MSIL-KH-SPCL-PRESS (A+b) - Press Shop GA Drgs-TCE Approved With Comments
MSIL-KH-SPCL-PRESS (A+b) - Press Shop GA Drgs-TCE Approved With Comments
MSIL-KH-SPCL-PRESS (A+b) - Press Shop GA Drgs-TCE Approved With Comments
B) COMMENTS NOT
INCORPORATED IN
THE DRAWING:-
Refer comments
marked in this
Notes- drawing.
Contractor shall ensure that, the Design , Loading and Drawings are in compliance
with the project DBR provided and the latest Indian Standard Codes of design. C) MISSING DETAILS
NOT YET RECEIVED IN
Contractor shall also ensure that all optimization opportunities in design are
DRAWING-
explored and adopted. Contractor shall be responsible and shall provide the stability > Refer mail dated
certificate for the structure. 14-01-2023, sent to
Shall be ensured by the contractor that these comments are incorporated in the SPCL about missing
details in drawings.
subsequent working & submittals. > ANCHOR BOLT
design and detail
drawings from Grid
14 to 2a.
> Grid 13 to 2a
Connection design
calculations & details
of same in drawing
are not yet
submitted.
> Missing Levels &
Dimensions. (Like
clear height/
dimension & Top of
TCE.12648C-3010-SPCL-PRS-155 structure).
> Purlin Layout & all
Girt elevations (Side
wall and gable end
framing) with sag rod
layout not shown in
drawings.
> Staircase design
calculations & details
of same in drawing
are not yet
submitted.
> Deck slab, Deck
sheet design
calculations & details
of same in drawing
are not yet
submitted.
> Roof plan showing
gutter and downtake
location.
> Sheeting drawings
showing Sheeting
lines, levels, height,
Sheet lapping,
flashing, trim, soffit,
framed openings,
connection bolts and
screw details, etc
shall be submitted.
Add details
B) COMMENTS NOT
950** INCORPORATED IN THE
DRAWING:-
C1-Staircase location is not
matching with the latest
architectural drawing.
C2-Show Cross section with
all details & dimension.
C2
Contractor shall ensure that, the Design and Drawings are in compliance with the project DBR provided
and the latest Indian Standard Codes of design. Contractor shall also ensure that all optimization
opportunities in design are explored and adopted. Contractor shall be responsible and shall provide the
** As per MSIL Comments dated stability certificate for the structure.
23-01-2023 Shall be ensured by the contractor that these comments are incorporated in the subsequent working &
submittals.
A) This is for information:-
<>This is the 1st
resubmission submitted by
SPCL for review purpose
received to TCE.
<>But it is observed that
some of TCE comments are
not yet incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
C2 herewith approving this
drawing with comments.
<>SPCL to submit the correct
record purpose drawings
after incorporating all our
comments.
B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C2-Show Cross section with
all details & dimension.
B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C3-Catwalk location is not
matching with the Latest
architectural drawing.
C4-What are CB1, CB2, and
CB3? Define abbreviations
C3
A) This is for information:-
<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and drawing is not up to the mark.
<>However for the timeline interest of the project, TCE herewith approving this drawing with comments.
<>SPCL to submit the correct record purpose drawings after incorporating all our comments.
C10
C7
Sheeting
Dim.,?? C11 C9
Dim.,??
C6 (Typical) Dim?
C5 (Typical)
C8
TCE.12648C-3010-SPCL-PRS-159
Dim??
dim.,?? dim.,??
Update detail as per Architectural
drawing (R0).
C12
Check text
B) COMMENTS NOT
C14 C13
INCORPORATED IN THE
C12 DRAWING:-
C12-Specify all the dimensions.
C13-Bottom of base plate shall
be -300mm from FFL.
C14-Down take shall be up to
nearest storm chamber
(typical).
TCE.12648C-3010-SPCL-PRS-165
C16
C15
C18
6250mm clear
3050mm clear
C19
B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C18-Ensure connection
stability (Typical)
C19-At grid 14, there is no
shed. Check and update.
C20-Show Deck slab line.
C21-Jack Truss chords size are
larger than Main truss chords,
draw all sizes in true scale.
(typical)
C22-Should be equal spacing
between verticals, check and
update. (Typical)
C23-Show full section.
C24-1500mm min distance
require between Girts (typical
requirement in all frame).
TCE.12648C-3010-SPCL-PRS-167
C26
C25
B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C25-All vertical and diagonal
member's spacing should be
uniform. (Typical).
C26-Weld Substation,
update wall condition
accordingly.(Typical
comment)
TCE.12648C-3010-SPCL-PRS-168 C27-Mention Grid with truss
type (typical).
C28-Refer drawing number
160 for Truss type 6A.Add
section of Truss type 6A.
Sheeting?
C29
B) COMMENTS NOT
INCORPORATED IN THE DRAWING:-
C29-Staircase at this location, check
and update.
