<>Column orientation in STAAD are not matching with the A) This is for

drawing / architectural drawing, check and correct. information:-


<>Loading applications are missing and need to be incorporated. <>This is the 1st
resubmission
submitted by SPCL for
review purpose
received to TCE.
<>But it is observed
that some of TCE
comments are not
RCC Staircase yet incorporated in
this resubmission and
drawing is not up to
the mark.
<>However for the
timeline interest of
the project, TCE
herewith approving
this drawing with
Check column comments.
<>SPCL to submit the
position, shall correct record
be at grid purpose drawings
center. after incorporating all
our comments.

B) COMMENTS NOT
INCORPORATED IN
THE DRAWING:-
Refer comments
marked in this
Notes- drawing.
Contractor shall ensure that, the Design , Loading and Drawings are in compliance
with the project DBR provided and the latest Indian Standard Codes of design. C) MISSING DETAILS
NOT YET RECEIVED IN
Contractor shall also ensure that all optimization opportunities in design are
DRAWING-
explored and adopted. Contractor shall be responsible and shall provide the stability > Refer mail dated
certificate for the structure. 14-01-2023, sent to
Shall be ensured by the contractor that these comments are incorporated in the SPCL about missing
details in drawings.
subsequent working & submittals. > ANCHOR BOLT
design and detail
drawings from Grid
14 to 2a.
> Grid 13 to 2a
Connection design
calculations & details
of same in drawing
are not yet
submitted.
> Missing Levels &
Dimensions. (Like
clear height/
dimension & Top of
TCE.12648C-3010-SPCL-PRS-155 structure).
> Purlin Layout & all
Girt elevations (Side
wall and gable end
framing) with sag rod
layout not shown in
drawings.
> Staircase design
calculations & details
of same in drawing
are not yet
submitted.
> Deck slab, Deck
sheet design
calculations & details
of same in drawing
are not yet
submitted.
> Roof plan showing
gutter and downtake
location.
> Sheeting drawings
showing Sheeting
lines, levels, height,
Sheet lapping,
flashing, trim, soffit,
framed openings,
connection bolts and
screw details, etc
shall be submitted.

Add details

<>FFL= (-) 1.0m Check column position, shall


be at grid center.
<> FFL= (-) 1.0m <>Column bottom of base plate shall be 300mm below FFL.
<>Column bottom of base plate shall be <>Column position are not matching with Latest architectural drawing
300mm below FFL. (R0), check and update. Staircase location Shall be as per
<>Please take care this in Pile and pile cap <>Please take care this in Pile and pile cap drawing. architectural drawing-R0, check and
drawing. <>Column Orientation in STAAD is wrong, check and update update.
<>Column Orientation in STAAD is wrong,
check and update Canopy 5.1m wide
A) This is for information:-
C1 <>This is the 1st resubmission
C2 submitted by SPCL for review
purpose received to TCE.
<>But it is observed that
some of TCE comments are
not yet incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
herewith approving this
drawing with comments.
<>SPCL to submit the correct
1350** C2 record purpose drawings
after incorporating all our
comments.

B) COMMENTS NOT
950** INCORPORATED IN THE
DRAWING:-
C1-Staircase location is not
matching with the latest
architectural drawing.
C2-Show Cross section with
all details & dimension.

1350** C) MISSING DETAILS NOT YET


C2 RECEIVED IN DRAWING-
> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
950** drawings.
> ANCHOR BOLT design and
detail drawings from Grid 14
to 2a.
> Grid 13 to 2a Connection
design calculations & details
of same in drawing are not
yet submitted.
> Missing Levels &
1350**
C2 Dimensions. (Like clear
height/dimension & Top of
structure).
> Purlin Layout & all Girt
TCE.12648C-3010-SPCL-PRS-156 elevations (Side wall and
950** gable end framing) with sag
rod layout not shown in
drawings.
> Staircase design calculations
** & details of same in drawing
<>Staircase to be shifted are not yet submitted.
@2nd bay. > Deck slab, Deck sheet
<>First floor mezzanine design calculations & details
to be reduced.
1350** C2 of same in drawing are not
yet submitted.
> Roof plan showing gutter
and downtake location.
> Sheeting drawings showing
950** Sheeting lines, levels, height,
Sheet lapping, flashing, trim,
soffit, framed openings,
connection bolts and screw
details, etc shall be
submitted.

