executed and the quantities given in the schedule of works.
However, any variation is restricted to the variation clause applicable to WAPCOS as per the
Main Agreement with the client.
The Consultant will be paid approved percentage of Project cost as total fee against the
assignment/services delivered to the client. The client shall be under obligation to pay the said
total fees against each project in the following manner:
a) The consultant payment will be made as per the breakup of payment is given below.
= 0.3 X (Total Value of work orders awarded to the contractor x Approved rate in percentage of
work order of the Consultant / Duration of Works in month as specified in the contractors
agreement).
EIC will ensure prorata progress of works. Mobilizing and demobilizing of required resources
have to be ensured by EIC as per prorata progress of works.
1) Team Leader shall submit the time sheet along with monthly invoice raised for payment
verifying the staff deployed and the man days consumed for fulfilling the obligations under
the contract.
2) Monthly payment to the Consultant shall be paid as per approved rate in percentage of cost
of the total work orders after deducting applicable GST from the contractor’s bills.
3) No payment shall be made to Consultant against price escalation paid to the contractor.
4) If in case, the value of actual works executed is less than the likely cost of works to be executed
(as mentioned in the Bid) then the payment of consulting charges shall be as per actual
execution of works.
5) For on-going in-village scheme and also ongoing major projects, fee shall be limited to only
the balance works to be executed and mode of payment shall be as indicated above.
4. Transportation: The bidder shall provide the vehicles in the Project Area as per the requirement
of Client/WAPCOS depending on the schemes spread over area in order to complete the project
related activities.
5. The bidder shall provide the 3 nos of new computers with latest configuration & software, one
colour printer, One b/w printer with photocopy & scan facilities and internet facilities at Regional
Level Office of WAPCOS at Udaipur.
6. The bidder shall be provided Design Engineers (hydraulic & structural) with at least 5 years of
experience in hydraulic & structural design of water supply components at Regional Level Office
of WAPCOS at Udaipur
Note:
1. GST payment will be made after submission of proof/ challan and form 3B, if
applicable.
2. Taxes as applicable shall be deducted at source as per GOI norms.
3. Number of copies (Hard and Soft) submitted by the bidder as required by the client
and one final approved copy shall be submitted to WAPCOS.
16.0 PROGRAMME
The contractor shall furnish within five days of the LOA full particular of his programme of field/ home
office activity proposed for execution of the contract.
The contractor shall intimate the employer within 3 (three) days the name of the authorized person,
who will be responsible for field activity and day to day interaction with the employers authorized
representative for field activity.
The contractor shall remain fully responsible for the accuracy and relevancy of all field activities and
for subsequent processing of field data including generated outputs. Sub-contracting of any part or
whole of the works is prohibited and these provisions shall be strictly adhered to. In the event of sub-
contracting of any part if detected, the contract shall be liable for termination forthwith without
assigning any reason thereafter.
16.2 Insurance
The bidder shall insure himself against any liability under any workmen compensation ordinance or
equivalent prevailing legislation and any modifications thereof which may be put in force by the
government during the continuance of the contract.
In the event of any loss or damage suffered in consequence of any accident or injury or disease
resulting from his work to any workman or other person in the employment of the bidder, the bidder
shall pay compensation to the victims.
16.3 The bidder shall in respect of his employees who are employed by him pay rates of wages,
observed hours of labour and provide other facilities not less favourable than those required
by law.
16.4 In case, any delay occurs due to local hindrance the bidder shall mobilize additional manpower
and equipment/instruments to accelerate the work with a sole intention to compensate the
lost time period. The bidder shall not be entitled to any payment on account of any
accelerated effort if required to complete the work within the stipulated time period and is
deemed to have included in the quoted prices.
16.5 The bidder shall submit weekly progress report to WAPCOS Project Manager (INFS-1) at
Jaipur. The bidder shall equip their site in charge with mobile phone with internet facility to
facilitate communication and control over work progress.
16.6 Bidder shall use Mobile application for maintenance of attendance of field staff / experts /
team leader with live location and live self-photograph along with GPS location. The
expenditure of mobile and internet shall be including in the quoted rates by the bidder in the
financial proposal.
16.7 Bidder shall adopt appropriate software / online system / online application for handy
information related the progress of the project at site available online 24x7. The access to see
the information shall be given to the client’s concerned Superintending Engineer / Additional
Chief Engineer / Chief Engineer, EIC of WAPCOS and Team Leader. The correct data to be
uploaded in the application by the authorised persons only. The expenditure of online
application development and maintenance shall be including in the quoted rates by the bidder
in the financial proposal.
16.8 No compensation of any kind on account of jungle clearance/ objection by local officials/
stoppage of work by local people/ damage to cultivated fields etc. during the course of
investigations shall be entertained by WAPCOS at any stage.
i) The Bidder will strictly comply with all the provisions of the Forest Conservation Act 1980.
Under no circumstances any tree should be cut or destroyed in the vicinity of the project area.
ii) The agency has to make all arrangements to provide necessary accommodation / shelter to
all its employees at their own cost.
iii) The Bidder shall be responsible to take all precautions to ensure safety of the public and his
own personnel. Further, you will also be required to take following insurances at your own
cost.
Third party liability insurance.
Worker's compensation insurance in respect of bidder's personnel.
Any other insurance for public & bidder's personnel in accordance with the
relevant provisions of the applicable land.
iv) The agency shall comply with the provisions of the following acts:
Contract labour (Regulation & Abolition) Act 1970
Employees Provident Fund Act, 1952
Minimum Wages Act, 1948 (Amended)
Employer's Liability Act, 1938 (Amended)
Industrial Employment Act, 1946 (Amended)
Personnel Injuries (Compensation Insurance) Act, 1963 (Amended)
18.0 ARBITRATION
“Any dispute, controversy or claims arising out of or relating to this Agreement or the breach,
termination or invalidity thereof, shall be settled through following mechanism.
a) Firstly, the aggrieved party shall write a letter to the other party detailing its grievances and calling
upon the other party to amicably resolve the dispute by convening a joint meeting. Accordingly,
the parties as per their convenience shall jointly convene the said meeting(s), wherein minutes of
the said meeting(s) shall be prepared and countersigned by all the parties. It is mandatory to
prepare minutes of meeting(s) and to be countersigned by all the parties, irrespective of the
outcome of the said meeting(s).
b) In the event the parties are unable to reach on any settlement in the said meeting(s), then the
aggrieved party shall mandatory resort to pre-litigation mediation mechanism with Delhi High
Court Mediation Cell, New Delhi.
c) It is only upon failure of the pre-litigation mediation mechanism with Delhi High Court Mediation
Cell, then the aggrieved party shall resort to resolution of disputes through arbitration of a Sole
Arbitrator. The appointing authority of Sole Arbitrator is CMD, WAPCOS Limited, to which neither
of the parties have any objection nor they shall ever object.
d) Subject to the parties agreeing otherwise, the Arbitration proceedings shall be conducted in
accordance with the provisions of the Indian Arbitration and Conciliation Act, 1996 (amended as
on date).
e) It is also acknowledged and accepted that WAPCOS is only working as Intermediary between the
Associate/ Sub-Consultant/ Sub-Bidder and the Principal Employer/ Client, thus in the event, any
dispute arises under the present agreement and referred to Arbitration for adjudication, then
subject to corresponding clause in the Contract/ Agreement/ Work Order/ Arrangement between
Principal Employer/ Client & WAPCOS, Principal Employer/ Client shall also be made party to the
said Arbitration proceedings. Also, the award including costs if any passed against WAPCOS and
costs incurred in the proceedings shall be the sole responsibility of Principal Employer/Client. The
said clause if found inapplicable, even then the other terms of the Arbitration Clause shall survive
and shall be acted upon.
f) The place/seat of arbitration shall be Delhi and any award whether interim or final, shall be made,
and shall be deemed for all purposes between the parties to be made, in Delhi. The arbitral
procedure shall be conducted in English language and any award or awards shall be rendered in
English. The procedural law of the arbitration shall be Indian Law. The award of the arbitrator shall
be final and conclusive and binding upon the Parties.
g) The Contract and any dispute or claim arising out of or in connection with it or its subject matter
or formation (including non-contractual disputes or claims) shall be governed by and construed in
accordance with the laws of India and the Parties submit to sole & exclusive jurisdiction of courts
at Delhi”.
19.1 If there is any delay in Consultant’s engineering services, which is conclusively proved is on
account of reasons solely attributable to the Bidder, resulting in extension of overall schedule
for completion of the project, then WAPCOS shall be entitled to recover from Bidder by the
way of liquidated damages.
19.2 If the Bidder does not establish their office at site with furniture, computer, printer/plotter,
scanner, stationary, staff, vehicle for supervision etc. within 30 days from effective date, then
Rs.3000/- per day per district for the number of days delayed for establishing the office for
the particular project will be deducted from the bill.
a) If the Bidder fails to deploy the requisite staff as per the requirement of the ToR / Scope of
work, the Consultant shall be liable to pay Rs. 7500.00 per day on proportionate basis of
numbers of person deployed against required deployment, for first 30 days thereafter Rs.
10000.00 per day on proportionate basis for next 90 days. If delay in deployment of requisite
staff is more than 120 days then the Bidder shaII be liable to pay 0.05% of the total cost of
the consultancy fee for delay of each day (for delay beyond 120 days).
b) If construction work is delayed by more than 07 days due to delay in checking/ certification
of material, the Bidder shall be liable to pay 0.05% of the consultancy fee of that Particular
project for delay of each day.
c) In case delay in completion of the project due to the delay in performance of the activities
on consultant side, 0.05% of the consultancy fee of that particular project for delay of
each day.
d) The total amount of liquidated damages under this Contract shall not exceed 10% of the
total value of the contract.
Force Majeure is herein defined as any cause, which is beyond the control of the Agency or
WAPCOS/Client as the case may be which they could not foresee or with a reasonable amount of
diligence could not have foreseen and which substantially affect the performance of the Contract,
such as:
a. Natural Phenomenon, including but not limited to floods, droughts earthquakes and
epidemics/ Pandemics (i.e. Covid-19 etc.).
b. Acts of any government, including but not limited to war, declared or undeclared priorities,
quarantines and embargos.
c. Terrorist attack, public unrest in work area provided either party shall within 10 days form
occurrence of such a cause, notifies the other in writing of such cause. The Agency or WAPCOS/Client
shall not be liable for delay in performing his/her obligations resulting from any force majeure cause
as referred to and/his/her obligations resulting from any force majeure cause as referred to and / or
defined above. Any delay beyond 30 days shall lead to termination of contract by parties and all
obligations expressed quantitatively shall be calculated as on date of termination. Notwithstanding
this, provisions relating to indemnity, confidentiality survive termination of the Contract.
Force Majeure shall not include any events caused due to acts/omissions of such party or result from
a breach/contravention of any of the terms of the Contract, Proposal and/or the Tender. It shall also
not include any default on the part of a party due to its negligence or failure to implement the
stipulated/proposed precautions, as were required to be taken under the contract. The failure or
occurrence of a delay in performance of any of the obligations of either party shall constitute a Force
Majeure event only where such failure or delay could not have reasonably been foreseen, or where
despite the presence of adequate and stipulated safeguards the failure to perform obligations has
occurred. In such an event, the affected party shall inform the other party in writing five days of the
occurrence of such event. The WAPCOS/Client will make the payments due for services rendered till
the occurrence of Force Majeure. However, any failure or lapse on the part of the consultant in
performing any obligation as is necessary and proper, to negate the damage due to projected force
majeure events or to mitigate the damage that may be caused due to the above-mentioned events
or the failure to provided adequate disaster management/recovery or any failure in setting up a
contingency mechanism would not constitute force majeure, as set out above.
