Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in the
of the
Work: State of Tamilnadu on Build Operation and transfer (BOT Basis)
Package No:NS-2/BOT/TN-07
Construction of VUP RE Wall Approaches at Km 94+921 -Abstract:-RA Bill No-09
1 2 3 4 5 6 7 8
Deduct Previous
Since Last Measurement Remarks
BOQ Contents (or) Total Value upto Measurement
Description of work Unit Rate Quantity. Value of rates in
No Area Date (in Rs.) Page Quantity
Col(2-6) col(4)
Dismantling of flexible pavement and disposal of
dismantled materials upto a lead of 1000
1 3043.04 Cum 393.28 1196762 3000.504 42.540 16730
metres,stacking serviceable and unserviceable
materials separately
Dismantling of kerb stone by manual means and
2 disposal of dismantled material with all lifts and upto a 1311.34 Rmt 24.51 32140 1291.34 20.000 490
lead of 1000 metre
Earthwork in excavation of foundations for structures
3 including all leads and lifts as per joint and technical 16892.83 Cum 158.87 2683713 16786.55 106.286 16885
specification Clause 304.
6 Crash Barrier - M-40 GRADE 1105.71 Cum 7364.181 8142649 1105.71 0.000 0
Km 95+430 to Km 95+440-GSB 1st Layer Cum BHS 2.00 10 11.000 0.130 28.600 HW/935 Dated 29.11.2021
Km 95+430 to Km 95+440-GSB 2nd Layer Cum BHS 2.00 10 9.500 0.130 24.700 HW/936 Dated 30.11.2021
Total= 53.300
Constructing Wet Mix Macadam (WMM) to full width for widening with
11 approved material complete as per Technical Specification Clause
406.
Km 95+430 to Km 95+440-WMM 1st layer Cum BHS 2 10 9.25 0.125 23.125 HW/937 Dated 30.11.2021
Km 95+430 to Km 95+440-WMM 2nd Layer Cum BHS 2 10 9 0.125 22.500 HW/938 Dated 30.11.2021
Total= 45.625
Construction of cement concrete kerb with top and bottom width 115
and 165 respectively, 250mm above FRL in M20 Grade PCC on M10
12
Grade foundation 150mm thick, foundation having 50mm projection
beyond kerb stone, kerb stone laid with kerb laying machine
Page 3 of 61
Mesurements
S.No Description of work Unit side Nos Qty RFI No & Date of Inspection
L B D
Providing bituminous Primer coat @ 6 kg/10 sq.m. over granular surface
13 using slow setting bituminous emulsion as per IS : 8887 complete as per
Technical Specifications Clause 502.
Km 94+700 to Km 94+727.25 Sqm LHS 1 27.25 8.85 241.163
Km 94+727.25 to Km 94+768.5 Sqm LHS 1 41.25 10.175 419.719 HW/947 Dated 20.12.2021
Km 94+768.5 to Km 94+914 Sqm LHS 1 145.5 11.5 1673.250
Km 94+927 to Km 95+337.5 Sqm LHS 1 410.5 11.5 4720.75
Km 95+337.5 to Km 95+378.75 Sqm LHS 1 41.25 10.175 419.7188 HW/948 Dated 20.12.2021
Km 95+378.75 to 95+440 Sqm LHS 1 61.25 8.85 542.0625
Km.94+700 to 94+767.25 Sqm RHS 1 67.25 8.85 595.1625
Km.94+767.25 to 94+808.5 Sqm RHS 1 41.25 10.175 419.719 HW/953 Dated 22.12.2021
Km.94+808.5 to 94+914 Sqm RHS 1 105.5 11.5 1213.250
Km.94+927.77 to 95+341.5 Sqm RHS 1 413.73 11.5 4757.895
Km.95+341.5 to 95+382.75 Sqm RHS 1 41.25 10.175 419.719 HW/954 Dated 22.12.2021
Km.95+382.75 to 95+440 Sqm RHS 1 57.25 8.85 506.663
Total= 15929.070
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
14
bituminous surface cleaned with mechanical broom as per IS:8887 all
complete as per Technical Specification Clause 503.
Km 94+700 to Km 94+727.25 Sqm LHS 1 27.25 8.75 238.438
Km 94+727.25 to Km 94+768.5 Sqm LHS 1 41.25 10.125 417.656 HW/980 Dated 04.01.2022
Km 94+768.5 to Km 94+910.5 Sqm LHS 1 142 11.5 1633.000
Km 94+931.270 to Km 95+337.5 Sqm LHS 1 406.23 11.5 4671.645
Km 95+337.5 to Km 95+378.25 Sqm LHS 1 41.25 10.125 417.6563 HW/982 Dated 04.01.2022
Km 95+378.25 to 95+440 Sqm LHS 1 61.75 8.75 540.3125
Km.94+700 to 94+727.25 Sqm RHS 1 27.25 8.75 238.4375
Km.94+727.25 to 94+768.5 Sqm RHS 1 41.25 10.125 417.656 HW/960 Dated 29.12.2021
Km.94+768.5 to 94+910.5 Sqm RHS 1 141.5 11.5 1627.250
Km.94+931.5 to 95+341.5 Sqm RHS 1 410 11.5 4715.000
Km.95+341.5 to 95+382.75 Sqm RHS 1 41.25 10.125 417.656 HW/962 Dated 28.12.2021
Km.95+382.75 to 95+440 Sqm RHS 1 57.25 8.75 500.938
Km.94+700 to 94+767.25 Sqm RHS 1 67.25 8.75 588.4375
Km.94+767.25 to 94+808.5 Sqm RHS 1 41.25 10.125 417.656 HW/988 Dated 05.01.2022
Km.94+808.5 to 94+910.50 Sqm RHS 1 102 11.5 1173.000
Km.94+931.270 to 95+341.5 Sqm RHS 1 410.23 11.5 4717.645
Km.95+341.5 to 95+382.75 Sqm RHS 1 41.25 10.125 417.656 HW/990 Dated 05.01.2022
Km.95+382.75 to 95+440 Sqm RHS 1 57.25 8.75 500.938
Km.94+700 to 94+727.25 Sqm LHS 1 27.25 8.75 238.438
Km.94+727.25 to 94+768.5 Sqm LHS 1 41.25 10.125 417.656 HW/994 Dated 07.01.2022
Km.94+768.5 to 94+910.5 Sqm LHS 1 142 11.5 1633.000
Km.94+931.27 to 95+337.5 Sqm LHS 1 406 11.5 4669
Km.95+337.5 to 95+378.75 Sqm LHS 1 41.25 10.125 417.656 HW/1000 Dated 07.01.2022
Km.95+378.75 to 95+440 Sqm LHS 1 61.25 8.75 535.938
Total= 31562.665
Providing and laying bituminous macadam with 100-120 TPH hot mix
plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading premixed with bituminous binder,
15
transported to site, laid over a previously prepared surface with paver
finisher to the required grade, level and alignment and rolled as per
clauses 501.6 and 501.7 to achieve the desired compaction
Km.94+727.25 to 94+768.5 Cum LHS 1 41.25 10.175 0.08 33.58 HW/955 Dated 23.12.2021
Km.94+768.5 to 94+914 Cum LHS 1 145 11.5 0.08 133.40
Km.95+341.5 to 95+382.5 Cum LHS 1 41 10.175 0.08 33.37 HW/956 Dated 23.12.2021
Km.95+382.5 to 95+440 Cum LHS 1 57.5 8.85 0.08 40.71
Km.94+767.25 to 94+808.5 Cum RHS 1 41.25 10.175 0.08 33.578 HW/958 Dated 25.12.2021
Km.94+808.5 to 94+910.50 Cum RHS 1 102 11.5 0.08 93.840
Km.95+341.5 to 95+382.75 Cum RHS 1 41.25 10.175 0.08 33.5775 HW/959 Dated 25.12.2021
Km.95+382.75 to 95+440 Cum RHS 1 57.25 8.85 0.08 40.533
Total= 1267.539
Km 94+700 to Km 94+727.25-DBM 1st layer Cum RHS 1 27.25 8.75 0.055 13.114
Km 94+727.25 to Km 94+768.5-DBM 1st layer Cum RHS 1 41.25 10.125 0.055 22.971 HW/961 Dated 29.12.2021
Km 94+768.5 to Km 94+910.5-DBM 1st layer Cum RHS 1 141.5 11.5 0.055 89.499
