Existing Primary Substation Plans: Cost (1000US$)
Existing Primary Substation Plans: Cost (1000US$)
Existing Primary Substation Plans: Cost (1000US$)
App.-58
Appendix 6.1.1.1
App.-59
Analysis Result of primary substation capacity(ECG) Appendix6.1.1.2
Capacity Maximum Demand (MVA)
Region Substation Name
(MVA) 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Tema Asutuare 10 1.1 1.1 1.2 1.3 1.3 1.4 1.5 1.6 1.7 1.8
( 11% ) ( 11% ) ( 12% ) ( 13% ) ( 13% ) ( 14% ) ( 15% ) ( 16% ) ( 17% ) ( 18% )
Juapong 5 1.2 1.3 1.4 1.4 1.5 1.6 1.7 1.8 1.9 2.0
( 24% ) ( 26% ) ( 27% ) ( 29% ) ( 31% ) ( 32% ) ( 34% ) ( 36% ) ( 39% ) ( 41% )
Kpong 10 6.4 6.8 7.2 7.6 8.1 8.6 9.1 9.6 10.2 10.8
( 64% ) ( 68% ) ( 72% ) ( 76% ) ( 81% ) ( 86% ) ( 91% ) ( 96% ) ( 102% ) ( 108% )
Ashanti Obuasi 5 1.9 1.9 2.0 2.0 2.1 2.1 2.2 2.2 2.3 2.4
( 37% ) ( 38% ) ( 39% ) ( 40% ) ( 41% ) ( 42% ) ( 44% ) ( 45% ) ( 46% ) ( 47% )
Western Aboso 10 0.9 1.0 1.0 1.1 1.1 1.1 1.2 1.2 1.3 1.3
( 9% ) ( 10% ) ( 10% ) ( 11% ) ( 11% ) ( 11% ) ( 12% ) ( 12% ) ( 13% ) ( 13% )
Awaso 2.5 1.2 1.2 1.3 1.3 1.4 1.4 1.5 1.5 1.6 1.7
( 47% ) ( 49% ) ( 51% ) ( 53% ) ( 55% ) ( 57% ) ( 60% ) ( 62% ) ( 64% ) ( 67% )
Axim 2.5 2.0 2.1 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8
( 79% ) ( 82% ) ( 85% ) ( 89% ) ( 92% ) ( 96% ) ( 99% ) ( 103% ) ( 107% ) ( 111% )
Atuabo 5 7.5 7.8 8.1 8.4 8.7 9.0 9.4 9.7 10.1 10.5
( 150% ) ( 155% ) ( 161% ) ( 168% ) ( 174% ) ( 181% ) ( 188% ) ( 195% ) ( 202% ) ( 210% )
Bibiani 5 2.6 2.7 2.8 2.9 3.0 3.1 3.2 3.3 3.5 3.6
( 51% ) ( 53% ) ( 55% ) ( 57% ) ( 60% ) ( 62% ) ( 64% ) ( 67% ) ( 69% ) ( 72% )
Bonsa 5 1.7 1.7 1.8 1.9 2.0 2.0 2.1 2.2 2.3 2.4
( 34% ) ( 35% ) ( 36% ) ( 38% ) ( 39% ) ( 41% ) ( 42% ) ( 44% ) ( 45% ) ( 47% )
Dwenasi 5 3.0 3.1 3.3 3.4 3.5 3.7 3.8 3.9 4.1 4.3
( 61% ) ( 63% ) ( 65% ) ( 68% ) ( 70% ) ( 73% ) ( 76% ) ( 79% ) ( 82% ) ( 85% )
Eastern Akwatia 10 3.3 3.5 3.7 3.9 4.1 4.3 4.6 4.8 5.1 5.4
( 33% ) ( 35% ) ( 37% ) ( 39% ) ( 41% ) ( 43% ) ( 46% ) ( 48% ) ( 51% ) ( 54% )
Koforidua 20 11.4 11.7 12.0 12.3 12.7 13.0 13.3 13.7 14.0 14.4
( 57% ) ( 59% ) ( 60% ) ( 62% ) ( 63% ) ( 65% ) ( 67% ) ( 68% ) ( 70% ) ( 72% )
Nkawkaw 10 57
5.7 58
5.8 60
6.0 62
6.2 63
6.3 65
6.5 67
6.7 69
6.9 70
7.0 72
7.2
( 57% ) ( 58% ) ( 60% ) ( 62% ) ( 63% ) ( 65% ) ( 67% ) ( 69% ) ( 70% ) ( 72% )
Oda 10 7.8 8.4 9.1 9.9 10.7 11.6 12.6 13.6 14.8 16.0
( 78% ) ( 84% ) ( 91% ) ( 99% ) ( 107% ) ( 116% ) ( 126% ) ( 136% ) ( 148% ) ( 160% )
Central Benso 5 1.4 1.4 1.4 1.5 1.5 1.6 1.6 1.7 1.7 1.8
( 27% ) ( 28% ) ( 29% ) ( 30% ) ( 31% ) ( 32% ) ( 33% ) ( 34% ) ( 35% ) ( 36% )
Cape Coast 10 8.6 9.1 9.7 10.3 10.9 11.6 12.2 13.0 13.8 14.7
( 86% ) ( 91% ) ( 97% ) ( 103% ) ( 109% ) ( 116% ) ( 122% ) ( 130% ) ( 138% ) ( 147% )
Saltpond 5 5.5 5.8 6.2 6.5 6.9 7.3 7.7 8.2 8.6 9.1
( 110% ) ( 117% ) ( 123% ) ( 130% ) ( 138% ) ( 146% ) ( 154% ) ( 163% ) ( 173% ) ( 183% )
Volta Aflao 10 3.3 3.4 3.6 3.8 4.0 4.2 4.4 4.6 4.8 5.1
( 33% ) ( 34% ) ( 36% ) ( 38% ) ( 40% ) ( 42% ) ( 44% ) ( 46% ) ( 48% ) ( 51% )
Anloga 2.5 0.5 0.5 0.5 0.6 0.6 0.6 0.6 0.7 0.7 0.7
( 19% ) ( 20% ) ( 21% ) ( 22% ) ( 23% ) ( 25% ) ( 26% ) ( 27% ) ( 29% ) ( 30% )
Hohoe 2.5 2.1 2.2 2.3 2.4 2.6 2.7 2.8 3.0 3.1 3.3
( 84% ) ( 88% ) ( 93% ) ( 98% ) ( 102% ) ( 108% ) ( 113% ) ( 119% ) ( 125% ) ( 131% )
Kpandu 5.0 2.7 2.9 3.0 3.2 3.3 3.5 3.7 3.9 4.1 4.3
( 55% ) ( 58% ) ( 60% ) ( 64% ) ( 67% ) ( 70% ) ( 74% ) ( 78% ) ( 81% ) ( 86% )
Kpeve 2.5 2.9 3.0 3.2 3.3 3.5 3.6 3.8 4.0 4.2 4.4
( 114% ) ( 120% ) ( 126% ) ( 132% ) ( 139% ) ( 146% ) ( 153% ) ( 161% ) ( 169% ) ( 178% )
Tsito 2.5 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.6 2.7 2.8
( 72% ) ( 76% ) ( 80% ) ( 84% ) ( 88% ) ( 93% ) ( 97% ) ( 102% ) ( 107% ) ( 113% )
App.-60
Analysis Result of primary substation capacity(VRA-NED) Appendix6.1.1.2
Analysis Result of Capacity Maximum Demand (MVA)
Substation Name
primary substation (MVA) 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
VRA-NED Berekum 5 4.9 5.0 5.2 5.4 5.6 5.8 6.1 6.3 6.5 6.8
( 97% ) ( 101% ) ( 104% ) ( 108% ) ( 112% ) ( 117% ) ( 121% ) ( 126% ) ( 131% ) ( 136% )