C2

Contractor shall ensure that, the Design and Drawings are in compliance with the project DBR provided
and the latest Indian Standard Codes of design. Contractor shall also ensure that all optimization
opportunities in design are explored and adopted. Contractor shall be responsible and shall provide the
** As per MSIL Comments dated stability certificate for the structure.
23-01-2023 Shall be ensured by the contractor that these comments are incorporated in the subsequent working &
submittals.
A) This is for information:-
<>This is the 1st
resubmission submitted by
SPCL for review purpose
received to TCE.
<>But it is observed that
some of TCE comments are
not yet incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
C2 herewith approving this
drawing with comments.
<>SPCL to submit the correct
record purpose drawings
after incorporating all our
comments.

B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C2-Show Cross section with
all details & dimension.

C) MISSING DETAILS NOT YET


C2 RECEIVED IN DRAWING-
> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
drawings.
> ANCHOR BOLT design and
detail drawings from Grid 14
to 2a.
> Grid 13 to 2a Connection
design calculations & details
of same in drawing are not
yet submitted.
> Missing Levels &
C2 Dimensions. (Like clear
height/dimension & Top of
structure).
TCE.12648C-3010-SPCL-PRS-157 > Purlin Layout & all Girt
elevations (Side wall and
gable end framing) with sag
rod layout not shown in
drawings.
> Staircase design
calculations & details of same
in drawing are not yet
submitted.
> Deck slab, Deck sheet
C2 design calculations & details
of same in drawing are not
yet submitted.
> Roof plan showing gutter
and downtake location.
> Sheeting drawings showing
Sheeting lines, levels, height,
Sheet lapping, flashing, trim,
soffit, framed openings,
connection bolts and screw
details, etc shall be
submitted.
C3

A) This is for information:-


<>This is the 1st resubmission
submitted by SPCL for review
purpose received to TCE.
<>But it is observed that
some of TCE comments are
not yet incorporated in this
resubmission and drawing is C4 (Typical)
not up to the mark.
<>However for the timeline
interest of the project, TCE
herewith approving this
drawing with comments.
<>SPCL to submit the correct
record purpose drawings
after incorporating all our
comments.

B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C3-Catwalk location is not
matching with the Latest
architectural drawing.
C4-What are CB1, CB2, and
CB3? Define abbreviations

C) MISSING DETAILS NOT YET


RECEIVED IN DRAWING-
> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
drawings.
> ANCHOR BOLT design and
detail drawings from Grid 14
to 2a.
TCE.12648C-3010-SPCL-PRS-158
> Grid 13 to 2a Connection
design calculations & details
of same in drawing are not
yet submitted.
> Missing Levels &
Dimensions. (Like clear
height/dimension & Top of
structure).
> Purlin Layout & all Girt
elevations (Side wall and
gable end framing) with sag
rod layout not shown in
drawings.
> Staircase design
calculations & details of same
in drawing are not yet
submitted.
> Deck slab, Deck sheet
design calculations & details
of same in drawing are not
yet submitted.
> Roof plan showing gutter
and downtake location.
> Sheeting drawings showing
Sheeting lines, levels, height,
Sheet lapping, flashing, trim,
soffit, framed openings,
connection bolts and screw
details, etc shall be
submitted.

C3
A) This is for information:-
<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and drawing is not up to the mark.
<>However for the timeline interest of the project, TCE herewith approving this drawing with comments.
<>SPCL to submit the correct record purpose drawings after incorporating all our comments.
C10

C7

Sheeting

Dim.,?? C11 C9
Dim.,??
C6 (Typical) Dim?

C5 (Typical)

C8

TCE.12648C-3010-SPCL-PRS-159

Dim??