Km 94+931.27 to Km 95+341.5-DBM 1st layer Cum RHS 1 383.23 11.5 0.055 242.393
Km 94+341.5 to Km 95+382.75-DBM 1st layer Cum RHS 1 41.25 10.125 0.055 22.971 HW/963 Dated 29.12.2021
Km 94+382.75 to Km 95+440-DBM 1st layer Cum RHS 1 57.25 8.75 0.055 27.552
Page 4 of 61
Mesurements
S.No Description of work Unit side Nos Qty RFI No & Date of Inspection
L B D
Km 94+700 to Km 94+727.25-DBM 1st layer Cum LHS 1 27.25 8.75 0.055 13.114
Km 94+727.25 to Km 94+768.5-DBM 1st layer Cum LHS 1 41.25 10.125 0.055 22.971 HW/981 Dated 04.01.2022
Km 94+768.5 to Km 94+910.5-DBM 1st layer Cum LHS 1 142 11.5 0.055 89.499
Km 94+931.27 to Km 95+337.5-DBM 1st layer Cum LHS 1 406.23 11.5 0.055 256.940
Km 95+337.5 to Km 95+378.25-DBM 1st layer Cum LHS 1 41.25 10.125 0.055 22.971 HW/983 Dated 04.01.2022
Km 95+378.25 to Km 95+440-DBM 1st layer Cum LHS 1 61.75 8.75 0.055 29.717
Km.94+700 to 94+767.25 DBM 2nd layer Cum RHS 1 67.25 8.75 0.055 32.364
Km.94+767.25 to 94+808.5 DBM 2nd layer Cum RHS 1 41.25 10.125 0.055 22.971 HW/989 Dated 06.01.2022
Km.94+808.5 to 94+910.50 DBM 2nd layer Cum RHS 1 102 11.5 0.055 64.515
Km 94+931.27 to Km 95+341.5-DBM 2nd layer Cum RHS 1 410.23 11.5 0.055 259.470
Km 94+341.5 to Km 95+382.75-DBM 2nd layer Cum RHS 1 41.25 10.125 0.055 22.971 HW/991Dated 06.01.2022
Km 94+382.75 to Km 95+440-DBM 2nd layer Cum RHS 1 57.25 8.75 0.055 27.552
Km 94+700 to Km 94+727.25-DBM 2nd layer Cum LHS 1 27.25 8.75 0.055 13.114
Km 94+727.25 to Km 94+768.5-DBM 2nd layer Cum LHS 1 41.25 10.125 0.055 22.971 HW/995 Dated 08.01.2022
Km 94+768.5 to Km 94+910.5-DBM 2nd layer Cum LHS 1 142 11.5 0.055 89.815
Km 94+931.27 to Km 95+337.5-DBM 2nd layer Cum LHS 1 406 11.5 0.055 256.795
Km 95+337.5 to Km 95+378.25-DBM 2nd layer Cum LHS 1 41.25 10.125 0.055 22.971 HW/1001 Dated 08.01.2022
Km 95+378.25 to Km 95+440-DBM 2nd layer Cum LHS 1 61.25 8.75 0.055 29.477
Total= 1718.698
Supply and erection of 12 meters long octagonal type steel pole with all
22 foundation accessories.And Supply installation & energising of flood
light fitting with 1X150 watt HPSV Tubular lamp.
12 Meters long longitudinal type steel pole Nos BHS 6 6.000
HW/944 Dated 16.12.2021
150 Watt HPSV Tubular lamp Nos BHS 8 8.000
Total= 14.000
Total= 400.000
Page 5 of 61
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in the State of Tamilnadu on
Build Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 28.02.2022
ITEM 1 Dismantling of flexible pavement and disposal of dismantled materials upto a lead of 1000 metres,stacking serviceable and unserviceable materials separately
Sr No BOQ Code RFI No. Date From TO Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
94+815 94+914 BC layer 1 99.000 8.750 0.050 43.313 43.313 Approved
Dismantling of Flexible
1 RE. 1 HW/106 13.03.2020 94+815 94+914 DBM layer RHS 1 99.000 8.850 0.110 96.377 139.689 Approved
Pavement
94+815 94+914 BM layer 1 99.000 8.850 0.080 70.092 209.781 Approved
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 28.02.2022
ITEM 2 Dismantling of kerb stone by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 metre
Sl. No BOQ Code RFI No. Date From TO Side Activity Layer L B D Total Cum Qty Status Remark
1 RE-2 Str/142 12.05.2020 Km 94+770 to Km 95+345 BHS Kerb dismantling 2 575 1150.000 1150.000 Approved RA Bill-4
2 RE-2 HW/520 03.12.2020 Km 94+750 to Km 94+770 BHS Kerb dismantling 2 20 40.000 1190.000 Approved
3 RE-2 HW/521 03.12.2020 Km 95+345 to Km 95+415 BHS Kerb dismantling 2 70 140.000 1330.000 Approved RA Bill-5
4 RE-2 HW/709 02.02.21 Km 94+700 to Km 94+750 BHS Kerb dismantling 2 5.67 11.340 1291.340 Approved RA Bill-6
5 RE-2 Km 95+430 to Km 95+440 LHS Kerb dismantling 1.00 10 10.000 1301.340 Approved
HW/932 15.09.21 RA Bill-9
6 RE-2 Km 95+430 to Km 95+440 RHS Kerb dismantling 1.00 10 10.000 1311.340 Approved
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 28.022022
ITEM No-3.Earthwork in excavation of foundations for structures including all leads and lifts as per joint and technical specification Clause 304.
Sr No BOQ Code RFI No. Date From TO Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
94.815 94.914 WMM layer 1 99.000 9.315 0.250 230.546 230.546 Approved
1 RE 3 HW/109 18.03.2020 RHS Dismantling of Flexible Pavement
94.815 94.914 GSB layer 1 99.000 11.483 0.260 295.560 526.106 Approved
94.770 94.914 WMM layer 1 144.000 9.315 0.250 335.340 861.446 Approved
2 RE 3 HW/109 18.03.2020 LHS Dismantling of Flexible Pavement
94.770 94.914 GSB layer 1 144.000 11.483 0.260 429.905 1291.351 Approved
RA Bill-3
94.928 95.345 WMM layer 1 417.000 9.315 0.250 971.089 2262.439 Approved
3 RE 3 HW/108 18.03.2020 RHS Dismantling of Flexible Pavement
94.928 95.345 GSB layer 1 417.000 11.483 0.260 1244.933 3507.372 Approved
94.928 95.335 WMM layer 1 407.000 9.315 0.250 947.801 4455.173 Approved
4 RE 3 HW/108 18.03.2020 LHS Dismantling of Flexible Pavement
94.928 95.335 GSB layer 1 407.000 11.483 0.260 1215.078 5670.251 Approved
A1 Side -Km 94+770.924 to Rewall levelling pad 1 143.306 1.5 1.5 322.438 5992.690 Approved
5 RE 3 LHS Rewall levelling pad Section
Km 94+914.230 Section 1 143.306 6.6 0.95 898.529 6891.219 Approved
Str/137 23.03.2020
A1 Side -Km 94+816.550 to Rewall levelling pad 1 97.68 1.5 1.5 219.780 7110.999 Approved
6 RE 3 RHS Rewall levelling pad Section
Km 94+914.230 Section 1 97.68 6.6 0.95 612.454 7723.452 Approved
RA Bill-4
A2 Side-Km 94+927.770 to Rewall levelling pad 1 406.522 1.5 1.5 914.674 8638.127 Approved
7 RE 3 LHS Rewall levelling pad Section
Km 95+334.292 Section 1 406.522 6.6 0.95 2548.893 11187.020 Approved
Str/143 13.05.2020
A2 Side-Km 94+927.770 to Rewall levelling pad 1 416.819 1.5 1.5 937.843 12124.862 Approved
8 RE 3 RHS Rewall levelling pad Section
Km 95+344.589 Section 1 416.819 6.6 0.95 2613.455 14738.317 Approved
ITEM No-3.Earthwork in excavation of foundations for structures including all leads and lifts as per joint and technical specification Clause 304.