In case of a Force Majeure all parties will endeavor to agree on an alternate mode of performance
in order to ensure the continuity of service and implementation of the obligations of a party under
the contract and to minimize any adverse consequences of Force Majeure.
“The Blacklisting Policy of the company is available on official website of WAPCOS Limited.
The bidder/tenderer/consultant/contractors have to mandatorily furnish an undertaking
addressing the same to Engineer-in-Charge in the form of certificate to abide the contents
of Blacklisting Policy. The format of undertaking is provided at Form-D. Any action in
violation of the Blacklisting Policy or to the certificate furnished shall result in cancellation
of tender at the stage before or after the award of work.”
The bidder must comply with Order Nos. P-45021/112/2020-PP(BE-II)(E-43780) dated 24.08.2020,
28.08.2020, and 31.08.2020 and also Make in India Order No. P-45021/2/2017-PP (BE-II) dated 16th
September 2020 of Department for Promotion of Industry and Internal Trade (DPIIT), Ministry of
Commerce and Industry, Government of India and any amendments thereon. The details available on
ministry website.
Self-certification that the item offered meets the minimum local content of 50% giving details of the
location(s) at which the local value addition is made in case the bidder wishes to avail the benefits
under the make in India policy, if applicable.
In cases of procurement for a value in excess of ₹10crores, the local supplier shall be required to
provide a certificate from the statutory auditor or cost auditor of the company (in the case of
companies) or from a practicing cost account ant or practicing chartered accountant (in respect of
suppliers other than companies) giving the percentage of local content to avail the benefits under the
make in India policy, if applicable.
Government has issued Public Procurement (Preference to Make in India) [PPP-MII] Order 2017 vide
the Department for Promotion of Industry and Internal Trade (DPIIT) Order No.P45021/2/2017-B.E.-II
dated 15.06.2017 and subsequent revisions vide Order No.45021/2/2017PP(BE-II) dated 28.05.2018,
29.05.2019, 04.06.2020 and 16.09.2020 to encourage ‘Make in India’ and to promote manufacturing
and production of goods, services and works in India with a view to enhancing income and
employment. This Order is issued pursuant to Rule 153 (iii) of the General Financial Rules 2017. The
salient features of the aforesaid Order are as under:
The Order is applicable for procurement by Ministry / Department / attached / subordinate office of,
or autonomous body controlled by, the Government of India and includes Government companies as
defined in the Companies Act.
In procurement of all goods, services or works in respect of which the Nodal Ministry/ Department
has communicated that there is sufficient local capacity and local competition, only 'Class-I local
supplier', as defined under the Order, shall be eligible to bid irrespective of purchase value.
The margin of purchase preference shall be 20%. ‘margin of purchase preference’ means the
maximum extent to which the price quoted by a local supplier may be above the L1 for the purpose
of purchase preference.
Ministry of Electronics and Information Technology is the Nodal Ministry for implementation of the
Electronic Product Notifications issued in furtherance of PPP-MII Order 2017.
Classes of Local Suppliers based on local content as per the revised PPP-MII Order dated 04.06.2020
issued by the Department for Promotion of Industry and Internal Trade (DPIIT) are as under:
Class-I Local supplier - a supplier or service provider, whose goods, services or works offered for
procurement, has local content equal to or more than 50%.
Class-II Local supplier - a supplier or service provider, whose goods, services or works
offered for procurement, has local content more than 20% but less than 50%.
Non-Local supplier - a supplier or service provider, whose goods, services or works offered for
procurement, has local content less than or equal to 20%.
Only 'Class-I local supplier' and 'Class-II local supplier' shall be eligible to bid in procurement of all
goods, services or works, and with estimated value of purchases less than Rs. 200 crore.
The order available on the Ministry of Finance Department of Expenditure Public Procurement Division
website.
25.1 The Client may conduct independent quality monitoring and checking of works inspected by
the Bidder. If such checks or otherwise disclose that the works inspected by the Bidder do not
meet the specified requirement, the employers will not pay the WAPCOS fees for the affected
portion and the same amount would not pay the Bidder. In addition, the Bidder will incur a
penalty equal to 10% of fee payable and shall not be entitled for payment of fee for any re-
inspection.
25.2 If the service of a team member provided by the Bidder is not acceptable to the Client
Department, the Bidder shall immediately replace the team member on request of Client
Department / WAPCOS. If the Bidder falls to quickly replace a team member as instructed by
the Employer and also if Bidder fails to deploy required personnel as per the TOR the
deduction shall be made from the monthly running bill payable to the Bidder equal to:
Monthly rates for Key Experts and Non-Key Experts submitted by the Bidder and agreed with
Client. However, if the Bidder fails to deploy the requisite personnel or replace any member
as instructed, the Bidder shall be liable for action for termination of Contract or blacklisting.
25.3 The penalty shall be imposed on the bidder if it is imposed by the Client on WAPCOS due to
the delay in completion of works or above related reasons. The amount of the penalty would
be same as imposed by the client on WAPCOS (not on proportionate basis)
On request for release of running payment from the executing Agency by the Contractor, a
combined inspection of site will be undertaken by-
1) Gram Panchayat and / or its sub - committee, i.e. VWSC (only in case of in-village
infrastructure)
2) Concerned Client Department; and
3) Third-party inspection agency engaged by Client.
The agreed discussion points will be recorded and signed with Gram Panchayat and / or VWSC.
The role of Bidder shall include the following:
b) Pre-despatch Inspection of materials and equipment such as pipes, valves, pumps, motors,
etc as specified in the RFP at manufacturer’s premises
c) Monitoring of quality and quantity of works during construction as per standard
engineering practices based on relevant BIS standards
d) Suggesting and implementing corrective measures for removal of defects during
construction
e) Recommendation on the payment of the work executed and monitoring functioning of all
infrastructure under JJM Contracts. But final recommendations may be submitted to client
through EIC of WAPCOS.
f) The bidder would be responsible for delivery of the assignment in close coordination with
the District Jai Jeevan Mission, headed by the District water supply Committee.
g) Checking of designs and drawings submitted by the contractor in Major Projects.
h) Checking of Quality Assurance Plans (QAPs) submitted by the contractor.
i) Checking of Work Plans submitted by the contractor and further submit it to the EIC of
WAPCOS
j) Monitor progress of works to ensure that progress of work is as per approved Work Plan
and suggest remedial measures if progress found to be lagging. The correspondence
regarding lagging of the progress may be informed to client well in time through EIC of
WAPCOS
k) Suggest safety measures to be adopted in the field during execution of works by appointing
one safety engineer at District level.
The bidder shall provide the qualified Manpower, logistic and infrastructure support
activities for the following activities:
26.1. CONSTRUCTION STAGE
The Consultant shall, during the construction period, be available on a Continuous basis at the
complete stretch of the project site in order to inspect the quality of works, ensure conformity with
Technical Requirements and the Performance Standards stipulated for the works. The Consultant shall
be responsible to generate the data/reports required to be submitted to Government of Rajasthan on
a periodic basis or as required by the Engineer in charge.
Check and review of Contractor’s documents to Hydraulic designs of rising mains, distribution
network, designs and drawings of Civil Structures and EMI works, capacity calculations of reservoirs,
sizing calculations of piping in the pumping stations, Single Line Diagrams, earthing system design,
PLC, SCADA, etc as conveyed by EIC, within 7 days from submission.
26.1.2 For Major Projects (MP) and Other than Major Projects (OTMP)
1) The Consultant is required to go through the QAQC manual issued by the Chief Engineer
Quality Control (QC), of the client department. The scope of inspection shall be in
Compliance to the provision of QAQC manual.
2) Check and review of Contractor’s documents related to Quality Assurance Plans
3) Liaising between the Client and the Contractor to ensure effective communication to avoid
disputes. If any arises, such disputes are settled reasonably and amicably and assist in any
adjudication if any.
4) Submit Monthly Progress Reports of based on M.S. Project software or any other suitable
software approved by client department.
5) Monitor progress of the works in accordance with the approved Work Plan / Implementation
Schedule.
6) Review and recommend, as and when required, revised programs and schedules.
7) Calculate delays on part of department and / or contractor and suggest remedial measures.
8) Liaison between Client and external agencies like Railway, NHAI, Forest, etc to obtain
requisite permissions.
9) Inspection of Materials, Machineries and equipment‘s at the place of manufacture / Factory
premises within Rajasthan and outside Rajasthan in the country whenever required.
10) Typical inspection checklists shall be prepared for each category of materials and works with
reference to IS Codes, CPHEO Manual, Other codes and manuals as applicable and bid
documents. QAQC Manual issued by the Department shall also be referred.
11) The inspection system and procedure shall be prepared and maintained on day- to- day
basis. The inspection crews shall have guidelines, test plans, scope of inspection, procedures,
checklists and various formats to carry out inspection in a systematic method.
12) The inspection report of materials, equipment and works based on site inspection shall be
submitted to the Executive Engineer of concerned Division, periodically as per requirement.
13) The Consultant shall issue necessary certification on progressive completion of each
category of work after ensuring quality control and assurance so as to achieve the designed
objectives of the particulars works.
14) Witness collection of sample of pipes received at site for onward submission to an approved
laboratory for testing.
15) Advise the Contractor for safety measures and epidemics. Check that all the equipment and
machineries are delivered at site as per the pre-dispatch clearance given by the Bidder
bearing the seal and marking of the bidder.
16) Issue to the Contractor from time to time, as and when necessary, such further instructions
through Client as required under the construction contract to enable the Contractor to
complete his obligations under this contract in a timely manner.
17) The quantity executed in every bill shall be witnessed and verified by the bidder and the duly
signed and verified report for the same shall be attached / submitted with every bill
processed for the payment.
18) Witness from time to time such tests regarding construction materials and equipment and
workmanship as required under the construction contract to be executed by the Contractor
or elsewhere and instruct the Contractor through Client to undertake corrective action in
case of non-compliance with the specification or the applicable standards.
19) Ensure that all materials used for execution of work are as per the relevant IS standards and
procedures of execution of work should be carried out as per best Engineering Practices.
20) Ensure that all materials used by contractor for contractor for execution of work should be
tested in approved labs and simultaneously field test will be carried out at field testing lab,
if necessary.
21) The consultant shall ensure highest quality to work while monitoring the construction
activities.
22) Ensure Materials to be used for construction activities are checked and verified as per the
standard operating process and specifications.
23) Ensure the compliance with the plant of action and decide on the basis of the results of the
testing as to whether the said facilities are sufficiently sound be incorporated in the
permanent works without affecting later operation and functioning.
24) Supervise the mobilization of contractor, his staff, plant, equipment etc. and his provisions
for storage and other operating areas is in accordance with the manufactures’
recommendation.
25) Monitor and inspect the physical works as per the prescribed standards and norms and to
ensure the works are to be implemented in adherence to the same.
26) Undertake corrective action in case of non-compliance with the specification or the
applicable standards.
27) Supervise the contractor’s testing facilities, decide whether the said facilities are sufficiently
sound to be incorporated in the permanent works without adversely effecting later
operation and functioning.
28) Consultant shall supervise all construction activities such as the following:
29) Pipeline trenching, bedding (if required),
30) Lowering, laying and jointing of pipelines.
31) Installation of valves, specials fittings.
32) Inside in-situ lining/Encasing
33) Pipeline hydro testing and pre commissioning test.
34) Functioning of tube wells
35) Proper alignment of pipeline trenching.