C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-


> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings. B) COMMENTS NOT
INCORPORATED IN THE
> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
DRAWING:-
> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet
submitted. C5-Specify roof monitor out to
out width.
> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not C6-2m wide canopy (Typical).
shown in drawings. C7-Show center to sheeting out.
(Typical)
> Staircase design calculations & details of same in drawing are not yet submitted.
C8-Show Skylight & Air washer,
> Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted.
> Roof plan showing gutter and downtake location. exact location shall be as per
Latest architectural drawing and
> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit,
add arrangement detail for
framed openings, connection bolts and screw details, etc shall be submitted.
review.
C9-Show Toilet Block, location
shall be as per Architectural
drawing R0.
C10-Show sheeting out to out
dimension (Typical).
C11-Check Gutter slope and
<>Refer mail Dated -18-12-2022 for changes in arrow direction. (Typical)
roof monitor.
<>Extend the roof monitor as shown, 3500 mm
from the end of the roof monitor to the sheeting
out. (Typical)

Width of Roof monitor shall


be 7.0m, As per MSIL
Comment dated 23-01-2023)
2m wide Canopy

dim.,?? dim.,??
Update detail as per Architectural
drawing (R0).
C12

Check text

A) This is for information:-


<>This is the 1st resubmission
submitted by SPCL for review
purpose received to TCE.
<>But it is observed that some
of TCE comments are not yet
incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
herewith approving this
3050mm clear 6250mm clear drawing with comments.
3050mm clear <>SPCL to submit the correct
record purpose drawings after
incorporating all our comments.

B) COMMENTS NOT
C14 C13
INCORPORATED IN THE
C12 DRAWING:-
C12-Specify all the dimensions.
C13-Bottom of base plate shall
be -300mm from FFL.
C14-Down take shall be up to
nearest storm chamber
(typical).

C) MISSING DETAILS NOT YET


RECEIVED IN DRAWING-
<> Refer mail dated
14-01-2023, sent to SPCL about
TCE.12648C-3010-SPCL-PRS-164 missing details in drawings.
<> ANCHOR BOLT design and
detail drawings from Grid 14 to
2a.
<> Grid 13 to 2a Connection
design calculations & details of
same in drawing are not yet
submitted.
<> Missing Levels &
Dimensions. (Like clear height/
dimension & Top of structure).
<> Purlin Layout & all Girt
elevations (Side wall and gable
end framing) with sag rod
layout not shown in drawings.
<> Staircase design calculations
& details of same in drawing
are not yet submitted.
<> Deck slab, Deck sheet design
calculations & details of same in
drawing are not yet submitted.
<> Roof plan showing gutter
and downtake location.
<> Sheeting drawings showing
Sheeting lines, levels, height,
Sheet lapping, flashing, trim,
soffit, framed openings,
connection bolts and screw
details, etc shall be submitted.
Contractor shall ensure that, the Design a, Loading nd Drawings are in
compliance with the project DBR provided and the latest Indian <>Show pipe rack, ducting and cable tray supporting arrangement with all
Standard Codes of design. Contractor shall also ensure that all
details and submit design calculation for review.
optimization opportunities in design are explored and adopted.
Contractor shall be responsible and shall provide the stability
certificate for the structure.
shall be ensured by the contractor that these comments are
incorporated in the subsequent working & submittals.
C17 (Typical)

TCE.12648C-3010-SPCL-PRS-165

C16

C15

A) This is for information:-


<>This is the 1st resubmission
submitted by SPCL for review
purpose received to TCE.
<>But it is observed that some of
TCE comments are not yet
incorporated in this
resubmission and drawing is not
up to the mark.
<>However for the timeline
interest of the project, TCE
herewith approving this drawing
with comments. C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
<>SPCL to submit the correct <> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
record purpose drawings after <> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
incorporating all our comments. <> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet
submitted.
B) COMMENTS NOT <> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
INCORPORATED IN THE <> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not
DRAWING:- shown in drawings.
C15-Lean to between grids 3-12, <> Staircase design calculations & details of same in drawing are not yet submitted. Contractor shall ensure that, the Design a, Loading nd Drawings are in compliance with the
show with all details. <> Deck slab, Deck sheet design calculations & details of same in drawing are not yet project DBR provided and the latest Indian Standard Codes of design. Contractor shall also
C16-Clear 1500mm (Typical). submitted. ensure that all optimization opportunities in design are explored and adopted. Contractor
C17-Show Exhaust fan <> Roof plan showing gutter and downtake location. shall be responsible and shall provide the stability certificate for the structure.
supporting detail, bracing should <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, shall be ensured by the contractor that these comments are incorporated in the subsequent
be planned accordingly. soffit, framed openings, connection bolts and screw details, etc shall be submitted. working & submittals.
C20