Sr No BOQ Code RFI No. Date From TO Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
94.750 94.770 WMM layer LHS 1 20 9.315 0.25 46.58 14784.892 Approved
9 RE 3 HW/491 25.11.2020 Dismantling of Flexible Pavement
94.750 94.770 GSB layer LHS 1 20 11.483 0.26 59.71 14844.601 Approved
94.750 94.815 WMM layer RHS 1 65 9.315 0.25 151.37 14995.970 Approved
10 RE 3 HW/454 07.11.2020 Dismantling of Flexible Pavement
94.750 94.815 GSB layer RHS 1 65 11.483 0.26 194.05 15190.024 Approved
RA Bill-5
95.335 95.430 WMM layer LHS 1 95 9.315 0.25 221.23 15411.256 Approved
11 RE 3 HW/498 26.11.2020 Dismantling of Flexible Pavement
95.335 95.430 GSB layer LHS 1 95 11.483 0.26 283.62 15694.873 Approved
95.3450 95.4300 WMM layer RHS 1 85 9.315 0.25 197.94 15892.817 Approved
12 RE 3 HW/497 26.11.2020 Dismantling of Flexible Pavement
95.3450 95.4300 GSB layer RHS 1 85 11.483 0.26 253.76 16146.580 Approved
Km 95+430 to Km 95+440-
15 RE 3 WMM layer BHS Dismantling of Flexible Pavement 2.00 10 9.315 0.25 46.575 16639.548 Approved
WMM
HW/933 27.11.21 RA Bill-9
Km 95+430 to Km 95+440-
16 RE 3 GSB layer BHS Dismantling of Flexible Pavement 2.00 10 11.483 0.26 59.711 16699.259 Approved
GSB
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 28.022022
ITEM No-4.Reinforced Earth Retaining Wall (Reinforced earth retaining walls have four main components as under: b) Facia material and its placement. c) Assembling, joining with facing elements and laying of the
reinforcing element
Sr No BOQ Code RFI No. Date Section Approved Side Activity Type of panel Area No of panels Total(area) Cum Qty Status Remark
B3 1.767 21 37.107 37.107
F6 3.2 7 22.400 59.507
1 RE-4 Str/166 ? 94+914 - 94+808 RHS 1st Lift Approved
F5 3.2 6 19.200 78.707
B2 1.767 5 8.835 87.542
B4 1.767 11 19.437 106.979
F7 3.200 3 9.600 116.579
2 RE-4 Str/174 10.07.2020 94+914 - 94+771 LHS 1st Lift B3 1.767 11 19.437 136.016 Approved
F6 3.200 24 76.800 212.816
F5 3.200 3 9.600 222.416
B4 1.767 38 67.146 289.562
F8 3.200 20 64.000 353.562
F7 3.200 20 64.000 417.562
3 RE-4 Str/197 28.07.2020 94+914 - 94+817 RHS 2nd Lift B3 1.767 3 5.301 422.863 Approved
F6 3.200 27 86.400 509.263
F5 3.200 1 3.200 512.463
F4 3.200 13 41.600 554.063
F7 3.200 2 6.400 560.463
B3 1.767 33 58.311 618.774
RA Bill-4
4 RE-4 Str/198 28.07.2020 94+9174 - 94+771 LHS 2nd Lift F6 3.200 30 96.000 714.774 Approved
F5 3.200 11 35.200 749.974
F4 3.200 40 128.000 877.974
F8 3.200 2 6.400 884.374
B3 1.767 12 21.204 905.578
F6 3.200 12 38.400 943.978
5 RE-4 Str/205 05.08.2020 94+927 - 95+334 LHS 1st Lift Approved
F5 3.200 12 38.400 982.378
F4 3.200 28 89.600 1071.978
B2 1.767 29 51.243 1123.221
B4 1.767 12 21.204 1144.425
F8 3.200 2 6.400 1150.825
F 3.200 9 28.800 1179.625
B3 1.767 16 28.272 1207.897
6 RE-4 Str/218 13.08.2020 94+927 - 95+345 RHS 1st Lift F6 3.200 11 35.200 1243.097 Approved
F5 3.200 10 32.000 1275.097
F4 3.200 20 64.000 1339.097
T6C 4.116 2 8.232 1347.329
T6D 3.939 2 7.878 1355.207
Sr No BOQ Code RFI No. Date Section Approved Side Activity Type of panel Area No of panels Total(area) Cum Qty Status Remark
F 3.200 13 41.600 1396.807
B3 1.767 35 61.845 1458.652
F6 3.200 40 128.000 1586.652
F5 3.200 11 35.200 1621.852
F4 3.200 22 70.400 1692.252
7 RE-4 Str/239 25.08.2020 94+810 - 94+914 BHS 3rd Lift Approved
T6C 4.116 1 4.116 1696.368
T6D 3.939 2 7.878 1704.246
T6B 3.585 1 3.585 1707.831
T4D 3.016 2 6.032 1713.863
T4E 2.570 3 7.710 1721.573
B4 1.767 10 17.670 1739.243
F8 3.200 2 6.400 1745.643
B4R 1.767 2 3.534 1749.177
B3 1.767 2 3.534 1752.711
B3R 1.767 3 5.301 1758.012
F5 3.200 14 44.800 1802.812
F4 3.200 20 64.000 1866.812
8 RE-4 Str/243 28.08.2020 94+810 - 94+914 BHS 4th Lift B2 1.767 2 3.534 1870.346 Approved
T6B 3.585 4 14.340 1884.686
T4C 3.217 2 6.434 1891.120 RA Bill-4
F5R 3.000 1 3.000 1894.120
T4D 3.016 2 6.032 1900.152
T4E 2.570 3 7.710 1907.862
T4F 2.347 2 4.694 1912.556
T4B 1.901 2 3.802 1916.358
F8 3.200 2 6.400 1922.758
B4R 1.767 2 3.534 1926.292
F6 3.200 6 19.200 1945.492
F5 3.200 13 41.600 1987.092
F4 3.200 25 80.000 2067.092
B2 1.767 2 3.534 2070.626
T6D 3.939 2 7.878 2078.504
9 RE-4 Str/249 07.09.2020 95+050 - 95+190 RHS 1st Lift Approved
T6B 3.585 4 14.340 2092.844
T4C 3.217 2 6.434 2099.278
3L 1.767 3 5.301 2104.579
F4L 3.000 1 3.000 2107.579
T4F 2.347 2 4.694 2112.273
T4B 1.901 2 3.802 2116.075
T2A 1.429 3 4.287 2120.362
Sr No BOQ Code RFI No. Date Section Approved Side Activity Type of panel Area No of panels Total(area) Cum Qty Status Remark
F6R 3.000 2 6.000 2126.362
B4 1.767 6 10.602 2136.964
F8 3.200 2 6.400 2143.364
B4R 1.767 2 3.534 2146.898
B3 1.767 4 7.068 2153.966
F5 3.200 15 48.000 2201.966
F4 3.200 26 83.200 2285.166
B2 1.767 2 3.534 2288.700
T6C 4.116 2 8.232 2296.932
10 RE-4 Str/253 12.09.2020 94+870 - 94+771 LHS 3rd Lift T6D 3.939 4 15.756 2312.688 Approved
B2X 1.767 1 1.767 2314.455
T6B 3.585 2 7.170 2321.625
T4C 3.217 2 6.434 2328.059
F8R 3.000 1 3.000 2331.059
F4L 3.000 2 6.000 2337.059
T4F 2.347 2 4.694 2341.753
T4B 1.901 2 3.802 2345.555
T2A 1.429 2 2.858 2348.413
T6BL 3.585 1 3.585 2351.998
B4R 1.767 2 3.534 2355.532 RA Bill-4
B3 1.767 2 3.534 2359.066
B3R 1.767 2 3.534 2362.600
