1. A _________should be used for the erection of scaffolding.
a. Cold Work permit
b. Hot Work permit
c. Confined Space Entry Work permit
d. Release of Hazardous Liquids or Gases Work permit
4. Who is jointly responsible
for the safety of people and equipment at the worksite?
a. The issuer and receiver.
b. The issuer, receiver, gas tester and Loss Prevention representative.
c. The receiver and other workers at the job site
d. Operations and maintenance engineer
5. A work permit may be extended for one (1) additional operation shift, if:
a. The new on-coming issuer and receiver agree on conditions and sign the
permit to extend it
b. Only cold work is being done c. The work is almost complete
d. All hot work has been completed
6. When can an electrician use a welder’s work permit?
a. When they work on the same equipment at different times
b. If both the issuer and receiver agree and state so on the permit form
c. When the foreman gives his permission
d. Never
7. Which of the following answers best describes a Work Permit Receiver?
a. Any maintenance or construction supervisor
b. Only Saudi Aramco supervisors
c. All electrician, but not all welder
D. Craftsmen, or others, who have been certified to receive work permits
8. If the receiver must leave the job site, the work permit can be left with:
a. The receiver is not allowed to leave the job site under any circumstances
b. Anyone, as long as the permits remain on the job site
c. Anyone who can read the work permit
d. A senior crew member who understands the job and the conditions stated on
the work permit
9. Toxic flammable gases could be found in:
a. Excavations
b. Office buildings
c. Lakes or rivers
d. Elevators
11. Wind direction must be considered when a permit is issued because:
a. Dust particles may be blown into opened lines or vessels
b. Because work must always take place downwind of the release
c. Flammable gases may be blown towards an ignition source
d. Items may be blown to the site making the work area untidy
13. The confined Space Entry permit requires that:
a. Only cold work can be performed
b. non-sparking tools be used
c. Only hot work can be done
d. The confined space is properly isolated
14. Workers must wear breathing apparatus if hydrogen sulfide (H
2S) reading is:
a. Less than 10 ppm
b. More than 10 ppm
c. Less than 5 ppm
d. More than 5 ppm
17. A major reason for conducting the joint site inspection is to:
a. Determine worker skillsb. Identify hazards and determine precautions
c. Check on work in progress
d. Check work permit certification cards
19. Who must also sign a work permit issued for over 16 hours?
a. The operations manager and maintenance superintendent
b. Only the issuers and receiver’s signatures are required
c. The operations and area loss prevention superintendents
d. The operations and maintenance division heads
20. The issuer will issue the work permit after he or his designated
representative has:
a. Obtained the approval and signature of managers
b. Ensure that driving license are checked
c. Conducted a joint site inspection
d. Obtained the signature of the maintenance foreman
21. When required to ensure job site safety, additional precautions
should be listening the __________section of the work permit.
a. Work to be done
b. Additional precautions
c. Joint site
d. Gas test result
22. What is the number one cause of confined space deaths?
a. Explosive atmospheres
b. Oxygen enriched atmospheres
c. Hydrogen sulfide poisoning
d. Oxygen deficient atmospheres
26. The receiver normally receives a work permit from:
a. The Project Engineer
b. His immediate supervisor
c. Any qualified Gas Tester
d. The certified operation’s supervisor
29. When can a receiver leave a job site?
a. When the issuer has given permission in advance
b. After work has safely started
c. When supervising more than one job sited. Never when doing hot work
30. Where are work permits required?
a. All restricted areas
b. All fenced areas
c. All assembly points
d. All Saudi Aramco areas
32. Gas tests are conducted in confined spaces:
a. To determine the correct temperature. Because all confined
spaces have toxic gases
c. To determine the correct humidity
d. To determine if the space is safe to enter
33. Why do we have a Work Permit System?
a. To inform you of restricted areas
b. To authorize permission to leave work
c. Timekeeping purposes
d. To provide a safe work place
34. After the issuer and receiver(s) have placed their locks and hold tags on the
main breaker, they must:
35. When the receiver signs a work
permit, he:
a. Receivers do not normally sign work permits
b. Can sign as the Gas Tester, if approved by the issuer
c. Does not accept responsibility for other workers on his crew
d. Agrees with all conditions stated on the work permit
38. The maximum voltage permitted for portable power tool is:
a. 110V
b. 220V
c. 240V
d. 150V
39. Flammable material storage areas cannot be located within _________of ot
her buildings or structures:
a. 25 ft
b. 50 ft
c. 50 meters
d. 100 ft
40. The ratio of vertical to horizontal spacing for a straight or extension ladder is:
a. 1 to 1
b. 2 to 1
c. 3 to 1
d. 4 to 1
47. During storage of oxygen and acetylene gas cylinders
they must be separated by (1) A Fire-Resistant Wall, or (2) A Distance of
_________.
a. 20 ft
b. 50 ft
c. Not required if protective caps are on
d. None of the above
49. The soil type is least stable in an excavation is:
a. Type A
b. Type B
c. Type C
d. None of the above
51. How long is a Work Permit usually valid?
a. 1 month
b. 1 week
c. 1 shift
d. 1 day
52. How far apart shall access/egress ladders be in excavation?
a. 10 ft
b. 15 ft
c. 25 ft
d. 50 ft
58. Cigarette smoking is forbidden anywhere on Saudi Aramco construction
sites except in designated and approved smoking shelters.
a. True
b. False
59. Holes may be drilled into sides of hard hats to provide for cross
ventilation air-flow during very hot weather
. a. True
b. False
69. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12”
wide.
a. True
b. False70. Scaffold planks must be tied to or otherwise secured to the scaffold
bearers.
a. True
b. False
77. What work permit is required for welding, cutting, grinding?
a. Cold permit
b. Hot permit
c. Entry permit
78. Example of cold work: -
a. Using spanner
b. Welding
c. Entering in to a tank
79. Which is the fall protection
(Use when work at height)
a. Safety helmet
b. Safety harnessc. Safety shoes80. What PPE required in noisy area?
a. Ear plug
b. Goggles
c. Mask
81. What PPE required in dusty area?
a. Ear plug
b. Goggles
c. Mask
82. What you do when hearing Emergency Alarm in the plant?
a. Stop work, stop equipment and move to Emergency Assembly Point
b. Dial emergency number inform control room
c. Continue work
83. Who is responsible for safety?
a. Supervisor
b. Safety staff