Wa 5 4.3 4.5 4.7 4.9 5.1 5.4 5.6 5.9 6.1 6.4
( 86% ) ( 90% ) ( 94% ) ( 98% ) ( 103% ) ( 107% ) ( 112% ) ( 117% ) ( 122% ) ( 128% )
Navrongo 3 1.7 1.8 2.0 2.1 2.3 2.5 2.7 2.9 3.1 3.3
( 56% ) ( 61% ) ( 65% ) ( 71% ) ( 76% ) ( 82% ) ( 89% ) ( 96% ) ( 103% ) ( 111% )
Bawku 3 2.9 3.2 3.4 3.6 3.9 4.1 4.4 4.7 5.0 5.4
( 98% ) ( 105% ) ( 112% ) ( 120% ) ( 128% ) ( 137% ) ( 147% ) ( 157% ) ( 168% ) ( 179% )
Wenchi 3 1.1 1.1 1.2 1.2 1.3 1.3 1.4 1.5 1.5 1.6
( 37% ) ( 38% ) ( 40% ) ( 41% ) ( 43% ) ( 45% ) ( 47% ) ( 48% ) ( 50% ) ( 52% )
App.-61
Appendix 6.2.2
(Legend)
① : New 33kV/11kV substation construction
(including ancillary facilities such as 33kV distribution lines)
② : Installation of new distribution line
③ : Enlargement of lines(Overhead line)
④ : Enlargement of lines(Cable)
⑤ : Voltage increase
⑥ : Installation of Capacitor Bank and Condensor, or Booster
⑦ : Alleviation of load by construction of a switching station
App.-62
Table 1 Results of reinforcement planning (ECG Accra East Office) (2/3)
App.-63
Same as above
L03(L02) ① 2010 192
(120mm2 AAC, 9km)
Partial shift of load after
M05
① construction of the Nmai 2010 GEDAP
(Old Legon 2)
Djorn substation
Cable replacement
M01
④ (185mm2 Al → 240mm2 Cu, 2011 1,108
(Old Legon 1)
16km)
Partial shift of load after
M07
① construction of the Nmai 2010 GEDAP
Main M (Madina) 1,172
Djorn substation
Installation of a new
distribution line from the GEDAP
Kwabenya substation (to be New
M08
① constructed in 2010 under the 2010 distribution line
(Kwabenya)
GEDAP), and partial shift of installation cost:
load 64
(120mm2 AAC, 3km)
App.-64
Table 1 Results of reinforcement planning (ECG Accra East Office) (3/3)
App.-65
Table 2 Results of reinforcement planning(ECG Accra West Office) (1/2)
App.-66
E08,
Main E E07, Partial shift of load after
(Tran- EG14, ① construction of the Adabraka 2009 GEDAP
shipment) E20, substation
E150
Main F Partial shift of load after
F11,
(Koko- ① construction of the Adabraka 2009 GEDAP
F10
miemie) substation
App.-67
Table 2 Results of reinforcement planning(ECG Accra West Office) (2/2)
App.-68
Table 3 Results of reinforcement planning (ECG Tema Office)
App.-69
Installation of a capacitor bank
Tema L Comm.20
⑥
(tentatively 300 kVar) to 2013 1 1
(Lashibi) (L91)
improve voltage
Partial shift of load after
Tema S S31 Construction of a new
① construction of the Mobole 2010
(Ashiaman) (AFARIWA) substation
substation now under planning
Installation of a new
distribution line from the
KPONG Krobo Area ② substation and partial shift of 2013 341 341
load
(120mm2 AAC, 16km)
Aerial line replacement
Asutsuare Asutsuare ③ (35mm2 Cu → 120mm2 AAC, 2008 358 358
16km)
App.-70
Table 4 Results of reinforcement planning (ECG Ashanti East Office)
App.-71
Table 5 Results of reinforcement planning (ECG Ashanti West Office)
Cost (USD1,000)
Distributi
Substations
on lines Type of countermeasure Year Distributi
(existing) Substati
(existing) on line
on units
units
Partial shift of load to the Guiness 1
(Already
feeder completed; installation of
implemente
four new distribution lines from the
2007 d)
Amanform substation (already
OBR ② distribution
constructed) and partial shift of
2008 line
load (installation work already
installation
started; lengths of 0.1 km (three)
cost: 28
and 1 km (one)
Cable replacement
Main A IND OHL ④ 2008 92 129
(35mm2 Cu →185mm2 Al, 2.7km)
LAKE Installation of a new distribution
ROAD line from the KTI (Japckson Park)
substation now under construction
and partial shift of load, plus
① 2008 10
POWER installation of three new
HOUSE 2 distribution lines (each with 185
mm2 Al cable and a length of 0.1
km)
Installation of a new distribution
line from the Main E substation and
B11 ② 2009 107
partial shift of load
(120mm2 AAC, 5km)
Installation of a new distribution
line from the Main E substation and
B21 ② 2009 107
partial shift of load
(120mm2 AAC, 5km)
Installation of a new distribution
line from the Abuakawa substation
Main B B61 ② 2008 107 533
and partial shift of load
(120mm2 AAC, 5km)
Installation of a new distribution
line from the Abuakawa substation
