This document provides a handover takeover report for a solar pump site. It summarizes key details of the site in 3 sentences:
The report documents the handover of a solar pump installation from the solar installation and commissioning agency to Vindhya Telelinks Limited, noting the pump rating, solar capacity, civil foundations, commissioning date, and completion of work. It includes a checklist of items inspected and certified as completed, such as structure alignment, cable dressings, and equipment installation. Representatives from both parties signed and dated the report to acknowledge the handover of the completed solar work.
This document provides a handover takeover report for a solar pump site. It summarizes key details of the site in 3 sentences:
The report documents the handover of a solar pump installation from the solar installation and commissioning agency to Vindhya Telelinks Limited, noting the pump rating, solar capacity, civil foundations, commissioning date, and completion of work. It includes a checklist of items inspected and certified as completed, such as structure alignment, cable dressings, and equipment installation. Representatives from both parties signed and dated the report to acknowledge the handover of the completed solar work.
This document provides a handover takeover report for a solar pump site. It summarizes key details of the site in 3 sentences:
The report documents the handover of a solar pump installation from the solar installation and commissioning agency to Vindhya Telelinks Limited, noting the pump rating, solar capacity, civil foundations, commissioning date, and completion of work. It includes a checklist of items inspected and certified as completed, such as structure alignment, cable dressings, and equipment installation. Representatives from both parties signed and dated the report to acknowledge the handover of the completed solar work.
This document provides a handover takeover report for a solar pump site. It summarizes key details of the site in 3 sentences:
The report documents the handover of a solar pump installation from the solar installation and commissioning agency to Vindhya Telelinks Limited, noting the pump rating, solar capacity, civil foundations, commissioning date, and completion of work. It includes a checklist of items inspected and certified as completed, such as structure alignment, cable dressings, and equipment installation. Representatives from both parties signed and dated the report to acknowledge the handover of the completed solar work.
Date: Site/GP's Name GP/Scheme ID Block & District Name Pump Rating (HP) Installed Solar with 2 kWp Aux. Load (kWp) No. of Civil Foundations for Solar Structure (Nos) Date of Commissioning (Pump tested on solar load) Work Completion Date (with dressing & finishing)
S.N. Particulars Yes No Remarks
Civil packing : Gap B/w Civil foundation and column 1 post 2 Structure & Module's fastener tightening 3 Structure & Module alignment Dressings of DC strings with cable tie & DWC 4 conduits
5 Dressing U/G DC cable up to the automation panel
6 Cable route marker for U/G DC cable 7 AJB-1 for Pump (proper installed) 8 AJB-2 for 2 kWP Aux. load (proper installed) Earthling installation & connection from solar 9 structure, module to module and LA to respective earth pits. O&M Tools for cleaning of solar panels: Telescopic 10 wiper- 5 meter length, garden hose pipe with nozzle spray gun - 1 Nos. per site Survey reports, Design & documents of particular 11 sites Testing & Commissioning : Work Completion 12 Report (Enclosed) Handed over By: Taken Over By: [Solar I & C Agency] [Vindhya Telelinks Limited] Name: of I&C: Site Engineer Block Head / Area Manager