C18

6250mm clear

3050mm clear

C19

A) This is for information:-


<>This is the 1st resubmission
submitted by SPCL for review
purpose received to TCE.
<>But it is observed that some of
TCE comments are not yet
incorporated in this resubmission TCE.12648C-3010-SPCL-PRS-166
and drawing is not up to the
mark.
<>However for the timeline
interest of the project, TCE
herewith approving this drawing C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
with comments. <> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
<>SPCL to submit the correct <> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
record purpose drawings after <> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet
incorporating all our comments. submitted.
<> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
B) COMMENTS NOT <> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not
INCORPORATED IN THE shown in drawings.
DRAWING:- <> Staircase design calculations & details of same in drawing are not yet submitted.
C18-Ensure connection stability <> Deck slab, Deck sheet design calculations & details of same in drawing are not yet
(Typical) submitted. <>With reference to Staad model submitted on
C19-At grid 14, there is no shed. <> Roof plan showing gutter and downtake location. 05.01.2023, Still some members are failing and need
Check and update. <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, to optimize.
C20-Show Deck slab line. soffit, framed openings, connection bolts and screw details, etc shall be submitted.
<>Keep utilization ratio around 0.9
A) This is for information:-
<>This is the 1st resubmission
submitted by SPCL for review
C20 purpose received to TCE.
C21
<>But it is observed that some
of TCE comments are not yet
incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
herewith approving this
drawing with comments.
C22 <>SPCL to submit the correct
record purpose drawings after
incorporating all our
comments.

B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C18-Ensure connection
stability (Typical)
C19-At grid 14, there is no
shed. Check and update.
C20-Show Deck slab line.
C21-Jack Truss chords size are
larger than Main truss chords,
draw all sizes in true scale.
(typical)
C22-Should be equal spacing
between verticals, check and
update. (Typical)
C23-Show full section.
C24-1500mm min distance
require between Girts (typical
requirement in all frame).

C) MISSING DETAILS NOT YET


RECEIVED IN DRAWING-
> Refer mail dated 14-01-2023,
sent to SPCL about missing
details in drawings.
> ANCHOR BOLT design and
detail drawings from Grid 14 to
2a.
> Grid 13 to 2a Connection
design calculations & details of
C24 same in drawing are not yet
submitted.
> Missing Levels & Dimensions.
(Like clear height/dimension &
Top of structure).
> Purlin Layout & all Girt
elevations (Side wall and gable
end framing) with sag rod
layout not shown in drawings.
> Staircase design calculations
& details of same in drawing
are not yet submitted.
> Deck slab, Deck sheet design
calculations & details of same
in drawing are not yet
submitted.
> Roof plan showing gutter and
downtake location.
> Sheeting drawings showing
Sheeting lines, levels, height,
Sheet lapping, flashing, trim,
soffit, framed openings,
connection bolts and screw
C23 details, etc shall be submitted.

TCE.12648C-3010-SPCL-PRS-167
C26

C25

B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
C25-All vertical and diagonal
member's spacing should be
uniform. (Typical).
C26-Weld Substation,
update wall condition
accordingly.(Typical
comment)
TCE.12648C-3010-SPCL-PRS-168 C27-Mention Grid with truss
type (typical).
C28-Refer drawing number
160 for Truss type 6A.Add
section of Truss type 6A.

C) MISSING DETAILS NOT


YET RECEIVED IN DRAWING-
> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
drawings.
> ANCHOR BOLT design and
C28 detail drawings from Grid 14
to 2a.
> Grid 13 to 2a Connection
design calculations & details
of same in drawing are not
yet submitted.
> Missing Levels &
Dimensions. (Like clear
height/dimension & Top of
structure).
> Purlin Layout & all Girt
A) This is for elevations (Side wall and
information:- gable end framing) with sag
<>This is the 1st rod layout not shown in
resubmission submitted drawings.
by SPCL for review > Staircase design
purpose received to TCE. calculations & details of
<>But it is observed that same in drawing are not yet
some of TCE comments submitted.
Section along Grid 16 are not yet incorporated > Deck slab, Deck sheet
in this resubmission and design calculations & details
drawing is not up to the of same in drawing are not
mark. yet submitted.
C27 <>However for the > Roof plan showing gutter
timeline interest of the and downtake location.
project, TCE herewith > Sheeting drawings
approving this drawing showing Sheeting lines,
with comments. levels, height, Sheet lapping,
<>SPCL to submit the flashing, trim, soffit, framed
correct record purpose openings, connection bolts
drawings after and screw details, etc shall
incorporating all our be submitted.
comments.
Check loading application some loads are missing, like Live &
dead load. Ensure all loads are applied as per DBR provided
and Indian design Code. (typical)