F5 3.200 14 44.800 2407.400
F4 3.200 28 89.600 2497.000
B2 1.767 2 3.534 2500.534
T6C 4.116 2 8.232 2508.766
11 RE-4 Str/254 12.09.2020 94+870 - 94+817 RHS 3rd Lift T6D 3.939 3 11.817 2520.583 Approved
T6B 3.585 2 7.170 2527.753
T4C 3.217 2 6.434 2534.187
B4L 1.767 1 1.767 2535.954
F7R 3.000 1 3.000 2538.954
T4B 1.901 2 3.802 2542.756
T2B 1.270 1 1.270 2544.026
T4EL 2.57 1 2.570 2546.596
F4 3.200 35 112.000 2658.596
T6C 4.116 2 8.232 2666.828
12 RE-4 Str/257 15.09.2020 95+190 -95+345 RHS 2nd Lift T6D 3.939 2 7.878 2674.706 Approved
F7R 3.000 1 3.000 2677.706
T4CL 3.217 1 3.217 2680.923
B2 1.767 2 3.534 2684.457
B3 1.767 1 1.767 2686.224
B3R 1.767 2 3.534 2689.758
F6 3.200 11 35.200 2724.958
13 RE-4 Str/263 2.11.2020 Km 95+090 to Km 95+345 RHS 3rd Lift F7 3.200 5 16.000 2740.958 Approved RA Bill-5
F7R 3.000 2 6.000 2746.958
T4B 1.901 27 51.327 2798.285
T6B 3.585 6 21.510 2819.795
Sr No BOQ Code RFI No. Date Section Approved Side Activity Type of panel Area No of panels Total(area) Cum Qty Status Remark
T6D 3.939 4 15.756 2835.551
Sr No BOQ Code RFI No. Date Section Approved Side Activity Type of panel Area No of panels Total(area) Cum Qty Status Remark
F4 3.200 9 28.800 2864.351
F6 3.200 11 35.200 2899.551
F7 3.200 5 16.000 2915.551
14 RE-4 Str/264 2.11.2020 Km 95+000 to Km 95+050 RHS 2nd Lift F8 3.200 2 6.400 2921.951 Approved
T4C 3.217 19 61.123 2983.074
T6B 3.585 5 17.925 3000.999
T6D 3.939 4 15.756 3016.755
F4 3.200 7 22.400 3039.155
F5 3.200 11 35.200 3074.355
F5R 3.000 1 3.000 3077.355
F6 3.200 11 35.200 3112.555
F7 3.200 5 16.000 3128.555
15 RE-4 Str/265 02.11.2020 Km 95+000 to Km 95+334 LHS 2 nd lift F8 3.200 2 6.400 3134.955 Approved
F8R 3.000 1 3.000 3137.955
T2A 1.429 22 31.438 3169.393
T2B 1.270 10 12.700 3182.093
T6B 3.585 5 17.925 3200.018
T6D 3.939 4 15.756 3215.774
F4 3.200 7 22.400 3238.174
F6 3.200 11 35.200 3273.374
F6R 3.000 1 3.000 3276.374
F7 3.200 5 16.000 3292.374 RA Bill-5
16 RE-4 Str/266 06.11.2020 Km 95+090 to Km 95+334 LHS 3 rd lift F8 3.200 2 6.400 3298.774 Approved
T2A 1.429 22 31.438 3330.212
T2B 1.270 10 12.700 3342.912
T6B 3.585 5 17.925 3360.837
T6D 3.939 4 15.756 3376.593
F4 3.200 9 28.800 3405.393
F6 3.200 11 35.200 3440.593
F6R 3.000 2 6.000 3446.593
17 RE-4 Str/267 07.11.2020 Km 94+820 to Km 95+870 RHS 4th Lift F7 3.200 5 16.000 3462.593 Approved
F8 3.200 2 6.400 3468.993
T6B 3.585 5 17.925 3486.918
T6D 3.939 4 15.756 3502.674
F4 3.200 9 28.800 3531.474
F4R 3.000 2 6.000 3537.474
F4L 3.000 1 3.000 3540.474
F6 3.200 11 35.200 3575.674
18 RE-4 Str/268 07.11.2020 Km 94+960 to Km 95+000 RHS 2nd Lift F7 3.200 5 16.000 3591.674 Approved
F8 3.200 2 6.400 3598.074
T4CL 3.217 2 6.434 3604.508
T6B 3.585 5 17.925 3622.433
T6D 3.939 4 15.756 3638.189
Sr No BOQ Code RFI No. Date Section Approved Side Activity Type of panel Area No of panels Total(area) Cum Qty Status Remark
F4 3.200 7 22.400 3660.589
F4R 3.000 2 6.000 3666.589
F4L 3.000 7 21.000 3687.589
F6 3.200 11 35.200 3722.789
19 RE-4 Str/269 07.11.2020 Km 95+000 to Km 95+090 LHS 3rd Lift F7 3.200 5 16.000 3738.789 Approved
F8 3.200 2 6.400 3745.189
T4F 2.347 20 46.940 3792.129
T6B 3.585 5 17.925 3810.054
T6D 3.939 4 15.756 3825.810
F4 3.200 7 22.400 3848.210
F6 3.200 11 35.200 3883.410
F7 3.200 5 16.000 3899.410
20 RE-4 Str/270 07.11.2020 Km 95+090 to Km 95+224 - 4th lift LHS 4th Lift F8 3.200 2 6.400 3905.810 Approved
T4B 1.901 27 51.327 3957.137
T6B 3.585 5 17.925 3975.062
T6D 3.939 4 15.756 3990.818
F4 3.200 16 51.200 4042.018
F6 3.200 11 35.200 4077.218
F7 3.200 5 16.000 4093.218
F7R 3.000 1 3.000 4096.218
21 RE-4 Str/285 08.12.2020 Km 94+927 to Km 94+960 - 2nd lift BHS 2nd Lift Approved
F8 3.200 2 6.400 4102.618
T4C 3.217 19 61.123 4163.741 RA Bill-5
T6B 3.585 5 17.925 4181.666
T6D 3.939 4 15.756 4197.422
F4 3.200 7 22.400 4219.822
F6 3.200 11 35.200 4255.022
F7 3.200 5 16.000 4271.022
F8 3.200 2 6.400 4277.422
22 RE-4 Str/286 08.12.2020 Km 94+960 to Km 95+000 - 3rd lift LHS 3rd Lift T4C 3.217 19 61.123 4338.545 Approved
T4D 3.016 9 27.144 4365.689
T4F 2.347 20 46.940 4412.629
T6B 3.585 5 17.925 4430.554
T6D 3.939 4 15.756 4446.310
F4 3.200 7 22.400 4468.710
F6 3.200 11 35.200 4503.910
F7 3.200 5 16.000 4519.910
F8 3.200 2 6.400 4526.310
T4D 3.016 9 27.144 4553.454
23 RE-4 Str/287 08.12.2020 Km 95+000 to Km 95+090 - 4th lift LHS 4th Lift Approved
T4E 2.570 10 25.700 4579.154
T4F 2.347 22 51.634 4630.788
T6B 3.585 7 25.095 4655.883
T6BL 3.585 2 7.170 4663.053
T6D 3.939 4 15.756 4678.809
Sr No BOQ Code RFI No. Date Section Approved Side Activity Type of panel Area No of panels Total(area) Cum Qty Status Remark
F4 3.200 7 22.400 4701.209
F6 3.200 11 35.200 4736.409
F7 3.200 5 16.000 4752.409
24 RE-4 Str/288 08.12.2020 Km 95+090 to Km 95+224 - 5th lift LHS 5th Lift F8 3.200 2 6.400 4758.809 Approved
T4D 3.016 10 30.160 4788.969
T4E 2.570 8 20.560 4809.529
T6BL 3.585 2 7.170 4816.699
T6D 3.939 4 15.756 4832.455
F4 3.200 9 28.800 4861.255
F6 3.200 11 35.200 4896.455
F7 3.200 5 16.000 4912.455
F8 3.200 2 6.400 4918.855
25 RE-4 Str/289 08.12.2020 Km 95+224 to Km 95+334 - 4th lift LHS 4th Lift T2A 1.429 23 32.867 4951.722 Approved
T2B 1.270 10 12.700 4964.422
