Surveyor 53.1 - Final Web
Surveyor 53.1 - Final Web
Surveyor 53.1 - Final Web
53
No.1
2018
m2 (x, y) x 3
We also have peer-reviewed articles. The section starts with the rental choice in green-rated office building by the
commercial tenants. The authors from Universiti Malaya proposed a conceptual framework in evaluating the trend,
with locality is still among the central considerations. The neo-classical and behavioural views have been the main
theories behind office location decisions. Tenant demand for green office buildings also provides varied findings.
The size of the firms does form part of the factor as well. All these theories are well blended within the explanation
and at the end, the authors proposed their own theory in exploring tenant office choice.
We also have a residential issue this time. It’s regarding the Strata Management Tribunal (SMT) in Malaysia. Since
high-rise developments are becoming more complex, there is a need for a special tribunal to deal with all the
issues that arise. SMT is promoted to be a quicker, less costly and less adversarial method of resolving disputes as
compared to court action. The top three claims are recovery of charges or contribution to the sinking fund, failure
to perform duty and dispute concerning common property. This article shed some light on SMT to eliminate its
inefficiencies and increase effectiveness.
The Building Surveying practice talks about Maxwell Hill in this issue. The building conservation and historical
perspectives are put into context. In the case of the hill, building is not only the legacy that the British left in this
country, but the unique landscape that formed part of their colony. The author tries to uphold the uniqueness of
Maxwell Hill so it goes parallel with the other famous hill stations in Bukit Bendera, Bukit Fraser and Cameron
Highlands. Systematic literature review using PRISMA has been adopted to identify sources from various journals.
Site observation identified that many of the original bungalows are abandoned and deteriorated over time.
RISM networking continues at both international and local levels. On March 2018, RISM had signed the MoU
with the Malaysian Institute of Arbitrators (MIArb) at Hilton Hotel, Petaling Jaya. The signing ceremony was held
during the National Real Estate Convention (NREC) and attended by QS Division, President of MIArb and President
of RISM. On January 2018, CABE Presidential Visit took place at RISM HQ. The delegation is greeted by Deputy
President of RISM, Vice-President of RISM (BS Division) and the other BS Division members and RISM Secretariat.
There is great interest from both parties to collaborate, especially organising joint CPD talks and our renowned ISC.
We also had a blood donation campaign that involved 91 donors, and the RISM Inter-Firms Bowling Tournament
2018.
Under the Professional Practice section, Prof Sr Dr Ting Kiew Hwa talks about the
direct office investment done by the several Malaysian institutional investors. This
has been practiced since 2010 for investment in overseas property market such as
in the UK and Australia. This is a good and viable alternative investment option to
increase one’s asset portfolio. Last but not least, Book Review section covers the
book titled “Isu-isu Perundangan Berkaitan Kontrak Binaan” written by Sr Amran
Mohd. Majid. This book published by Dewan Bahasa dan Pustaka in 2017. It is
definitely a worthwhile read because of its simple language style and provides you
information that you need.
A.I. Che-Ani
Editorial
CONTENTS
President
YBhg. Dato’ Sr Lau Wai Seang, DSPN, DJN, BCN, FRISM,
Reg. Valuer, Reg. Estate Agent, CIPV
Pg31
Secretary to the Board
Zarinah bt. Danial Maxwell Hill: Exploring from Built Environment
and Historical Perspectives
INTERNATIONAL ADVISORY BOARD
Prof. Chitra Weddikkara
University of Moratuwa, Sri Lanka RISM News
Prof. Graeme Newell
University of Western Sydney, Australia
Pg39 Memorandum of Understanding (MoU) between
Sr Noushad Ali Naseem Ameer Ali, PPRISM
RISM and Malaysian Institute of Arbitrators (MIArb)
Massey University, Auckland, New Zealand
Professor Michael Riley Pg40 CABE Presidential Visit to RISM
Liverpool John Moores University, Liverpool, United Kingdom
PRINTER
Fong Wah Trading
No. 17, Jalan Tembaga SD 5/2G
52200 Kuala Lumpur
19
31 39
Professional Practice 40
Pg43 Direct Office Investment for Institutional
Investors
Book Review
Pg44 Isu-Isu Perundangan Berkaitan Kontrak Binaan
Elemental Cost Analysis
Pg45 Elemental Cost Analysis
Regulars
Pg52 List of New Members
42
‘Sr’ is the abbreviation for surveyors and was first mooted by RISM in 2005 and used
by all RISM members since 2006 as a badge of identity for surveying professionals.
The Institute as a body does not hold itself responsible for statements made or
opinions expressed in the articles and advertisements printed in this publication, or
for the strict accuracy of references to law cases, which are intended only as a gloss
on authorised reports. Rights of translation and reproduction reserved.
Vol.53 No.1 2018
Background/History
The construction of Bangunan Juruukur commenced in early 1973 after the then
Petaling Jaya Town Board approved its submission plans in 1972.
To finance the construction cost of RM566,200, the Institution had mortgaged some
lands to obtain an overdraft from Bank Bumiputra.
On 19 June 1976, the then Minister of Lands and Mines Datuk Dr Mohd Asri Hj Muda
laid the foundation stone of the building that is still visible today. The building was
officially opened by then Senator Rafidah Aziz on 14 October 1977.
Recently the 40-year-old building underwent some renovation works and the
foundation stone had to be relocated to accommodate security, a fire control panel
and a post.
The last renovation was carried out some 15 years ago and it was mainly at Level 3
where the secretariat office is located.
If you had been coming to the RISM building before the renovation, you could
appreciate that it was in need of repairs and upgrades.
The QS Division chair at that time was put in-charge of the project. This interview
was designed to give more in depth knowledge of the whole project and the process
that they had to go through. Who better to tell us all about it but the key person
herself, Sr Wan Ainon Zuraiha Wan Abdul Khalid.
5
INTERVIEW
The Malaysian Surveyor
Q&A
Q. How did you first get involved with the
renovation and upgrading works of the
Bangunan Juruukur Diraja Malaysia
where the RISM headquarters is
housed?
Prior to my involvement, the RISM secretariat called
for Design and Build quotations, mainly for the Board
Room on Level 2. However, the secretariat was faced
with an issue pertaining to the tabling of the quotation
report as all the tenderers had submitted different
designs and quoted for different items, hence it was
not an apple to apple comparison.
6
Vol.53 No.1 2018
Building safety
- Ensure the TNB room is safe. Previously, water was
ponding inside and there was even a dead rat in the
water.
- Remove the stench of rats.
- Ensure any openings at the basement ceiling and
-
walls are closed up to avoid pests finding their way
in.
Stop pigeons from nesting at the building ledges as
Q. What are your strategies and plans to
ensure the vision is achieved?
The RISM President had requested for a proper tender
they pose a cleanliness and health hazard.
procedure to be adopted and a Tender Board was
- Build a proper security area. formed to look after the project. Based on the outline
given by the Council, the designer prepared the brief
Building repairs and improvements from wear and
and translated the requirements into drawings.
tear
- Upgrade all toilets, including sanitary fittings, Once the brief was completed, the designer presented
plumbing and sewerage piping. Toilets are added the proposal to the Tender Board and Management
at Level 1 and 2, from one to two cubicles for each Committee to get approval before the preparation of
gender. detail drawings could proceed.
- Repair basement ceiling leaks that were coming
So, with the completed detail drawings and Tender
from the Ground Floor. The toilet floors were
Documents, comprising Bills of Quantities, the Tender
waterproofed again before being retiled.
Board called for tender on the works. The list of
- Upgrade Level 1 to tenantable spaces so it can be tenderers also included those who had previously
rented out. submitted their quotations.
- Repaint and repair broken doors and windows,
partitions, replace existing vinyl tiles and carpets. The successful tenderer M/S Fok Lee Sdn Bhd had
provided the lowest quotation of all the tenderers.
Overall building development, including provision of
new spaces and enhancement of aesthetic values
- Create a board room with a minimum of 25-table
seating capacity. Install projector and screen
Q. What are the main challenges in
completing the renovation works?
Luckily, there was no time constraint for the renovation
display.
work. However, we had a limited budget to meet all the
- Refurbish the President’s Lounge so it can be used requirements. After several discussions, the budget
for activities and to receive guests. of RM839,000 was approved at the EGM in 2016 as
- Display photos of all the RISM Presidents on the expenditure above RM50,000 must be greenlit by the
wall. They were previously in safekeeping. general membership.
- Increase storage space for secretariat’s office.
New work RM 634,000
- Ensure all outdoor air-con units are neatly arranged.
- Ensure cabling and wiring are arranged properly. Repair work (sinking fund) RM 98,200
- Upgrade all outdated RISM logos to new ones.
Equipment RM 106,800
- Upgrade all pantry areas. ------------------
- New surau is added at the basement. Total RM 839,000
7
INTERVIEW
The Malaysian Surveyor
The other challenge was to ensure all the requirements The Board of Building Management has always been
were met. Some of these requirements were only under the care of Property Surveyor Division until
mentioned after works had been done as different recently. So, the approach in maintaining the building
Councillors had different ideas. Some of the feedback is slightly different now.
that came later could not be implemented in time or
adhered to budget constraints. Since the facelift is completed, RISM should look
into renting out available spaces to improve the
Q. How did you overcome these Institution’s finance. The Board should ensure the
building is fully tenanted and facilities are utilised.
challenges?
Due to budget constraints, the designer had to prepare The tenants should be companies or organisations
three sets of Tender Drawings and Documents, and that are suited to RISM, and professionals to help
three Tender Reports over the course of eight months bolster our image. Professional organisations will
to fit the requirements. appreciate the building and help maintain it.
The Tender Board studied the requirements to ensure Currently, our first floor houses tenants such as
that RISM got value for money with this renovation. MIPFM (Malaysian Institute of Property & Facility
The Councillors also agreed that renovation works Managers) and BCIC (Building Cost Information Centre).
needed to be done well and stand up to regular use.
We now need to find tenants for the spaces at the
Therefore, we ensured that the tender amount ground floor to resolve the challenges we had with
submitted based on the agreed scope of work could food and beverage tenants.
be well executed.
During RISM’s renovation, I noticed that the Institute
The funding for the facelift was from three sources. of Engineers Malaysia had upgraded their building’s
During the AGM in 2015, members approved the usage façade, incorporating new logo wall and fresh paint.
of RM650,000, which covers the cost of new work. And recently, the hotel building next to RISM had also
To supplement the fund, RISM had also requested adopted our external colour scheme.
for members to contribute, similar to what had been
carried out in 2003 for an upgrade exercise. Now our row of buildings look fresh and I hope this will
improve our overall branding. To maintain the building,
RISM had collected about RM153,000 to date and that RISM will need to have a maintenance schedule,
allowed us to purchase new equipment such as screen detailing what should be done every one, three and five
and projectors, air-conditioning units, TV and furniture. years.
The names of the contributors will be displayed.
Also, it is good that RISM has a sinking fund that can
For repair works, approximately RM100,000 was used be used for any required repair works.
from the building’s sinking fund.
The major repairs such as plumbing and sewerage
Q. How has the facelift helped in creating had been dealt with during the renovation so the Board
now monitors the minor ones like leaks that occur
a more conducive environment for after a downpour.
RISM activities and elevate the
Institution’s corporate image? However, I believe those in the secretariat should also
provide feedback as they are the building’s regulars
We now have a proper board room while the other users.
meeting rooms are suitable to conduct examinations.
Q.
The basement is now conducive for RISM events Your final thoughts?
as the area is pest-free and the ceiling is no longer
crumbling. We are more than ready to receive Royal There are still works that need to be done at the
visits should the need arises. building. For example, we need more tables and chairs,
and audio-visual equipment for the seminar rooms so
Q. You have chaired the RISM Board of RISM can rent it out to its members.
Building Management since 2016. We are also looking into creating more storage space
How do you intend to maintain the and additional CCTV security. The Board of Building
upgraded premises? Management is open to suggestions on further
improvements.