Sheeting?

C29

A) This is for information:-


<>This is the 1st resubmission
submitted by SPCL for review
purpose received to TCE.
C30 Check loading application some loads are missing, like Live & <>But it is observed that some of
dead load. Ensure all loads are applied as per DBR provided TCE comments are not yet
and Indian design Code. (typical) incorporated in this resubmission
and drawing is not up to the mark.
<>However for the timeline interest
of the project, TCE herewith
approving this drawing with
comments.
<>SPCL to submit the correct record
TCE.12648C-3010-SPCL-PRS-169
purpose drawings after
incorporating all our comments.

B) COMMENTS NOT
INCORPORATED IN THE DRAWING:-
C29-Staircase at this location, check
and update.
C30-Mention Grid, shall be as per
Latest Architectural drawing.
C31-Remove Purlin from Grid 9
section, since there is a roof monitor
above. (typical)

C31 C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-


> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet
submitted.
> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout
not shown in drawings.
> Staircase design calculations & details of same in drawing are not yet submitted.
> Deck slab, Deck sheet design calculations & details of same in drawing are not yet
submitted.
> Roof plan showing gutter and downtake location.
> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim,
soffit, framed openings, connection bolts and screw details, etc shall be submitted.

@Weld shop area -


The spacing between vertical and diagonal members of the truss should be
made in such a way that a 1300 diameter duct may pass through without
fouling any members.
Member's Spacing
shall be uniform.
(Typical)

A) This is for information:-


<>This is the 1st resubmission
submitted by SPCL for review purpose
received to TCE.
<>But it is observed that some of TCE
C32 comments are not yet incorporated
C32 in this resubmission and drawing is
C32 not up to the mark.
<>However for the timeline interest
of the project, TCE herewith
approving this drawing with
comments.
<>SPCL to submit the correct record
purpose drawings after incorporating
C33 all our comments.
(Typical)
B) COMMENTS NOT INCORPORATED
IN THE DRAWING:-
C32-Size is not matching with STAAD.
t is 600x500, correct and update.
(Typical)
>Ensure that all member sizes are
matching with optimised STAAD.
C33-Specify height and level from FFL

C) MISSING DETAILS NOT YET


RECEIVED IN DRAWING-
C32 C32 Refer mail dated 14-01-2023, sent to
SPCL about missing details in
drawings.
ANCHOR BOLT design and detail
drawings from Grid 14 to 2a.
ADD TRUSS SECTION 9A & 9B Grid 13 to 2a Connection design
TCE.12648C-3010-SPCL-PRS-170 calculations & details of same in
drawing are not yet submitted.
Missing Levels & Dimensions. (Like
clear height/dimension & Top of
structure).
Purlin Layout & all Girt elevations
(Side wall and gable end framing)
with sag rod layout not shown in
drawings.
Staircase design calculations &
details of same in drawing are not yet
submitted.
Deck slab, Deck sheet design
calculations & details of same in
drawing are not yet submitted.
Roof plan showing gutter and
downtake location.
Sheeting drawings showing Sheeting
lines, levels, height, Sheet lapping,
flashing, trim, soffit, framed
openings, connection bolts and screw
details, etc shall be submitted.
STAAD Comment-
<>Wind load is missing in the stubs.
Check, can we
<>Release moment at base.
remove this
<>Effective length factor shall be 2.
Provide Beam bracing? (typical)

1500mm minimum (clear)


Dim?

Bracing (typical)

Show Eave and clear height.