36) Nallah / River crossings - culverts bridges etc.
37) Major / minor road crossings
38) Railway crossing/NH crossings/Canal crossings
39) Orientation location of structures depth of foundation etc. with respect to approved
drawings and approved test plan.
40) Dimensions, reinforcement, concreting, masonry, sanitary, electrical, finishing items of
major civil works like water reservoirs, treatment plants, pumping stations, buildings,
boundary walls, valve chambers.
41) Supervision and quality checking of miscellaneous items and any other major items not
included in the lists but required for the successful implementation of the project shall also
form the part of scope of work under this assignment.
42) Witness Contractors internal tests on materials, concrete, mortar etc.
43) Records and review of contractor’s monthly Running account Bills and verify the same
against the measurement and valuation, as required under the work contract and forward
them to the EIC of WAPCOS and EIC of WAPCOS may forwarded it to the Client (Executive
Engineer) for payment. MB books needs to be certified and signed by bidder.
44) Ensuring setting up of field laboratories by the works Contractor, if proposed in works
contract and check adequacy and accuracy of testing facilities in the lab.
45) Sample inspection (minimum 10%) of proper alignment of pipeline trenching, depth and
cover of bedding and refilling and compaction etc.
46) Quality of coating and lining of MS pipes of transmission main
47) Sample inspection (minimum 10%) of the installation and testing of valves, specials fittings
etc.
48) Witness the sectional testing of Pipeline (Transfer Main, Rising Main, and Distribution
network and consumers service line) and pre-commissioning test.
49) Orientation, location of structures, depth of foundation etc. with respect to approved
drawings and approved test plan.
50) Dimensions, reinforcement, concreting in foundation for major civil works.
51) Shuttering, plumb, dimensions, concreting etc. in sub structure including vertical wall, ring
beams, tie beams, columns, slab etc, as per approved inspection test plan.
The Bidder in presence of EIC of WAPCOS shall witness commissioning of the scheme/project and shall
report the functionality of the complete system for any malfunctions during trial runs and subsequent
successful commissioning of the system.
27. DELIVERABLES
27.1.1 To carry out inspection of all engineering works relating to civil, mechanical and electrical
components (intake structures, treatment plants, intra and inter district distribution network,
balancing/ intermediate reservoirs, pumping and electrical systems,
instrumentation/automation system, chlorinators, rainwater harvesting/ recharge,
watershed, water resources management, etc.,) covering the following aspects:
27.1.2. Bidder has to inspect works under rural water supply works. The likely cost of works to be
executed is tentative and may vary.
The Bidder shall carry out the Services as defined in these Terms of Reference or as otherwise required
for efficient works execution, while acting in the capacity of the "Representative of the Client“.
Principally, the Bidder has to Carry Out the day-to day qualitative and quantitative inspection of works
on the behalf of the Client following the laid down procedures:
The Bidder, during the contract, shall provide the Client through EIC of WAPCOS with monthly /
quarterly/ annual reports indicating physical progress compared to the work schedule and cost
aspects including amounts certified so far and during that month/ quarter/ year and any financial
implication in the reports, the bidder shall also include observations and comments on testing results
and quality of workmanship.
Pre-dispatch inspection
a) Any effective modification found necessary during their inspection process for achieving the
designated aim shall be brought to the notice of the Client and obligatory on the agency.
b) Typical inspection checklists shall be prepared for each category of works on each operation and
activities with reference to documents and standards. The acceptance / rejection report through
the concerned inspection engineer ensuring all the points shall be mandatory.
c) The inspection system and procedure shall be prepared and maintained on day-to- day basis. The
inspection crews shall have copies of approved QAP’s , relevant IS Codes, guidelines, test plans,
scope of inspection, procedures, checklists and various forms as to carry out inspection in a
systematic method.
d) The inspection report based on factory and / or on-site inspection shall be submitted to the
engineer-in-charge of the project, periodically- monthly, quarterly and annually.
e) All stationary, drawing stationary, design facilities, reprographic facilities, transportation etc. shall
be arranged by the bidder at his own cost.
f) The bidder shall prepare the draft letters / certifications and submit to the EIC of the WAPCOS to
issue necessary certification on progressive completion of each category of work after ensuring
quality control and assurance so as to achieve the designed objectives of the particular’s woks.
The certification shall be based on satisfactory adherence of the system and procedures of the
inspection.
Post-dispatch inspection
a) The Bidder shall immediately carry out the physical inspection of all the materials received at site.
b) The physical appearance test of the pipe received at site shall be checked.
c) Bidder shall also witness collection of samples identified by the Engineer-In-charge to be sent to
designated laboratory/institute of repute.
The Bidder is required to establish furnished offices at each District headquarter under his assignment
and scope. The dimension and size of the office shall be sufficient for comfortable sitting of all the
bidder team. The bidder shall inform EIC about the commencement of functioning of office. The bidder
shall assist client for successful execution of the project by ensuring supply of material/equipment
received/ used of the highest quality standard. The objective of the contract is to ensure supply and
use of Material/equipment of the highest standards in various Contracts entered by the client with
works Contractors. The specifications and the tests specified for the items subject to third party
inspections shall be given in the works contract as per the latest national/ international standards and
it is expected that the works Contractor will follow the same while ordering his equipment/material
from a manufacturer.
a) Review of Test Facilities in the Manufacturer’s Premises: The inspector should review the test
facilities available in the manufacturer’s premise and verify the calibration approval of the test
equipment. If there are any short comings, these should be pointed out and inspections to be
carried out only after rectification of shortcomings.
b) Raw Material Quality Assurance: The inspectors are expected to go through the record of the
procurement of the raw material and its test records to satisfy them5elves that the quality of the
raw material used is satisfactory. This check should be made for important and critical
components of the equipment. However, inspection of HDPE Pipes shall be carried out stage wise
as per manufacturing process and the inspector shall witness all stages of pipe manufacturing
process taking sample at each stage for strict quality adherence.
c) Review of the Quality Assurance of brought out items: The source of the brought-out items, the
test reports if any, and their conformance to the order should be verified. This needs to be done
for all important and critical items.
d) Review of the type tests records of similar items carried out by the manufacturer: The past type
tests carried out by the manufacturer should be reviewed and their copies be attached with the
inspection report.
31. Conducting acceptance tests for the equipment /material as per the relevant latest BIS:
The results of the test report have to be submitted with the inspection report. The tests shall be
conducted as per the relevant BIS and approved Quality Assurance Plan (QAP). However, if there
are some stipulations in the works contract, the stipulations of the works contract shall prevail.
This shall apply to tests to be conducted and sampling criteria.
Bidder shall inspect, test all the material, machinery and equipment within the scope of the
works contract as per specifications laid out in Contract Agreement with works Contractor and
following the principles of good engineering practice. The Indicative list of items that are likely
to be inspected under this contract is given below. The scope of work shall include but not
limited to the items mentioned in the list:
S.No Items
A. Mechanical Works
1. Horizontal Split Casing (Clear Water and Back Wash) and Vertical Turbine Pumps (Raw
water)/Submersible Centrifugal pumps
2 Submersible-Pumping sets of varying duty conditions for tubewells.
3 Solar Pumps and Solar Panel.
4 Vacuum Pumps, Mono-block Pumps, High-discharge pumps.
5 Air relief Valves, Kinetic Air Valves, Soft-Seated Gate Valves
6 Sluice Valves and Butterfly valve with / without Actuators
7 Non-Return Valves of various types
8 Pressure Reducing Valves & Flow Control Valves
9 Consumer connection meters and bulk meters,
10 Sluice Gates
11 E.0.T Crane
12 Air Vessel and Pressure Filter
13 Air Compressor
14 Chlorinator
15 Motor Above 15kW
16 Pipes, Joints and Specials of various types and materials for use in Water Supply purposes
B. Electrical Works
1 Transformer LT & HT Panels
2 HV Outdoor Switch Dis-connector/ Isolator
3 Gantry/ Structure for Switchyard/ Transmission Line
4 Transformer (including OLTC, RTCC panel)
5 APFC Panel
C. Instrumentation Works
1 Instrument Control Panel for Raw Water Pumping Station comprising of PLC system, digital
indicators, digital flow Indicator and integrator, alarm annunciator, pushbuttons etc.
2 Instrument Control Panel for CWPS comprising of PLC system, digital indicator, alarm
annunciator, pushbuttons etc.
3 Instrument Control Panel for Water Treatment Plant along with PLC System.
4 Local SCADA Systems (Integrated testing with PLC system) for WTP, RWPS, CWPS
33. Human Resource Requirement
Broad qualification and experience of the key personnel and other staff given below are from
clients’ perception in respect of the specific requirement of the project. Agencies are advised
to propose personnel specifically highlighting the qualification and experience in the related
area of expertise as per requirements.
B. Detailed Information on the Major Tasks and Duties are as follows but not limited to:
Shall witness testing and inspection of construction materials and the inspection of the
mechanical, electrical as well as automation components of the project at factory and site. As
and when required.
Shall carry out inspection of materials/equipment procured by the contractor at
manufacturers premises and shall ensure that the same is as per the technical specifications
of the contract with the contractor /as per latest standards.
Carry out inspection of works for ensuring quality of the works executed /being executed.
Shall support team leader and represent Bidder team in case team leader is no present.
Shall function as technical advisor in quality and quantity check of all the schemes.
Shall be responsible for overall check on quality control, quality assurance and measurement
recorded by Bidder team.
Shall assist Client and WAPCOS in correspondence to clarifications from the contractors in
technical and financial aspects regarding bills raised.
Shall oversee the contractor’s submission documents and coordinate for reviewing the
contractor’s submissions.
Undertake site visits as required/ directed by the Client.
Shall guide /assist the team/Client in reviewing the measurement bills, documents and
drawings submitted by the contractor.
Shall assist the team leader to establish system to check the measurements periodically such
that time required for certification of measurement and intermittent bills shall be minimum.
All other duties assigned by the team leader and client.
2 FIELD QUALITY CONTROL ENGINEER
To review quality assurance and quality control (QAQC) system of the Bidder team and
monitor that the ongoing work on site are as per approved designs, drawings, specifications
and in line with approved QAQC plan.
To update /highlight the team and client about any non-conformity to the QAQC.
Check the measurement recorded in the measurement books are in sync with the actual
progress of work on site and per agreed contract.
Witness start-up, testing and commissioning as per detailed specification and contract
conditions;
The above tasks are indicative and further tasks may be allotted by Client / Team Leader depending
on the requirements of the projects / schemes. The above tasks are to be delivered by the Consultant
as a whole and non- deployment / absence of some members of the Bidder team shall not be
considered as a reason for non-delivery of any aspects of the Services as envisaged under the Contract.
It is the responsibility of the Bidder to ensure delivery of the entire scope of work as envisaged under
the Contract at all times during the contract period.
Above scope of work is indicative in nature and the Department may seek additional advisory support
from the full- time deployed team to meet the objectives under Mission. Department may also request
for additional competencies / disciplinary field other than identified above on need basis.
The Bidder will be responsible for deployment / withdrawal of staff / additional staff or efficient and
complete checks / certification. Client may instruct for increase / decrease in deployment of staff as
required during the contract. The CV’s of key personnel shall be included in the proposal along with
documentary proof of qualification and experience, their written consent and availability. Format of
CV’s of the team members are to be submitted to the concerned EIC in the format annexure along
with TOR. Only under exceptional circumstances and with prior approval of Additional Chief Engineer
Concerned, key staff team member will be allowed to be replaced. Any such request for replacement
shall be raised by giving proper justification of the need of replacement. In case of such replacements,
the Bidder will ensure that there is an overlap of at least one month between staff to be replaced for
knowledge transfer, at the cost of the Bidder. After award of the contract, the Client expects all the
proposed personnel to be available during implementation of the contract as per the agreed staffing
schedule. Penalty imposed by the client due to non-availability of any expert at site shall be imposed
on the bidder. The penalty amount would be the same as imposed by the client on WAPCOS (not on
proportionate basis).