C30-Mention Grid, shall be as per
Latest Architectural drawing.
C31-Remove Purlin from Grid 9
section, since there is a roof monitor
above. (typical)
Bracing (typical)
Tie beam @
both column
3050mm clear
Dim? (Typical)
Show joist
spacing.
7000mm
Dim?
Tie beam
Portal beam @ both Portal beam @ both
column Tie beam column
Bracing (Typical)
7000mm
Check this
member in STAAD.
<>Refer attached
<>Show all Critical dimension. snap below.
<> Refer previous sheet for typical
comments.
Member's size <> Dead Load on joist shall be (Concrete thickness above
should be in true sheet crest +1.5 floor finish+ water proofing)
scale. (Typical) <> Live load applied in STAAD does not match the load
requirement of 500kg/sqm.Check and update.
<>Update STAAD accordingly.
Gutter and
downtake?
Height?
Level?
Mention size
Bottom of base plate? <>This is the 1st resubmission submitted by SPCL for review purpose received to
TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this
resubmission and drawing is not up to the mark.
<>However for the timeline interest of the project, TCE herewith approving this
For all typical observations, previous commented sheets. drawing with comments.
TCE.12648-3010-SPCL-PRS-173 <>SPCL to submit the correct record purpose drawings after incorporating all our
comments.
Add scrap yard and lean to between 3-5 details. C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
> Grid 13 to 2a Connection design calculations & details of same in drawing are
not yet submitted.
> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag
rod layout not shown in drawings.
> Staircase design calculations & details of same in drawing are not yet
submitted.
> Deck slab, Deck sheet design calculations & details of same in drawing are not
yet submitted.
> Roof plan showing gutter and downtake location.
> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping,
flashing, trim, soffit, framed openings, connection bolts and screw details, etc
shall be submitted.
Contractor shall ensure that, the Design and Drawings are in compliance with the project DBR provided and the latest
Indian Standard Codes of design. Contractor shall also ensure that all optimization opportunities in design are explored
and adopted. Contractor shall be responsible and shall provide the stability certificate for the structure.
Shall be ensured by the contractor that these comments are incorporated in the subsequent working & submittals.
Size is not matching with STAAD.
Why Jack beams are required in the
this position?
Toilet block
Check the requirement of this
column and its position.
here, check
the
arrangement
Dim? accordingly.
C) MISSING DETAILS
NOT YET RECEIVED IN
DRAWING-
<> Refer mail dated
14-01-2023, sent to
SPCL about missing
details in drawings.
<> ANCHOR BOLT A) This is for information:-
design and detail <>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
drawings from Grid 14 <>But it is observed that some of TCE comments are not yet incorporated in this
to 2a. resubmission and drawing is not up to the mark.
<> Grid 13 to 2a <>However for the timeline interest of the project, TCE herewith approving this
Connection design drawing with comments.
calculations & details <>SPCL to submit the correct record purpose drawings after incorporating all our
of same in drawing are comments.
not yet submitted.
<> Missing Levels & B) COMMENTS NOT INCORPORATED IN THE DRAWING:- Truss 6A
Dimensions. (Like clear Refer Comments marked in this drawing.
height/dimension &
Top of structure).
<> Purlin Layout & all
Girt elevations (Side Truss 6A location
wall and gable end in STAAD, update
framing) with sag rod section drawing
layout not shown in accordingly.
drawings.
<> Staircase design
calculations & details
of same in drawing are
not yet submitted.
Not found in STAAD. Truss 9B
<> Deck slab, Deck
sheet design Kindly check and
calculations & details update.
of same in drawing are
not yet submitted.
<> Roof plan showing
gutter and downtake
location.
<> Sheeting drawings
showing Sheeting
lines, levels, height,
Sheet lapping,
flashing, trim, soffit,
framed openings,
connection bolts and
screw details, etc shall
be submitted.
TCE.12648C-3010-SPCL-PRS-160
Arrangement is
not clear.
C35
C36
**
Additional beam is required. The
bottom of the additional beam must
be flush with the bottom of the
chord.
<>Check with MSIL for the exact
location.
<>Loading shall be as per Process
load drawing provided.
C36
TCE.12648C-3010-SPCL-PRS-161
TCE.12648C-3010-SPCL-PRS-162
TCE.12648C-3010-SPCL-PRS-163
<>Refer mail Dated -18-12-2022 for changes in
roof monitor. 11.5m
<>Extend the roof monitor as shown, 3500 mm
from the end of the roof monitor to the sheeting A) This is for information:-
out. (Typical) <>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and
drawing is not up to the mark.
<>However for the timeline interest of the project, TCE herewith approving this drawing with
comments.
<>SPCL to submit the correct record purpose drawings after incorporating all our comments.
B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
Refer comments marked in
this drawing.