Portal beam @ both Portal beam @ both Portal beam @ both Tie beam Portal beam @ both Portal beam @ both
Tie beam column
column column Tie beam column column

Tie beam @
both column

3050mm clear
Dim? (Typical)

Refer our mail


dated 18-12-2022.
<>Out to Out
Width of roof
monitor is 11.5m.

Show joist
spacing.
7000mm

Dim?

Tie beam
Portal beam @ both Portal beam @ both
column Tie beam column

A) This is for information:-


<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and
drawing is not up to the mark. TCE.12648C-3010-SPCL-PRS-171
<>However for the timeline interest of the project, TCE herewith approving this drawing with
Make vertical and diagonal comments.
member's uniform spacing <>SPCL to submit the correct record purpose drawings after incorporating all our comments.

B) COMMENTS NOT INCORPORATED IN THE DRAWING:-


Refer Comments marked in the drawing.

C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-


<> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
<> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
<> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet submitted.
<> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
<> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not shown
Show grid 2 column with
in drawings.
dimension.
<> Staircase design calculations & details of same in drawing are not yet submitted.
<> Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted.
RCC Column, <> Roof plan showing gutter and downtake location.
shown in hatch <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit,
framed openings, connection bolts and screw details, etc shall be submitted.
Refer comments from Sheet number 171.

Bracing (Typical)

7000mm

A) This is for information:-


<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and
drawing is not up to the mark.
<>However for the timeline interest of the project, TCE herewith approving this drawing with
2 comments.
<>SPCL to submit the correct record purpose drawings after incorporating all our comments.
TCE.12648C-3010-SPCL-PRS-172
B) COMMENTS NOT INCORPORATED IN THE DRAWING:-
Refer Comments marked in the drawing.

C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-


Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
Add expansion ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
joint details Grid 13 to 2a Connection design calculations & details of same in drawing are not yet submitted.
Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not shown in
drawings.
Mention Truss Staircase design calculations & details of same in drawing are not yet submitted.
type. (Typical) Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted.
Roof plan showing gutter and downtake location.
Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit, framed
openings, connection bolts and screw details, etc shall be submitted.
For all typical observations, please see our
comments in the weld shop drawing and press
shop previous commented sheets.

Check this
member in STAAD.
<>Refer attached
<>Show all Critical dimension. snap below.
<> Refer previous sheet for typical
comments.

Member's size <> Dead Load on joist shall be (Concrete thickness above
should be in true sheet crest +1.5 floor finish+ water proofing)
scale. (Typical) <> Live load applied in STAAD does not match the load
requirement of 500kg/sqm.Check and update.
<>Update STAAD accordingly.
Gutter and
downtake?

Height?
Level?

Column type and size?


Size?

Level? A) This is for information:-

Mention size
Bottom of base plate? <>This is the 1st resubmission submitted by SPCL for review purpose received to
TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this
resubmission and drawing is not up to the mark.
<>However for the timeline interest of the project, TCE herewith approving this
For all typical observations, previous commented sheets. drawing with comments.
TCE.12648-3010-SPCL-PRS-173 <>SPCL to submit the correct record purpose drawings after incorporating all our
comments.

B) COMMENTS NOT INCORPORATED IN THE DRAWING:-


Refer Comments marked in this drawing.

Add scrap yard and lean to between 3-5 details. C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-
> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
> Grid 13 to 2a Connection design calculations & details of same in drawing are
not yet submitted.
> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag
rod layout not shown in drawings.
> Staircase design calculations & details of same in drawing are not yet
submitted.
> Deck slab, Deck sheet design calculations & details of same in drawing are not
yet submitted.
> Roof plan showing gutter and downtake location.
> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping,
flashing, trim, soffit, framed openings, connection bolts and screw details, etc
shall be submitted.

Mention column number.

Bottom of base plate?

Contractor shall ensure that, the Design and Drawings are in compliance with the project DBR provided and the latest
Indian Standard Codes of design. Contractor shall also ensure that all optimization opportunities in design are explored
and adopted. Contractor shall be responsible and shall provide the stability certificate for the structure.
Shall be ensured by the contractor that these comments are incorporated in the subsequent working & submittals.
Size is not matching with STAAD.
Why Jack beams are required in the
this position?

Toilet block
Check the requirement of this
column and its position.
here, check
the
arrangement
Dim? accordingly.