36.2 Bidder will submit inspection report of each inspection in the format approved by Client with
comments if any to the concerned Engineer-In-Charge. Inspection certificate will also contain
date of inspection scheduled and actual date of inspection.
36.3 Bidder shall furnish monthly statement of works inspected to EIC of WAPCOS by 05th day of each
month so that the same may be submitted to concerning Engineer and a consolidated
information to the Concerned Additional Chief Engineer, of the client by 10th day of each month.
36.4 Bidder shall furnish quarterly and annual reports with details on monthly inspections to EIC of
WAPCOS, so that the same may be submitted to the concerned Additional Chief Engineer, of
the client department at the end of each year.
36.5 Fortnightly report on the rejection of works with reasons; demolishing/ disposal for rejected
material in his presence and; improvement made by the Contractor/supplier as a result of
rejection etc will be submitted.
36.7 The Bidder will submit the following periodic reports at the time and in the number of copies
(also in electronic copies) indicated for each, in addition to reports, which will be submitted on.
The specific tests under the scope of work. Some of the reports would be in questionnaire form
so that all required aspects are covered.
Monthly Progress Report: Monthly progress reports to be submitted by the fifth day of the following
month in English. The report shall include the progress of works, along with photographs of
construction progress. The report shall summarize the work accomplished by the Bidder for the
preceding month (along with photographs). The report will outline any issues/concerns/problems
encountered (administrative, technical, environmental, social or financial) and give recommendation
on how these problems may be overcome. The report should record the status of payment of
Contractor’s monthly certificates, of all claims for cost and of action required by government and other
agencies to permit unconstrained works implementation.
Quarterly / Annual Site Assessment Report: Bidder shall submit a comprehensive report summarizing
all activities under the services at the end of each quarter / year, and also at other times when
considered warranted by the Client because of delay of the construction works of because of the
occurrence of technical or contractual difficulties. Such report shall summarize (i) the activities of the
Bidder (ii) the progress of the Contracts (iii) the status of Contractor‘s claims, if any; etc. The report
shall include brief descriptions of the technical and contractual problems being encountered, physical
and financial progress in approved formats, financial status of the contract and other relevant
information for the on-going contracts.
All report should be given in hard copy as well as MS office formats in soft copy. Report should include
the work plan in Microsoft Project (MSP) or equivalent software.
i. The Contract shall not be considered as completed until a completion Certificate shall have
been signed by the Engineer-in-Charge stating that the Works have been completed and
maintained to his satisfaction. The completion Certificate shall be given by the Engineer-in-
Charge within twenty eight days after the expiration of the Period of completion, or, if different
periods of completion shall become applicable to different sections or parts of the Works, the
expiration of the latest such period, or as soon thereafter as any works ordered during such
period, shall have been completed to the satisfaction of the Engineer-in-Charge and full effect
shall be given to this Clause, notwithstanding any previous entry on the Works or the taking
possession, working or using thereof or any part thereof by the WAPCOS. Provided always that
the issue of the completion Certificate shall not be a condition precedent to payment to the
Agency of the Security Deposit in accordance with the conditions set out hereof.
The Agency shall not publish/ use the content of the report/ document in fully or partially prepared
under this contract without seeking the permission of WAPCOS. The Agency shall not claim the
experience of the Assignment for Business purposes without seeking the permission of WAPCOS in
writing during the period of the Assignment.
41.0 Insurances
A. The Agency shall insure against such liability with an insurer and shall continue such insurance
during the whole of the time that any persons are employed by him on the Works and shall, when
required, produce to the Engineer-in-Charge or the Engineer-in-Charge’s Representative such
policy of insurance and the receipt for payment of the current premium. Provided always that, in
respect of any persons employed by any sub-Agency, the Contractor’s obligation to insure as
aforesaid under this sub-clause shall be satisfied if the sub-Agency shall have insured against the
liability in respect of such persons in such manner that WAPCOS is indemnified under the policy,
but the Agency shall require such sub- Agency to produce to the Engineer-in-Charge or the
Engineer-in-Charge’s Representative, when required, such policy of insurance and the receipt for
the payment of the current premium.
B. The Agency shall take out the following insurances in the name of WAPCOS limited & client if
required by the client:
1) Professional liability insurance, with a minimum coverage of 100% of contract value:
2) Third Party motor vehicle liability insurance in respect of motor vehicles operated in the
Client’s country by the Consultant or its Experts or Sub-consultants, with a minimum coverage
of [insert amount and currency or state “in accordance with the applicable law in the Client’s
country”];
3) Third Party liability insurance, with a minimum coverage of [insert amount and currency or
state “in accordance with the applicable law in the Client’s country”];
4) employer’s liability and workers’ compensation insurance in respect of the experts and Sub-
consultants in accordance with the relevant provisions of the applicable law in the Client’s
country, as well as, with respect to such Experts, any such life, health, accident, travel or other
insurance as may be appropriate; and
5) insurance against loss of or damage to (i) equipment purchased in whole or in part
with funds provided under this Contract, (ii) the Consultant’s property used in the
performance of the Services, and (iii) any documents prepared by the Consultant in
the performance of the Services.
10) The rate quoted by bidder and accepted by WAPCOS Ltd. shall remain firm during the tenure of work
including permissible variations, if any and no escalation shall be paid by WAPCOS Ltd. due to any
changes in market prices for any commodity including Diesel.
11) The Payment shall be strictly made to the agency on Back to Back basis i.e. after receipt of payment
from Principal Client to WAPCOS in accordance to the Payment Schedule mentioned in the tender
document.
12) The Employer reserves the right to terminate the agency at any time after award of work in case of
any faulty/ non-satisfactory services/ non-deployment of resources within given Mobilization Period/
complaint from Principal Client.
13) In case of any penalty imposed upon WAPCOS from the Principal Client due to faulty services of the
Selected agency, the same shall be recovered from the Agency.
14) The whole cost of complying with the provisions of the Contract shall be included in the quoted price.
15) The method of measurement of completed work for payment shall be in accordance with the standard
practice and requirement as stated in the relevant section of the condition of the contract.
16) The bidder may be allocated work for one region or both regions depending upon the discretion of
WAPCOS based on competitiveness of the Bid submitted.
SECTION III
FORMS
LETTER OF TRANSMITTAL
To
Additional Chief Engineer
INFS-1 Division, WAPCOS Limited,
Gurgaon
Sub: Hiring of Agency for Providing Manpower, Infrastructure, Logistics & Technical Support for
the works in Distt. Udaipur (Division Rural District Udaipur) & Distt Pratapgarh (Pratapgarh
division) (Package-1)
NIT No: -
Dear Sir,
i) I/We downloaded /obtained the tender document(s) for the above mentioned
Tender/Work from the website namely: ___________________
as per your advertisement.
ii) I/We hereby certify I/We hereby certify that I/We have read the entire Terms & Conditions of
the Tender Documents (including all documents like annexure(s), schedule(s), etc.,), which form
part of the contract agreement and I/We shall abide hereby the terms/conditions/clauses
contained therein.
iii) The corrigendum(s) issued from time to time by your department/organization too have also
been taken into consideration, while submitting this acceptance letter
iv) I/We hereby unconditionally accept the tender condition of above mentioned tender
document(s)/corrigendum(s) in its totality/entirety
v) In case any provisions of this tender are found violated, then your department / organization
shall without prejudice to any other right or remedy be at liberty to reject this tender/bid
including the forfeiture of the full said Earnest Money Deposit absolutely.
Yours faithfully,
FORM-A
FINANCIAL INFORMATION
[To be submitted on Original Letter Head of Bidder or Original Letter Head of CA]
1. Financial Analysis: Details to be furnished duly supported by figures in balance sheet/ profit &
loss account for the Five years duly certified by the Chartered Accountant, as submitted by the
applicant to the Income Tax Department (Copies to be attached).
Profit/Loss
Years Gross Annual turnover
(After Tax)
2018-2019
2019-2020
2020-2021
2021-2022
2022-2023
2. Financial arrangements for carrying out the proposed work: It is hereby declared that ------------
------------------------ (Name of firm with address) has enough financial resources to execute the
proposed work.
Note: (i) Original Signature with Stamp of CA is Mandatory. Copy will not be entertained.
(ii) Yearly financial Turnover and Audited Balance Sheet for Last 5 (Five) years ending on
the financial year 2022-2023 duly certified by Chartered Accountant should be attached.
(iii) The date of certificate shall not be older than one month of the date of submission of
the bid.
FORM - B
NOTE:
1) The Tenderer should provide information as per this Performa for the firm/company for all
completed similar works as per eligibility criteria’s works during last 7 years.
2) Certificate from client for the above information should be attached with the offer.
Name Address, Email Id & Contact Total No. of staff-months of the assignment:
number of Client:
Name of associated Consultants, if any: Name of senior professional staff of your firm
Nil involved and functions performed (indicate most
significant profiles such as Project Director /
Coordinator, Team Leader):
Signature of Bidder(s)
FORM-D
Name of Work:
Ref: Tender No……………..Dated…………..
To
Additional Chief Engineer
INFS-1 Division, WAPCOS Limited,
Gurgaon
This is to certify that we have taken the cognizance of Blacklisting Policy of WAPCOS Limited. Further,
we hereby confirm and declare that we, M/s. is not blacklisted/ Deregistered/
debarred by any government department/Public Sector Undertaking/Private Sector/or any other
agency for which we have Executed/Undertaken the works /Services during the last 5 years.
Yours faithfully,
Date:
Place:
FORM-E
FORMAT FOR UNDERSTANDING THE PROJECT SITE
[To be submitted on Bidder’s Original Letter Head]
A. I/We hereby solemnly declare that I/We have visited the site of work and have familiarized
myself/ourselves of the working conditions there in all respects and in particular, the following:
-
a). Topography of the Area.
b). Ground conditions at the site of work.
c). Availability of local labour, both skilled and unskilled and the prevailing labour rates.
d). Availability of water & electricity.
e). The existing roads and access to the site of work.
f). Availability of space for putting labour camps, Offices, stores, godown, Engineering yard etc.
g). Climatic conditions
h). Methodology to be adopted for successful completion of work.
i). Working hours and shifts for completing the work as per tender conditions.
B. I/We have kept myself/ourselves fully informed of the provisions of this tender document
comprising NIT, General Information, Form of Bid, Instructions to the Tenderer & Appendices,
General Conditions of the Contract, Special Conditions of Contract, and Specifications,
Annexure and Statement of advertised Quantities apart from information conveyed to me/ us
through various other provisions in this tender document.
C. I/We have quoted my/ our rates for each of the items in “Schedule of Items, Statement of
I / We hereby submit our BID considering above all facts gathered during site visit and each & every
aspect have been considered. Advertised Quantities taking into account all the factors given above
and elsewhere in tender document.
Yours faithfully,
Date:
The Bidder should submit the Approach & Methodology as per following:-
FORM-F
FORMAT FOR NO DEVIATION CERTIFICATE
[To be submitted on Bidder’s Original Letter Head]
To
Additional Chief Engineer
INFS-1 Division, WAPCOS Limited,
Gurgaon
We hereby also confirm that we have not taken any deviation from Tender Clause together with
other reference as enumerated in the above referred Notice Inviting Tender and we hereby convey
our unconditional acceptance to all terms & conditions as stipulated in the Tender Document.