8
Vol.53 No.1 2018
9
PEER
PEER REVIEW
REVIEW
Adibah Arif, Yasmin Mohd Adnan, Zahiriah Yahya
Commercial Tenant’s
Office Space Choice for
Green Office Building -
A Conceptual Approach
ABSTRACT:
The aim of this paper is to provide an overview of the literature that summarises
how the locational dimensions of office buildings and aspects within the sustainable
office features may affect the choice made by tenants in their office building selection
process which will then lead to the development of a conceptual framework for this
10
Commercial Tenant’s Office Space Choice for Green Office Building - A Conceptual Approach
K
1.0 Introduction currently 34 official GBI and other
ratings rated commercial purpose
in their countries. Apart from
ensuring efficient use of resources,
uala Lumpur has seen built office buildings (either built particularly energy and water use,
the development of as GBI rated or refurbished) green building also reduce the GHG
many office buildings within Kuala Lumpur. It has been emission (ETP, 2015). In Malaysia
in recent years. The generally acknowledged that most there is no such regulation that
current supply of space of the green rated buildings display provides a regulatory framework
from the available advanced features in terms of the for energy efficiency potential as
office buildings in Kuala Lumpur technology and features that are practiced in the UK (Chegut et.al.
amounts to 8.88 million sq m. designed for sustainability. In the 2012). However, it can be seen
(NAPIC, 2017). Being the commercial Kuala Lumpur city centre, there that in the last five years, Kuala
centre of Malaysia, it has most large are also buildings that have been Lumpur commercial property
corporate head offices. In 2009, designed to incorporate several market has experienced a trend
in response to the sustainability “sustainable” features that do not towards the development of green
movement, Malaysia has developed have an official GBI or other green office buildings. Eleven certified
the guidelines towards the rating. In this study, a building that commercial purpose built office GBI
development and rating of green either has GBI rating or is considered rated buildings were completed in
buildings which is known as Green sustainable by the stakeholders the Kuala Lumpur central business
Building Index (GBI). This rating whereby these buildings can take district (CBD) since 2015. As such,
index system is aimed system for many different forms (McIntosh & this study seeks to establish the
evaluating the environmental design Roberts, 2012). factors that affect the building
and performance of Malaysian selection by tenants within the Kuala
Malaysia is one of the countries Lumpur city centre and the role
buildings based on several criteria,
that have participated in the United of perceived sustainability among
namely, indoor environmental
Nation Environmental Programme them. However, this paper only
quality, sustainable site planning
since 2015.The sustainable provides an overview of the literature
and management, material and
goals have been introduced with pertaining to the factors in relation of
resources, water efficiency and
guidelines for the implementation office occupation.
innovation. Until 2017, there are
of the sustainable programme
11
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
12
Commercial Tenant’s Office Space Choice for Green Office Building - A Conceptual Approach
13
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
building due to their CSR policies. reasons related to social and sources and number of publications
Tenants in Hong Kong proved that environmental. (Myers et al., 2007). which were reviewed.
they are attracted towards the ‘green Another study has also revealed
minded’ landlord in order to pursue that the CSR awareness among After reviewing the available
their CSR policy. These perspectives developers and investors are literature, a synthesis of the areas
have provided the conclusion that prevalent in choosing to operate in covering both aspects of location
building tenants also consider office the commercial property market and sustainability was made. The
space in order to publicise their in Canada (Hebb et.al. 2010). analysis will be presented in the next
environmentally-friendly vision of However, a green certification section.
their company (Robinson et.al. 2016) is least important among the
Upon identifying the factors that
attributes (Karhu et al., 2012). The
The CSR has been observed affects office decision making,
existences of green certificates
to be influenced by the type of further exploration of the these
are not so valuable to the tenants
organisations. Miller and Buys factors shall be made through a
since they would incur costs in
(2008) have indicated that qualitative research approach which
obtaining them as well as the
smaller organisations are often aims to explore the factors affecting
increment of construction costs.
advancing towards sustainability tenants to occupy green office
On the other hand, another study
and demanding buildings that are building in Kuala Lumpur. In-depth
has identified the potential benefits
designed to reduce greenhouse interviews shall be conducted with
which are to be differentiated
gases as well adopting energy the tenants the selected locations
between those recognised due to the
efficiency. Small private companies through the use of semi-structured
implementation of these assessment
tend to focus on sustainability and questionnaires. The in-depth
tools and those encountered behind
it has become their core practice to interview will be able to understand
the overall “green revolution” (Poveda
align with their corporate interests the tenant’s perspective and their
& Young, 2015). Larson (2010) also
(Watering, 2011). A recent study view towards the choice in locating
emphasised that the tenants need
in Australia has found that the their business in certain location.
the certification in order reach the
characteristics of tenants and the In addition, document reviews of
sustainability goals.
types of organisations whether they tenants’ organisation’s will uncover
are in public and private sectors Thus, in the review of the literature the background and aim of the
displayed a considerable influence on the experience of tenants in organisation which eventually
on sustainability. They found that sustainable building, it is revealed uncover the influence the choice to
tenants from government sectors that there may be other factors that occupy green office building in Kuala
chose sustainable buildings for are being considered other than Lumpur.
green buildings itself. The factors
may include CSR, goodwill and 4.0 Literature
comfort. Synthesis and
Small firms tend 3.0 Sources for Discussion
to focus at the Literature Review While many of the sources have
highlighted several factors in
locate business In order to identify the other factors relations to office occupation, the
with regards to office occupation, factors that have been identified
on the fringe of an extensive search and critical in the various sources of the
the city where review of the literatures which
are related to locational and
literature with respect to the theory
of locational decision making and
they can enjoy sustainability aspects were made. sustainability are summarised in
The literature search and review Table 2.
great accessibility covered publications of journal
The theory of locational decision
without paying articles, conference proceedings, and
books. The reviewed publications making has highlighted the influence
rental premium. were made over 37 journal articles,
four conference proceedings and
for tenants in making a choice to
occupy green office building in
two books from 1981 to 2017. Table certain location. Small firms tend
1 provides the list of the publication to focus at the locate business on
14
Commercial Tenant’s Office Space Choice for Green Office Building - A Conceptual Approach
Table 1: List of sources for literature review and number of publications considered the fringe of the city where they can
enjoy great accessibility without
paying rental premium. Larger firms
Source Title Number of Publication
believe that the location reflects
the public identity and their identity
Journal of Real Estate Economic 1 in the market (Levy and Peterson,
2013). Company structure, which
Journal of Progress in Human Geography 1
may comprise large or small firms,
Journal of The Annals of Regional Science 1 may be diverse in their operations.
Additionally, the company operations
Building Research and Information 2 may involve capital that can be an
influence on their location decision
Environment and Planning 1
by microeconomic factors. There
Journal European Real Estate Research 2 are also other considerations with
regards to the firms’ characteristics.
Journal Property Research 3 Edwards (1983) identified that
the more authority granted to an
Property Management 5 individual the more likely they will
be to influence the decision process
Property Investment and Finance 6
and Greenhalgh (2008) concluded
Journal of Real Estate Research 1 that people at the heart of decision-
making processes had a large
RICS Research 1 influence on the final choice. The
study also found that in small firms
International Journal of Strategic Property 1 one individual would tend to drive
Management the decision-making process and
Bulletin of Geography, Socio-economic series 1 the decision was largely influenced
by their personal preference. In
Smart and Sustainable Built Environment 1 larger companies however, the
decision tended to be made by a
Research and Policy Direction for Developments 1
company board with a team of
and Finance
people involved in the final decision.
International Journal of Sustainable Built 1 The firms’ size, structure, culture
Environment and type do influence the decision
of firms in locating their business. In
Journal of Real Estate Research 1
addition, the firms are locating the
American Economic Review 1 business because of the interest of
Ecolibrium 1
15
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
the company in occupying space this study portrays the commercial that organisations also have their
that will benefit them. This decision tenant’s office space choice with goals and mission in ensuring that
is influenced by the profile of the regards to the locational aspects. office operations portray good
company. For this research, it would image. CSR is one of the company’s
be useful to uncover the varying view The sustainability perspective that missions that have been made
of tenants at green office buildings may influence the tenants to occupy by many companies to meet their
in locating their business in a green green office building reflect the organisations’ goals in the long run.
office building. The location of the organisational and market aspect The CSR is closely linked to image
business whether in the city centre such as trying to satisfy the staff, and branding of firms where CSR
or the suburban area are based fulfilling company’s CSR and other implementation will provide good
on the firm’s choice. This choice is factors related with the demand image to both client and investor. By
based on company considerations of green office market. These occupying a green office building,
in choosing the suitable space for insights summarise the various they can meet the needs of the
their business. It has been noted factors considered by tenants in company through the sustainability
that both location theories can be considering green office buildings. agenda as well as meet the
used in this study. For neo-classical It can be shown that the availability expectations of clients and investors.
theory, the maximisation of profit of green office building will affect
is a nature of the business, but the the office building choice since the The main aim of this paper is not to
weakness of the approach is the unavailability of these buildings make distinct comparisons of that lie
none involvement of human. Thus, in the market will drive tenants to within the two main areas of location
the behaviour locational theory will choose non-green buildings. With the and sustainability, but to identify
complement through the human presence of green office buildings, the sustainability influence on office
satisfactory and human solutions tenants can then more selective occupation space choice. Through
aspects (Greenhalgh, 2008). Human in choosing the office space that the identification, the factors shall
perception, assumption and decision suits them. Additionally, green be used to provide the framework
will be part of the decision-making office buildings will help to reduce in identifying the influence of office
process of a firm. While deciding, the operating costs due to building occupation choice for tenants that
drivers that influence the decision of energy efficiency characteristics. are occupying green office buildings
the firm would include size, nature, Furthermore, green office buildings in Kuala Lumpur. This identification
structure and culture which form the will provide healthy and comfortable is especially useful so as then for
important factors in decision making office environment to tenants the need to know the ‘value added’
(Greenhalgh, 2008). These drivers which relate to the design that has that assist tenants for their business
will influence the other factors that been adapted. This in turn tends perspective. It can be summarised
are considered while deciding in to reduce the absenteeism among that there are several studies which
locating a business. For example, workers which is due to medical relates to both the office location
corporate social responsibility may associated problems. The effect and green building literature. The
be influenced by the structure of will be the reduction of the cost factors that identified include the
a company which has their own and financial expenses to be borne complicated nature of location
policy in running a business. With by the organisations in term of decision making, company culture
the application of both perspectives, medical needs. It can be observed and structure, building flexibility and
16
Commercial Tenant’s Office Space Choice for Green Office Building - A Conceptual Approach
17
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
freepublications/publication/Energy Leaman, A., Thomas, L. and Poveda, C. A., & Young, R. (2015).
TechnologyPerspectives2015Executive Vandenberg, M. (2007), “‘Green’ Potential benefits of developing and
SummaryEnglishversion.pdf buildings: what Australian building implementing environmental and
users are saying”, EcoLibrium, sustainability rating systems: Making
Falkenbach, H., Lindholm, A. L., & November, pp. 22-30 the case for the need of diversification.
Schleich, H. (2010). Review articles: International Journal of Sustainable
environmental sustainability: drivers for Leishman, C. and Watkins, C. (2004), Built Environment, 4(1), pp 1-11
the real estate investor. Journal of Real “The decision-making behaviour of
Estate Literature, 18(2), pp 201-223 office occupiers”, Journal of Property Rijal, H. B., Humphreys, M. A., & Nicol,
Investment & Finance, Vol. 22 No. 4, pp. J. F. (2009). Understanding occupant
Greenhalgh, P. (2008), “An examination 307-319 behaviour: the use of controls in
of business occupier relocation mixed-mode office buildings. Building
decision making: distinguishing small Levy, Deborah and Peterson, Gemma, Research & Information, 37(4),
and large firm behaviour”, Journal of (2013) “The effect of sustainability on pp 381-396.