C) MISSING DETAILS
NOT YET RECEIVED IN
DRAWING-
<> Refer mail dated
14-01-2023, sent to
SPCL about missing
details in drawings.
<> ANCHOR BOLT A) This is for information:-
design and detail <>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
drawings from Grid 14 <>But it is observed that some of TCE comments are not yet incorporated in this
to 2a. resubmission and drawing is not up to the mark.
<> Grid 13 to 2a <>However for the timeline interest of the project, TCE herewith approving this
Connection design drawing with comments.
calculations & details <>SPCL to submit the correct record purpose drawings after incorporating all our
of same in drawing are comments.
not yet submitted.
<> Missing Levels & B) COMMENTS NOT INCORPORATED IN THE DRAWING:- Truss 6A
Dimensions. (Like clear Refer Comments marked in this drawing.
height/dimension &
Top of structure).
<> Purlin Layout & all
Girt elevations (Side Truss 6A location
wall and gable end in STAAD, update
framing) with sag rod section drawing
layout not shown in accordingly.
drawings.
<> Staircase design
calculations & details
of same in drawing are
not yet submitted.
Not found in STAAD. Truss 9B
<> Deck slab, Deck
sheet design Kindly check and
calculations & details update.
of same in drawing are
not yet submitted.
<> Roof plan showing
gutter and downtake
location.
<> Sheeting drawings
showing Sheeting
lines, levels, height,
Sheet lapping,
flashing, trim, soffit,
framed openings,
connection bolts and
screw details, etc shall
be submitted.

TCE.12648C-3010-SPCL-PRS-160

Dim? Dim? Check column position, shall


be at grid center.

Arrangement is
not clear.

Why is Jack beam required in the this Spacing?


position?

<>Sizes are not matching with STAAD.


<>All Jack beam deflection shall be checked by Span/240.
C34

C35

C36
**
Additional beam is required. The
bottom of the additional beam must
be flush with the bottom of the
chord.
<>Check with MSIL for the exact
location.
<>Loading shall be as per Process
load drawing provided.

C36

TCE.12648C-3010-SPCL-PRS-161

A) This is for information:- C) MISSING DETAILS NOT YET RECEIVED IN DRAWING-


<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE. <> Refer mail dated 14-01-2023, sent to SPCL about missing details in drawings.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and <> ANCHOR BOLT design and detail drawings from Grid 14 to 2a.
drawing is not up to the mark. <> Grid 13 to 2a Connection design calculations & details of same in drawing are not yet submitted.
<>However for the timeline interest of the project, TCE herewith approving this drawing with <> Missing Levels & Dimensions. (Like clear height/dimension & Top of structure).
comments. <> Purlin Layout & all Girt elevations (Side wall and gable end framing) with sag rod layout not shown in
**As per MSIL comments <>SPCL to submit the correct record purpose drawings after incorporating all our comments. drawings.
dated 23-01-2023 <> Staircase design calculations & details of same in drawing are not yet submitted.
B) COMMENTS NOT INCORPORATED IN THE DRAWING:- <> Deck slab, Deck sheet design calculations & details of same in drawing are not yet submitted.
C34-Add skylight cutout. <> Roof plan showing gutter and downtake location.
C35-Remove the bottom chord plan bracing, since there are ducting lines, to avoid fouling. <> Sheeting drawings showing Sheeting lines, levels, height, Sheet lapping, flashing, trim, soffit, framed openings,
C36-Add bracing as marked. connection bolts and screw details, etc shall be submitted.
C) MISSING
DETAILS NOT YET
RECEIVED IN
DRAWING-
Arrangement is not clear
<> Refer mail dated
14-01-2023, sent to
SPCL about missing
details in drawings.
<> ANCHOR BOLT
design and detail
drawings from Grid
14 to 2a.
<> Grid 13 to 2a
Connection design
calculations &
details of same in
drawing are not yet
submitted.
<> Missing Levels &
Dimensions. (Like
clear height/
dimension & Top of
structure).
<> Purlin Layout &
all Girt elevations
(Side wall and
gable end framing)
with sag rod layout
not shown in
drawings.
<> Staircase design
calculations &
details of same in
drawing are not yet
submitted.
<> Deck slab, Deck
sheet design
calculations &
details of same in
drawing are not yet
submitted.
<> Roof plan
showing gutter and
downtake location.
<> Sheeting
drawings showing
Sheeting lines,
levels, height,
Sheet lapping,
flashing, trim,
soffit, framed
openings,
connection bolts
and screw details,
etc shall be
submitted.

