ZF 5hp19e Repair Manual

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Zf 5hp19e Repair Manual

Full download: http://manualplace.com/download/zf-5hp19e-repair-manual/

REPAIR-MANUAL

5 HP - 19

ZF GETRIEBE GMBH SAARBRÜCKEN


Version 99/04/15

This is the cut pages sample. Download all 132 page(s) at: ManualPlace.com
Subject to alterations

© Copyright 1998, all rights reserved. Published by


ZF Getriebe GmbH, Saarbrücken, Department MKTD

No part of this manual may be repoduced or transmitted in any form


or by any means, electronic or mechanical, including photocopying and recording,
for any purpose without the express written permission of
ZF Getriebe GmbH, Saarbrücken

Printed in Germany
Contents
Page
Preliminary information ii

1. General information 1.1/1


1.1 Picture of the transmission 1.1/1
1.2 Power flow diagram 1.2/1
1.3 Specifications 1.3/1
1.3.1 Screw torque specifications 1.3/1
1.3.1.1 Pump 1.3/1
1.3.1.2 Cylinder DG 1.3/1
1.4 Making adjustments 1.4/1
1.4.0 Preparing the clearance measurement tool 1.4/1
1.4.1 Adjusting clearance of brake F (snap ring) 1.4/3
1.4.2 Adjusting clearance of brake D (snap ring) 1.4/5
1.4.3 Adjusting clearance of brake G (snap ring) 1.4/7
1.4.4 Adjusting clearance of brake E (snap ring) 1.4/9
1.4.5 Adjusting clearance of clutch A (snap ring) 1.4/11
1.4.6 Adjusting clearance of clutch B (snap ring) 1.4/13
1.4.7 Adjusting clearance of brake C (snap ring) 1.4/15
1.4.8 Output play (shim) 1.4.17
1.4.9 Input play (shim) 1.4.19
1.4.10 Adjusting the switch (detent spring) 1.4.21
1.5 Tightening torques 1.5/1
1.6 Transmission test (test bench/vehicle) 1.6/1
1.7 Special tools 1.7/1

2. Removing assemblies 2.1/1


2.1 Removing the converter, oil pan and automatic control unit 2.1/1
2.2 Removing the oil supply 2.2/1
2.3 Removing the input assembly 2.3/1
2.4 Removing the tower 2.4/1
2.5 Removing the output assembly 2.5/1
Disassembly
2.6 Output assembly 2.6/1
2.7 Tower 2.7/1
2.7.1 Planetary drive 2.7/1
2.7.2 Clutch F 2.7/4
2.7.3 Brake D/G 2.7/5
2.8 Input assembly 2.8/1
2.8.1 Clutch E 2.8/2
2.8.2 Clutch A 2.8/3
2.8.3 Clutch B 2.8/4
2.9 Oil supply with brake C 2.9/1
2.9.1 Brake C 2.9/1
2.9.2 Pump 2.9/2

99/04/15 5 HP 19 © ZF Getriebe GmbH Saarbrücken CD I


3. Assembly 3.1/1
3.1 Housing with selector mechanism and parking lock 3.1/1
3.2 Tower 3.2/1
3.2.1 Planetary drive 3.2/1
3.2.2 Clutch F 3.2/4
3.2.3 Brake DG with freewheel, 1st gear 3.2/6
3.3 Output assembly 3.3/1
3.4 Planetary drives I and II 3.4/1
3.5 Input assembly (with clutches A and B) 3.5/1
3.5.1 Clutch E (input) 3.5/1
3.5.2 Clutch A (input) 3.5/4
3.5.3 Clutch B (input) 3.5/7
3.6 Oil supply with brake C 3.6/1
3.7 Input assembly with oil supply 3.7/1
3.8 Automatic control unit, flow control valve, oil filter and oil pan 3.8/1
3.9 Position switch and converter 3.9/1

II CD 5 HP 19 © ZF Getriebe GmbH Saarbrücken 99/04/15


Preliminary information

This manual covers the procedure for repairing the complete transmission.

Repairs to this transmission must be carried out by persons trained by ZF Getriebe GmbH.

All disassembly and re-assembly work should be carried out in the order described.

The photographs apply to various versions and have therefore been kept general. They are not bin-
ding in every case.

Important changes that are specific to particular applications and need to be taken into account
when carrying out repair work are announced in Service Bulletins and training courses.
If this repair manual is given to a third party, it will not be covered by our alteration service.

The instructions and specifications given in the Service Bulletins must be followed when carrying
out repairs.

Depending on the damage that has occurred, it may be possible to limit repair work to this dama-
ge.

The following points should be noted:

• Seals, e.g. O-rings, shaft seals, gaskets and filters, should always be renewed.
• All O-rings, rectangular-section rings and other sealing rings should be smeared with
white petroleum jelly before being fitted.
• All bearings must be fitted in a lightly oiled condition.
• All lined clutch discs and steel discs on high-mileage transmissions ( > 80,000 km) must
be replaced.
• Following damage to clutches/brakes, the converter, oil tubes and oil cooler must be
thoroughly and adequately cleaned with a suitable cleaning agent.

Before carrying out repair work, make sure that:

• All special tools required are readily available.


The complete set of special tools is listed in Chapter 1.8.
• A suitable transmission test bench is available.
See Service Bulletins for the required test values.

99/04/15 5 HP 19 © ZF Getriebe GmbH Saarbrücken CD III


Please note:

In this manual, the automatic control unit is treated as a complete unit. It should not be disassem-
bled except by a specialist. It should be exchanged as a complete unit.

A separate manual is planned for the automatic control unit.

Important:

The transmission is filled with a long-life oil.

The oil does not have to be changed until it has been in use for 10 years.

The transmission must be delivered with the volume and type of oil specified in the relevant parts
list documentation (see ELCAT).
Otherwise, the transmission may fail.

Techn. After Sales Service Techn. Documentation After Sales Service School

Bach Reus Schultz

IV CD 5 HP 19 © ZF Getriebe GmbH Saarbrücken 99/04/15


1. General information
1.1 Picture of the transmission

99/04/15 5 HP 19 © ZF Getriebe GmbH Saarbrücken CD 1.1/1


1.2 Power flow diagram

1. Gear

2. Gear

3. Gear

4. Gear

5. Gear

Reverse Gear

99/04/15 5 HP 19 © ZF Getriebe GmbH Saarbrücken CD 1.2/1


Zf 5hp19e Repair Manual
Full download: http://manualplace.com/download/zf-5hp19e-repair-manual/

This is the cut pages sample. Download all 132 page(s) at: ManualPlace.com

You might also like