Property Research, Vol.25 No.2, pp. commercial occupiers’ building choice”,
107-126 Journal of Property Investment & Robinson, S., Simons, R., Lee, E., & Kern,
Finance, Vol. 31(3), pp.267-284 A. (2016). Demand for Green Buildings:
Hebb, T., Hamilton, A., & Hachigian, Office Tenants’ Stated Willingness-to-
H. (2010). Responsible Property McCann, P. (1999), “A note on the Pay for Green Features. Journal of Real
Investing in Canada: Factoring Both meaning of neo-classical location Estate Research, 38(3), pp 423-452
Environmental and Social Impacts theory and its usefulness as a basis for
in the Canadian Real Estate Market. applied research”, Papers in Regional Safian, M., Ezwan, E., Bagdad,
Journal of Business Ethics, 92(1), pp Science: Journal of the Regional M., & Nawawi, A. H. (2011). The
99-115 Science Association International, Vol. characteristics of purpose built
78 No. 3, pp. 323-331 offices in Malaysia: a review of
Hodgson Geoffrey M. (1992), The issue, proceeding, Sixth International
Reconstruction of Economics: Is there McIntosh, A. and Roberts, G. Conference on Construction in the
still place for Neoclassical Theory? (2012), Whole-life Carbon Footprint 21st Century (CITC-VI) “Construction
Journal of Economic Issues, Taylor & Measurement and Office, British Challenges in the New Decade” July
Francis, 26 (3), pp 746-767 Council For Offices, Manchester 5-7, Kuala Lumpur, Malaysia
Jailani, J., Reed, R., & James, K. (2015). Miller, E. and Buys, L. (2008), Sayce, S., Sundberg, A., Parnell, P. and
Examining the perception of tenants in “Retrofitting commercial office Cowling, E. (2009), “Greening leases:
sustainable office buildings. Property building for sustainability: tenants’ do tenants in the United Kingdom
Management, 33(4), pp 386-404. perspectives”, Journal of Property want green leases?” Journal of
Investment & Finance, Vol. 26 No. 6, pp. Retail & Leisure Property, Vol. 8 No. 4,
Karhu, J., Laitala, A., Falkenbach, H., 552-561 pp. 273-284
& Sarasoja, A.-L. (2012). The green
preferences of commercial tenants in Myers, G., Reed, R.and Robinson, J. Van de Wetering, J. and Wyatt, P.
Helsinski. Journal of Corporate Real (2008), “Sustainable property –the (2011), “Office sustainability: occupier
Estate, 14(1), pp 50-62 future of the New Zealand market”, perceptions & implementation of
Pacific Rim Property Research Journal, policy”, Journal of European Real
Komolafe, M. O., Oyewole, M. O., Vol. 14 No. 3, pp. 298-321. Estate Research, Vol.4 No.1, pp.29-47
& Kolawole, J. T. (2016). Extent of
incorporation of green features in office NAPIC (2017), Property Market Report. Zieba Malgorzata, S., & Belniak, G.
properties in Lagos, Nigeria. Smart and In JPPH (Ed.). Putrajaya: NAPIC M. (2013). Demand for sustainable
Sustainable Built Environment, 5(3), pp office space in Poland: the results
232-260 Pivo, G., & Fisher, J. (2010, 10.3.2011-
from conjoint experiment in Krakow.
11.3.2011). Toward Sustainable and
Property Management, 31(5),
Larson, A., Meier, M., & York, J. (2017). Responsible Property Investment
pp 404-419
Rating Environmental Performance Indices. Paper presented at the
in the Building Industry: Leadership Strengthening the Green Foundation:
in Energy and Environmental Design Research and Policy Direction for
(LEED). Darden Business Publishing Developments and Finance, Tulan
Cases, pp 1-20 University
18
PEER REVIEW
Hamzah, H. and Abdullah, S.A
Strata properties characterise the real estate development in most major cities due
to the scarcity of urban land, high urban land prices and persistent demand from the
city population. The current Malaysian housing market observes a tendency for local
developers to build more strata residences to fulfil the demand of house buyers in
urban areas. For stratified residential properties, the nature of high-rise living is fertile
ground for inter and intra-group disputes, which can impede on the management
of these properties. As lifestyle variables change alongside broader socio-economic
developments, Malaysian developers offer lifestyle housing that have more design
19
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
elements, building features and lifestyle facilities that may consequently increase
the volume and complexity of strata disputes in the future. In 2013, the Malaysian
government has established the Strata Management Tribunal (SMT) in response to
increased disputes. Among previous efforts in enhancing the management of strata
residence, the SMT is seen as one of the most potent institutional instruments in
resolving disputes outside the formal judiciary system. The SMT is promoted to be
a quicker, less costly and less adversarial method of resolving disputes compared
to court action. Nonetheless, the SMT has not been subject to a close review by
researchers despite the possibility of inherent issues that may affect its effectiveness
in the long run. Focusing on residential strata, this paper reveals the issues that
may impede the SMT and highlight how the SMT operations may be affected.
Whilst the SMT was perceived as a useful and potentially potent dispute resolution
mechanism, its operation may be hindered by the nature of the negotiation process,
lack of manpower and resources, the method of notice service and overlapping legal
framework. The paper ends with some recommendations on how to overcome these
problems.
S
1. Introduction semi-detached and detached houses
have escalated beyond the reach
As living in strata residence becomes
more common among city folks,
trata properties of the average Malaysian in city various lifestyle adjustments have to
characterise the real areas in recent years. In Malaysia, be made to adapt to vertical living.
estate development strata residence range from the Strata residents must deal with more
in most major cities low-end (low-cost flats, flats and neighbours (horizontal and vertical
due to the scarcity of apartments) to high-end (serviced units) compared to landed residents
urban land, high urban apartments, condominiums and (horizontal units only) and deal
land prices and persistent demand luxury apartments). Recently, some with high-density neighbourhoods.
from the city population. Notably, gated communities comprising Additionally, strata residence gives
the high demand for housing townhouses and terraced houses rise to the need for a more intense
from city dwellers has spurred the have been developed under strata property management, which is less
growth of vertical living. This trend schemes for mid- and high-level conspicuous in landed residence.
has also permeated the Malaysian purchasers. Thus, strata residence Professional property management
housing market, whereby strata in Malaysia accommodates low to and maintenance is necessary
residence forms nearly 30% of the high cost and landed to high-rise as the scope has now widened to
total housing stock of 5,398,133 schemes and like in most countries include not only the individual units
units and almost 50% of incoming is seen as a “key response to urban but also common properties shared
supply of 480,060 units (VPSD, planning challenges in major cities” among strata owners. Strata living
2017). Strata residence is considered (Leshinsky & Mouat, 2012). This therefore comprises myriads of
more affordable compared to landed paper focuses on high-rise strata stakeholders namely the developer,
properties as prices of terraced, residence as this is the dominant owner, management body, managing
type of strata residence in Malaysia. agent, renter and contractors.
20
Dispute Resolution of Stratified Residential Properties: The Strata Management Tribunal of Malaysia
21
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
The fundamental characteristic an independent third party to help management agent to negotiate
of disputes being an outcome of disputants to reach agreements. the many dynamics of communal
a process has led traditional legal living. Communal living depends on
researchers to believe that dispute At its most basic, a building can be good relationship with neighbours
incidents can be avoided or at least subdivided into lots or parcels that and an effective management team
moderated (Felstiner et al., 1980- are individually owned while the to ensure a convivial and conducive
1981). In terms of Felstiner et al.’s right to use of and responsibility for living environment (Kamarudin,
transformation theory, the unPIE common areas such as corridors, 2014). Robust governance strategies
must have been significant enough lifts, the roof, swimming pool, are essential in allocating and
to transform into PIE which leads the etc. are shared between owners. managing the “communal space”
injured party to litigate for remedial Living in a strata scheme entails (Leshinsky & Mouat, 2012), which
actions. Disputes that have been having more neighbours due to is highly dependent on an effective
allowed to escalate and become the dense population within a management body and good
unmanageable can inflict damage relatively small area and sharing relationship between and among
on the parties involved (Burton, common areas, both uncommon different stakeholders.
1990; Moore, 2014). As argued in conventional landed dwellings.
by Moore, mediation can assist in Strata living is seen as “communal Human behaviour and various
reconciling the individual objectives living” (Leshinsky & Mouat, physical, environmental and
with common needs and interests 2012), necessitating the owner/ economic factors have the tendency
in a positive way. This entails having occupant, owners’ corporation1 and to interact and result in dissents
22
Dispute Resolution of Stratified Residential Properties: The Strata Management Tribunal of Malaysia
among strata stakeholders. Living fail to be resolved internally by the and should be applied as early as
at such close proximity within a management agent or owner’s possible for any dispute.
relatively small, densely populated corporation that often lack the
area can give rise to dissents, necessary skills to mediate disputes The strata legislation of many
stresses and nuisance related to (Leshinsky & Mouat, 2012). Legal countries including Malaysia,
human behaviour. The PhD research disputes can be resolved in court, Indonesia, South Africa and
by Kamarudin (2014) summarised but this method is time consuming Singapore has been greatly
the main causes of dispute in strata and cost ineffective. Importantly influenced by the Australian strata
schemes as reported in literature into for residential strata disputes, the regulatory regime (Leshinsky
six categories; the nature of strata adversarial manner of the court & Mouat, 2012). In the case of
living, diversity of stakeholders, system when deciding disputes is Victoria, Australia, a three-tier
restrictive by-laws, insufficient not favourable when the parties have dispute resolution scheme has been
knowledge in strata living, bad to co-exist again in the same strata implemented since 2007. The first
attitude and behaviour of occupants scheme after the case is eventually stage of the scheme involves an
and lack of quality leadership decided (M. Mohamad et al., 2015). internal mediation at the owners’
in strata schemes. On the other The importance of a conciliatory corporation level, the second stage
hand, Leshinsky and Mouat (2012) solution to social and technical
cited five common types of strata disputes within a residential strata
disputes; owners’ dissatisfaction scheme cannot be understated
with managers, arguments with to facilitate the process of place-
the manager that may result from making and community building The main causes
the initial contract entered into among the owners.
by the developer, incompetent or of dispute in strata
Alternative dispute resolution (ADR)
recalcitrant members of the owners’
corporation that hindered decision- uses basic mediation principles schemes are; the
making, owners’ corporation taking in providing a facilitative and
negotiation-based strata disputes
nature of strata
action against individual occupiers
for breach of rules and disagreement resolution method (Leshinsky & living, diversity
over owners’ corporation fee levels. Mouat, 2012; N. A. Mohamad, 2015).
In the context of Malaysia, the Compared to court adjudication, of stakeholders,
complaints have been said to mainly
concern the management body2 and
ADR offers a simpler procedure,
lower costs and faster settlement
restrictive by-
the owners3 (N. A. Mohamad, 2015). (N. A. Mohamad, 2015). Its non- laws, insufficient
adversarial nature often excludes
Dispute prevention and containment lawyers, thus advantageous towards knowledge in
measures, community engagement preserving the relationship between
and public participation may reduce the parties, and where this is not strata living, bad
but not completely eliminate
disputes in strata schemes due
possible, ending the relationship
fairly. Additionally, the disputants
attitude and
to the shared communal facilities work together to reach a mutually behaviour of
and spaces (Leshinsky & Mouat, agreeable solution rather than
2012). Thus, strata legislation in having the outcome imposed by occupants and
most countries normally has dispute
resolution mechanisms in place as
a third party, which can increase
the disputants’ commitment to the
lack of quality
part of strata management strategy. agreed solution (Leshinsky & Mouat, leadership in
2012). At a social level, Leshinsky
Dispute Resolution for Strata and Mouat (2012) submitted that strata schemes.
