Control Scheme For Acb Bus-Coupler - PMCC - (Dae)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

Cat-I, however Main Contractor to ensure complete compliance with requirements with Technical Specification, if arises out of this

document
or elsewhere

CONTROL SCHEME FOR ACB BUS-COUPLER


– PMCC- (DAE)

Digitally signed
Signature Not Verified
by Sunny
Date: 2019.06.17 UTTAR PRADESH RAJYA VIDYUT
16:53:02 IST UTPADAN NIGAM LIMITED
(A UP GOVERNMENT UNDERTAKING)
Reason: CAT I
Location: DEVELOPMENT CONSULTANTS
PRIVATE LIMITED, KOLKATA
NTPCEOC DOOSAN POWER SYSTEMS
INDIA PVT. LTD

C&S ELECTRIC LTD.


C-59 NO IDA PHASE -II,NO IDA -201305
DIS T. G AUTA M BUDH NAGAR(U.P)

NOTES:- SUB-SUPPLIER NAME

1. FOR LEGENDS REF DRG NO.-DP16004-YR02-90BGE-144581 OBRA'C' 2x660 MW THERMAL POWER


EXTENSION PROJECT
NTPC COMMENTS RESPONSE SHEET
Project: OBRA C 2 x 660 MW THERMAL POWER EXTENSION PROJECT
Contractor DOOSAN POWER SYSTEMS INDIA, Gurgaon

Owner UTTAR PRADESH RAJYA VIDYUT UTPADAN NIGAM LIMITED, Lucknow

Owner's Consultant DEVELOPMENT CONSULTANTS PRIVATE LIMITED, Kolkata

Review Engineering Consultant NATIONAL THERMAL POWER CORPORATION, Noida
DPSI Correspondence No. Date:
NTPC Doc No. Date:

Document / Drawing Number Document / Drawing Title Revision Assigned Approval Category*


CONTROL SCHEME FOR ACB BUS COUPLER PMCC‐ 
DP16004‐YS01‐90BGE‐144569 1 II
(DAE)

No. NTPC Comment C & S Response NTPC Resolution

Drawing revised as per Jawaharpur Cat‐1 drawing.
1 Comments as per 9876-206-PVE-B-176 of Jawaharpur POINT CLOSED
Additionally Backup panel Signal added in the drawing.

Backup panel  Signal is applicable only for Obra project 
2 Why were not in Jawaharpur
not for JAWA.

* NTPC Approval Categories:
1 = Approved
2 = Approved, subject to incorporation of comments /modifications as noted. Resubmit revised drawing / documents after incorporation for final approval.
3 = Not Approved. Resubmit revised drawing/ documents after incorporation of comments for approval
4 = For information and records
4R = Additional information / detail required. Revised drawings to be submitted (in  case of drawings required to be submitted to NTPC for information only).