General Questions For The Preparation Of: WPR (Workpermitreceiver) Training

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 13

General Questions for the Preparation

of
W P R ( Work Permit Receiver) T r a i n i n g

SIVAKUMAR
ABRICAN SERVICES

1. A _________should be used for the erection of scaffolding.
a. Cold Work permit
b. Hot Work permit
c. Confined Space Entry Work permit
d. Release of Hazardous Liquids or Gases Work permit
 

2. What are ‘hold tags’ used for? A. To replace padlocks and lockout devices


b. For hot work
c. To explain reasons for locking out equipment
d. To isolate electrical circuit breakers
 
3. Where are work permits required? a. All Saudi Aramco areas
b. All restricted areas
c. All assembly pointsd. All fenced area

4. Who is jointly responsible
for the safety of people and equipment at the worksite?
a. The issuer and receiver. 
b. The issuer, receiver, gas tester and Loss Prevention representative. 
c. The receiver and other workers at the job site
d. Operations and maintenance engineer

5. A work permit may be extended for one (1) additional operation shift, if:
a. The new on-coming issuer and receiver agree on conditions and sign the
permit to extend it
b. Only cold work is being done c. The work is almost complete
d. All hot work has been completed

6. When can an electrician use a welder’s work permit?
a. When they work on the same equipment at different times
b. If both the issuer and receiver agree and state so on the permit form
c. When the foreman gives his permission
d. Never

7. Which of the following answers best describes a Work Permit Receiver?
a. Any maintenance or construction supervisor
b. Only Saudi Aramco supervisors
c. All electrician, but not all welder
D. Craftsmen, or others, who have been certified to receive work permits

8. If the receiver must leave the job site, the work permit can be left with:
a. The receiver is not allowed to leave the job site under any circumstances
b. Anyone, as long as the permits remain on the job site
c. Anyone who can read the work permit
d. A senior crew member who understands the job and the conditions stated on
the work permit

9. Toxic flammable gases could be found in:
a. Excavations
b. Office buildings
c. Lakes or rivers
d. Elevators

10. Any work that develops heat or provides an ignition source in a restricted


area requires what type of work permit?
a. Confined Space Entry
b. Cold Work
c. Hot Work
d. Release Permit

11. Wind direction must be considered when a permit is issued because:
a. Dust particles may be blown into opened lines or vessels
b. Because work must always take place downwind of the release
c. Flammable gases may be blown towards an ignition source
d. Items may be blown to the site making the work area untidy

12. The receiver’s copy of the work permit which is currently in use should be:


a. Kept with the Maintenance or Construction foreman
b. Posted or readily available at the job site
c. Kept at the Maintenance or Construction office
d. Posted in the control room

13. The confined Space Entry permit requires that:
a. Only cold work can be performed
b. non-sparking tools be used
c. Only hot work can be done
d. The confined space is properly isolated

14. Workers must wear breathing apparatus if hydrogen sulfide (H
2S) reading is:
a. Less than 10 ppm
b. More than 10 ppm
c. Less than 5 ppm
d. More than 5 ppm

15. How many keys should there be for the padlock you use on a lockout


device?
a. Only one
b. Two only
c. One for each of your workers
d. One for both the issuer and receiver

16. A workman is permitted to enter  an atmosphere containing _________


oxygen without wearing breathing apparatus
a. 21%
b. 4.3%
c. 16%
d. 12%

17. A major reason for conducting the joint site inspection is to:
a. Determine worker skillsb. Identify hazards and determine precautions
c. Check on work in progress
d. Check work permit certification cards

18. Does the receiver have to fill in and attach a hold tag when locking out


equipment?
a. No, only the issuer is allowed to lock out equipment
b. No, locks and hold tags are only required when handling radioactive materials
and are therefore only used in special occasions
c. No, he only has to complete and attach the tag
d. Yes, the receiver must complete and attach the tag

19. Who must also sign a work permit issued for over 16 hours?
a. The operations manager and maintenance superintendent
b. Only the issuers and receiver’s signatures are required
c. The operations and area loss prevention superintendents
d. The operations and maintenance division heads
20. The issuer will issue the work permit after he or his designated
representative has:
a. Obtained the approval and signature of managers
b. Ensure that driving license are checked
c. Conducted a joint site inspection
d. Obtained the signature of the maintenance foreman
21. When required to ensure job site safety, additional precautions
should be listening the __________section of the work permit.
a. Work to be done
b. Additional precautions
c. Joint site
d. Gas test result

22. What is the number one cause of confined space deaths?
a. Explosive atmospheres
b. Oxygen enriched atmospheres
c. Hydrogen sulfide poisoning
d. Oxygen deficient atmospheres