B71 ② 2009 107
and partial shift of load
(120mm2 AAC, 5km)
Installation of a new distribution
line from the Abuakawa substation
B81 ② 2009 107
and partial shift of load
(120mm2 AAC, 5km)
Plan for a partial shift of load to the Substation
Main D D21 ① Knust substation already 2008 already
constructed constructed
App.-72
Plan for a partial shift of load to the Substation
D31 ①
Knust substation already 2008 already
constructed constructed
Aerial line replacement
BEKWAI KOKOFU ③ (16mm2 Cu → 120mm2 AAC, 2008 12 12
1.9km)
Aerial line and cable replacement
(35mm2 Cu → 120mm2 AAC,
8.7km)
Dunkwa DUNKWA ③ (16mm2 Cu → 120mm2 AAC, 2008 162 162
1.5km)
(35mm2 Cu cable
→185mm2 Al XLPE, 2.7km)
App.-73
Table 6 Results of reinforcement planning (ECG Western Office)
Cost (USD1,000)
Distribution
Substations
lines Type of countermeasure Year Distributi
(existing) Substati
(existing) on line
on unit
units
Cable replacement
A10 ④ (120mm2 Cu PILC 2017 74
→185mm2 Cu PILC, 1.5km)
Cable replacement
(120mm2 Cu PILC
Western A A31 ④ →240mm2 Cu PILC, 4.3km) 2008 304 637
Partial shift of load from the existing
distribution line A41 to A57
Aerial line replacement
A55 ③ 2010 259
(150mm2 Al → 265mm2 Al, 7.6km)
Cable replacement
B21 ④ (185mm2 Cu PILC 2012 205
→240mm2 Cu PILC, 2.9km)
Western B 453
Cable replacement
B71 ④ (120mm2 Cu PILC 2008 248
→240mm2 Cu PILC, 3.5km)
Western C C08 ⑤ Voltage increase from 11 to 33 kV 2010 719 719
Construction of a switching station and
"Bogoso
Bogoso ⑦ division of the existing distribution 2010 400 400
/ Asanko"
lines
Aerial line replacement
Aboso 1 ③ 2012 775
(150mm2 AAC →240mm2 AAC, 38km)
Aerial line replacement
Aboso 2 ③ (150mm2 AAC 2012 789
→240mm2 AAC, 38.7km)
Atuabo 1,976
Aerial line replacement
Town 2 ③ 2013 100
(70mm2 Cu→240mm2 AAC, 12km)
Voltage increase from 11 to 33 kV and
Manganese ① construction of a new 33/11-kV 2008 312
substation (5 MVA)
Aerial line replacement
Awaso
③ (150mm2 AAC 2017 123
/Wiawso
→200mm2 AAC, 15km)
Asawinso 725
Aerial line replacement
Bibiani ③ (150mm2 AAC 2012 602
→400mm2 AAC, 29.5km)
Aerial line replacement
(120mm2 AAC →240mm2 AAC,
Dwenase Juaboso ③ 2012 1,942 1,942
about 60km、Need for replacement
of supporting structures as well)
App.-74
Table 7 Results of reinforcement planning (ECG Eastern Office)
Cost (USD1,000)
Distribution
Substations
lines Type of countermeasure Year Distributi
(existing) Substati
(existing) on line
on unit
units
Kibi / Suhum ⑤ Voltage increase from 11 to 33 kV 2008 1,270
Installation of a new 33-kV
distribution line (240 mm2 AAC, 24
km) from the Tafo BSP, construction
Tafo ① of a new 33/11-kV substation (10 2008 1,743
Tafo MVA) ahead of it, and connection to 3,518
the existing Tafo distribution line
along the way
Installation of a new 33-kV
distribution line (240 mm2 AAC, 17
Koforidua ② km) from the Tafo BSP, and 2008 505
connection to the existing Tafo
Koforidua distribution line
Akwatia ⑤ Voltage increase from 11 to 33 kV 2008 616
Installation of a new 33-kV
distribution line (240 mm2 AAC, 25
km) from the Akwatia BSP,
Asamankese ① construction of a new 33/11-kV 2008 1,425
substation (5 MVA) ahead of it, and
Akwatia 2,932
connection to the existing Asamkese
distribution line along the way
Installation of a new 33-kV
distribution line (240 mm2 AAC, 30
Oda ② km) from the Akwatia BSP, and 2008 891
connection to the existing Oda
distribution line
Installation of a tie (11 kV, 120 mm2
AAC, 15 km) to the Adoagyiri
Nsawam Adoagyiri ② distribution line from the existing 2008 320 320
Asamkese distribution line, and
change of the load power flow
Aerial line replacement
Oda Achiase ③ (35mm2 Cu →120mm2 AAC, 56km) 2008 374 374
(50mm2 AAC→120mm2 AAC, 4km)
Aerial line replacement
(16mm2 Cu→120mm2 AAC, 32km)
Construction of a 33/11-kV substation
Mountains ① (5 MVA) along the way, and partial 2010 898
shift of load on the existing
Nkawkaw 1,087
Mountains distribution line to the
Donkorkrom distribution line
Cable replacement
Town ④ (95mm2 Al XLPE, 185mm2 Al XLPE 2008 189
→240mm2 Cu XLPE, 3km)
App.-75
Table 8 Results of reinforcement planning (ECG Central Office)