Schemes ADR for strata conflict resolution
The nature of strata living often is a necessary component for
produces disputes that oftentimes social learning and urban vitality
2 Common complaints include mismanagement of fund, lack of understanding of the law, cronyism, political inclination.
3 Common complaints are about noisiness, parking, cleanliness, inter-floor leakage, pets and misuse of the common area.
23
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
involves mediation by a Consumer 1989; Yahaya, 1989). An example population growth, rural-urban
Affairs employee and the third of such policies is the Bumiputera migration and increased household
stage will see the dispute being (native) housing quota under the income are some of the factors that
determined by the Victorian Civil and New Economic Policy (NEP) (1970- have spurred the housing market in
Administrative Tribunal (VCAT). In 1990) that ensured up to 30% are the west coast.
the Malaysian context, ADR in strata sold to the Malay and other native
disputes has been in place since ethnic groups. The government The concept of strata residence
1985 but with little success until the allows foreigners to purchase was introduced in the mid to late
SMT was established in 2013 (N. A. houses, even to the extent of 1970s to accommodate the spike
Mohamad & Sufian, 2015). promoting foreign home ownership in housing demand as Malaysia
under the Malaysia My Second moved from an agricultural-based
3. The Context: Strata Home scheme. At present, foreigners to manufacturing-based economy.
are allowed to purchase properties As development land in the city
Dispute Resolution in priced at above RM1 million became more scarce and expensive,
Malaysia (approximately USD260,000). developers began to build upwards.
To cater for different buyer profile, a
Malaysia is a federation of 14 The Department of Survey of range of strata residence has been
states that was formed in 1963. It Malaysia estimated that the provided in terms of price and type.
is a multicultural country with three population of the country currently As shown in Table 1, strata residence
major ethnic groups comprising stands at 32.3 million in the fourth forms almost 30% of the existing
Malay, Chinese and Indian. The quarter of 2017 (DOSM, 2017). It residential stock in Malaysia (VPSD,
diversity in culture can be seen in the was estimated that 76.1% of the 2017). Notably, the proportion of
different languages being spoken population would currently reside strata residence to landed residence
and religions being practised by in urban areas (DOSM, 2010), increases for incoming and planned
each ethic group. Geographically, mainly due to better employment, supply at approximately 50%
the country can be divided into West education and social opportunities. and 42% respectively. This trend
Malaysia, also known as Peninsular The previous three-year period also has implications on the property
Malaysia, and East Malaysia. Since saw some economic growth, with management and legal framework of
the country’s independence, the the GDP growth rate at 5.0 in 2015, strata schemes.
Malaysian government has been 4.2 in 2016 and 5.9 in 2017 (DOSM,
promoting housing policies based 2018). Historically and to this day, In Malaysia, a strata property
on social engineering to ensure the the west coast of the Peninsular owner’s legal position is three ways;
three main ethnic groups co-exist Malaysia has been the centre of firstly, as the individual owner of his
peacefully in urban areas (Agus, economic development. Natural parcel; secondly, as a co-owner of
the common property (including the
land that accommodates the strata
scheme) and thirdly, as a member
24
Dispute Resolution of Stratified Residential Properties: The Strata Management Tribunal of Malaysia
management of common properties and management was statutorily house rules, building maintenance
(Teo, 2012). However, Act 56 was mandated on the developer. fund and sinking fund, and
proven to be inadequate in the Developers’ incompetence and managing agents (Buang, 2017).
major areas of strata management indifference had led to problems of The Commissioner of Building (COB)
and its lack of recourse for dispute huge outstanding service charges was institutionalised to administer
resolution. In 1985, the Strata Titles owed by the purchasers, non- Act 663. However, Act 663 was
Act 1985 (Act 318) was introduced audited statements of account unclear on the COB’s scope of duty
to address the problems that Act 56 and missing documents such as which resulted in overburdening the
did not adequately resolve. At first, building plans, certified strata plans, COB and omitting to confer COB the
strata disputes were referred to the documents of title of the lot and power to resolve disputes that arise
state land authority but this was insurance certificates. Additionally, from the operations of Act 318 and
proven ineffective as the state body Act 318 failed to keep abreast with Act 663 (N. A. Mohamad & Sufian,
only possessed advisory power over advancement in strata development. 2015).
strata disputes. In 2001, Act 318 was When mixed strata development
amended to transfer the power to became more common in the Post-Tribunal Period
settle strata disputes to a new body 2000s, Act 318 did not provide for (2015-to Date)
namely the Strata Title Board (STB) the separation of users for common As a response to the issues that
that was authorised to determine property, which was important Act 663 failed to resolve, the Strata
disputes and provided an alternative for a fair determination of service Management Act 2013 (Act 757)
to going to court (M. Mohamad et charges for each type of user. Thus, was introduced in 2013 and came
al., 2015). Nonetheless, the STB was the Building and Common Property into operation on 1 June 2015.
never established in any state in (Maintenance and Management) Upon the enactment of Act 757,
Malaysia despite the provision for its Act 2007 (Act 663) was introduced the whole of Act 663 and some
formation and potential for dispute specifically to deal with the provisions in Act 318 were repealed.
resolution (N. A. Mohamad, 2015). management and maintenance of Act 757 brought a long-awaited
strata properties. body to complement to the strata
Indeed, strata properties developed management system namely the
too fast in volume, design and It was the intention of lawmakers for SMT that is placed under the purview
components which caused Act Act 663 to be read together with Act of the Ministry of Urban Wellbeing,
318 to be amended five times, with 318 as each act deals with different Housing and Local Government.
the most recent amendment in subject matters; Act 663 provides for SMT replaced the Strata Board and
2013 to address maintenance and the management and maintenance is empowered to handle all disputes
management issues (M. Mohamad of strata properties whilst Act 318 pertaining to strata properties. The
et al., 2015). Act 318 was not outlines the title procedures. Act current strata dispute resolution
able to tackle maintenance and 663 established more new bodies to system is depicted in Figure 2,
management issues that would strengthen the strata management showing how a dispute may first
lead to disputes between parties. framework including the Joint be referred to the SMT, which is a
A problematic area was during the Management Body (JMB), Joint channel that is outside the court
pre-MC period when maintenance Management Committee (JMC), system. The SMT does not preclude
25
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
Figure 2: Strata dispute resolution system in Malaysia exceeding two years or both (“Strata
Management Act,” 2013). The finality
Strata disputes of the SMT’s decision also means
that the only appeal to the High
Court is only on a point of law (N. A.
Mohamad, 2015).
Strata Management
High Court We undertook a review of claim
Tribunal (SMT)
files at the SMT located at the
administrative capital of Putrajaya
to understand more about the types
Resolved Unresolved of claims being heard. Altogether
114 files were reviewed over the
Source: Author’s own analysis
period of eight hours, involving
118 claims. Special permission
was sought and obtained for the
exercise. Frequency analysis of the
disputes from being directly heard by duty, cost disputes for residential claimant, respondent and type of
the High Court. As an ADR scheme, strata, recovery of debt concerning claim provided a clear picture of the
the SMT provides a two-tier dispute charges and sinking fund and related SMT’s case profile. We found that the
resolution mechanism which was payable interest, the procedure and majority of claims were lodged by
an improvement from the previous resolution of a general meeting, management bodies (f=91, 79.8%),
system. insurance related matters, the followed by the owner (f=11, 9.6%)
supply of information or documents and the developer (f=10, 8.8%).
The SMT was established to pertaining to the strata management, In comparison, it was discovered
adjudicate disputes in strata order concerning consent to that the majority of claims were
schemes in Peninsular Malaysia alterations to common property or lodged against the owner (f=105,
only. The primary function of the limited common property and order 91.2%), followed by the developer
SMT is to provide alternative forums concerning COB’s decision (“Strata and management bodies (f=5, 4.4%
to resolve disputes on issues of Management Act,” 2013). respectively). Whilst the majority
strata management in an expedient of claimants were discovered to
manner4 and minimal costs (Tan, SMT’s proceeding begins with the be management bodies and the
2015). The parties entitled to submit filing of a claim by the injured party majority of respondents were
a claim are developer, purchaser, (Figure 3). The respondent has a owners, the main type of claim being
original proprietor, JMB, MC, Sub- choice of either admitting liability, heard was the recovery of charges
MC, management agent, any person upon which an order of admittance or contribution to the sinking fund
with registered interest (Tan, 2015). will be issued, or not admitting to (f=96, 81.4%). This result somewhat
Members of the SMT include a the claim, with or without a counter concurs with the profile of claimant
chairman, a deputy chairman and claim. The claim then proceeds and respondent.
not less than 20 other members, to be evaluated by the SMT
all of whom shall be members of Secretary if it was appropriate for Here the nature of disputes in our
the judicial and legal services of negotiation. A claim that is resolved sample is worth a discussion.
no less than seven years standing. under negotiation will be issued Clearly, the main disputes taken to
However, there is no requirement for with a settlement order, whilst an the SMT concern the management
the members to have negotiation unsuccessful negotiation will result bodies’ attempt at recovering
qualification. The SMT hears and in the claim to go to the hearing. A monies owed to the management
determines any claim not exceeding notice calling for hearing will precede and sinking funds by recalcitrant
RM250,000 allowed under Part 1 the proceeding, where eventually the owners. Without funding, it is
of the Fourth Schedule, Act 757 award will be made. The gravitas of impossible for the management
(“Strata Management Act,” 2013). the SMT’s decision means that any bodies to effectively carry out
Fourteen types of claim are allowed contravention to the order may result their functions in ensuring a safe
including disputes over non or in a fine not exceeding RM10,000 and well-kept strata scheme. This
under performance of statutory or imprisonment for a term not affects many aspects of strata living
4 The SMT endeavours to resolve claims within 60 days from the date of hearing.
26
Dispute Resolution of Stratified Residential Properties: The Strata Management Tribunal of Malaysia
Claimant
files Form 1 Defence to Counter claim
Counter Claim in Form 2
with SMT in Form 3
HEARING
SMT WILL
MAKE Not resolved NEGOTIATION
AWARD IN
FORM 11
Resolved (Settlement Order)
Item f %
27
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
including security, well-being, peace The timing of the formal negotiation The limited manpower and financial
and neighbourliness. Although the process is deemed unsuitable as resources also prevented each
SMT provides the management the claim has already been lodged state from having a SMT. With only
bodies a non-adversarial avenue at at that point which may lead the four SMTs to serve the country,
recovering the payment arrears, the respondent to feel inconvenienced case backlogs may become more
whole strata scheme could suffer and defensive. If the negotiation common in the future as the
from inadequate maintenance and process is made available internally, number of strata development and
management. There is no guarantee conciliation may be reached before accordingly, disputes, grow in the
that the non-paying owners will formal claim is lodged. This may future.
mend their ways in the future, and avoid the unpleasantness of having
the whole unpleasant cycle could be to attend and respond at a formal Service of Notice
triggered again. proceeding. Early conciliation can Another issue with the SMT
also spare the losing party from procedure is the service of notice
4. Issues with the any embarrassment and ill-feeling calling for the imminent proceeding.
towards the winning party, who may
Strata Management well be the next door neighbour to be
There are three ways how the
proceeding notice is served to the
Tribunal tolerated while living at the scheme. other party; personally, by registered
post to the last known address and
Weak Negotiation Process Lack of Manpower and by attaching it at a prominent part of
SMT is a dispute resolution
Resources
the last known address of business,
mechanism that assists disputants Being a multicultural country, an registered office, parcel or residence.
in coming to a congruent outcome. important criterion of the arbitrator The SMT endeavours to settle
As a facilitative dispute resolution is the ability to understand the disputes speedily, which means that
method, negotiation is an important arguments of both parties. Problem the procedure of the proceeding
element in mediation that should be arises when the arbitrator fail runs like clockwork and has to be
present not only at an early stage of to conduct the proceeding in inflexible to avoid delays. There is
ADR but also during the proceeding. the language understood by the a provision that allows for award
Disputants should be allowed and disputants. Some disputants do not to be made despite the absence of
properly aided to negotiate before speak Malay, which is the national any party during the proceeding.
the SMT comes to a decision language and the official language of This means that once the notice
because perspectives may change SMT proceedings, or English, which is deemed served, the proceeding
as new facts may come into light is the country’s second language. In will take place regardless of the
at a later stage of the proceeding. both cases, the SMT must provide respondent’s attendance.