23. What type of work permit is required for a worker to enter an excavation


which is greater than 4 feet deep?
a. Release of Hazardous Liquids or Gases
b. Hot
c. Confined Space Entry
d. Cold

24. If you are working on a job and smell gas, you should


: a. Stop work, get out of the area and notify the issuer
b. Conduct your own gas tests to find out what it is
c. Keep working, but shut down all ignition sources

25. When a welder and an electrician work on the same system or equipment:


a. Each craft must have its own permit
b. A superintendent must countersign the permit
c. No joint site inspection is required a. One permit covers all crafts

26. The receiver normally receives a work permit from:
a. The Project Engineer
b. His immediate supervisor
c. Any qualified Gas Tester
d. The certified operation’s supervisor

27. A __________ is required when there is a potential for the release of a


hazardous gas.
a. Confined Space Entry Work permit
b. Hot Work permit
c. Release of Hazardous Liquids or Gases Work permit
d. Cold Work permit

28. A work permit may be extended for one (1) additional operational shift, if:


a. Only cold work is being done
b. The work is almost complete
c. The new on-coming issuer and receiver agree on conditions and sign the
permit to extend it
d. All hot work has been completed

29. When can a receiver leave a job site?
a. When the issuer has given permission in advance
b. After work has safely started
c. When supervising more than one job sited. Never when doing hot work

30. Where are work permits required?
a. All restricted areas
b. All fenced areas
c. All assembly points
d. All Saudi Aramco areas

31. If a joint site inspection is required, it must be done:


a. By the permit issuer and receiver
b. In the office if the issuer and receiver agree
c. By the permit issuer and his supervisor
d. By the permit receiver and his supervisor

32. Gas tests are conducted in confined spaces:
a. To determine the correct temperature. Because all confined
spaces have toxic gases
c. To determine the correct humidity
d. To determine if the space is safe to enter

33. Why do we have a Work Permit System?
a. To inform you of restricted areas
b. To authorize permission to leave work
c. Timekeeping purposes
d. To provide a safe work place
34. After the issuer and receiver(s) have placed their locks and hold tags on the
main breaker, they must:

a. Make sure gas tests are 0% LEL


b. Authorize hot work
c. Try to start the equipment at the local switch
d. Notify his supervisor

35. When the receiver signs a work
 permit, he:
a. Receivers do not normally sign work permits
b. Can sign as the Gas Tester, if approved by the issuer
c. Does not accept responsibility for other workers on his crew
d. Agrees with all conditions stated on the work permit

36. If new hazards develop at a job site that were not discussed on the work


permit, the receiver should:
a. Contribute with the work until he is instructed by the issuer to do otherwise
b. Continue to work until a new work permit can be issued
c. Stop the job and inform the issuer
d. Continue to work but work safely

37. When grinding a piece of material of metal with a portable power grinder, the


type of Personal Protective Equipment required is:
a. Safety glasses only
b. Goggles only
c. Face Shield only
d. Safety glasses/ face shield combination

38. The maximum voltage permitted for portable power tool is:
a. 110V
b. 220V
c. 240V
d. 150V
39. Flammable material storage areas cannot be located within _________of ot
her buildings or structures:
a. 25 ft
b. 50 ft
c. 50 meters
d. 100 ft
40. The ratio of vertical to horizontal spacing for a straight or extension ladder is:
a. 1 to 1
b. 2 to 1
c. 3 to 1
d. 4 to 1

41. A straight or extension ladder must extend over the edge of a roof,


excavation, or scaffold platform by a minimum distance of:
a. 1 foot
b. 4 feet
c. 0.9 meter
d. No set distance

42. The Saudi Aramco General Instruction which sets forth the Work Permit


Receiver’s requirement is:
a. GI 1.200
b. GI 5.430
c. GI 2.100
d. GI 6.200

43. If someone is injured on your job site, a


preliminary written report must be submitted to the Saudi Aramco PMT within
_________period of time:
a. 2 hours
b. 24 hours
c. 8 hours
d. 3 days

44. Work platforms must have toe boards, mid rails, top rails and access ladders


once they reach a height of __________:
a. 4 ft
b. 8 ft
c. 6 ft
d. when the height is four times greater than the base width
45. Excavation “Spoils” must be set back a minimum of _________ from
the sides of the excavation.
a. 1 meter
b. 6 ft
c. 3 ft
d. 2 ft
46. The maximum working pressure on an acetylene gauge is _________psi g.
a. 7
b. 10
c. 15
d.19.50

47. During storage of oxygen and acetylene gas cylinders
they must be separated by (1) A Fire-Resistant Wall, or (2) A Distance of
_________.
a. 20 ft
b. 50 ft
c. Not required if protective caps are on
d. None of the above