Cost (USD1,000)
Substations Distribution
Type of countermeasure Year Distributi
(existing) lines (existing) Substati
on line
on unit
units
Installation of a new
distribution line (120 mm2
WINNEBA ② AAC, 4 km) and partial shift 2010 85
of load, or partial shift of load
to the APAM distribution line
App.-76
Table 9 Results of reinforcement planning (ECG Volta Office)
Cost (USD1,000)
Distribution
Substations
lines Type of countermeasure Year Distributi
(existing) Substati
(existing) on line
on unit
units
App.-77
Table 10 Results of reinforcement planning (VRA-NED Area) (1/2)
Cost (USD1,000)
Distribution
Substations
lines Type of countermeasure Year Distribu
(existing) Substati
(existing) tion line
on unit
units
Installation of new 34.5-kV line (185 mm2
ALXLPE, 18 km) from the Tamale BSP,
construction of a 34.5/11.5-kVsubstation
28F3B ① 2008 1,292
(5 MVA) ahead of this line (near Tolon),
and connection to the existing 28F3B
distribution line along the way
Installation of a 11.5kV new line
28F4B ② 2009 131
(185mm2 ALXLPE, 4km)
Tamale 1,907
Installation of a 11.5kV new line
28F6B ② 2008 131
(185mm2 ALXLPE, 4km)
Aerial line replacement
28F7B ③ 2013 66
(100mm2 AAC → 240mm2 AAC, 8km)
Aerial line replacement
28F8B ③ 2009 156
(100mm2 AAC → 240mm2 AAC, 19km)
Installation of a 11.5kV new line
28F9B ② 2010 131
(185mm2 ALXLPE, 4km)
Sunyani
Aerial line replacement
- Drobo ③ 2009 279
(120mm2 AAC →150mm2 AAC, 40km)
(BRYF1)
"Berekum
Aerial line replacement
- Dormaa ③ 2009 216
(120mm2 AAC →150mm2 AAC, 31km)
(BRYF2)"
Brekum Voltage increase from 11 to 34.5 kV, and 1,141
Berekum F1
⑤ aerial line replacement (35mm2 Cu, 50mm2 2008 555
(BRBF1)
AAC →200mm2 AAC, 23km)
Berekum F2 Aerial line replacement
③ 2008 42
(BRBF2) (50mm2 AAC →100mm2 AAC, 6km)
Berekum F3 Aerial line replacement (16mm2 Cu, 50mm2
③ 2008 49
(BRBF3) AAC →100mm2 AAC, 8km)
App.-78
Table 10 Results of reinforcement planning (VRA-NED Area) (2/2)
Cost (USD1,000)
Distribution
Substations Distrib
lines Type of countermeasure Year
(existing) ution Substati
(existing)
line on unit
units
Sawla-Wa
Installation of a capacitor bank (2,000
(38YF6)
⑥ kVar) in the Mim switching station to 2011 3
Wa-Hamile improve voltage
(WAFY1)
Replacement of the feeder cable in the
Wa Township 1 starting section with 185 mm2 Al
③ 2009 37
(479BF1) XLPE, and aerial line replacement
Sawla 155
(50mm2 AAC → 100mm2 AAC, 6km)
Aerial line replacement
Wa Township 2
③ (100mm2 AAC, 120mm2 AAC 2010 84
(479BF2)
→ 150mm2 AAC, 12km)
Replacement of the feeder cable in the
Wa Township 3 starting section with 185 mm2 Al
③ 2008 31
(479BF3) XLPE, and aerial line replacement
(50mm2 AAC → 100mm2 AAC, 5km)
Bimbilla Installation of a 10-MVA booster
Yendi ⑥ 2008 100 100
(35F5Y) station to improve voltage
Replacement of the feeder cable in the
starting section with 185 mm2 Al
29F1B
③ XLPE, and aerial line replacement 2010 168
(BOLGA)
(50mm2 AAC, 120mm2 AAC
→ 150mm2 AAC, 5km)
Bolgatanga Voltage increase from 11 to 34.5 kV, 1,486
29F4B
⑤ and aerial line replacement 2008 649
(BOLGA)
(50mm2 AAC → 100mm2 AAC, 20km)
Voltage increase from 11 to 34.5 kV,
29F6B
⑤ and aerial line replacement 2008 669
(BOLGA)
(50mm2 AAC → 100mm2 AAC, 8km)
Replacement of the feeder cable in the
26F1B starting section with 185 mm2 Al
③ 2008 125
(TECHIMAN) XLPE, and aerial line replacement
(50mm2 AAC→ 150mm2 AAC, 17km)
Techiman 319
26F2B Aerial line replacement
③ 2009 55
(TECHIMAN) (50mm2 AAC → 120mm2 AAC, 8km)
WHF2B Aerial line replacement
③ 2008 139
(WENCHI) (25mm2 AAC → 100mm2 AAC, 20km)
App.-79
Appendix 6.2.3
Extension Plan (Rural Electrification)
Great Accra Region
App.-80
Ashanti Region
App.-81
Eastern Region
App.-82
Western Region
App.-83
Central Region
App.-84
Volta Region
App.-85
Northern Region
App.-86
Brong Ahafo Region
App.-87
Upper East Region
App.-88
Upper West Region
App.-89
App.-90
Appendix 8. 1
Protected Areas in Ghana
App.-91
Appendix 8. 2
Environmentally Sensitive Areas
1 All areas declared by law as national parks, watershed reserves, wildlife reserves and
sanctuaries including sacred groves.