In the event of observance of any deviation in any part of our offer at a later date whether implicit
or explicit, the deviations shall stand null and void.
Yours faithfully,
Date:
FORM-G
FORMAT FOR INTEGRITY PACT
[To be submitted on Bidder’s Original Letter Head]
To,
WAPCOS Limited
76-C, Sector-18,
Gurugram – 122015, Haryana
Dear Sir,
I/We acknowledge that WAPCOS is committed to follow the principles thereof as enumerated
in the Integrity Agreement enclosed with the tender/bid document at Enclosure-I.
I/We agree that the Notice Inviting Tender (NIT) is an invitation to offer made on the condition that
I/We will sign the enclosed integrity Agreement, which is an integral part of tender documents,
failing which I/We will stand disqualified from the tendering process. I/We acknowledge that the
making of the bid shall be regarded as an unconditional and absolute acceptance of this condition
of the NIT.
I/We confirm acceptance and compliance with the Integrity Agreement in letter and spirit and
further agree that execution of the said Integrity Agreement shall be separate and distinct from the
main contract, which will come into existence when tender/bid is finally accepted by WAPCOS.
I/We acknowledge and accept the duration of the Integrity Agreement, which shall be in the line
with Article 1 of the enclosed Integrity Agreement.
I/We acknowledge that in the event of my/our failure to sign and accept the Integrity Agreement,
while submitting the tender/bid, WAPCOS shall have unqualified, absolute and unfettered right to
disqualify the tenderer/bidder and reject the tender/bid is accordance with terms and conditions of
the tender/bid.
Yours faithfully,
ENCLOSURE-1
INTEGRITY AGREEMENT
[To be submitted on Stamp paper of At least Rs.100 or on Bidder’s Original Letter Head]
This Integrity Agreement is made at ............... on this ........... day of ........... 20......
BETWEEN
WAPCOS Limited, New Delhi (Hereinafter referred as the ‘Principal/Owner’, which expression shall
unless repugnant to the meaning or context hereof include its successors and permitted assigns)
AND ........................................................................................... (Name and Address of the
Individual/firm/Company) through ......................................... (Hereinafter referred to as
the……………………………………(Details of duly authorized signatory)
“Bidder/Agency” and which expression shall unless repugnant to the meaning or context hereof
include its successors and permitted assigns)
PREAMBLE
WHEREAS the Principal / Owner has floated the Tender (NIT No. ................................) (hereinafter
referred to as “Tender/Bid”) and intends to award, under laid down organizational procedure,
contract for ................................................................................... (Name of work) hereinafter
referred to as the “Contract”.
AND WHEREAS the Principal/Owner values full compliance with all relevant laws of the land, rules,
regulations, economic use of resources and of fairness/transparency in its relation with its Bidder(s)
and Agency(s).
AND WHEREAS to meet the purpose aforesaid both the parties have agreed to enter into this
Integrity Agreement (hereinafter referred to as “Integrity Pact” or “Pact”), the terms and conditions
of which shall also be read as integral part and parcel of the Tender/Bid documents and Contract
between the parties.
NOW, THEREFORE, in consideration of mutual covenants contained in this Pact, the parties hereby
agree as follows and this Pact witnesses as under: -
(c) The Principal/Owner shall endeavor to exclude from the Tender process any person,
whose conduct in the past has been of biased nature.
(2) If the Principal/Owner obtains information on the conduct of any of its employees which
is a criminal offence under the Indian Penal code (IPC)/Prevention of Corruption Act, 1988
(PC Act) or is in violation of the principles herein mentioned or if there be a substantive
suspicion in this regard, the Principal/Owner will inform the Chief Vigilance Officer and in
addition can also initiate disciplinary actions as per its internal laid down policies and
procedures.
(4) The Bidder(s)/Agency(s) will not, directly or through any other person or firm indulge in
fraudulent practice means a willful misrepresentation or omission of facts or submission of
fake/forged documents in order to induce public official to act in reliance thereof, with the
purpose of obtaining unjust advantage by or causing damage to justified interest of others
and/or to influence the procurement process to the detriment of the WAPCOS interests.
(5) The Bidder(s)/Agency(s) will not directly or through any other person or firm use Coercive
Practices (means the act of obtaining something, compelling an action or influencing a
decision through intimidation, threat or the use of force directly or indirectly, where
potential or actual injury may befall upon a person, his/her reputation or property to
influence their participation in the tendering process).
(3) If the Bidder/Agency can prove that he has resorted / recouped the damage caused by
him and has installed a suitable corruption prevention system, the Principal/Owner may, at
its own discretion, revoke the exclusion prematurely.
brevity, both the Parties agree that this Integrity Pact will have precedence over the
Tender/Contact documents with regard any of the provisions covered under this Integrity Pact.
IN WITNESS WHEREOF the parties have signed and executed this Integrity Pact at the place
and date first above mentioned in the presence of following witnesses:
1...............................................
(signature, name and address)
2.
.......................................
........ (signature, name
and address)
Place: Dated :
FORM-H
FORMAT FOR LITIGATION HISTORY, LIQUIDATED DAMAGES, DISQUALIFICATION
[To be submitted on Bidder’s Original Letter Head and should be notarized]
To
Additional Chief Engineer
INFS-1 Division, WAPCOS Limited,
Gurgaon
It is hereby declared that our firm (Name of firm with address--------) neither disqualified, nor have
any Litigation history and no Liquidated Damage imposed on the firm by any Department.
Yours faithfully,
(Signature, name
and designation of the
Authorized signatory)
Date:
LITIGATION HISTORTY
Subject: Tenderer should provide information as per this Performa for the firm/company on
any history of litigation or arbitration resulting from contracts executed in the last 5
years ending 31.03.2023 or currently in execution.
1. ARBITRATION CASES
Disputed Actual
Name and address of Cause of litigation and
Year amount in Award
Name of work Client matter in dispute
Rs. amount in
2. COURT CASES
If judgment
Name and Cause of litigation Name of given whether for
Year Name of work
address of Client and matter in dispute court or against the
Tenderer
Yours faithfully,
Date:
(Signature, name and designation
of the Authorized signatory)
Place: Name and seal of Bidder
FORM I
DETAILS OF TECHNICAL PERONNEL PROPOSED WITH BIO-DATA*
1. Proposed Position:
2. Name of Firm
Name of Staff:
3. Date of Birth:
4. Nationality:
5. Education: (Degree, Specialization, Name of College/ University, Year
of Pass out)
6. Membership of Professional
Associations:
7. Other Training:
8. Countries of Work Experience: India
Name of project :
Year (From-To) :
Client :
Main project features :
Position Held :
Activities performed :
13. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes
myself, my qualifications, and my experience. I understand that any willful mis-statement described
herein may lead to my disqualification or dismissal, if engaged
FORM - J
Form of Banker's Certificate from a Scheduled Bank (Solvency)
(in sealed cover addressed to Authority)
To
Additional Chief Engineer
INFS-1 Division, WAPCOS Limited,
Gurgaon
Name of the work:
(Signature)
1. Solvency certificate should be on the letter head of the bank, in sealed cover addressed to the
authority and official email of the issuing bank must be mentioned.
2. The date of certificate shall not be older than initial date of publication of tender.
SECTION IV
ANNEXURES
Annexure - I
To
Additional Chief Engineer
INFS-1 Division, WAPCOS Limited,
Gurgaon
Dear Sirs,
1. In accordance with Invitation to Bid under your Specification No…………………..………………
M/s………………….. having its Registered/Head Office at……………………………….… (hereinafter
called the ‘Bidder’) wish to participate in the said Bid or………………………………… and you, as a
special favour have agreed to accept an irrevocable and unconditional Bank Guarantee for an
amount of………………….……… valid upto …………………….…on behalf of Bidder in lieu of the Bid
deposit required to be made by the Bidder, as a condition precedent for participation in the
said Bid.
2. We, the ……………………………. Bank at ………………………………………….……… (local address) having
our Head office at ……………………..……………….. guarantee and undertake to pay immediately on
demand by WAPCOS Limited, A Government of India Undertaking, the
amount………………………………………….. of …………………………………………………….. (in words &
figures) without any reservation, protest, demur and recourse. Any such demand made by said
‘Owner’ shall be conclusive and binding on us irrespective of any dispute or difference raised
by the Bidder.
3. This guarantee will not be discharged due to the change in the constitution of the Bank or the
Service Provider(s)/Service Provider(s).
4. Notwithstanding anything contained hereinabove:
(1) Our liability under this guarantee is restricted to Rs. ……………. (in words & figures).
(2) This Bank Guarantee will be valid upto ………………….; and
(3) We are liable to pay the guarantee amount or any part thereof under this Bank Guarantee
only upon service of a written claim or demand by you on or before ……………………..
In witness whereof the Bank, through its authorised officer, has set its hand and stamp on
this…………….day of…………..20……….at…………
WITNESS
…..………………….…………………..………………….………
(Signature) (Signature)
……..………………….……………………..………………….………
(Name)(Name)
……..………………….……………………..………………….………
(Official Address)(Designation with Bank Stamp)
Attorney as per Power of Attorney No…………………………………..…….Dated………………………………………
ANNEXURE II
FORM OF PERFORMANCE GUARANTEE
We, ____________________(name & address with issue branch mail id of bank) (hereinafter referred
to as "the Bank" which expression shall, unless repugnant to the context or meaning thereof, include
its successors, administrators, executors and assigns) do hereby guarantee and undertake to pay the
Employer, on demand any or, all monies payable by the Bidder to the extent of Rs.
_____________(Rupees __________________only) as aforesaid at any time upto
___________without any demur, reservation, contest , recourse or protest and/or without any
reference to the Bidder. Any such demand made by the Employer on the bank shall be conclusive
and binding notwithstanding any difference between the Employer and the Bidder or any dispute
pending before any Court, Tribunal, Arbitrator or any other authority. The Bank undertakes not to
revoke this guarantee during its currency without previous consent of the Employer and further
agrees that the guarantee herein contained shall continue to be enforceable till the Employer
discharges this guarantee.
We the said Bank further agree that the guarantee herein contained shall remain in full force and
effect during the period that would be taken for the performance of the said Contract and that it
shall continue to be enforceable till all the dues of the Employer under or by virtue of the said
contract have been fully paid and its claims satisfied or discharged or till the Employer certifies that
the terms and conditions of the said Contract have been fully and properly carried out by the said
Agency and accordingly discharges the guarantee.
The Employer shall have the fullest liberty without affecting in any way the liability of the Bank under
this guarantee, from, time to time to extend the time for performance of the Contract by the Agency.
The Employer shall have the fullest liberty without affecting this guarantee, to postpone from time to
time the exercise of any powers vested in them or of any right which they might have against the
Agency and to exercise the same at any time in any manner and either to enforce or to forbear to
enforce any covenants, contained or implied, in the Contract between the Employer and the Agency
or any other course or remedy or security available to the Employer. The bank shall not be released
of its obligations under these presents by any exercise by the Employer of its liberty with reference
to the matters aforesaid or any of them or by reason of any other act or forbearance or other acts of
omission or commission on the part of the Employer or any other indulgence shown by the Employer
or by any other matter or thing whatsoever which under law would but for this provision, have the
effect of relieving the Bank. The guarantee shall not be affected by a change in the constitution of the
bank or of the employer.