48. Which of the following would be classified as a Class “A” fire?


a. A fire involving ordinary combustibles
b. A fire involving flammable liquids
c. A fire involving combustible metals
d. A fire involving live electrical equipment

49. The soil type is least stable in an excavation is:
a. Type A
b. Type B
c. Type C
d. None of the above

50. Which of the following factors does not affect the load capacity of a mobile


crane?
a. Boom length
b. Boom angle
c. Extension of outriggers
d. Installation of a anti-two block device

51. How long is a Work Permit usually valid?
a. 1 month
b. 1 week
c. 1 shift
d. 1 day

52. How far apart shall access/egress ladders be in excavation?
a. 10 ft
b. 15 ft
c. 25 ft
d. 50 ft

53. A small mobile crane with rubber tires has struck a power line. The


line, which is now believed to be dead, is lying across the crane boom. Which of
the following best describes the proper course of action for the crane operator?
a. Jump from the crane and run away
b. Stay in the crane until emergency crews arrive
c. Have the oiler knock the line from the boom with a wood pole
d. Swing the boom back and forth until the line breaks or falls off

54. What are the most important self-developed skills of a site safety officer?


a. Conduct site safety inspections with a checklist
b. Develop a safety inspection checklist based on knowledge and anticipated
hazards
c. Conduct tool box safety meetings
d. Produce good looking reports

55. When step ladders have steps on one side and rungs on the other,


two manways be on the same ladder at the same time:
a. True
b. False

56. Portable power tools being operated from on-site generator need not be


protected by a GFCI (ground fault circuit interrupter) to be consistent with the
Saudi Aramco CSM.
a. True
b. False

57. Excavation not subject to vehicle


traffic may be barricaded using Red and White Warning Tape:
a. True
b. False

58. Cigarette smoking is forbidden anywhere on Saudi Aramco construction
sites except in designated and approved smoking shelters.
a. True
b. False
59. Holes may be drilled into sides of hard hats to provide for cross
ventilation air-flow during very hot weather
. a. True
b. False

60. If a tool breaks it is permissible to weld a piece of pipe as a


handle temporarily.
a. True
b. False

61. Push sticks must always be used when guiding woodwork into a table saw.


a. True
b. False

62. Rubber boots must be provided for persons engaged in the pouring of


concrete.
a. True
b. False

63. Placing an 8’2” board over two 20-liter paint cans are allowed for temporary


work platform.
a. True
b. False

64. From work boards should be removed to the de-nailing area as soon as


possible after they are disassembled.
a. True
b. False

65. A fire extinguisher must be places near (5 to 15 feet) to any


combustion engine being operated on site.
a. True
b. False
66. Tool box safety briefing must be held at least once a week
. a. True
b. False

67. Hand held power tools such as drills and grinders may be locked-on if


the job is going to take a long period of time to accomplish.
a. True
b. False

68. Permanent scaffolds should be secured by tying off to a firm portion of the


structure every 26 ft vertically, 30 ft horizontally, at each end, and the top.
a. True
b. False

69. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12”
wide.
a. True
b. False70. Scaffold planks must be tied to or otherwise secured to the scaffold
bearers.
a. True
b. False

71. The wind socks in Saudi Aramco facilities are to let people know in which


direction a gas or chemical leak will flow.
a. True
b. False

72. A safety officer must tour the site several times a day because conditions are


changing constantly during construction activities.
a. True
b. False

73. Dangerous safety hazards should be noted and kept in writing so that


they can be reported at the next Safety meeting.
a. True
b. False

74. A weekly Safety Inspection of each area should be carried out and a report


of defects given to those responsible for correcting them
.a. True
b. False

75. A Safety Officer checks all construction activities only. The personnel officer


checks the medical facilities, toilet facilities, drinking water and all things affecting
health and welfare.
a. True
b. False

76. It is okay to bring chemicals on site without a MSDS if you only have 20


liters of liquid or 10 cubic meters of a toxic gas.
a. True
b. False

77. What work permit is required for welding, cutting, grinding?
a. Cold permit
b. Hot permit
c. Entry permit

78. Example of cold work: -
a. Using spanner
b. Welding
c. Entering in to a tank

79. Which is the fall protection
 (Use when work at height)
a. Safety helmet
b. Safety harnessc. Safety shoes80. What PPE required in noisy area?
a. Ear plug
b. Goggles
c. Mask

81. What PPE required in dusty area?
a. Ear plug
b. Goggles
c. Mask

82. What you do when hearing Emergency Alarm in the plant?
a. Stop work, stop equipment and move to Emergency Assembly Point
b. Dial emergency number inform control room
c. Continue work
83. Who is responsible for safety?
a. Supervisor
b. Safety staff

You might also like