3 Areas which constitute the habitat of any endangered or threatened species of indigenous
wildlife (flora and fauna).
12 12. Mangrove areas characterised by one or any combination of the following conditions
a. areas with primary pristine and dense growth;
b. areas adjoining mouth of major river system;
c. areas near or adjacent to traditional fishing grounds;
d. areas which act as natural buffers against shore erosion, strong winds or storm floods.
Source: Schedule 5 of Ghana Environmental Assessment Regulations 1999
App.-92
Appendix 8. 3
Organizational Chart of Environmental Protection Agency
GOVERNING BOARD
EXECUTIVE DIRECTOR
GREATER ACCRA
ASHANTI EE EAA MINING MAIN ACCOUNTS
EASTERN OZONE OFFICE
VOLTA BUILT PROJECTS GENERAL
CENTRAL PESTICIDES EIDM LCE ENVT. ADMIN.
WESTERN PROCUREMENT &
BRONG AHAFO INDUSTRIAL NATURAL SUPPLIES
NORTHERN CHEMICALS PA EQ RESOURCES HRD
UPPER EAST NEF
UPPER WEST MI
CCMC – Chemical Control and Management EAA – Environmental Audit and Assessment
IEC – Information Education and Communication LCE – Legal Compliance Enforcement
ECE – Environmental Compliance and Enforcement EQ – Environmental QualityHRD – Human Resource Development
EE – Environmental Education ID – Intersectoral Division
EIDM – Environmental Information and Data Management MI – Manufacturing Industries
PA – Public Affairs (Source) EPA
App.-93
Appendix 11.2-1
Estate
(200kVA)
(B)
25mm2 AAC
1.4km
Nkoranza Road
(200kVA)
1.3km
Switch ABI
50mm2 AAC
0.8km
120mm2 AAC
VRA-NED
Techiman
Office
Techiman
Substation 0.5km
EAST
25mm2 AAC (200kVA)
50mm2 AAC
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
1.7km
50mm2 AAC
BAMIRI
(50kVA)
App.-94
Appendix 11.2-1
<Site 1>
Substation : Techiman
Tanoboase
Feeder : 26F1B (11kV) (100kVA)
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
Tubodom
Zongo
(200kVA)
Tubodom
(100kVA) Market
(200kVA)
Tubodom
Industrial Central
Area (200kVA)
(100kVA)
Snit
(100kVA)
Karemanga 11.8km
(50kVA)
Lifecol Booster
(200kVA)
North
(200kVA)
Veternary
(100kVA)
Movel
(50kVA)
(A)
App.-95
Appendix 11.2-1
<Site 1>
Substation : Techiman
Buoyem
Feeder : 26F1B (11kV) (200kVA)
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
ASUYIE
(100kVA)
GROTTO
(100kVA)
50mm2 AAC
50mm2 AAC
120mm2 AAC
JAMA
11.5km
(100kVA)
TSL
(200kVA)
50mm2 AAC
Kenten Market
(200kVA)
Ittu
(200kVA)
Shell
(200kVA)
App.-96
Appendix 11.2-1
<Site 2>
Substation : Techiman
Feeder : 26F2B (11kV)
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
Arabic
School
(200kVA)
West
(200kVA) 50mm2 AAC
1.3km
120mm2 AAC
Central
Market
(500kVA)
Central
Market
(200kVA)
0.5km
S.D.A
(50kVA) Council
(315kVA)
1.9km
Methodist
0.5km (200kVA)
M.O.H 1.0km
(200kVA)
Sunyani
Route
(400kVA)
1.2km
Techiman
Substation
2
50mm AAC 0.8km
2
120mm AAC
50mm2 AAC
Secondary
School
App.-97
(C)
Appendix 11.2-1
<Site 2>
Substation : Techiman
Feeder : 26F2B (11kV)
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal (C)
Library
(100kVA)
Secondary
School
Hensua
(225kVA)
120mm2 AAC
4.2km
Ghana Nuts
(750kVA)
Nuts
Factory
App.-98
Appendix 11.2-1
<Cost Estimation>
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
120mm2 AAC 50mm2 AAC
(without pole construction) (without pole construction)
25.5km 25.5km
<Site 1>
50mm2 AAC 25mm2 AAC
Substation :
(without pole construction) (without pole construction)
Techiman 160,147
0.5km 0.5km
Feeder :
26F1B(11kV)
App.-99
【Example of drawing (Case Study at Accra East (Greater Accra)】
App.-100
Ghana Cylinder Factory
Goil
Black : Existing(Remain)
Appendix 11.2-2
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
<Site 1> 240mm2 AAC (without pole construction) 120mm2 Cu (without pole construction)
Substation : 12km 12km
Y Baatsona 98,757
Feeder : 7,111.92(US$/km) x 12(km) 1,117.87(US$/km) x 12(km)