For opposing parties of the strata a translator for the proceeding. This
dispute to voluntarily conciliate, becomes a problem as the SMT The notice system therefore is
a qualified mediator should be is currently understaffed and lack vulnerable to abuse. Firstly, the
appointed to conduct the process qualified arbitrators who are bilingual, claimant may wrongly enter the
of negotiation. let alone speak a third language. respondent’s details in the claim
form, either intentionally or by
Under the current procedure, The number of foreign strata owners accident. Consequently, the notice
negotiation is only available at the is significant in the country due to will not reach the respondent.
beginning of the hearing upon the previous campaigns that promote Secondly, in cases involving the MC
lodging of the claim. This diverges foreign house buyers to purchase as the claimant and an owner as the
from the spirit of mediation in which apartments and condominiums in respondent, there have been reports
negotiation is seen as an integral Malaysia as their second home. In of the notice not being delivered to
component to induce conciliation. recent years, there has been a spate the respondent or being missing
Additionally, the mediation of property investors from China after passing the management
qualification of the SMT personnel who purchased strata residences office.
assisting the pre-proceeding in the southern region of Iskandar
negotiation is not verified. This opens Malaysia, an area touted as an Another notice under the SMT is
up the possibility of the insufficiency international economic zone. It is the default notice, which is served
of the mediation process as unlikely for the foreign strata owners on a party that disregards the
negotiation may not be fully available to be able to speak Malay, whilst the award by the SMT chairman. Once
and promoted to the disputants. SMT lacks bilingual manpower. the default notice is served, SMT’s
28
Dispute Resolution of Stratified Residential Properties: The Strata Management Tribunal of Malaysia
rectification procedure will run within that may diminish the quality of
a given timeline regardless of a new living of the occupants. The above
compliance or any intention from the observations suggest that despite Weaknesses in
SMT to review the award. its vast improvements in the area
of strata dispute resolution, SMT the negotiation
Overlapping Legal Framework contains a number of inherent issues
that may impede its full potential.
process, personnel
The mediation aspect of SMT calls
into question its accordance with Weaknesses in the negotiation and resource
the broader legal framework. In process, personnel and resource
particular, the Mediation Act 2012 constraints, notice procedure constraints,
(Act 749) was passed with the main
objective to promote and encourage
and overlapping legislation are
areas to be reviewed to eliminate
notice procedure
mediation as a method of alternative inefficiencies and increase and overlapping
dispute resolution by providing for effectiveness. These technical and
the process of mediation, thereby legal issues lie within the authority legislation
facilitating the parties in disputes to
settle disputes in a fair, speedy and
of the federal ministry overseeing
SMT who may consider a separate
are areas to
cost-effective manner and to provide subsidiary legislation that would be reviewed
for related matters. address the procedural gaps.
to eliminate
Clearly the objective of Act 749 One area that may be improved is
parallels the rationale for SMT, the negotiation element of SMT. inefficiencies
except that SMT was established
specifically to resolve strata
An additional layer to the dispute
resolution process can be introduced
and increase
disputes. Act 749 clearly sets out at the internal level before claim is effectiveness.
the types of disputes that do not lodged at the SMT. This additional
fall under its scope, and strata layer can be modelled after the
disputes are not contained in the three-tier internal dispute resolution
schedule. This raises the issue of scheme of Victoria, Australia. An
the compliance of SMT with Act 749 intervention at an early stage of the
provisions. Among others, Act 749 dispute can prevent its escalation skill that can prove invaluable to the
specifies the qualification required and provide a platform for parties to profession and should be looked
for a mediator, mediation procedure voice out their disagreements. As the into seriously to be at par with our
and liability of the mediator. It should aggrieved is empowered to narrate Singaporean counterparts.
be noted that the legal principle the perceived injurious experience
lex specialis derogat legi generali (a and the opposite party is allowed to More resources should be diverted
law governing a specific matter explain, justify or defend themselves into the SMT to prevent case
overrides a law concerning general in a conciliatory environment, the backlogs. Delays in hearings may
matters) applies in Malaysia as stress and negativity may dissipate result in festering negativity at the
indicated in several court cases. or diminish. A pre-SMT negotiation strata scheme. Eventually, each state
Thus, the specific nature of Act 757 should allow any aggrieved party should establish an SMT to ensure
that controls SMT may prevail over including the MC to file a complaint disputants’ costs are kept low in
Act 749, which is general in nature. at the MC. Being an internal dispute keeping with the spirit of mediation.
However, the applicability of lex resolution scheme, the MC should
specialis in this matter has yet been be able to call in an outside mediator From the perspective of the
tested. or train an in-house mediator to preventative principle, conflict
help the parties to conciliate before avoidance may be adopted as a
Conclusion and deciding to take the formal route. primary strategy for architects and
planners. Conflict may be avoided
This would reduce the number
Recommendations of cases to be heard at SMT and when the subject of dispute is taken
also promote a more amicable out of the equation or when an
If left unchecked, conflicts and unPIE never transforms into PIE. In
resolution among the disputants.
disputes can have a devastating the first instance, there are fewer
For professional property managers,
effect on the social relationships propensities for conflict where the
dispute resolution is definitely a
within a residential strata scheme
29
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
design of the strata residence takes from https://www.nst.com.my/ Peninsular Malaysia: An overview.
into consideration management news/2017/02/214662/high- Jurnal Pentadbiran Tanah.
activities and maintenance costs. expectations-new-strata-management-
As revealed in the claim file review, tribunal Mohamad, N. A. (2015). Developing a
there is a high possibility for model for pre-action dispute resolution
payment defaults by owners which Burton, J. W. (1990). Conflict: for strata dispute management in
would have resulted in claims by Resolution and Provention. London: Malaysia. Paper presented at the
management bodies. The root Macmillan. The 8th UUM International Legal
cause of owners’ non-payment Conference 2015, Bandung, Indonesia.
Burton, J. W. (1997). Conflict resolution:
has to be examined. Oftentimes
Towards problem solving. Peace and Mohamad, N. A., & Sufian, A. (2015).
owners default on payment not
Conflict Studies, 4(2). Legal development on management of
due to inability to pay but perhaps
strata dispute in Peninsular Malaysia.
due to the opacity in service DOSM. (2010). Basic Data Malaysia. International Review of Management
charge calculation. A transparent
and Business Research 2(2), 442-449.
management that includes owners DOSM. (2017). Population and
in monetary decisions may demography Retrieved 19 February, Moore, C. W. (2014). The mediation
avoid conflict. Similarly, a mixed 2017, from https://www.dosm. process: Practical strategies for
development that clearly demarcates gov.my/v1/index.php?r=column/ resolving conflict (Fourth ed.). USA:
each component’s common property ctwoByCat&parent_id=115&menu_ Jossey-Bass.
and provides sufficient facilities for id=L0pheU43NWJwRWVSZklWdz
each component can avoid future Q4TlhUUT09 Shukri, I. M., & Maidin, A. J. (2010).
disputes between different users. In Strata Titles law and Procedure. Asia:
the second instance, an unPIE will DOSM. (2018). Malaysia Economy Q4. Sweet and Maxwell.
not be contentious when features Putrajaya.
supporting communication, trust and Strata Management Act, The
relationship building for the future Felstiner, W. L. F., Abel, R. L., & Sarat, Government of Malaysia, 757 Stat.
users are incorporated in the design. A. (1980-1981). The Emergence and (2013).
In other words, being mindful of the Transformation of Disputes: Naming,
social and economic requirements Blaming, Claiming... Law & Society Strauss, A. L., & Glaser, B. G. (1967).
of the eventual stakeholders in a Review: Special Issue on Dispute The discovery of Grounded Theory:
strata scheme should be considered Processing and Civil Litigation, 15(3/4), Strategies for qualitative research:
alongside developers’ profit margin 631-654. Aldine Transaction.
as a way to improve the liveability
Kamarudin, F. (2014). The development Tan, C. (2015). Strata owner’s manual
within a residential strata scheme.
of an effective and efficient dispute and guidebook. Kuala Lumpur,
This paper specifically reviewed resolution process for strata scheme Malaysia: Catizens Sdn Bhd.
residential strata disputes and did disputes in Peminsular Malaysia. PhD,
Queensland University of Technology, Teo, K. S. (2012). Strata title in
not cover commercial strata. For
Australia. Singapore and Malaysia (Fourth ed.).
a more comprehensive outlook on Singapore: Lexis-Nexis Butterworths.
SMT’s operational effectiveness,
Keator, T. (2011). Dispute or Conflict?
future research may look into VPSD. (2017). Residential Property
The Importance of Knowing the
commercial strata disputes. Stock Table Q3 2017. In National
Difference Retrieved 27 February,
2018, from https://www.mediate.com/ Property Information Centre (Ed.),
References articles/KeatorT1.cfm Property Stock Report. Putrajaya,
Malaysia: Valuation and Property
Agus, M. R. (1989). Public sector low Leshinsky, R., & Mouat, C. (2012). New Services Department.
cost housing in Malaysia. Habitat ways to think about conflict resolution
International, 13(1), 105-115. for more harmonious strata living Yahaya, N. (1989). Housing in Malaysia,
Planning News, 38(2), 13-14. 1955-1990. Habitat International, 13(4),
Buang, S. (2017). High expectations 63-69.
for new strata management tribunal, Mohamad, M., Sufian, A., & Mohamad,
New Straits Times. Retrieved N. A. (2015). Strata Management in
30
PEER REVIEW
Siti Farrah Zaini1 Zuraini Md Ali2 Brit Anak Kayan3
1,2,3
Department of Building Surveying, Faculty of Built Environment, University of Malaya
Email: [email protected], [email protected], [email protected]
Maxwell Hill:
Exploring from Built
Environment and
Historical Perspectives
Abstract
31
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
to soothe the needs of the British people who had to live in the tropics for prolonged
periods of time. In Malaysia, hill stations were developed starting from Penang Hill
(Bukit Bendera), Maxwell Hill (Bukit Larut), Fraser’s Hill (Bukit Fraser) and Cameron
Highlands, which emerged since 1920s. This study explores Maxwell Hill from the
perspectives of its built environment and historical value. This hill station has not been
subjected to many studies, compared to other hill stations. This paper also intends
to ensure Maxwell Hill is not neglected. A holistic qualitative methodology including
in-depth literature reviews and on-site observations of Maxwell Hill was conducted in
2017. Based on this study, it was found that the settlement was related to the British
colonial social culture, but majority of the original bungalows are abandoned and
deteriorated over time.
F
1. Introduction Ahmad (1997) has argued that
some of British colonial remains
in order to understand its concept.