The bank also agrees that the Employer at its option shall be entitled to enforce this Guarantee
against the Bank as a principal debtor, in the first instance, without proceeding against the Agency
and notwithstanding any security or other guarantee that the Employer may have in relation to the
Agency's liabilities.
We The Said Bank do hereby declare that we have absolute and unconditional power to issue this
guarantee in your favour under the Memorandum and Articles of Association or such other
constitutional documents of the Bank and the undersigned have full power to execute this guarantee
under the Power of Attorney / Post Approval Authorization dated____________ of the bank granted
to him / us by the Bank. We the said bank do hereby declare and undertake that your claim under
the guarantee shall not be affected by any deficiency or other defect in the powers of the bank or its
officials and the guarantee shall be deemed to have been issued as if the bank and its officials have
all the powers and authorization to give this guarantee on behalf of the bank.
We the said bank do hereby certify the genuineness and appropriateness of the Stamp paper and
stamp value used for issuing the guarantee. We the said bank do hereby declare and undertake that
your claim under the guarantee shall not be affected by any deficiency or other defect in the stamp
paper or its stamp value.
We the said bank do hereby declare that our payments hereunder shall be made to you, free and
clear of and without and deduction, reduction on account of any reasons including any and all
present and future taxes, levies, charges of withholding whatsoever imposed or collected with
respect thereto.
Notwithstanding anything contained hereinabove our liability under this guarantee is restricted to
Rs. _ (Rupees only) and it shall remain in force upto and
including and shall be extended from time to time for such period as may be desired
by M/s WAPCOS Limited to whom this bank guarantee has been given.
iii) our liability to make payment shall arise and we are liable to pay the guaranteed amount or any
part thereof under this guarantee, only and only if you serve upon us a written claim or demand
in terms of the guarantee on or before (indicate a date twelve month
after validity of Guarantee)
Dated this _day of at _________.
TENTATIVE LIST OF SCHEMES IN DISTT. UDAIPUR (DIVISION RURAL DISTRICT UDAIPUR) & DISTT
PRATAPGARH (PRATAPGARH DIVISION) (PACKAGE-1)
1. Division Rural District Udaipur
Balance Project
SN Name Of Scheme
Cost (In lakhs)
1 Badgaon-Loyra-Paldi-Chikalwas-Rathoro Ka Guda
2 Sukher-Sapetiya-Brahmano ka gura 39.99
3 Rebariyon ka guda, Raghunath pura
4 Janta Jal Yojna- Kavita 3.51
5 Janta Jal Yojna-Bhilwara 0.15
6 RWSS Lakhawali-Dangiyon Ka Guda 0.21
7 Sangath-Karan ji ka Guda 4.68
8 Jhalo ka Guda-Kailashpuri-Munwas 37.85
9 Naranyanpura 18.03
10 Amarpura
11 Heenta-Gadriyawas-Lalpura
12 Bamaniya
13 Loonanda 270.87
14 Badgaon
15 Nawania & Nawania B
16 Toos Dangiya, & Rawat Pura Toos
17 Dhamaniya ,Banjari ,Bagthal , Shamboopura 21.36
18 RWSS- Lakadwas 0.59
19 Bachhar-Barao ka Kheda-Surana 89.69
20 Debari
21 Dhol ki pati-Phada
97.75
22 Kaladwas-Ekllingpura
23 Khegro ki Bhagal-Mota Deora
24 Nai 3.40
25 Teelakheda-Kamlod-Panwari 105.69
26 Kodiyat & Kodiyat B 1.95
27 Pheela 10.10
28 Kurabad 1.60
29 Jharno ki sarai 1.69
30 Padrada 3.05
31 Gundali 21.73
32 Sayra,Bhato ka Sayra 257.82
33 Bargaon - Makwano ka Gura 5.61
34 Bokhada -
35 Sanchli 6.26
36 Brahamano ka kalvana
37 Dhol
38 Dhoondi-Barwara-Sarda-Hathniyawal -Kharbodo ka Guda
39 Kamol
82.55
40 Tarpal
41 karda-Royda
42 Rawaliya Khurd
43 Rural water supply scheme Rawaliya kalan chak-A
Balance Project
SN Name Of Scheme
Cost (In lakhs)
44 Nandeshma-Shobhawas
78.95
45 Jaswantgarh-Ajaypura
46 Padawali Kalan 6.93
47 Padawali khurd,mundawali & lunawato ka was 5.43
48 Damana 0.28
49 Thobawada 11.34
50 Ogna 27.91
51 Dheemri & Banswari 7.48
52 Kanthariya 2.33
53 Kochla 17.95
54 Badad 103.32
55 Baghpura and Masingpura 25.36
56 Phalasiya -Bassi 35.88
57 Juda 2.72
58 Bikarni 20.43
59 Bitholi 2.45
60 Gudli ,Rebariyon ki Dhani
61 Khemli-Aasna-Joonawas
62 Mangthal ,Mankyawas ,Kharbado ka guda
63 Basani kalan & Wasni Khurd
139.03
64 Chandesra-Jhanjela
65 Palanakalan & Palanakhurd
66 Rakhiyawal
67 Medta-Dana- Moriya
68 Bhawali 5.66
69 Chundawat Kheri 8.53
Dabok-Gadwa-Ordi-B
70 -
Bamaniya Khet-Anandpura
71 Janta Jal Yojna-Sangwa 51.37
72 Khartana 0.43
73 Nandwel 7.91
74 RWSS Ghasa 8.00
75 Salera Kalan
76 Dhundhaliya-Nandoli Khurd
193.99
77 Dholimagri-ganeshpura-khedighasa
78 Sindhu-Mandhuthal
79 Tulsidas ki Sarai 10.67
80 Jhadol 124.06
81 Lunawato ka Kheda 105.22
82 Oda 24.08
83 Magwas 70.95
84 Madri 96.12
85 Panrwa 65.67
86 Koliyari 54.48
87 Bichiwara 77.76
88 Semtal 63.39
89 Cheerwa & Shivpuri 14.38
90 Rajpura 34.28
Balance Project
SN Name Of Scheme
Cost (In lakhs)
91 Saleda 73.86
92 Madar & Brahmnao ki Hunder 52.04
RWSS Badi,hawala,kala,hawada khurd,upli badi,liyo ka gurha,lal ka gurha,
93 329.34
katara,phernio ka guda,hathidhara
94 Palachh 51.83
95 RWSS Basna 24.75
96 Dhikliya and Vanpura 14.15
97 Daroli, Bhamrasiya 21.06
98 Lamba dhawda 5.50
99 Bedwas 19.78
100 Ambua 5.34
101 Madri -
102 Chukriya 5.62
103 Bambora 10.52
104 Bansra- Sunderpura 21.97
105 Nayakheda 2.77
106 Manasi 29.64
107 Sura 16.44
108 Chhapariya 2.13
109 Ariwara 3.58
110 Pandi Bor 10.94
111 Badla 7.89
112 Barothi -
113 Kedariya-Mogji ka Kheda 58.29
114 Karnali 50.00
115 Popalty 19.60
116 Keli 80.00
117 Dadiya
118 Majawari 35.91
119 Jhadoli & Ranawaton ka gurha
120 Teetradi
121 Umarda 176.39
122 Pai
123 Kunti ka lewa & Lambi Semal
124 NarsinghPura 29.52
125 Sameeja
126 Bhesra Khurd 153.57
127 Sultan ji Ka Kherwara 197.30
128 Chargadiya-Gadriyawas-Gopalpura 28.20
129 balicha (Girwa) 75.88
130 Punawali,Subawaton Ka Gurha & Madawa 6.83
131 Ghata
132 Bhat
302.13
133 Kachaba
134 Mokhi
135 Bhadwi gurha
136 Chhali 283.60
137 Obra khurd
Balance Project
SN Name Of Scheme
Cost (In lakhs)
138 Manwakheda 287.39
Vallabhnagar, gumanpur,bhana magra,uda khera,ranchhopura,akodra&kali
139 192.25
pahadi
140 Rama
47.04
141 Sare
142 Maharaj ki Khedi - Gadriwas-kat ka kua 11.19
143 Wali,Bela 40.71
144 Bhujada 134.16
145 Chanawada 253.83
146 Gourela
147 Kanpur,Kheda Kanpur 19.26
148 Dakan Kotra
149 Karanpur & Bansliya 21.94
150 Dhaneriya
151 Morath
152 Kuncholi
153 Falichada& Khedi falichada
154 Sakriyakheri,sukhwara& pawda
155 Udakheda,bheelakheda& Royada 110.57
156 Namari,ghanoli& suwaton ka guda
157 Rahmi& Chipkheda
158 Gadoli,dhani,jawanji ka kheda& tilora
159 Bijanwas & bikarni
160 Golwara& wajmiya
161 Deimata 55.38
162 Naya Khera 31.66
163 Udiya Khera 34.05
164 Amdari 63.07
165 Rawan 107.36
166 Dedkiya 177.76
167 Borikuwa 190.69
168 Gosiya 173.96
169 Chanbora 129.91
170 Ghawri Talai 132.91
171 Bamniya 216.57
172 Kodiya Khet-Toran Talab 199.29
173 Phoota Pana 124.03
174 Dhoonimata 76.88
175 Gukhar Mangri 65.15
176 Kanpur 147.82
177 Nala Phala 143.88
178 Lai 171.01
179 Jogi Talab 159.57
180 Nela 171.66
181 Rakampura 149.57
182 Jodhpuriya 125.43
183 Garada 88.30
184 Jhamar Kotra 348.72
Balance Project
SN Name Of Scheme
Cost (In lakhs)
185 Nala 316.39
186 Dodawali 257.59
187 Jawar 198.81
188 Kaliwas-Rayta 483.74
189 Undari Kalan 176.93
190 Saru 332.11
191 Jabla 568.68
192 Paduna-Patiya 924.49
193 Savina Khera (rural) 512.48
194 Dewali 307.04
195 Karawari
196 Ratharon ka Gurha
197 Ghasiyar
198 Kumawaton ka gurha ,MATA JI KA KHERA
199 Selu & Kundal ka guda
200 Ghodan Kalan
201 Bandarwara -29.75
202 Jhalo ka guda
203 Peli bhagal
204 Raya
205 barodiya & Dangiyon ka hunter
206 Bada
207 Basliya-Kasniyawad & Khuyanpura
208 Bhalo ka guda, Bhekda, Chhoda Guda,Karget 546.63
209 Sisarma, kalarohi 33.76
210 Madarda 344.68
211 Nal 347.13
212 Jorma 167.73
213 Teerol 233.60
214 Jemli 219.35
215 Madar 173.45
216 Umarna 204.50
217 Vishma 144.30
218 Jhalon Ka Kalwana 202.39
219 Bagar 231.54
220 Peeparna 214.74
221 Paner 236.96
222 Kadech 237.19
223 Hanyla 188.77
224 Guman 192.23
225 Kanji Ka Guda 231.85
226 Palan 259.57
227 Diyan 311.28
228 Kamba 319.32
229 Reechwara 265.57
230 Palasama 245.06
231 Semad A 274.89
232 Kyar Ka Khet 199.85
Balance Project
SN Name Of Scheme
Cost (In lakhs)
233 Baguni 228.99
234 Kundalavas 330.22
235 Ghanawal 428.84
236 Barawali 277.04
237 Cheetaravas 307.37
238 Basliya 267.35
239 Dhikora 317.97
240 Samal 369.05
241 Semad B 188.86
242 Gayphal 184.24
243 Bhanpura 631.43
244 Rawachh 601.09
245 Bagdada
246 Was
247 Badoondiya
248 MOtawida
249 Khampiya
250 Hathni
251 Bhat Madra
252 Surajwara
253 Jambua
254 Dedkiya
255 Bheoriya & Kadechawas
256 Matasula
257 Nayawas Sera
258 Suaawaton ka gurha
259 suthar Madra
2,755.77
260 Avani
261 Behra
262 Kalji ka gurha
263 Delawas
264 Chundawaton Ka Khera
265 Pandlon Ka Chora
266 Manna ji ka guda & Malliyon ki Madri
267 Mokhal
268 Solariya
269 Garda & Gadariyawas
270 Patiya
271 Surajgarh
272 Kelthara
273 Undithal
274 Sadgi ka Gura & Nalodar
275 Kharsan, Mavli Danigiyan, Gadriwas Mavli 309.95
276 Bharel
277 Chana Ki Umar
278 Gadliya 414.01
279 Sivariyon Ka Chora
280 Jhalra
Balance Project
SN Name Of Scheme
Cost (In lakhs)
281 Jhali Ka Gurha
300.38
282 Sathpur Gujran- Sathpur Meenan
283 Ter Ka Bhilwara 45.01
284 Karelon Ka Gurha 81.96
285 Mohanpura 40.70
286 Kundal Ubeshwarji 58.99
287 Jhakharon Ki Bhagal 67.10
288 Pawadiya 76.90
289 Paraya Ki Bhagal 25.53
290 Nagda 43.60
291 Losing Ka Dhana 57.73
292 Sameta
293 Dhamdhar 182.09
294 Biliya
295 Fatadara
296 Nangenla
297 Umariya
298 Chandani
962.30
299 Nala
300 Surpalaya
301 Sarupal (Mordugri)
302 Kharpina
303 Damron Ka Gurha
304 Mamadeo
545.84
305 Parola
306 Manpura
307 Dedron Ka Dhani
308 Ladiya Khera 265.79
309 Alla Ki Dhani
310 Gara 95.30
311 Sarli 90.91
312 Dadmiyma 97.46
313 Jhalra 94.18
314 Sandmariya 54.82
315 Mahula 47.44
316 Bekariya War 52.69
317 Amaliya 51.94
318 Digawari Khurd 51.48
319 Jhajharbadala 47.71
320 Nal 52.55
Total Amount 30,377.64
2. Pratapgarh Division
Balance Project
SN Name Of Scheme
Cost (In lakhs)
Conversion Of Pump & Tank Scheme To Piped Rural Water Supply Scheme Kotri Block
1 Arnod District Pratapgarh (Under JJM) Single Point Responsibility Basis With One Year 3.09
DLP
Conversion Of Pump & Tank Scheme To Piped Rural Water Supply Scheme Gomsna
2 Block Chhoti Sadri District Pratapgarh (Under JJM) Single Point Responsibility Basis With 17.92
One Year JJM
Augmentation Of Rural Water Supply Scheme Salamgarh Block Arnod District
3 3.36
Pratapgarh (Under JJM) Single Point Responsibility Basis With One Year JJM
Conversion of P&T scheme to piped Scheme for village Devla Tehsil Dhariyawad District
4 74.66
Pratapgarh including 1 year defect liability period and 5 year O&M Work Deola
Work of reorganization and conversion of various RWSS to provide FHTC including one
5 year DLP of various SVS & MVS under JJM in Jurisdiction of PHED Subdivision Dhariyawad
Division Pratapgarh- Village Mungana
Work of reorganization and conversion of various RWSS to provide FHTC including one
6 year DLP of various SVS & MVS under JJM in Jurisdiction of PHED Subdivision Dhariyawad
Division Pratapgarh- Village Parel
Work of reorganization and conversion of various RWSS to provide FHTC including one
7 year DLP of various SVS & MVS under JJM in Jurisdiction of PHED Subdivision Dhariyawad
Division Pratapgarh- Village Vikroon
Work of reorganization and conversion of various RWSS to provide FHTC including one
8 year DLP of various SVS & MVS under JJM in Jurisdiction of PHED Subdivision Dhariyawad