Y11 Spintex =85343.0(US$) =13,414.4(US$)
App.-101
Appendix 11.2-2
【Example of drawing (Case Study at Accra East (Greater Accra)】
Black : Existing(Remain)
Substation : V Dansoman V Dansoman Substation Red : Installation or Replacement
Blue : Removal
Feeder : V10
A242 (315kVA)
App.-102
A242 Distribution transformer
Candidate site for the new substation A138 (500kVA)
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
App.-103
+32,913.2(US$/km) x 1(km)
=2,532,913(US$)
Appendix 11.2-3
Appendix 11.2-4
【Example of drawing(Case Study at Konongo Area(Ashanti-East Region)】
50mm2 AAC
Kramokrom
(200)
Anunso
(150)
1.7km
Adumkrom
(200)
3.5km
2.6km
Kyempo 9.1km
(2,000)
50mm2 AAC
App.-104
Appendix 11.2-4
<Cost Estimation>
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
120mm2 AAC
(with pole construction)
49.2km
25,168.65(US$/km) x 49.2(km)
+ 23,262.31(US$/km) x 26.8(km)
=1,861,727(US$)
App.-105
Appendix 11.2-5
【Example of drawing(Case Study at Nsuta&Manpong Area(Ashanti-East Region)】
<Site 1>
Substation : Agona Black : Existing(Remain)
Feeder : Nsuta (33kV) Red : Installation or Replacement
Blue : Removal
Nsuta Substation
Bipoa
(50kVA)
0.6km
16mm2 Cu
Medomase 0.9km
2 (25kVA)
35mm AAC
16mm2 Cu
0.8km 2.3km
35mm2 AAC
120mm2 AAC
Afamanso
(25kVA)
Agona
Switching
Station
App.-106
Appendix 11.2-5
<Site 2>
Substation : Nsuta Black : Existing(Remain)
Feeder : Nsuta (11kV) Red : Installation or Replacement
Blue : Removal
120mm2 AAC
Nsuta
Substation
0.87km
2.7km
Beposo
16mm2 Cu Water (100kVA)
Booster
(50kVA)
35mm2 AAC 1.2km
App.-107
Appendix 11.2-5
<Site 3>
Substation : Nsuta
Feeder : Nsuta (11kV)
120mm2 AAC
120mm2 AAC
Factory
16mm2 Cu
2 16mm2 Cu
120mm AAC
0.4km
120mm2 AAC
Andrew
1.4km
120mm2 AAC
College
1.3km
0.8km
0.7km
2
16mm Cu
0.5km
120mm2 AAC
16mm2 Cu
1.2km
120mm2 AAC
Manpong
Town
ECG Manpong
Black : Existing(Remain) Office
Red : Installation or Replacement
Blue : Removal
120mm2 AAC
Nsuta
Substation
App.-108
Appendix 11.2-5
<Cost Estimation>
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
35 mm2 AAC 16 mm2 AAC
<Site 1> (without pole construction) (without pole construction)
Substation : Agona 4.6km 4.6km
23,204
Feeder : Nsuta
(33kV) 3,969.34(US$/km) x 4.6(km) 1,075.11(US$/km) x 4.6(km)
= 18,258.96(US$) = 4,945.5(US$)
35 mm2 AAC 16 mm2 AAC
<Site 2> (without pole construction) (without pole construction)
Substation : Nsuta 3.6km 3.6km
18,160
Feeder : Nsuta
(11kV) 3,969.34(US$/km) x 3.6(km) 1,075.11(US$/km) x 3.6(km)
= 14,289.6(US$) = 3,870.4(US$)
120mm2 AAC 16 mm2 AAC
<Site 3> (without pole construction) (without pole construction)
Substation : Nsuta 6.3km 6.3km
38,943
Feeder : Nsuta
(11kV) 5,106.24(US$/km) x 6.3(km) 1,075.11(US$/km) x 6.3(km)
= 32,169.3(US$) = 6,773.2(US$)
App.-109
Appendix 11.2-6
【Example of drawing(Case Study at Manso Nkwanta Area(Ashanti-West Region)】
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
Mansoatwere
Suntreso
Ajajokrom
Asuadei Nkontin
(600) Mem
1.7km Agroyesum
Ayirebikrom
Adobeda
120mm2 AAC Kensere
2.0km
1.2km Nyakomase
(500)
Kumpese
(2,600)
App.-110
Appendix 11.2-6
<Cost Estimation>
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
120mm2 AAC
(with pole construction)
Substation
4.9km
: Obuasi Substation 123,326
Feeder : 12F4 (11kV)
25,168.65(US$/km) x 4.9(km)
=123,326.4(US$)
App.-111
Appendix 11.2-7
【Example of drawing(Case Study at Bekwai, Obuasi Area(Ashanti-West Region)】
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
MAIN D
substation (Kumasi)
BEKWAI Feeder
(33kV)
Bekwai
Substation
(33/11kV)
App.-112
Appendix 11.2-7
Underground cables are along the road in direct buried type, but they will interfere with new road
construction. So 11kV over-head lines will be newly constructed and the distribution line will be
re-routed.