Maxwell Hill, or locally known as
rom the late 18th century deserved to be protected as heritage Bukit Larut, located in Taiping,
to 1957, the British buildings because they are tangible Perak, is one hill station that is not
has occupied Malaya evidence from the past, and possess rigorously studied compared to
(before we gained outstanding architectural values that others.
independence) with the exist in this country. Interestingly,
buildings are not the only `footprints’ According to research conducted by
interest of territorial and
that the British left behind, but also Zaini, Ali and Kayan (2017), it was
power control over this country.
unique places they used called hill found that there are limited available
The era of British colonialism in
stations. sources on Maxwell Hill’s historical
Malaya was so entrenched that
background and built environment
it gave them opportunities not
According to records and old books, research. Hence, this study is
only to have influence on power
there are four British colonial hill intended to be one of the starting
and administration system, but
stations in Malaya since the late researches that explores Maxwell
also to imprint their culture on our
18th century (S. Robert Aiken, 1994; Hill as a medium to avoid further
surroundings such as British colonial
Butcher, 1979; Crossette, 1999; Sim, negligence on this unique landscape.
architecture, especially in the
1946; Willis, 1936). The existence
Federated Malay States and Strait
Settlements.
of hill stations portrays human 2. British Hill Stations
intelligence in taking advantage of
Although Malaysia has gained the tropical landscape to soothe the Hill stations are peculiar landscapes
independence since 1957, British needs of the British in this country located on hilltops, which were
colonial architecture in this country (S. Robert Aiken, 1994; Crossette, created by the European; British
can still be seen on many buildings. 1999; Kenny, 1997; Spencer & and Dutch, as well as the American
In fact, some of these buildings are Thomas, 1948). in their colonies, especially in the
registered as heritage buildings Orient. British colonial hill stations
Thus, this paper was carried out did not only exist in Malaya, but also
under National Heritage Act (2005)
to explore one of four hill stations in British Raj (India) (Crossette, 1999;
that represent parts of Malaysian
from the perspective of its built Spencer & Thomas, 1948; Westlake,
cultural heritage (Ahmad, 1993).
environment and historical value 1993). Hill stations were created in
32
Maxwell Hill: Exploring from Built Environment and Historical Perspectives
the first place by the British as a way and Cameron Highlands (S. Robert materialise due to political conflicts,
to avoid the unpleasant hot weather Aiken, 1987; S. Robert Aiken, 1994; where part of the hill was located
and environment as well as from the Crossette, 1999). According to Aiken in Kelantan territory, which was not
reach of mosquitoes. (1994), there were more hill stations a Federated Malay States (Butcher,
designed by British but were unable 1979).
In addition, these colonists were to be developed due to specific
far from home. Based on the circumstances. He has categorised It is interesting to find that hill
government’s leave policy, the hill stations in Malaysia into three stations in Malaysia were able to be
British officers were not allowed to categories -- principal, minor and developed from a retreat landscape
return to England frequently. It was planned. into a social settlement, despite of its
documented that many of Europeans mountainous characteristics, for the
suffered from tropical pressure that Penang Hill, Maxwell Hill, Fraser’s Hill British families and friends who were
affected their mental health (Butcher, and Cameron Highlands are principal similar in social status to mingle and
1979; H.T.Ross, 1937; Kennedy, 1996; hill stations, Gunung Kledang in socialise, to play sports, hang out in
W.T.Wood, 1895). Perak, Bukit Kutu in Selangor and pubs, etc. These are proved by the
Gunung Angsi in Negeri Sembilan are existence of Tudor bungalows, pubs
Many of them retreated to higher the minor hill stations, and Mount and hotels, and old sport facilities
altitude as they found that it is Tahan in Pahang is the planned such as tennis court, golf course
colder and brought comfort to their (never developed) hill station and lawns (S. Robert Aiken, 1994;
health, while staying out of the reach (S. Robert Aiken, 1994). Crossette, 1999; Sim, 1946; Willis,
of mosquitos (Baker, 2014). A few 1936).
historical documents highlighted In 2017, an in-depth study hads been
hill stations were popular in 19th conducted to understand the criteria In India, the geographical
century, where the stations bring to of sites selected by the British to be characteristics of British hill stations
memory the lifestyle they might have developed as hill stations as shown played an important role in social
led in their own country (S. Robert in Table 1. It was found that minor element of the British people as the
Aiken, 1994; Crossette, 1999; Francis, hill stations were not developed due stations on the highest altitude were
2015; Weebers & Idris, 2016). to the geographical factor, where for who were of higher social and
they were not located high enough official elite, while the others were
In Malaysia, hill stations were to satisfy the needs of British people socialising at the lower levels of the
developed since the late 18th century (Zaini, Ali, & Kayan, 2017). hill (Herbert, 2011; Kennedy, 1996).
during the British era -- Penang Hill
(Bukit Bendera), Maxwell Hill (Bukit Mount Tahan in the other hand is Although there are no literature
Larut), Fraser’s Hill (Bukit Fraser) a planned hill station but did not on the matter, the settlement
Table 1: The geographical characteristics according to hill stations in Malaysia (Zaini, Ali & Kayan, 2017)
Hill stations
33
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
organisation of Malaysian hill 2017; Kennedy, 1996; Weebers & from the Preferred Reporting Items
stations could be similar to those in Idris, 2016; Westlake, 1993). for Systematic Reviews and Meta-
India. Thus, this study is to explore Analyses (PRISMA) checklist as this
the settlement setting of hill station Every literature on hill stations stated approach is able to ensure minimal
by looking at Maxwell Hill. English bungalows and gardens bias by the researcher in conducting
were part of their developments. systematic literature review (Moher
2.1. Maxwell Hill, Taiping There is an archived record in 1947 et al., 2009).
Maxwell Hill is the second hill station that highlighted the condition of 10
created in Malaya, but the first one bungalows and the distance of each 3.1.1. Identification
on the mainland, as Penang Hill was bungalow from the foothills to the This approach was started with
located on an island (S. Robert Aiken, hill top. related articles searches based on
1994; Crossette, 1999; Weebers following article databases: Web of
The 10 bungalows on Maxwell Hill
& Idris, 2016). It is located in the Science and SCOPUS. The search
are: The Cottage, the first retreat
northern state of Malaysia called was conducted using keywords
bungalow erected on the hill in
Perak and lies in the heritage town related to hill stations, hill resort,
1884 (German, 1927) is nine miles
of Taiping. Perfectly located as the
from the hill’s foot or 1,376 metres Maxwell Hill, Bukit Larut, Larut Hill
backdrop to Taiping, the Maxwell Hill
above sea level, followed by The and Taiping Hill as shown in Table
summit is at 1,250 metres above sea
Box, Hugh Low’s and Speedy’s 2. Careful screening was then
level.
(also known as The Rest House) conducted to ensure related articles
As mentioned earlier, there are bungalows which are eight miles on historical and built environment
limited historical resources from the hill’s foot, Treacher’s, The background on Maxwell Hill were
on Maxwell Hill (see Section Hut, Superintendant’s, Watson’s and identified.
3). However, the era of British Maxwell’s Bungalows were about
intervention in Taiping under seven miles away, and finally two 3.1.2. Screening
the Pangkor Treaty 1874 that Tea Gardens Bungalows which are Several acceptation and rejection
allowed Taiping to receive British located at the lowest part of the hill, criteria were determined. The journal
administration might be the starting about four miles from the hill’s foot articles selected must have reviews
point of Maxwell Hill’s development. (Perak Secretary, 1947). on the historical background and
The geographical characteristics built environment of Maxwell Hill
of this hill station provided an 3. Methodology or Bukit Larut. However, only one
opportunity to the British to overlook article on Maxwell Hill was found
To achieve its objective, this study on Web of Science and SCOPUS
tin mining activities at the lowlands.
was carried out through in-depth but is not related to research on
Maxwell Hill emerged as hill station,
and systematic historical review on built environment and historical
which not only served the English
British hill stations and particularly background. There are 66 articles
officers in Taiping, but also for
on Bukit Larut as well as on-site found in the ScienceDirect database
the English who came to visit this
observation. Despite of conducting based on keywords and six articles
country as written in personal
technical approach similar to other are related to hill stations in Malaysia.
journal by Sim (1946) titled “Malayan
surveying studies, it is crucial for this
Landscape”.
study to highlight the contribution of All six articles pointed to
The most unique element that has holistic qualitative methodology to characteristics of hill stations but
been existed on Maxwell Hill since the field of surveying studies. none are related to Maxwell Hill.
the colonialism era is the use of Land Hence, this study was preceded
3.1 Systematic Literature with in-depth literature review that
Rovers as the mode of transport
Reviews involved 10 old books and four
from the lowland to the top. Prior to
that, ponies and sedan chairs were A systematic literature review was archival records that had background
the only mode of transportation undertaken to ensure in-depth literature on Maxwell Hill and British
up the hill (Sim, 1946; Tourism understanding on the historical hill stations in India and Malaysia.
Malaysia, n.d). Hill stations created and built environment of Malaysian
and designated by the British in India hill stations and Maxwell Hill. The 3.2 On-Site Observation
and Malaya were synonymous with literature review process was On-site observation was conducted
bungalows (Crossette, 1999; Gibby, conducted based on relevant criteria in February 2017. On-site
34
Maxwell Hill: Exploring from Built Environment and Historical Perspectives
Average of
Types of crisis Perceived severity of crisis a
Web of Science TS=((“Maxwell* Hill” AND “Hill Station*” OR “Maxwell* Hill” AND “Hill Resort*” OR “Bukit Larut”
AND “Larut Hill” OR “Taiping Hill”)
SCOPUS 1. TITLE-ABS-KEY (“Maxwell* Hill” AND “Hill Station*” OR “Maxwell* Hill” AND “Hill Resort*” OR
“Bukit Larut” AND “Larut Hill” OR “Taiping Hill”)
observation is a data collection observing and its context (Hussein & at 1,389 metres near Caufield Hill,
technique that is used in this study Daud, 2016). where the road ends there. Based
as it is self-exploratory where the on observations, Maxwell Hill is
observer looks, listens and records 4. Findings and uninhabited. Existing bungalows
the observable phenomena or are used as lodgings for tourists.
behaviour in its natural setting and
Discussion Bungalows and other buildings on
understand them (Golicnik, 2005; Figure 1 shows the topography map the hilltop were observed in their
Gorman & Clayton, 2005; Silverman, of Maxwell Hill. The map portrays current conditions, materials and
2006). the placement of settlement on the locations.
hill is between 900 metres and 1,243
As this research objectively There are 10 bungalows in Maxwell
metres above sea level. According
explores the built environment and Hill (Hasmi, 2017; Taiping Municipal
to Taiping Municipal Council (n.d),
historical perspectives of Bukit Larut Council, n.d). However, only six
The Cottage bungalow is located
according to the hill station concept,
the observation conducted were
looking at original bungalows and
the settlement setting on the hilltop
in term of their current condition,
materials and location. This study
can be considered as a starting
point for further exploration. Thus,
observation technique is considered
suitable method as highlighted by
Golicnik and Thompson (2010),
where observation is a tool towards
gaining deeper knowledge about
the site; and that it can serve as an
orientation and a starting point for
further research (Hussein & Daud,
2016).
35
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
Figure 3: Federal/Superintendent’s bungalow presently Figure 5: Watson’s bungalow presently known as Beringin.
known as Angkasa.
36
Maxwell Hill: Exploring from Built Environment and Historical Perspectives
Figure 9: Clear view of town of Taiping from the top of Maxwell’s Hill.
37
PEER
PEER REVIEW
REVIEW
The Malaysian Surveyor
This paper has also presented the Crossette, B. (1999). The Great Hill Perak Secretary. (1947). Maxwell’s
condition, materials and location Stations of Asia. New York: Basic Hill, Taiping - Draft Rules Governing
of bungalows in Maxwell Hill on Books. the Occupation of Bungalows.
a surface level as well as the (1957/0304668). Arkib Negara
characteristics of the settlement Francis, R. (2015). Penang Hill Malaysia.
which aligned with the concept Furnicular Railway: Remembering an
of British hill stations. Despite Engineering Feat 1923-2010. Penang: Sim, K. (1946). Malayan Landscape.
of being overlooked as a unique Areca Books. London: Micheal Joseph LTD.
cultural landscape, more studies are
German, R. L. (1927). Handbook to Spencer, J. E., & Thomas, W. L. (1948).
expected to be conducted on built
British Malaya. London: Malay States The Hill Stations and Summer Resorts
environment of not only Maxwell Hill,
information agency. of the Orient. Geographical Review,
but other hill stations in Malaysia.