Division Pratapgarh- Village Parsola, Mokhampura
Work of reorganization and conversion of various RWSS to provide FHTC including one
9 year DLP of various SVS & MVS under JJM in Jurisdiction of PHED Subdivision Dhariyawad
Division Pratapgarh- Village Charpotiya
89.12
Work of reorganization and conversion of various RWSS to provide FHTC including one
10 year DLP of various SVS & MVS under JJM in Jurisdiction of PHED Subdivison Dhariyawad
Division Pratapgarh- Village Khunta
Work of reorganization and conversion of various RWSS to provide FHTC including one
11 year DLP of various SVS & MVS under JJM in Jurisdiction of PHED Subdivision Dhariyawad
Division Pratapgarh- Village Lohagarh
Work of reorganization and conversion of various RWSS to provide FHTC including one
12 year DLP of various SVS & MVS under JJM in Jurisdiction of PHED Subdivision Dhariyawad
Division Pratapgarh- Village Manpur
Work of reorganization and conversion of various RWSS to provide FHTC including one
13 year DLP of various SVS & MVS under JJM in Jurisdiction of PHED Subdivision Dhariyawad
Division Pratapgarh- Village Mangrol
Work of reorganization and conversion of various RWSS to provide FHTC including one
14 year DLP of various SVS & MVS under JJM in Jurisdiction of PHED Subdivision Dhariyawad
Division Pratapgarh- Village Jawahar Nagar
Conversion of Regional WS to Piped WSS For village Karjoo, Rawatpura, Piplikheda,
15 Udpurakala block Chhoti Sadri District Pratapgarh to provide FHTC including one year 52.06
DLP and 5 Year O&M under JJM
Reorganization and conversion of P&T to piped RWSS village Ninor, Sholi, Raipur and
16 Jeerawata Subdivision Arnod District Pratapgarh Under JJM on SPR Basis with one year 17.16
DLP District Pratapgarh
Conversion of Handpump Scheme to piped scheme under JJM for village Basera
17 8.63
P.S.Chhoti Sadri District Pratapgarh with one year DLP
Conversion Of Pump & Tank Scheme To Piped Scheme Under Jal Jeevan Mission (JJM)
18 8.61
For Village Semarda Panchayat Samitee Chhotisadari District Pratapgarh
Conversion of Pump & Tank Scheme to piped scheme under JJM for village Soobi
19 6.34
P.S.Chhoti Sadri District Pratapgarh with one year DLP
Balance Project
SN Name Of Scheme
Cost (In lakhs)
Conversion Of Pump & Tank Scheme To Piped Scheme Under Jal Jeevan Mission (JJM)
20 3.57
For Village Gagrol Panchayat Samitee Chhotisadari District Pratapgarh
Conversion Of Pump & Tank Scheme To Piped Scheme Under Jal Jeevan Mission (JJM)
21 41.80
For Village Satola Panchayat Samitee Chhotisadari District Pratapgarh
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
22 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Gadola
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
23 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Panmodi
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
24 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Bajrangarh
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
25 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Kulthana
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
26 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Sanoti
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
27 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Devgarh
103.70
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
28 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Nakor
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
29 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Deopura, Phoolda, & Pipalikhera
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
30 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Magri
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
31 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Madhuratalab
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
32 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Bardiya
Augmentation of various RWSS to provide FHTC including 1 year defect liability period
33 of various SVS & MVS under JJM in the jurisdiction of PHED sub dn. Pratapgarh -Village
Dhikaniya, Nayatapra, & Padakhora
Construction & Commissioning of work related to piped WSS village Bambori Under JJM
34 12.18
Block chotisadri, District Pratapgarh
Construction & Commissioning of work related to piped WSS village Jalodiya kelukhera
35 9.61
Under JJM Block chotisadri, District Pratapgarh
Construction & Commissioning of work related to piped WSS village Narani Under JJM
36 24.13
Block chotisadri, District Pratapgarh
Re-organization of Regional water supply scheme enroute villages Jakham Dam 30 nos.
37 villages & its Habitations of block Dhamotar & Pratapgarh District Pratapgarh 980.96
Construction & Commissioning of work related to piped water supply scheme under JJM
38
for village Raghunathpura block Chotisadri District Pratapgarh
11.96
Construction & Commissioning of work related to piped water supply scheme under JJM
39
for village Kitkhera block Chotisadri District Pratapgarh
Balance Project
SN Name Of Scheme
Cost (In lakhs)
Construction & Commissioning of work related to piped water supply scheme under JJM
40
for village Barol Jagir, block Chotisadri District Pratapgarh
Construction & Commissioning of work related to conversion of Handpump scheme to
41 47.09
piped scheme Under JJM for village Malawada block Chotisadri, District Pratapgarh
Construction & Commissioning of work related to piped water supply scheme under JJM
42 27.81
for village limbarwada block Dhariyawad District Pratapgarh
Conversion of Hand Pump in to water supply scheme under JJM at village Nayaboriya
43 58.76
block Dhariyawad District Pratapgarh
Conversion of Hand Pump in to water supply scheme under JJM at village Rathoro ka
44 56.50
khera and Arbara block Dhariyawad District Pratapgarh
Conversion of Hand Pump in to water supply scheme under JJM at village Bhanawta
45 59.58
block Dhariyawad District Pratapgarh
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM At Village Miyala
46 27.08
Block Dhariawad Distt Pratapgarh
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM At Village
47 51.62
Sewanagar Block Dhariawad Distt Pratapgarh
Conversion Of Handpump In To Piped Water Supply Scheme Under JJM At Village
48 16.68
Mundkosiya Block Dhariawad Distt Pratapgarh
Conversion Of Handpump In To Piped Water Supply Scheme Under JJM At Village
49 31.65
Sathpur Block Dhariawad Distt Pratapgarh
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM At Village Mau
50 40.95
Block Dhariyawad Distt Pratapgarh
Conversion of Hand pump in to pipe water supply scheme under JJM at Village
51 37.53
Jodhpuriya Block Chhotisadri District Pratapgarh
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM At Village Kulmiya
52 4.33
Block Chotisadri Distt Pratapgarh
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM At Village Satakui
53 30.06
Block Dhariyawad Distt Pratapgarh
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM At Village Payra
54 15.06
Block Dhariyawad Distt Pratapgarh
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM At Village
55 6.44
Bamangamra Block Dhariyawad Distt Pratapgarh
Conversion of Hand pump in to pipe water supply scheme under JJM at Village Jhadoli
56 175.23
Block Dhariyawad District Pratapgarh
Conversion of Hand pump in to pipe water supply scheme under JJM at Village Kumari
57 176.11
Block Dhariyawad District Pratapgarh
Conversion of Hand pump in to pipe water supply scheme under JJM at Village Gothra
58 196.48
Block Dhariyawad District Pratapgarh
Conversion of hand pump into piped water supply scheme under JJM at village Gadwas
59 16.92
block Dhariywad District Pratapgarh
Conversion of Hand pump scheme to piped scheme for village Jayakhera Block
60 7.04
Dhariyawad Distt Pratapgarh
Conversion of hand pump into piped water supply scheme under JJM at village
61 9.14
Waliseema block Dhariywad District Pratapgarh
Conversion of hand pump into piped water supply scheme under JJM at village Ghatela
62 37.99
block Dhariywad District Pratapgarh
Conversion of Hand pump in to pipe water supply scheme under JJM at Village sawala
63 6.54
Block Dhariyawad District Pratapgarh
Conversion of Hand pump in to pipe water supply scheme under JJM at Village
64 89.24
HazariGurha Block Dhariyawad District Pratapgarh
Conversion of hand pump scheme to piped water supply scheme under JJM at village
65 35.24
Biliya P.S Chhotisadri District Pratapgarh
Balance Project
SN Name Of Scheme
Cost (In lakhs)
Conversion of Hand pump scheme to piped scheme for village Choukri Block Chhotisadri
66 10.41
District Pratapgarh
Conversion of Hand pump in to pipe water supply scheme under JJM at Village Deoli
67 41.17
Block Chhotisadri District Pratapgarh
Providing Water Supply Through FHTC In Village Antrol Under Ambav Panchayat Under
68 15.99
Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Mahudi Kheda Under Pipliya Panchayat
69 21.32
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Nagliya Kalan Under Gadwas Panchayat
70 49.24
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Soldev Under Parvariya Sag Panchayat
71 34.07
Under Jal Jeevan Mission Lock Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Hirawaton Ka Akya Under Gopalpura
72 40.16
Panchayat Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Chitoriya Khurd Under Bajpura
73 35.05
Panchayat Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Sagwariya Under Lodi Mandvi Panchayat
74 30.58
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Naal Under Bildiya Panchayat Under Jal
75 82.71
Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Khokhri Kalan Under Parvariya Sag
76 37.49
Panchayat Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Khedi Under Gothada Panchayat Under
77 40.97
Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Dholi Magri Under Ambav Panchayat
78 51.35
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Billikheda Under Gopalpura Panchayat
79 72.61
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Ekling Ji Ka Semliya Under Lodi Mandvi
80 35.41
Panchayat Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Vela Under Shivpuri Panchayat Under
81 24.92
Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Chunpa Under Shakarkand Panchayat
82 36.74
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Karmal Khurd Under Bajpura Panchayat
83 26.79
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Keli Under Dantaliya Panchayat Under
84 21.26
Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Nathiya Khera Under Parel Panchayat
85 39.85
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Bhagto Ka Guda Under Kesharpura
86 21.49
Panchayat Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Umarvaniya Under Lohagarh Panchayat
87 80.87
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Rural Water Supply Scheme Village Gangagurha Under Jawahar Nagar Panchayat Under
88 74.05
Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Gagri Under Dantaliya Panchayat Under
89 16.10
Jal Jeevan Mission Block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Sakhi Khera Under Kesharpura
90 37.74
Panchayat Under Jal Jeevan Mission
Providing Water Supply Through FHTC In Village Undavela Under Kesharpura Panchayat
91 20.99
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Balance Project
SN Name Of Scheme
Cost (In lakhs)
Rural WATER SUPPLY SCHEME VILLAGE Amlikhera UNDER Nad PANCHAYAT UNDER JAL
92 28.43
JEEVAN MISSION Block Dhariywad District Pratapgarh