12F5
120mm2 AAC
(for overhead line)
Secondary
Substation
(Obuasi Town2)
1.2km
Obuasi
Substation
Diverging 0.6km
(33/11kV) 0.6km
Device
Secondary
Substation 1.0km
Sewage (Obuasi Town)
Canal
120mm2 AAC 0.7km
(for overhead line)
185mm2 XLPE
(Underground Cable)
Secondary
Substation
(Tutuka)
App.-113
Appendix 11.2-8
<Site 1>
Substation : Bolgatanga
Feeder : 29F6B (11kV)
50mm2 AAC
50mm2 AAC
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
Yorogo Rd
50mm2 AAC
120mm2 AAC
Yipara Rd
4.3km
ZARE
Market
50mm2 AAC
CIDA
VRA-NED
Bolgatanga
Office
50mm2 AAC
50mm2 AAC
1.0km 50mm2 AAC
120mm2 AAC
50mm2 AAC
Bolgatanga 120mm2 AAC
Substation
App.-114
Appendix 11.2-8
<Site 2>
Substation : Bolgatanga
Feeder : 29F1B (11kV)
Main Road
Bolgatanga from Tamale to Bolgatanga
Substation
Transmission Line
50mm2 AAC
1.6km
50mm2 AAC
120mm2 AAC
120mm2 AAC
<Site 3>
Substation : Bolgatanga
Feeder : 29F4B (11kV)
Bolgatanga
Substation
Main Road
from Tamale to Bolgatanga
120mm2 AAC
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
App.-115
Appendix 11.2-8
<Cost Estimation>
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
120mm2 AAC 50mm2 AAC
<Site 1>
(without pole construction) (without pole construction)
Substation :
8.8km 8.8km
Bolgatanga 54,396
Feeder :
5,106.24(US$/km) x 8.8(km) 1,075.11(US$/km) x 8.8(km)
29F6B(11kV)
=44,934.91(US$) =9,460.968(US$)
120mm2 AAC 50mm2 AAC
<Site 2>
(without pole construction) (without pole construction)
Substation :
1.6km 1.6km
Bolgatanga 9,890
Feeder :
5,106.24(US$/km) x 1.6(km) 1,075.11(US$/km) x 1.6(km)
29F1B(11kV)
=8,169.984(US$) =1,720.176(US$)
120mm2 AAC 50mm2 AAC
<Site 3>
(without pole construction) (without pole construction)
Substation :
4.0km 4.0km
Bolgatanga 24,725
Feeder :
5,106.24(US$/km) x 4.0(km) 1,075.11(US$/km) x 4.0(km)
29F4B(11kV)
=20,424.96(US$) =4,300.44(US$)
App.-116
【Example of drawing (Case Study at Cape Coast (Central)】 Black : Existing(Remain)
Red : Installation or Replacement
Substation : Cape Coast Blue : Removal
Feeder : Elmina (11kV)
120 mm2 Al
App.-117
Take-off point from the underground
A112(GMT)
: Auto recloser
: Ring unit
<Cost Estimation>
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
=2,512,794 (US$)
App.-118
Appendix 11.2-9
Appendix 11.2-10
【Example of drawing(Case Study at Akwatia&Asamankese Area (Eastern Region)】
<Site 1>
Substation : Akwatia Black : Existing(Remain)
Feeder : Asamankese (11kV) Red : Installation or Replacement
Blue : Removal
Akwatia
Substation
34km
3.5km
12km S/S
Nsawan Substation
(Accra West Area)
120mm2 AAC
(for 11kV)
11kV Line Switch (200A) for
loop (Normally opened)
should be installed.
App.-119
Appendix 11.2-10
Akwatia
Substation
240mm2 AAC
Osenase (for a 33kV trunk line)
with pole construction
34km
34km
120mm2 AAC
120mm2 AAC
(for 11kV)
New
S/S Asamankese
¥ 4km
3.5km
12km S/S
Nsawan Substation
(Accra West Area)
120mm2 AAC
(for 11kV)
11kV Line Switch (200A) for
loop (Normally opened)
should be installed.
App.-120
Appendix 11.2-10
<Cost Estimation>
Installation Removal Total Cost
Site
of Facilities of Facilities (US$)
Substation : Akwatia
Feeder : Asamankese (11kV)
Insulators for 33kV, 34km
137,511(US$)
Transformer Transformers
<33kV/0.4kV> <11kV/0.4kV>
500kVA : 2 315kVA : 1 500kVA : 2
200kVA : 3 100kVA : 5 315kVA : 1
<Plan 1> 50kVA: 2 25kVA : 1 200kVA : 3
The voltage of the section whose 265,217(US$)
100kVA : 5
length is 34km is to be upgraded 50kVA: 2
from 11kV to 33kV. And all 33kV/11kV Substation (5MVA) 25kVA : 1 2,381,817
transformers of this section are to 1,000,000(US$) 9,623(US$)
be replaced to “33kV/0.4kV
transformers”. 120mm2 AAC
(with pole construction), 3.5km
25,168.65(US$/km)x3.5(km)
=88,089
App.-121
【Example of drawing(Case Study at Keta(Volta Region)】 New line constructed by MOE
as rural electrification
Substation : Anloga (Voltage drop was not considered
Feeder : Keta(11kV) before and after construction!)
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
This part passes over the pond with
salt water, so the route should be
changed.