38(4), 637-651.
Gibby, M. (2017). Penang Hill: A
Acknowledgement Journey Through Time. Penang: Taiping Municipal Council. (n.d). Bukit
Entrepot Publishing Sdn Bhd. Larut Hill Resort. Taiping: Taiping
The authors gratefully acknowledge
Municipal Council.
the financial support of PG111- H.T.Ross. (1937, 4th August 1937).
2015B, a Postgraduate Research Official Memorandum. [Memorandum Tourism Malaysia. (n.d). Cool Highland
Grant established at Universiti on clerk in the Government Printing Resort. Arkib Negara Malaysia.
Malaya Department of FMS to get a treatment
health in hill station]. Official W.T.Wood. (1895). Application from
References Memorandum, (F.S 3166/37). Arkib Mr.W.T.Wood, Chief Draftman for
Negara Malaysia. eleven days leave to enable him to
Ahmad, A. G. (1993). Conservation of proceed to Penang Hill for the benefits
British Colonial Buildings Built Between Hasmi. (2017). History of Maxwell’s of his health. (1957/0056605). Arkib
1800 and 1930 in Malaysia. (Doctor Hill. In S. F. Zaini (Ed.). Negara Malaysia.
of Philosophy), University of Sheffield,
University of Sheffield. Herbert, E. W. (2011). Flora’s Empire: Weebers, R., & Idris, H. (2016). British
British Gardens in India. London: Hill Stations in South Asia and
Ahmad, A. G. (1997). British Colonial University of Pennsylvania Press. Mainland South East Asia: British India,
Architecture in Malaysia 1800-1930. Ceylon, Burma and British Malaya:
Kuala Lumpur: Museums Association Hussein, H., & Daud, M. N. (2016). An A Comparative Study. Journal od
of Malaysia. Observation Method For Qualitative Southeast Asian Studies, 21, 174-189.
Data Gathering Qualitative Research
Aiken, S. R. (1987). Early Penang Hill Tools and Techniques. USA: Farwood Westlake, G. D. (1993). An Introduction
Station. Geographical Review, 77(4), Publishing. To The Hill Stations Of India India:
421-438. Indus.
Kennedy, D. (1996). The Magic
Aiken, S. R. (1994). Imperial Belvederes: Moutains (Vol. 1). Berkeley: University Willis, A. C. (1936). Willis’s Singapore
The Hill Stations of Malaya. New York: of California Press. guide: with descriptive of interest
Oxford University Press. to tourists on Malaya. Singapore:
Kenny, J. T. (1997). Claiming the high Advertising and Publicity Bureu Ltd.
Baker, J. C. T. (2014). Mobility, ground: theories of imperial authority
tropicality and landscape: the and the British hill stations in India. Zaini, S. F., Ali, Z. M., & Kayan, B. A.
Darjeeling Himalayan Railway 1881- Political Geography, 16(8), 655-673. (2017). Site Selection Criteria for British
1939. Journal of Historical Geograophy, Colonial Hill Stations in Malaya. Paper
44, 133-144. Moher, D., Liberati, A., Tetzlaff, J., presented at the 2nd International
Altman, D., & The PRISMA Group. Symposium of Nusantara Cultural
Butcher, J. G. (1979). The British in (2009). Preferred Reporting Items Heritage, University of Bung Hatta,
Malaya 1880-1941. Oxford: Oxford for Systematic Reviews and Meta- Indonesia.
University Press. Analyses: The PRISMA Statement.
PLos Med, 6(7). doi: https://doi.
org/10.1371/journal.pmed.1000097
38
RISM NEWS
Vol.53 No.1 2018
Understanding
the President and some Council Members.
Malaysian
As such, the signing ceremony between RISM and
MIArb had taken place on 8 March 2018 at Hilton Hotel,
Petaling Jaya, Selangor.
Arbitrators
Real Estate Convention (NREC) that was at the same
venue. The purpose of signing the Memorandum is to
have common understanding to build a long term co-
39
RISM NEWS
The Malaysian Surveyor
40
RISM NEWS
Vol.53 No.1 2018
41
RISM NEWS
The Malaysian Surveyor
RISM Inter-
Firms Bowling
Tournament 2018
RISM Inter-Firms Bowling Tournament 2018 was held on
20 January 2018 with the participation of 30 firms. The
Champion of this event was UiTM Perlis, Team STORM.
42
PROFESSIONAL PRACTICE
Vol.53 No.1 2018
43
BOOK REVIEW
January – March 2018
Isu-Isu Perundangan
Berkaitan Kontrak Binaan
Author: Amran Mohd Majid
Publisher: Dewan Bahasa Pustaka
ISBN No: 978-983-49-0174-5
44
ELEMENTAL COST ANALYSIS
Vol.53 No.1 2018
Contract Sum
Less Contingencies RM 1,630,000.00
45
ELEMENTAL COST ANALYSIS
January – March 2018
46
ELEMENTAL COST ANALYSIS
Vol.53 No.1 2018
BRIEF SPECIFICATION
‘Gross Floor Area: 915 m2 Tender Date :July 2009
Element Specification
1 Substructure
1A Piling 150mm x 150mm precast reinforced concrete Grade 45
1B Work Below Lowest Floor Fnish Reinforced concrete pile caps, column stumps, ground floor beams, ground floor slab,
apron slab, bar reinforcement, formwork, anti-termite soil treatment and 230mm diameter
half round glazed drain
2 Superstructure
2A Frame Reinforced concrete columns, suspended floor beams and roof beams, bar reinforcement,
formwork and 150mm diameter round steel columns
2B Upper Floors Reinforced concrete suspended floor slab, bar reinforcement and formwork
2C Roof 'Reinforced concrete flat roof, bar reinforcement, formwork, waterproofing membrane,
colorbond metal sheet roof covering, aluminium fascia board, UPVCgalvanised iron rainwater
downpipe, UPVC gutter, aluminium flashing, galvanised iron spout pipes and steel roof
trusses system
2D Stairs Reinforced concrete staircase, homogenous tiles to landing slab, tread and skirting and
900mm high painted mild steel railing to staircase
2E External Walls Generally, 300mm, 230mm and 150mm thick brickwall in cement and sand bricks bedded
and jointed in cement mortar (1:3) reinforced with and including Exmet reinforcement at
every fourth course and 1500mm high aluminium louvres
2F Windows & External Doors Aluminium framed fixed glass, casement and top hung windows with 6mm thick clear glass
panel, 'Zincalum' aluminium door frame, timber flush doors, mild steel grille doors, sliding
glass doors and mild steel roller shutter
2G Internal Wall & Partitions Generally, 150mm thick brickwall in cemend and sand bricks bedded and jointed in cement
mortar (1:3) reinforced with and including Exmet reinforcement at every fourth course and
75mm thick gypsum board partition
2H Internal Doors ''Zincalum' aluminium door frame, aluminium framed glass door glazed with 8mm thick clear
glass panel, timber flush doors and one-hour fire rated doors
3 Finishes
3A Internal Wall Finishes Generally, cement and sand (1:6) with plasticiser, emulsion and epoxy paint and approved
ceramic tiles
3B Internal Floor Finishes Generally, cement and sand (1:3) screeding, cementitious waterproofing Sika Top Seal 107,
screeding trowelled hard, epoxy paint and approved homogenous tiles
3C Internal Ceiling Finishes Generally, 4mm thick cement based skim coat plaster system, 3.2mm thick mineral fibre
board ceiling and painting
3D External Finishes Generally, cement and sand (1:6) with plasticiser and painting to walls, screeding trowelled
hard, approved homogenous floor tiles, approved loose granite, 500mm x 500mm concrete
slab, 4mm thick cement based skim coat plaster system, powder coated aluminium strip
boarding and painting
47
ELEMENTAL COST ANALYSIS
January – March 2018
BRIEF SPECIFICATION
‘Gross Floor Area: 915 m2 Tender Date :July 2009
Element Specification
5 Services
5A Sanitary Appliances ''Johnson Suisse' vitreous china low level washdown water closet, lab sink, pillar tap,
semi-recessed toilet roll holder, semi-recessed vitreous china soap holder, 13mm diameter
stop cock and mirror with plywood backing
5B Plumbing Installation Soil, waste and vent pipes for sanitary plumbing services and cold water services
5C Refuse Disposal NIL
5D Air Conditioning & Ventilation System Direcet Expansion Air Cooled Split Units System including outdoor condensing unit and indoor
direct expansion fan coil units, exhaust fan, refrigerant copper piping, uPVC condensate drain
pipe, cabling and wiring works
5E Electrical Installation Low voltage installation, external and internal telecommunications installation, networking
empty trunking installation and relocation existing services
5F Fire Protection Installation Hose Reel System, Dry Riser System, Fixed CO2 System, Fire Alarm System and Fire
Extinguishers
5G Lift & Conveyor Installation NIL
5H Communication Installation NIL
5J Special Installation Gas piping installation
5K Builder’s Profit & Attendance on Services NIL
5L Builder’s Work In Connection With Services NIL
6 External Works
6A Site Work Site Clearance and Earthworks, Roads and Hardstanding, Turfing Works and Fencing Works
6B Drainage 750mm Diameter precast reinforced concrete pipre culvert (Grade Y), 1050mm x 900mm
brick sump, 225mm Diameter vitrified clay pipes, connection to existing manhole and testing
6C External Services 150mm Diameter approved cast iron double outlet pillar hydrant, duck foot bend, 100mm
diameter sluice valve rated 16 bar (flange end), precast concrete valve indicator posts, mass