T4E 2.570 10 25.700 4990.122
T6C 4.116 7 28.812 5018.934 RA Bill-5
T6D 3.939 4 15.756 5034.690
F4 3.200 9 28.800 5063.490
F6 3.200 11 35.200 5098.690
F7 3.200 5 16.000 5114.690
26 RE-4 Str/290 09.12.2020 Km 95+000 to Km 95+090 - 3rd lift RHS 3rd Lift F8 3.200 2 6.400 5121.090 Approved
T4E 2.570 10 25.700 5146.790
T6C 4.116 10 41.160 5187.950
T6D 3.939 4 15.756 5203.706
F4 3.200 11 35.200 5238.906
F6 3.200 13 41.600 5280.506
F7 3.200 5 16.000 5296.506
27 RE-4 Str/291 09.12.2020 Km 95+090 to Km 95+193 - 4th lift RHS 4th Lift F8 3.200 4 12.800 5309.306 Approved
T4EL 2.570 1 2.570 5311.876
T6C 4.116 12 49.392 5361.268
T6D 3.939 10 39.390 5400.658
F4 3.200 18 57.600 5458.258
km 94+927 to 94+960 RHS 3rd Lift F6 3.200 16 51.200 5509.458
T2B 1.270 3 3.810 5513.268
28 RE-4 Str/323 01.01.2021 T4B 1.901 3 5.703 5518.971
T4D 3.016 2 6.032 5525.003
km 94+927 to 94+950 LHS 3rd Lift
T4F 2.347 3 7.041 5532.044
T6B 3.585 2 7.170 5539.214
F4 3.200 21 67.200 5606.414 Approved RA Bill-6
29 RE-4 Str/324 01.01.2021 km 94+960 to 95+005 RHS 3rd Lift
F6 3.200 23 73.600 5680.014
F4 3.200 24 76.800 5756.814
29 RE-4 Str/325 01.01.2021 km 95+000 to 95+090 RHS 4th Lift
F6 3.200 24 76.800 5833.614
F4 3.200 18 57.600 5891.214
30 RE-4 Str/326 01.01.2021 km 95+090 to 95+135 RHS 5th Lift
F6 3.200 21 67.200 5958.414
F4 3.200 26 83.200 6041.614
30 RE-4 Str/327 01.01.2021 km 95+193 to 95+345 RHS 4th Lift
F6 3.200 21 67.200 6108.814
Sr No BOQ Code RFI No. Date Section Approved Side Activity Type of panel Area No of panels Total(area) Cum Qty Status Remark
F4 3.200 60 192.000 6300.814
31 RE-4 Str/413 25.03.2021 Km 94+927 to Km 95+000 BHS 4th Lift F4R 3.000 2 6.000 6306.814
F4L 3.000 2 6.000 6312.814
F4 3.200 32 102.400 6415.214
T2A 1.429 2 2.858 6418.072
T2B 1.270 4 5.080 6423.152
T4C 3.217 4 12.868 6436.020
32 RE-4 Str/414 26.03.2021 Km 95+000 to Km 95+090 BHS 5th Lift T4D 3.016 2 6.032 6442.052
T4E 2.570 4 10.280 6452.332
T4F 2.347 6 14.082 6466.414
T6B 3.585 4 14.340 6480.754
T6D 3.939 2 7.878 6488.632
F4 3.200 8 25.600 6514.232
T2A 1.429 5 7.145 6521.377
T4C 3.217 5 16.085 6537.462
33 RE-4 Str/417 01.04.2021 Km 94+927 to Km 95+000-5th lift LHS 5th Lift T4D 3.016 1 3.016 6540.478 Approved RA Bill-7
T4E 2.570 2 5.140 6545.618
T4F 2.347 2 4.694 6550.312
T6B 3.585 1 3.585 6553.897
F4 3.200 6 19.200 6573.097
T4C 3.217 2 6.434 6579.531
T4E 2.570 2 5.140 6584.671
34 RE-4 Str/418 01.04.2021 km 95+000 to 95+090-6th Lift LHS 6th Lift
T4F 2.347 2 4.694 6589.365
T6B 3.585 2 7.710 6597.075
T6D 3.939 2 7.878 6604.953
F4 3.200 6 19.200 6624.153
35 RE-4 Str/419 03.04.2021 Km 94+927 to Km 95+000-5th lift RHS 5th Lift T4E 2.570 3 7.710 6631.863
T4F 2.347 3 7.041 6638.904
T6D 3.939 4 15.756 6654.660
T2A 1.429 2 2.858 6657.518
T4D 3.016 6 18.096 6675.614
36 RE-4 Str/433 01.05.2021 Km 94+927 to Km 95+000-6th lift LHS 6th Lift
T4F 2.347 1 2.347 6677.961
T6B 3.585 2 7.170 6685.131
T6D 3.939 1 3.939 6689.070
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 28.02.2022
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
1 RE-5 HW/152 18.07.2020 Km 94+771 to Km 94+914 LHS Embankment 1st layer 1 143 7.00 0.2 200.200 200.200 Approved
2 RE-5 HW/154 20.07.2020 Km 94+771 to Km 94+914 LHS Embankment 2nd layer 1 143 7.00 0.2 200.200 400.400 Approved
3 RE-5 HW/162 24.07.2020 Km 94+817 to Km 94+914 RHS Embankment 1st layer 1 97 7.00 0.2 135.800 536.200 Approved
4 RE-5 HW/163 27.07.2020 Km 94+870 to Km 94+914 RHS Embankment 2nd layer 1 44 7.00 0.2 61.600 597.800 Approved
5 RE-5 HW/164 27.07.2020 Km 94+870 to Km 94+914 LHS Embankment 3rd layer 1 44 7.00 0.2 61.600 659.400 Approved
6 RE-5 HW/165 28.07.2020 Km 94+870 to Km 94+914 RHS Embankment 3rd layer 1 44 7.00 0.2 61.600 721.000 Approved
7 RE-5 HW/166 28.07.2020 Km 94+870 to Km 94+914 LHS Embankment 4th layer 1 44 7.00 0.2 61.600 782.600 Approved
8 RE-5 HW/167 29.07.2020 Km 94+870 to Km 94+914 RHS Embankment 4th layer 1 44 7.00 0.2 61.600 844.200 Approved
9 RE-5 HW/170 03.08.2020 Km 94+870 to Km 94+914 LHS Embankment 5th layer 1 44 7.00 0.2 61.600 905.800 Approved
10 RE-5 HW/171 03.08.2020 Km 94+870 to Km 94+914 RHS Embankment 5th layer 1 44 7.00 0.2 61.600 967.400 Approved
11 RE-5 HW/178 13.08.2020 Km 95+150 to Km 95+334 LHS Embankment 1st layer 1 184 7.00 0.2 257.600 1225.000 Approved
12 RE-5 HW/181 14.08.2020 Km 95+150 to Km 95+334 LHS Embankment 2nd layer 1 184 7.00 0.2 257.600 1482.600 Approved RA Bill-4
13 RE-5 HW/184 15.08.2020 Km 95+150 to Km 95+334 LHS Embankment 3rd layer 1 184 7.00 0.2 257.600 1740.200 Approved
14 RE-5 HW/185 17.08.2020 Km 95+150 to Km 95+334 LHS Embankment 4th layer 1 184 7.00 0.2 257.600 1997.800 Approved
15 RE-5 HW/186 18.08.2020 Km 95+150 to Km 95+334 LHS Embankment 5th layer 1 184 7.00 0.2 257.600 2255.400 Approved
32 RE-5 HW/206 26.08.2020 Km 94+771 to Km 94+870 LHS Embankment 3rd layer 1 99 7 0.2 138.600 2394.000 Approved
33 RE-5 HW/207 26.08.2020 Km 94+817 to Km 94+870 RHS Embankment 2nd layer 1 53 7 0.2 74.200 2468.200 Approved
36 RE-5 HW/210 27.08.2020 Km 94+771 to Km 94+870 LHS Embankment 4th layer 1 99 7 0.2 138.600 2606.800 Approved
37 RE-5 HW/211 27.08.2020 Km 94+817 to Km 94+870 RHS Embankment 3rd layer 1 53 7 0.2 74.200 2681.000 Approved