(Some poles are planned to be newly 16mm2 Cu
constructed along this road.) 1.2km ↓
120mm2
AAC
120mm2 AAC
0.4km 16mm2 Cu
185mm2 35mm2 Cu
App.-122
↓
XLPE 120mm2 AAC
(Cable) 1.9km
120mm2 AAAC
14.9km 16mm2 Cu
↓
Primary
2.4km 120mm2
Substation AAC
ECG Keta
70mm2 Cu Office
↓
120mm2 AAC
Sogakope 185mm2
Incomer (33kV) XLPE
(Cable)
Appendix 11.2-11
<Cost Estimation>
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
120mm2 AAC (without pole construction) 70mm2 Cu (without pole construction)
20.4km 2.4km
App.-123
=104,167.3(US$) =22,464.3(US$)
Appendix 11.2-11
Appendix 11.2-12
【Example of drawing(Case Study at Sunyani Office Area (VRA-NED)】
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
120mm2 AAC
Gambia No.1
120mm2 AAC
2 120mm2 AAC
120mm AAC
About 9.5km
120mm2 AAC
App.-124
Appendix 11.2-12
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal
120mm2 AAC
120mm2 AAC
120mm2 AAC
270m
to Tepa
120mm2 AAC
to Hwidlum
App.-125
Appendix 11.2-12
<Cost Estimation>
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
120mm2 AAC
Substation :
(with pole construction)
Sunyani Substation
9.8km
Feeder : 246,653
Mim/Goaso/Hwidie
25,168.65(US$/km) x 9.8(km)
(34.5kV)
=246,652.8(US$)
App.-126
【Example of drawing(Case Study at Sunyani)】
Black : Existing(Remain)
Red : Installation or Replacement
Blue : Removal 70mm2 Cu
↓ 50mm2 AAC
100mm2 AAC
Connected to another feeder
by the cable
13.5km
50mm2 AAC
↓
100mm2 AAC
50mm2
App.-127
AAAC 0.1km
Hospital 1.0km
35mm2 Cu
↓
1.4km 100mm2 AAC
35mm2 Cu
↓
35mm2 Cu 100mm2 AAC
2.1km ↓
100mm2 AAC 50mm2 AAC
↓
100mm2 AAC
0.2km VRA-NED
Appendix 11.2-13
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
100 mm2 AAC 35 mm2 AAC
(without pole construction) (without pole construction)
18.3km 4.5km
50 mm2 AAC
(without pole construction)
0.3km
<Site 1>
Substation : Main B 113,119
70 mm2 AAC
Feeder : Circuit 5
(without pole construction)
13.5km
5,106.24(US$/km) x 18.3(km)
=93,444.2(US$) 1,075.11(US$/km) x 4.5(km)
App.-128
1,075.11(US$/km) x 0.3(km)
1,075.11(US$/km) x 13.5(km)
=19,674.5(US$)
Appendix 11.2-13
Appendix 11.2-14
【Example of drawing(Case Study at Tamale (Northern Region)】
Substation : Tamale
Dipali
Feeder : DALUN(28F1Y) Tuunaie
(Unelectrified)
(Unelectrified)
Sugarcane Bolgatanga
N
Plantation Gushie
(Unelectrified)
(15MW)
10.3km
100mm2 AAC
(Route 1) 23km
100mm2 AAC
(Route 2)
18.5km Tuunaie
Dalun
Pumping Station
Tamale
Gas
Airport Station
Dalun-Airport
T-off
VRA-NED
Head Office
Installation of
a New Transformer Tamale City Center of Tamale
Substation
20MVA (additional)
App.-129
Appendix 11.2-14
(*) 100mm2 AAC line (34.5kV) will be newly constructed from Tamale Substation to “Dalun – Airport T-off” to
reinforce the capability of sending power of this feeder. As a result, this section will have 2 circuits on the same
supporting structures. (New line can be constructed on existing iron towers.)
<Cost Estimation>
Removal of Total Cost
Site Installation of Facilities
Facilities (US$)
Substation : Tamale
Feeder : DALUN
(28F1Y)
[34.5kV]
100mm2 AAC (with pole construction) 18.5km
App.-130
【Example of drawing (Case Study at Tema (Greater Accra)】
Auto recloser
App.-131
Prampram town
Ningo town
Black : Existing(Remain)
Substation H (33kV/11kV)
Red : Installation or Replacement
Blue : Removal : Auto recloser
Appendix 11.2-15
: Switch station
<Cost Estimation>
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
=2,681,253(US$)
App.-132
Appendix 11.2-15
Appendix 11.2-16
120mm2 AAC
↓
265mm2 AAC
6.2km
2.1km
Main B
Main C
App.-133
Appendix 11.2-16
<Site 2>
Substation : Main C
Feeder : C08
Pretsia
S/S
Circuit 5
6.6km (33kV)
Main C
Existing Feeder
C08 (11kV)
To improve the voltage drop of existing feeder “C08”, a new 33kV feeder is to be constructed from the
middle point of 33kV feeder “Circuit 5” to the city “Pretsia”. The conductor size of it is 265mm2.
The existing part of “C08” will be split on “Pretsia” and be separated to 2 parts. The part from “Main C”
to “Pretsia” will be left as it is, and the other part (from “Pretsia” to the end) will be connected to a new
substation that will be constructed in “Pretsia” and transform 33kV from the new feeder into 11kV.
App.-134
Appendix 11.2-16
<Site 3>
Substation : Main A
Feeder : A55 (11kV)
Replacement of Conductor
150mm2 AAC
→ 265mm2 AAC
7.6km
0.4km
To improve the overload current and the voltage drop of existing feeder “A55 (11kV)”, the existing
cable (185mm2 Al XLPE, 0.4km) should be replaced to 240mm2 Cu ALPE, and the existing overhead line
(150mm2 AAC, 7.6km) should be replaced to 265mm2 AAC. The supporting structures of the replaced
section are all pylons that can endure the mechanical strengths of 265mm2 AAC conductor, so it is not
necessary to replace the supporting structure. Only conductors are to be replaced.
App.-135
Appendix 11.2-16
<Cost Estimation>
Total Cost
Site Installation of Facilities Removal of Facilities
(US$)
265 mm2 AAC 120 mm2 AAC
(with pole construction)
6.2km 8.3km
App.-136