Maharashtra State Electricity Distribution Co. Ltd.

, Office
AHAVITAR
Maharashtra State Electricity Distribution Co. Ltd. of the Chief Engineer (Commercial),
"Prakashgad", 5111 Floor, Station Road, Bandra (E), Mumbai - 400 051.
Tel.: (P) 26474753, (0) 26474211, Fax: (022) 26472366
(A Govt. of Maharashtra Undertaking)
CIN: U40109MH2005SGC153645
Email: cecommhogmail.com, Website: www.mahadiscom.com

CE/Comm/GIRREGS Regulations 20191*0 Date:


6533 rp i HAR 2022
COMMERCIAL CIRCULAR No.

Sub: Guidelines in the matter of RE generators intending to connect their power plants
"Behind the meter" as per the provisions of MERC (Grid Interactive Rooftop
Renewable Energy Generating Systems) Regulations, 2019.

Ref: 1. MERC (Grid Interactive Rooftop Renewable Energy Generating Systems)


Regulations, 2019
2. Commercial Circular no. 322 dated 21.01.2020

In pursuance of the MERC (Grid Interactive Rooftop Renewable Energy Generating


Systems) Regulations, 2019, the Commercial Circular No. 322 dated 21.01.20 was
issued for information of the various provisions to the field offices.
However, this office is in receipt of various queries from the field seeking clarifications
regarding the procedure of connecting RE plants behind the consumer's meter.
In view of the above, it is clarified as under:
The Clause 7.9 of MERC (Grid Interactive Rooftop Renewable Energy Generating
Systems) Regulations, 2019 provides as below:

7.9

"Grid Connected Renewable Energy Generating Systems connected behind the


Consumer's meter, and not opting for either Net Metering Arrangement or Net
Billing Arrangement, shall be allowed only after prior intimation to the
respective Distribution Licensee:
Provided that the Consumer shall be responsible for ensuring that all necessary
safeguarding measures as specified by Central Electricity Authority (CEA) are
taken:
Provided further that the Commission may determine additional Fixed Charges
or Demand Charges and any other Charges for such Grid Connected systems
excluding Non-fossil fuel-based Co generation Plants, in the retail Tariff Order, if
the Distribution Licensee proposes such additional Fixed Charges or Demand
Charges and any other Charges for such systems, in its retail supply Tariff
Petition, supported by adequate justification:
Pro vided also that in case the Consumer installs Renewable Energy Generating
Systems behind the Consumer's meter without prior intimation to the
respective Distribution Licensee, then the total additional liabilities in terms of
additional Fixed Charges or Demand Charges and any other Charges for such
systems, shall be levied at twice the determined rate for such period of
default."

Page lof 2
Clarification:

a) Prior Intimation & Sanction of application:

As per the above Clause 7.9, the consumer is permitted to install and connect his
RE generating system behind the meter only after giving prior intimation to the
host Distribution Licensee.
Therefore, the consumer is required to submit an application online at the "RE
Energy Portal" provided under Consumer Portal at the official website of
Mahavitaran. This on-line application shall be treated as prior intimation. No
separate sanction is required.
Only on-line applications will be considered and processed further in the IT billing
system for proper tagging of the consumer.

b) Safety norms specified by the CEA

As per the regulatory provisions, the consumer shall ensure that all the safety
norms specified by the Central Electricity Authority (CEA) are adhered to and
followed.
Therefore, the consumer shall be asked to obtain the charging permission!
certificate about compliance of safety norms from the concerned Electrical
Inspector office and to upload the same while submitting the online application.
The application will not be considered as prior intimation in absence of the said
charging permission/certificate. If plant capacity is ~ 200 KW, the certificate
about compliance of safety norms issued by Licensed Electrical Contractor shall
be obtained and uploaded.
c) Authority to deal the matters:
As per the existing practice, the matters related to HT consumers shall be dealt
by the O&M Circle and the matters related to the LT consumers shall be dealt by
the O&M Subdivision in consultation with Testing Department.
The application and the uploaded charging permission/certificate about
compliance of safety norms shall be verified and acknowledged by the concerned
authority online. In case of discrepancy, if any, the application will not be
accepted and intimation will be triggered to the consumer via sms/email for
compliance & resubmit.

Chief EngiIféf (Commercial)

To
All field offices,
As per Mailing list