Regional piped water supply scheme Bedma for Village Nagdeda & Bedma Sub Dn. Arnod
93 128.08
under JJM
work of Conversion of Hand Pump to Piped water supply scheme under JJM at village
94 140.00
Swaroopganj, Chohankhera, Gadriywada, Dhamniya Jagir Balankhera Block Chotisadri
Rural WATER SUPPLY SCHEME Village Akya khera UNDER Gopalpura PANCHAYAT
95 90.49
UNDER JAL JEEVAN MISSION block Dhariywad District Pratapgarh
Rural WATER SUPPLY SCHEME Village Chandana gaon UNDER Waliseema PANCHAYAT
96 97.78
UNDER JAL JEEVAN MISSION block Dhariywad District Pratapgarh
Providing Water Supply Through FHTC In Village Gopalpura Under Gopalpura Panchayat
97 96.95
Under Jal Jeevan Mission Block Dhariywad District Pratapgarh
Rural WATER SUPPLY SCHEME Village Karmal Kalan UNDER Bhandla PANCHAYAT UNDER
98 92.24
JAL JEEVAN MISSION Block Dhariywad District Pratapgarh
Rural WATER SUPPLY SCHEME Village Limba Khera UNDER Gopalpura PANCHAYAT
99 96.57
UNDER JAL JEEVAN MISSION Block Dhariywad District Pratapgarh
PROVIDING WATER SUPPLY THROUGH FHTC IN Village Rathodo Ka Semaliya UNDER
100 99.03
Bajpura PANCHAYAT UNDER JAL JEEVAN MISSION Block Dhariywad District Pratapgarh
PROVIDING WATER SUPPLY THROUGH FHTC IN Village Shehpura UNDER Sihad
101 97.72
PANCHAYAT UNDER JAL JEEVAN MISSION Block Dhariywad District Pratapgarh
PROVIDING WATER SUPPLY THROUGH FHTC IN Village Tihawalo Ka Phala UNDER Sihad
102 103.94
PANCHAYAT UNDER JAL JEEVAN MISSION Block Dhariywad District Pratapgarh
Rural WATER SUPPLY SCHEME Village Bhagardera UNDER Vagatpura PANCHAYAT
103 97.27
UNDER JAL JEEVAN MISSION Block Dhariywad District Pratapgarh
PROVIDING WATER SUPPLY THROUGH FHTC IN VILLAGE Khoravela UNDER Bharkudi
104 101.29
PANCHAYAT UNDER JAL JEEVAN MISSION Block Dhariywad District Pratapgarh
PROVIDING WATER SUPPLY THROUGH FHTC in Village Udaibhanpura UNDER
105 Gadariyawas PANCHAYAT UNDER JAL JEEVAN MISSION Block Dhariywad District 101.24
Pratapgarh
Rural WATER SUPPLY SCHEME Village Kotri UNDER Juna Boriya PANCHAYAT UNDER JAL
106 93.00
JEEVAN MISSION Block Dhariywad District Pratapgarh
Rural WATER SUPPLY SCHEME Village Padla Burjon Ka UNDER Charniya PANCHAYAT
107 UNDER JAL JEEVAN MISSION Block Dhariywad District Pratapgarh Village Padla Burjon 116.49
Ka
Rate Contract For Construction Of Sources, Rising Main Pipelines, Cwrs, Pump Houses,
Esrs, Glsrs, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
108 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 58.28
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Mahudikhera
Rate Contract For Construction Of Sources, Rising Main Pipelines, Cwrs, Pump Houses,
Esrs, Glsrs, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
109 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 269.16
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Sihar
Rate Contract For Construction Of Sources, Rising Main Pipelines, Cwrs, Pump Houses,
Esrs, Glsrs, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
110 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 54.08
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Dholiya
Rate Contract For Construction Of Sources, Rising Main Pipelines, Cwrs, Pump Houses,
Esrs, Glsrs, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
111 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 82.63
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Mundla
Balance Project
SN Name Of Scheme
Cost (In lakhs)
Rate Contract For Construction Of Sources, Rising Main Pipelines, Cwrs, Pump Houses,
Esrs, Glsrs, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
112 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 142.79
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Ramnagar
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
113 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 3,243.59
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Keshariyawad
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
114 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 178.95
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Shivpuri
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
115 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 183.06
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Dantaliya
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
116 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 405.00
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Aad
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
117 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 237.61
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Jagalwada
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
118 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 101.42
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Ujar Kheda
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
119 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer -2,304.03
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Lodi Mandvi
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
120 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 430.79
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Shakarkand
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
121 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 421.42
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Leekaniya
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
122 ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect 326.69
Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer
Balance Project
SN Name Of Scheme
Cost (In lakhs)
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Bharkundi
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
123 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 365.39
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Mandkalan
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
124 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 370.69
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Garda
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
125 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 431.66
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Mandvi
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
126 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 587.79
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Pahara
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
127 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 258.60
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Natela
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
128 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 422.91
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Pipliya
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
129 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 341.18
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Padla Bori
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
130 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 310.76
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Lodiya
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
131 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 384.63
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Gadriyawas
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
132 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 372.76
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Nad
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
133 326.27
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
Balance Project
SN Name Of Scheme
Cost (In lakhs)
Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Bajpura
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
134 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 268.02
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Bhandala
Rate Contract For Construction Of Sources, Rising Main Pipelines, CWRS, Pump Houses,
ESRS, GLSRS, Internal Village Distribution Pipe Line And FHTC Including One Year Defect
135 Liability Period Of SVS &MVS And There After O&M Of Works Up To Village Transfer 280.42
Chamber (VTC) For Five Years For MVS Under JJM In The Jurisdiction Of PHED Dn.
Pratapgarh, District Pratapgarh For Village Kesarpura
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM For 10 Villages Of
136
Block Dhariawad Distt Pratapgarh -Village Bildiya
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM For 10 Villages Of
137
Block Dhariawad Distt Pratapgarh -Village Gurha
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM For 10 Villages Of
138
Block Dhariawad Distt Pratapgarh -Village Ganera
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM For 10 Villages Of
139
Block Dhariawad Distt Pratapgarh -Village Anat
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM For 10 Villages Of
140
Block Dhariawad Distt Pratapgarh -Village Bhojpur
1,739.47
CONVERSION OF HANDPUMP INTO PIPED WATER SUPPLY SCHEME UNDER JJM FOR 10
141
VILLAGES OF BLOCK DHARIAWAD DISTT PRATAPGARH -Villagemuniya
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM For 10 Villages Of
142
Block Dhariawad Distt Pratapgarh -Village Nalwa
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM For 10 Villages Of
143
Block Dhariawad Distt Pratapgarh -Village Borda
Conversion Of Handpump Into Piped Water Supply Scheme Under JJM For 10 Villages Of
144
Block Dhariawad Distt Pratapgarh -Village Bilkabas
CONVERSION OF HANDPUMP INTO PIPED WATER SUPPLY SCHEME UNDER JJM FOR 10
145
VILLAGES OF BLOCK DHARIAWAD DISTT PRATAPGARH -Village Das Ka Gurha
Total Amount 15,601.77
Note: The Project cost is Tentative which can be change during the execution by the Principal Client.
The Employers reserves the right to delete/ substitute any number schemes from the list as per
requirement of Principal Client. No change in the quoted percentage shall be acceptable on account
of this.
ANNEXURE – A
(On Letter Head of Bidder- (To be uploaded along with Technical Bid )
Form of Quotation
To,
Additional Chief Engineer
INFS-1 Division,
WAPCOS Limited
76-C, Institutional Area, Sector – 18, Gurgaon
Email: [email protected],
Contact No. +91-124-2399225
Subject: - Hiring of Agency for Providing Manpower, Infrastructure, Logistics & Technical Support for
the works in Distt. Udaipur (Division Rural District Udaipur) & Distt Pratapgarh (Pratapgarh division)
(Package-1)
I/We the undersigned, having carefully examined and understood the documents on which quotation
to be based, hereby agree to carry out the aforesaid work as described in the NIT Document, in
conformity with the Scope of works and terms and condition as specified in the document.
I/We the undersigned, declare that the price Quoted Online in BoQ will remain valid for 90 (Ninety) days
from the date of submission of bid. Unless and until a formal contract is prepared and executed, this
quotation, together with your acceptance thereof, shall constitute a binding contract between us.
I/We undersigned, that you are not bound to accept the lowest or any Bid you may receive. Signed this
day 2023
Name of firm :
Address of firm :
Telephone No :
Fax No. :
E-mail
ANNEXURE– B
(On Letter Head of Bidder- (To be uploaded in Financial Breakup on GEM Portal only)
BILL OF QUANTITIES (BOQ) AND SCHEDULE OF PRICE
Name of the Assignment: Hiring of Agency for Providing Manpower, Infrastructure, Logistics &
Technical Support for the works in Distt. Udaipur (Division Rural District Udaipur) & Distt Pratapgarh
(Pratapgarh division) (Package-1)