concrete thrust block, anchor block, pillar hydrant chamber, sluice valve marker post and
connection to existing pipe
6D Ancillary Buildings NIL
6E Recreational Facilities NIL
48
ELEMENTAL COST ANALYSIS
Vol.53 No.1 2018
49
ELEMENTAL COST ANALYSIS
January – March 2018
50
ELEMENTAL COST ANALYSIS
Vol.53 No.1 2018
External Doors
Description No L W Area
RS1 1 3.45 2.40 8.28
RS2 1 1.20 2.40 2.88
D1 4 1.20 2.40 11.52
D2 5 0.90 2.40 10.80
D4 2 0.75 2.40 3.60
D5 1 2.60 2.40 6.24
D12 1 1.20 2.40 2.88
D13 1 1.20 1.50 1.80
D14 1 0.75 1.50 1.13
Total 659.00 49.13
Internal Doors
51
LIST OF NEW MEMBERS
January – March 2018
QUANTITY SURVEYING Sr Sumie Saryanti Binti Abd Suki Leo Malicay Moncada
Aziz, Azizi & Partners Sdn Bhd Vinci Construction Grands Projects
Fellow
Sr Dr. Norsiah Mohamad
Sr Syuibah Binti Mohamad Graduate
UiTM Shah Alam
Irama Duta Sdn Bhd Abul-Hai Bin Mohd Fadzullah
PI Brilliant Berhad
Sr Mohammad Fadhil Bin Mohammad
Sr Airul Faizal Bin Othman
UiTM Shah Alam
Caw Kerja Bgn Am, JKR Malaysia Afif Bin Shapiai
KAS Juruukur Bahan Sdn Bhd
Sr Syed Abdul Haris Syed Mustapa
Sr Azizah Binti Md Hussin
University Teknologi MARA, Perak
Jabatan Perdana Menteri Ahmad Syahmi Bin Ahmad Said
Politeknik Kota Bahru
Sr Richard Ooi Hoo Ong
Sr Che Mohd Abdillah Bin Abdullah
Northcroft Lim Perunding Sdn Bhd
ACQS Ahmad Taha Sabri Bin Mhd Tajuddin
ARH Jurukur Bahan Sdn Bhd
Sr Hoo Kim See
Sr Elaine Wong Siew Chyn
IJM Land Management Services
Ashghal (Qatar) Cho Kin Yew
WT Partnership
Member
Sr Gan Hock Leong
Sr Anisha Shazwani Bt Ahmad Anuar
Imperia Institute of Technology Goon Carry
Kementerian Pendidikan Malaysia
GKG Konsultant Kos
Sr Halimatun Sa’diah Binti Othman
Sr Hafizah Binti Haron
JKR Terengganu Kamaruddin Bin Che Abas
CKUB, JKR
QS Associates
Sr Ooi Poh Siang
Sr Hasanulfadlie Bin Che Md Ariffin
AS Gemilang Enteprise Sdn Bhd Karmiza Binti Ab Kadir
Design Cost Consultants
ARH Jurukur Bahan Sdn Bhd
Sr Mohd Arif Bin Muda
Sr Mohd Rizal Bin Salleh
Perunding Arif QS Lee Sui Sheng
Perunding DMA Sdn Bhd
JUB Padu
Sr Ong Chen Cheak
Sr Nasafian Bin Mohd Shariff
Perunding AT Sdn Bhd Mohamad Azizi Bin Razali
AR Jurukur Bahan Sdn Bhd
CIC-QS Services Sdn Bhd
Sr Ridzuan Bin Mohamed Radzi
Sr Nik Noor Diana Bt Mohd Noor
Pej. Pembangunan Persekutuan Neg. Perak Natalie Wong Yoong Vern
JKR Malaysia
CSL QS Consult
Sr Rosiyawati Binti Mostar
Sr Nor Hasiah Binti Ibrahim
JKR Malaysia Noorhayati Bt Mohd Noh
Caw. Kerja Keselamatan JKR
ARH Jurukur Bahan Sdn Bhd
Sr Siti Atasah Binti Johari
Sr Nor Hasni Binti Muhd Supian
Ranhill Bersekutu Sdn Bhd Nurul Najia Binti Mohd Nasir
JKR Malaysia
ARH Jurukur Bahan Sdn Bhd
Sr Suhairi Bin Ngah
Sr Pham Keeng Chek
Universiti Malaysia Pahang Pua Zhi Xun
PUBM Quanity Surveyors Brunei
Yong Dan Mohamad Faiz Sdn Bhd
Sr Wan Huzaimi Bin Wan Abdullah
Sr Samian Bin Johari
Kem. Kesihatan Malaysia Ross Saliha Safura Binti Hamzah
CKUB, JKR
Politeknik Kota Bahru
Sr Woo Kah Kheong
Sr Shakirah Binti Md. Zainuddin
DL QS Consult Sara Ruhaya Bt Abu Bakar
Bhg. Kesihatan CKUB, JKR
ARH Jurukur Bahan Sdn Bhd
Sr Zilawati Binti Yaakub
Sr Syahir Azfar Bin Mohd Noor
Sime Darby Property Berhad Sharifah Aminah Bt Ayob
JKR Malaysia
ARH Jurukur Bahan Sdn Bhd
Associate Member
Sr Wong Su Lee
Assoc. Prof. Dr. Ahmed Mohammed Siti Nasirah Binti Bahrudin
GLM Propercy Services
Kamarudin ARH Jurukur Bahan Sdn Bhd
University College of Technology Sarawak
Sr Zulkipeli Bin Yamat
Tan Choon Wong
JKR Malaysia
Eloisa Jorge Fulla SP Setia
Vinci Construction Grands Projects
Sr Mohd Khairul A’mri Bin Mohd Salleh
Tey Khai Theng
Irama Duta Sdn Bhd
Manibo Danilo Bueno IJM Constrcution Sdn Bhd
Vinci Construction Grands Projects
52
LIST OF NEW MEMBERS
Vol.53 No.1 2018
Woon Sian Chin Nik Shahirah Binti Nik Hisham Lim Jin Fen
Konsult MQS JUB Central Sdn Bhd Remajaya Sdn Bhd
Abd. Sukor Samba Bin Mohamed Nor’aifa Binti Nazaruddin Mohd Khairul Fitri Bin Othman
ARH Juruukur Bahan Sdn Bhd JUB Central Sdn Bhd Universiti Teknologi MARA (Sarawak)
Aliff Azize Bin Abdul Hadi Nor Azmi Bin Suhardi Natrah Binti Josip
ER Consult JUB Central Sdn Bhd Etika Hijau Sdn Bhd
Angeline A/P Petrus Norfasihah Binti Ibrahim Norhayati Binti Abdul Rahman
ER Consult Besraya (M) Sdn Bhd Tradewinds Facilicities Mgmt Sdn Bhd
Atikah Binti Ramly Nur Asyiqeen Binti Resdi Norizah Binti Ismail
Sri Medan Holding Sdn Bhd CIC-QS Services Sdn Bhd Kinabalu Setia Konsult Sdn Bhd
Kamarul Arifin Bin Samion Rose Emilda Binti Roslan Rumilya Binti Shariman
Pesona Metro Sdn Bhd ARH Juruukur Bahan Sdn Bhd CIDB Neg. Pulau Pinang
Keh Siok Lian Siti Arijah Noor Bt Abdul Kader Siau Chiu Ting
ER Consult JUB Central Sdn Bhd Baharuddin Ali & Low Sdn Bhd
Khoo Peck Lu Tan Wan Xuan Syamimi Liyana Binti Amat Rais
THS QS Consult Yong Dan Mohamad Faiz Sdn bhd Universiti Teknologi MARA (Sarawak)
Liew Ted Min Wong Chee Khan Terence Chong Yee Vui
QSP Consultants Sdn Bhd TRX City Sdn Bhd Perunding Kos KVC
Loo Jian Tern Dewi Noorain Binti Bolhassan Zurita Binti Abd Said
Q & C Juruukur Perunding Sarawak Energy Berhad Etika Hijau Sdn Bhd
53
LIST OF NEW MEMBERS
January – March 2018
Member
Goh Ang Keong Sr Ahmad Roslan Bin Mohd Bakri
PROPERTY SURVEYING Repsol Oil & Gas Malaysia Limited Jurukur Setia Sdn Bhd
Member
Goh Qian Yen
Sr Abdullah Bin Shafil Sr Amir Hamzah Bin Othman
Gamuda Engineering Sdn Bhd
JPPH Batu Pahat Geomatika University College
54
LIST OF NEW MEMBERS
Vol.53 No.1 2018
Sr Nasarularifin Bin Kamarudin Nor Amani Fadzilah Binti Mohd Kamil Siti Nur Hasibah Binti Azlani
INSTUN Juruukur Dinar Ideaworks Resources Sdn Bhd
Sr Nik Mohd Fadhil Bin Nik Mohd Kamil Nur Nadiah Binti Abdul Sukor Tahrina Binti Taib
TNB Jurukur Suasa Sepakat DBKL
Sr Nisfariza Binti Mohd Noor Nurul Nadirah Binti Abdul Kadir Muhammad Zakireen Bin Yusof
Sr Nur Hidayu Binti Ishak Kbuilders Training and Consulting
Geomatic University College Student
Alif Izzuddin Bin Anuar Nadzirah Binti Ishak
Sr Shaiffulrizal Bin Zainordin Brenda Anak Antalai NTQT Sdn. Bhd.
Jurukur Nilam Cynthia Anak Sada
Darina Anak Jimbai Nik Azlan bin Nik Aman
Sr Shuib Bin Rambat Effie Defeney Binti Rozaino Heriot-watt University
UTM Farah Ilyana Binti Hairuddin
Intan Noor Aifatika Binti Norfildaos Azlan Bin Abdul Aziz
Sr Tan Tian Chaun Muhammad Faeezwan Bin Omar JKR Perak
Jurukur Khoo Muhammad Na’im Bin Ahmad Lotfi
Muizzuddin Bin Muhammad Mazlina Bt Harun
Sr Taufek Bin Kassim Nor Fatihah Hida Binti Jaharuddin Politeknik Mukah, Sarawak
INSTUN Nor Hanani Binti Sani
Nor Syafiqah Binti Mohamad Mohd Faeez Bin Zainal Ariff
Sr Tsalimy Bin Abdullah Nornadhirah Binti Zulkhafli Advance Construction Holding Bhd
JUPEM Nur Aina Izzati Binti Yacob
Nur Azyyati Husnina Binti Ahmad Muhamad Zaihafiz Bin Zainal Abidin
Sr Zaidatul Akmal Binti Zawani Nur Farhana Athirah Binti Zainudin Ikram Education
Geomatic University College Nur Hidayah Binti Abu Bakar
Nur Nadia Rasiqah Binti Zaini Muhammad Rabbani Bin Mohamed Nordin
Graduate Nur Nadia Syaznee Binti Mohd Zuki Sunway Construction
Azri Bin Mat Saad Nur Najiha Binti Abd Aziz
AZF Ukur Consult Nur Najma Binti Hamsein Nurizyan Syamimi Binti Mohd Asri
Nur Syaidatul Syuhada Binti Ahmad Zuki JKR Kuala Lumpur
Khor Kim Khim Nurshuhada Binti Rosman
PKNS Nurul Farhani Binti Hashim Nurul Haya Binti Ismail
Nurul Hasniati Binti Badrul Hisham Naza TTDI Sdn Bhd
Loke Wai Seang Nurul Intan Syahira Binti Abd Karim
Jurukur Perunding Nurul Najlaa Binti Husin Rizal Bin Shuib
Nurul Najwa Binti Mohtar JKR Perak
Mohd Farouk Bin Rustam Nurulshafatin Binti Mohd Sabree
Gamuda Berhad Perena Anak Chin Siti Rohani Binti Ishak
Putri Alya Binti Mohd Nasir JKR Penang
Muhammad Hazimin Bin Roslan Qistina Binti Abdullah
IGS Consultant Siti Farhana Binti Zamri Suriyati @ Marwati Binti Sulaiman
Siti Nur Nadiah Binti Sh Salleh UiTM Shah Alam
Rosmashaida Binti Mat Lazim Siti Nuratiqah Syahirah Binti Osman
Sarawak Ukur Consult Siti Nurazurin Binti Ngatheman Dr. Zulhabri Bin Ismail
Siti Zulaikha Binti Norizan UiTM Penang
Yong Zen Jiun Wan Nor Atikah Binti Wan Zainal Abidin
Perunding Ukur Tekun Zalila Fahira Binti Zabidin Probationer
Zulfadhli Ezani Bin Meezad Muhamad Yusof Bin Abdullah
Jurukur SII Sdn Bhd Universiti Tenaga Nasional
BUILDING SURVEYING
Firdaus Bin Chek Sulaiman Muhammad Nasrol Bin Jamal
Graduate
Global Detection Solution Sdn Bhd Lim Kok Wing University
Hakimal Khairin Bin Saman
DBKL
Badrul Hisham Bin Rahim Dr. Basharudin Bin Abdul Hadi
Jurukur Sentral UiTM Penang
Ismawijaya Zah Bin Mohamed Jais
DBKL
Hazirah Binti Mohd Wazir
Mohammad Haminuddin Bin Abdul Hadi Mohd Izwan Ismadi Bin Abdul Hadi
Muhamad Khairussani Bin Zainal Abidin DBKL
Teraju Ukur
Nor Azahar Bin Abdul Karim
Muhammad Alif Bin Amran DBKL
Jurukur Amran
55
Royal Institution of Surveyors Malaysia,
3rd Floor, Bangunan Juruukur, No. 64 & 66, Jalan 52/4, 46200 Petaling Jaya, Selangor, Malaysia
Tel: +603 7955 1773 Fax: +603 7955 0253 Email: [email protected]
eISSN 2232-1292