40 RE-5 HW/216 28.08.2020 Km 94+771 to Km 94+870 LHS Embankment 5th layer 1 99 7 0.2 138.600 2819.600 Approved
41 RE-5 HW/217 28.08.2020 Km 94+817 to Km 94+870 RHS Embankment 4th layer 1 53 7 0.2 74.200 2893.800 Approved
45 RE-5 HW/221 29.08.2020 Km 94+817 to Km 94+870 RHS Embankment 5th layer 1 53 7 0.2 74.200 2968.000 Approved
64 RE-5 HW/251 09.09.2020 Km 95+050 to Km 95+193 RHS Embankment 1st layer 1 143 7 0.2 200.200 3168.200 Approved
65 RE-5 HW/253 10.09.2020 Km 95+050 to Km 95+193 RHS Embankment 2nd layer 1 143 7 0.2 200.200 3368.400 Approved
73 RE-5 HW/265 12.09.2020 Km 95+193 to Km 95+345 RHS Embankment 1st layer 1 152 7 0.2 212.800 3581.200 Approved
RA Bill-4
74 RE-5 HW/266 12.09.2020 Km 95+050 to Km 95+193 RHS Embankment 3rd layer 1 143 7 0.2 200.200 3781.400 Approved
76 RE-5 HW/274 14.09.2020 Km 95+193 to Km 95+345 RHS Embankment 2nd layer 1 152 7 0.2 212.800 3994.200 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
77 RE-5 HW/275 14.09.2020 Km 95+050 to Km 95+193 RHS Embankment 4th layer 1 143 7 0.2 200.200 4194.400 Approved
78 RE-5 HW/276 15.09.2020 Km 95+193 to Km 95+345 RHS Embankment 3rd layer 1 152 7 0.2 212.800 4407.200 Approved
79 RE-5 HW/277 16.09.2020 Km 95+193 to Km 95+345 RHS Embankment 4th layer 1 152 7 0.2 212.800 4620.000 Approved
16 RE-5 HW/188 19.08.2020 Km 95+150 to Km 95+334 LHS Embankment 6th layer 1 184 13.29 0.2 489.072 5109.072 Approved
17 RE-5 HW/189 20.08.2020 Km 95+150 to Km 95+334 LHS Embankment 7th layer 1 184 13.29 0.2 489.072 5598.144 Approved
18 RE-5 HW/190 20.08.2020 Km 94+870 to Km 94+914 LHS Embankment 6th layer 1 44 13.29 0.2 116.952 5715.096 Approved
19 RE-5 HW/191 20.08.2020 Km 94+870 to Km 94+914 RHS Embankment 6th layer 1 44 13.29 0.2 116.952 5832.048 Approved
20 RE-5 HW/192 21.08.2020 Km 95+150 to Km 95+334 LHS Embankment 8th layer 1 184 13.29 0.2 489.072 6321.120 Approved
21 RE-5 HW/193 21.08.2020 Km 94+870 to Km 94+914 LHS Embankment 7th layer 1 44 13.29 0.2 116.952 6438.072 Approved
22 RE-5 HW/194 21.08.2020 Km 94+870 to Km 94+914 RHS Embankment 7th layer 1 44 13.29 0.2 116.952 6555.024 Approved
23 RE-5 HW/195 22.08.2020 Km 95+150 to Km 95+334 LHS Embankment 9th layer 1 184 13.29 0.2 489.072 7044.096 Approved
24 RE-5 HW/196 22.08.2020 Km 94+870 to Km 94+914 LHS Embankment 8th layer 1 44 13.29 0.2 116.952 7161.048 Approved
RA Bill-4
25 RE-5 HW/197 22.08.2020 Km 94+870 to Km 94+914 RHS Embankment 8th layer 1 44 13.29 0.2 116.952 7278.000 Approved
26 RE-5 HW/198 24.08.2020 Km 94+870 to Km 94+914 LHS Embankment 9th layer 1 44 13.29 0.2 116.952 7394.952 Approved
27 RE-5 HW/199 24.08.2020 Km 94+870 to Km 94+914 RHS Embankment 9th layer 1 44 13.29 0.2 116.952 7511.904 Approved
28 RE-5 HW/202 25.08.2020 Km 94+870 to Km 94+914 LHS Embankment 10th layer 1 44 13.29 0.2 116.952 7628.856 Approved
29 RE-5 HW/203 25.08.2020 Km 94+870 to Km 94+914 RHS Embankment 10th layer 1 44 13.29 0.2 116.952 7745.808 Approved
30 RE-5 HW/204 26.08.2020 Km 94+870 to Km 94+914 LHS Embankment 11th layer 1 44 13.29 0.2 116.952 7862.760 Approved
31 RE-5 HW/205 26.08.2020 Km 94+870 to Km 94+914 RHS Embankment 11th layer 1 44 13.29 0.2 116.952 7979.712 Approved
34 RE-5 HW/208 27.08.2020 Km 94+870 to Km 94+914 LHS Embankment 12th layer 1 44 13.29 0.2 116.952 8096.664 Approved
35 RE-5 HW/209 27.08.2020 Km 94+870 to Km 94+914 RHS Embankment 12th layer 1 44 13.29 0.2 116.952 8213.616 Approved
38 RE-5 HW/214 28.08.2020 Km 94+870 to Km 94+914 LHS Embankment 13th layer 1 44 13.29 0.2 116.952 8330.568 Approved
39 RE-5 HW/215 28.08.2020 Km 94+870 to Km 94+914 RHS Embankment 13th layer 1 44 13.29 0.2 116.952 8447.520 Approved
42 RE-5 HW/218 29.08.2020 Km 94+870 to Km 94+914 LHS Embankment 14th layer 1 44 13.29 0.2 116.952 8564.472 Approved
43 RE-5 HW/219 29.08.2020 Km 94+870 to Km 94+914 RHS Embankment 14th layer 1 44 13.29 0.2 116.952 8681.424 Approved
44 RE-5 HW/220 29.08.2020 Km 94+820 to Km 94+870 LHS Embankment 6th layer 1 50 13.29 0.2 132.900 8814.324 Approved
46 RE-5 HW/222 31.08.2020 Km 94+820 to Km 94+870 LHS Embankment 7th layer 1 50 13.29 0.2 132.900 8947.224 Approved
47 RE-5 HW/223 31.08.2020 Km 94+817 to Km 94+870 RHS Embankment 6th layer 1 53 13.29 0.2 140.874 9088.098 Approved
RA Bill-4
48 RE-5 HW/226 01.09.2020 Km 94+820 to Km 94+870 LHS Embankment 8th layer 1 50 13.29 0.2 132.900 9220.998 Approved
49 RE-5 HW/227 01.09.2020 Km 94+817 to Km 94+870 RHS Embankment 7th layer 1 53 13.29 0.2 140.874 9361.872 Approved
50 RE-5 HW/228 02.09.2020 Km 94+820 to Km 94+870 LHS Embankment 9th layer 1 50 13.29 0.2 132.900 9494.772 Approved
51 RE-5 HW/229 02.09.2020 Km 94+817 to Km 94+870 RHS Embankment 8th layer 1 53 13.29 0.2 140.874 9635.646 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
52 RE-5 HW/230 03.09.2020 Km 94+820 to Km 94+870 LHS Embankment 10th layer 1 50 13.29 0.2 132.900 9768.546 Approved
53 RE-5 HW/231 03.09.2020 Km 94+817 to Km 94+870 RHS Embankment 9th layer 1 53 13.29 0.2 140.874 9909.420 Approved
54 RE-5 HW/232 03.09.2020 Km 94+771 to Km 94+820 LHS Embankment 6th layer 1 49 13.29 0.2 130.242 10039.662 Approved