Extra Erection Note: The installation/


Erection of trusses and bracing above
all Pits must be planned after placing
the machine.

Top chord bracing is


missing.

TCE.12648C-3010-SPCL-PRS-162

A) This is for information:-


<>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and
drawing is not up to the mark.
<>However for the timeline interest of the project, TCE herewith approving this drawing with
comments.
<>SPCL to submit the correct record purpose drawings after incorporating all our comments.

B) COMMENTS NOT INCORPORATED IN THE DRAWING:-


Refer comments marked in this drawing.
C) MISSING DETAILS
NOT YET RECEIVED IN
DRAWING-
<> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
drawings.
<> ANCHOR BOLT design
and detail drawings from
Grid 14 to 2a.
<> Grid 13 to 2a
Connection design
calculations & details of
same in drawing are not
yet submitted.
<> Missing Levels &
Dimensions. (Like clear
height/dimension & Top
of structure).
<> Purlin Layout & all
Girt elevations (Side wall
and gable end framing)
with sag rod layout not
shown in drawings.
<> Staircase design
calculations & details of
same in drawing are not
yet submitted.
<> Deck slab, Deck sheet
design calculations &
details of same in
drawing are not yet
submitted.
<> Roof plan showing
gutter and downtake
location.
<> Sheeting drawings
Refer our mail showing Sheeting lines,
dated 18-12-2022. levels, height, Sheet
lapping, flashing, trim,
soffit, framed openings,
connection bolts and
screw details, etc shall
be submitted.

TCE.12648C-3010-SPCL-PRS-163
<>Refer mail Dated -18-12-2022 for changes in
roof monitor. 11.5m
<>Extend the roof monitor as shown, 3500 mm
from the end of the roof monitor to the sheeting A) This is for information:-
out. (Typical) <>This is the 1st resubmission submitted by SPCL for review purpose received to TCE.
<>But it is observed that some of TCE comments are not yet incorporated in this resubmission and
drawing is not up to the mark.
<>However for the timeline interest of the project, TCE herewith approving this drawing with
comments.
<>SPCL to submit the correct record purpose drawings after incorporating all our comments.

B) COMMENTS NOT INCORPORATED IN THE DRAWING:-


Refer comments marked in this drawing.
A) This is for information:-
<>This is the 1st resubmission
submitted by SPCL for review
purpose received to TCE.
<>But it is observed that
some of TCE comments are
not yet incorporated in this
resubmission and drawing is
not up to the mark.
<>However for the timeline
interest of the project, TCE
herewith approving this
drawing with comments.
<>SPCL to submit the correct
record purpose drawings
after incorporating all our
comments.

B) COMMENTS NOT
INCORPORATED IN THE
DRAWING:-
Refer comments marked in
this drawing.

C) MISSING DETAILS NOT YET


RECEIVED IN DRAWING-
> Refer mail dated
14-01-2023, sent to SPCL
about missing details in
drawings.
Typical > ANCHOR BOLT design and
<> Include a lateral arrangement for detail drawings from Grid 14
Trust load transfer and for stability. to 2a.
> Grid 13 to 2a Connection
design calculations & details
of same in drawing are not
yet submitted.
> Missing Levels &
Dimensions. (Like clear
height/dimension & Top of
structure).
> Purlin Layout & all Girt
elevations (Side wall and
gable end framing) with sag
rod layout not shown in
drawings.
> Staircase design TCE.12648C-3010-SPCL-PRS-186
calculations & details of same
in drawing are not yet
submitted.
> Deck slab, Deck sheet
design calculations & details
of same in drawing are not
yet submitted.
> Roof plan showing gutter
and downtake location.
> Sheeting drawings showing
Sheeting lines, levels, height,
Sheet lapping, flashing, trim,
soffit, framed openings,
connection bolts and screw
details, etc shall be
submitted.

Submit STAAD and Design


consideration Data for record.