55 RE-5 HW/233 03.09.2020 Km 94+870 to Km 94+914 LHS Embankment 15th layer 1 44 13.29 0.2 116.952 10156.614 Approved
56 RE-5 HW/239 04.09.2020 Km 94+820 to Km 94+870 LHS Embankment 11th layer 1 50 13.29 0.2 132.900 10289.514 Approved
57 RE-5 HW/240 05.09.2020 Km 94+817 to Km 94+870 RHS Embankment 10th layer 1 53 13.29 0.2 140.874 10430.388 Approved
58 RE-5 HW/241 05.09.2020 Km 94+771 to Km 94+820 LHS Embankment 7th layer 1 49 13.29 0.2 130.242 10560.630 Approved
59 RE-5 HW/242 05.09.2020 Km 94+870 to Km 94+914 RHS Embankment 15th layer 1 44 13.29 0.2 116.952 10677.582 Approved
60 RE-5 HW/245 08.09.2020 Km 94+820 to Km 94+870 LHS Embankment 12th layer 1 50 13.29 0.2 132.900 10810.482 Approved
61 RE-5 HW/246 08.09.2020 Km 94+817 to Km 94+870 RHS Embankment 11th layer 1 53 13.29 0.2 140.874 10951.356 Approved
62 RE-5 HW/247 08.09.2020 Km 94+771 to Km 94+820 LHS Embankment 8th layer 1 49 13.29 0.2 130.242 11081.598 Approved RA Bill-4
63 RE-5 HW/249 08.09.2020 Km 94+870 to Km 94+914 RHS Embankment 16th layer 1 44 13.29 0.2 116.952 11198.550 Approved
66 RE-5 HW/254 10.09.2020 Km 95+224 to Km 95+334 LHS Embankment 10th layer 1 110 13.29 0.2 292.380 11490.930 Approved
67 RE-5 HW/259 11.09.2020 Km 95+224 to Km 95+334 LHS Embankment 11th layer 1 110 13.29 0.2 292.380 11783.310 Approved
68 RE-5 HW/260 12.09.2020 Km 94+771 to Km 94+820 LHS Embankment 9th layer 1 49 13.29 0.2 130.242 11913.552 Approved
69 RE-5 HW/261 12.09.2020 Km 94+820 to Km 94+870 LHS Embankment 13th layer 1 50 13.29 0.2 132.900 12046.452 Approved
70 RE-5 HW/262 12.09.2020 Km 94+870 to Km 94+914 LHS Embankment 16th layer 1 44 13.29 0.2 116.952 12163.404 Approved
71 RE-5 HW/263 12.09.2020 Km 94+820 to Km 94+870 RHS Embankment 12th layer 1 50 13.29 0.2 132.900 12296.304 Approved
72 RE-5 HW/264 12.09.2020 Km 94+870 to Km 94+914 RHS Embankment 17th layer 1 44 13.29 0.2 116.952 12413.256 Approved
73 RE-5 HW/267 12.09.2020 Km 95+224 to Km 95+334 LHS Embankment 12th layer 1 110 13.29 0.2 292.380 12705.636 Approved
74 RE-5 HW/282 18.09.2020 Km 95+224 to Km 95+334 LHS Embankment 13th layer 1 110 13.29 0.2 292.380 12998.016 Approved
75 RE-5 HW/283 21.09.2020 Km 95+193 to Km 95+344.59 RHS Embankment 5th layer 1 151.59 4.5 0.2 136.431 13134.447 Approved
76 RE-5 HW/284 22.09.2020 Km 95+193 to Km 95+340 RHS Embankment 6th layer 1 147 13.29 0.2 390.726 13525.173 Approved
77 RE-5 HW/285 23.09.2020 Km 94+790 to Km 94+820 LHS Embankment 10th layer 1 30 13.29 0.2 79.740 13604.913 Approved
78 RE-5 HW/286 23.09.2020 Km 94+820 to Km 94+870 LHS Embankment 14th layer 1 50 13.29 0.2 132.900 13737.813 Approved
79 RE-5 HW/287 23.09.2020 Km 94+870 to Km 94+914.230 LHS Embankment 17th layer 1 44.23 13.29 0.2 117.563 13855.376 Approved
80 RE-5 HW/288 23.09.2020 Km 94+870 to Km 94+914.23 RHS Embankment 18th layer 1 44.23 13.29 0.2 117.563 13972.940 Approved RA Bill-5
81 RE-5 HW/289 22.09.2020 Km 94+820 to Km 94+870 RHS Embankment 13th layer 1 50 13.29 0.2 132.900 14105.840 Approved
82 RE-5 HW/290 24.09.2020 Km 94+800 to Km 94+820 LHS Embankment 11th layer 1 20 13.29 0.2 53.160 14159.000 Approved
83 RE-5 HW/291 24.09.2020 Km 94+820 to Km 94+870 LHS Embankment 15th layer 1 50 13.29 0.2 132.900 14291.900 Approved
84 RE-5 HW/292 24.09.2020 Km 94+870 to Km 94+914.23 LHS Embankment 18th layer 1 44.23 13.29 0.2 117.563 14409.463 Approved
85 RE-5 HW/293 24.09.2020 Km 94+870 to Km 94+914.23 RHS Embankment 19th layer 1 44.23 13.29 0.2 117.563 14527.026 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
86 RE-5 HW/294 24.09.2020 Km 94+820 to Km 94+870 RHS Embankment 14th layer 1 50 13.29 0.2 132.900 14659.926 Approved
87 RE-5 HW/296 25.09.2020 Km 95+224 to Km 95+290 LHS KEmbankment 14th layer 1 66 13.29 0.2 175.428 14835.354 Approved
88 RE-5 HW/297 25.09.2020 Km 95+050 to Km 95+193 RHS Embankment 5th layer 1 143 5.764 0.2 164.850 15000.205 Approved
89 RE-5 HW/298 26.09.2020 Km 95+090 to Km 95+150 LHS Embankment 1st layer 1 60 6.557 0.2 78.684 15078.889 Approved
90 RE-5 HW/299 26.09.2020 Km 95+224 to Km 95+334.292 LHS Embankment 15th layer 1 110.292 13.29 0.2 293.156 15372.045 Approved
91 RE-5 HW/300 26.09.2020 Km 95+050 to Km 95+193 RHS Embankment 6th layer 1 143 13.29 0.2 380.094 15752.139 Approved
92 RE-5 HW/301 28.09.2020 Km 94+770.920 to Km 94+820 LHS Embankment 12th layer 1 49.08 13.29 0.2 130.455 15882.594 Approved
93 RE-5 HW/302 28.09.2020 Km 94+820 to Km 94+870 LHS Embankment 16th layer 1 50 13.29 0.2 132.900 16015.494 Approved
94 RE-5 HW/303 28.09.2020 Km 94+870 to Km 94+914.230 LHS Embankment 19th layer 1 44.23 13.29 0.2 117.563 16133.057 Approved
RA Bill-5
95 RE-5 HW/304 28.09.2020 Km 94+830 to Km 94+870 RHS Embankment 15th layer 1 40 13.29 0.2 106.320 16239.377 Approved
96 RE-5 HW/305 28.09.2020 Km 94+870 to Km 94+914.23 RHS Embankment 20th layer 1 44.23 13.29 0.2 117.563 16356.940 Approved
97 RE-5 HW/307 29.09.2020 Km 94+820 to Km 94+870 LHS Embankment 17th layer 1 50 13.29 0.2 132.900 16489.840 Approved
98 RE-5 HW/308 29.09.2020 Km 94+870 to Km 94+914.230 LHS Embankment 20th layer 1 44.23 13.29 0.2 117.563 16607.404 Approved
99 RE-5 HW/309 29.09.2020 Km 94+830 to Km 94+870 RHS Embankment 16th layer 1 40 13.29 0.2 106.320 16713.724 Approved
100 RE-5 HW/310 29.09.2020 Km 94+870 to Km 94+914.230 RHS Embankment 21st layer 1 44.23 13.29 0.2 117.563 16831.287 Approved
101 RE-5 HW/315 01.10.2020 Km 94+820 to Km 94+870 LHS Embankment 18th layer 1 50 13.29 0.2 132.900 16964.187 Approved
102 RE-5 HW/316 Km 94+870 to Km 94+914.230 LHS Embankment 21st layer 1 44.23 13.29 0.2 117.563 17081.750 Approved
01.10.2020
103 RE-5 HW/318 03.10.2020 Km 94+820 to Km 94+870 LHS Embankment 19th layer 1 50 13.29 0.2 132.900 17214.650 Approved
104 RE-5 HW/319 Km 94+870 to Km 94+914.230 LHS Embankment 22nd layer 1 44.23 13.29 0.2 117.563 17332.214 Approved
03.10.2020
105 RE-5 HW/320 03.10.2020 Km 94+830 to Km 94+870 RHS Embankment 17th layer 1 40 13.29 0.2 106.320 17438.534 Approved
106 RE-5 HW/321 Km 94+870 to Km 94+914.230 RHS Embankment 22nd layer 1 44.23 13.29 0.2 117.563 17556.097 Approved
03.10.2020
107 RE-5 HW/323 05.10.2020 Km 94+820 to Km 94+870 LHS Embankment 20th layer 1 50 13.29 0.2 132.900 17688.997 Approved
108 RE-5 HW/324 05.10.2020 Km 94+870 to Km 94+914.230 LHS Embankment 23rd layer 1 44.23 13.29 0.2 117.563 17806.560 Approved
109 RE-5 HW/326 05.10.2020 Km 95+090 to Km 95+150 LHS Embankment 2nd layer 1 60 7 0.2 84.000 17890.560 Approved RA Bill-5
110 RE-5 HW/327 05.10.2020 Km 95+150 to Km 95+224 LHS Embankment 10th layer 1 74 13.29 0.2 196.692 18087.252 Approved
111 RE-5 HW/328 05.10.2020 Km 95+135 to Km 95+193 RHS Embankment 7th layer 1 58 13.29 0.2 154.164 18241.416 Approved
112 RE-5 HW/329 05.10.2020 Km 95+193 to Km 95+345 RHS Embankment 7th layer 1 152 13.29 0.2 404.016 18645.432 Approved
113 RE-5 HW/331 06.10.2020 Km 94+820 to Km 94+870 LHS Embankment 21st layer 1 50 13.29 0.2 132.900 18778.332 Approved
114 RE-5 HW/332 06.10.2020 Km 94+870 to Km 94+914.230 LHS Embankment 24th layer 1 44.23 13.29 0.2 117.563 18895.896 Approved
115 RE-5 HW/333 06.10.2020 Km 95+090 to Km 95+135 RHS Embankment 7th layer 1 45 13.29 0.2 119.610 19015.506 Approved
116 RE-5 HW/334 06.10.2020 Km 95+135 to Km 95+320 RHS Embankment 8th layer 1 185 13.29 0.2 491.730 19507.236 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
117 RE-5 HW/337 07.10.2020 Km 94+820 to Km 94+870 LHS Embankment 22nd layer 1 50 13.29 0.2 132.900 19640.136 Approved
118 RE-5 HW/338 07.10.2020 Km 94+870 to Km 94+914.230 LHS Embankment 25th layer 1 44.23 13.29 0.2 117.563 19757.699 Approved
119 RE-5 HW/340 07.10.2020 Km 95+045 to Km 95+090 LHS Embankment 1st layer 1 45 7 0.2 63.000 19820.699 Approved
120 RE-5 HW/341 07.10.2020 Km 95+090 to Km 95+150 LHS Embankment 3rd layer 1 60 7 0.2 84.000 19904.699 Approved
121 RE-5 HW/342 07.10.2020 Km 95+150 to Km 95+224 LHS Embankment 11th layer 1 74 13.29 0.2 196.692 20101.391 Approved
122 RE-5 HW/343 07.10.2020 Km 95+224 to Km 95+280 LHS Embankment 16th layer 1 56 13.29 0.2 148.848 20250.239 Approved
123 RE-5 HW/344 Km 94+870 to Km 94+914.230 LHS Embankment 26th layer 1 44.23 13.29 0.2 117.563 20367.802 Approved
08.10.2020
124 RE-5 HW/345 08.10.2020 Km 94+830 to Km 94+870 RHS Embankment 18th layer 1 40 13.29 0.2 106.320 20474.122 Approved
125 RE-5 HW/346 Km 95+090 to Km 95+150 LHS Embankment 4th layer 1 60 7 0.2 84.000 20558.122 Approved RA Bill-5
08.10.2020
126 RE-5 HW/347 08.10.2020 Km 95+000 to Km 95+045 LHS Embankment 1st layer 1 45 7 0.2 63.000 20621.122 Approved
127 RE-5 HW/348 08.10.2020 Km 95+150 to Km 95+224 LHS Embankment 12th layer 1 74 13.29 0.2 196.692 20817.814 Approved
128 RE-5 HW/349 08.10.2020 Km 95+224 to Km 95+280 LHS Embankment 17th layer 1 56 13.29 0.2 148.848 20966.662 Approved
129 RE-5 HW/356 12.10.2020 Km 95+090 to Km 95+150 LHS Embankment 5th layer 1 60 13.29 0.2 159.480 21126.142 Approved
130 RE-5 HW/357 12.10.2020 Km 95+000 to Km 95+090 LHS Embankment 2nd layer 1 90 7.03 0.2 126.540 21252.682 Approved
131 RE-5 HW/358 12.10.2020 Km 95+150 to Km 95+224 LHS Embankment 13th layer 1 74 13.29 0.2 196.692 21449.374 Approved
132 RE-5 HW/359 12.10.2020 Km 95+224 to Km 95+280 LHS Embankment 18th layer 1 46 13.29 0.2 122.268 21571.642 Approved
133 RE-5 HW/360 12.10.2020 Km 95+135 to Km 95+345 RHS Embankment 9th layer 1 210 13.29 0.2 558.180 22129.822 Approved
134 RE-5 HW/361 13.10.2020 Km 95+090 to Km 95+150 LHS Embankment 6th layer 1 60 13.29 0.2 159.480 22289.302 Approved
135 RE-5 HW/362 13.10.2020 Km 95+000 to Km 95+090 LHS Embankment 3rd layer 1 90 7.03 0.2 126.540 22415.842 Approved
136 RE-5 HW/363 13.10.2020 Km 95+150 to Km 95+224 LHS Embankment 14th layer 1 74 13.29 0.2 196.692 22612.534 Approved
137 RE-5 HW/364 13.10.2020 Km 95+135 to Km 95+300 RHS Embankment 10th layer 1 165 13.29 0.2 438.570 23051.104 Approved
138 RE-5 HW/365 14.10.2020 Km 95+090 to Km 95+150 LHS Embankment 7th layer 1 60 13.29 0.2 159.480 23210.584 Approved
139 RE-5 HW/366 14.10.2020 Km 95+000 to Km 95+090 LHS Embankment 4th layer 1 90 13.29 0.2 239.220 23449.804 Approved
140 RE-5 HW/367 14.10.2020 Km 95+150 to Km 95+224 LHS Embankment 15th layer 1 74 13.29 0.2 196.692 23646.496 Approved
141 RE-5 HW/368 15.10.2020 Km 95+090 to Km 95+150 LHS Embankment 8th layer 1 60 13.29 0.2 159.480 23805.976 Approved RA Bill-5
142 RE-5 HW/369 15.10.2020 Km 95+045 to Km 95+090 LHS Embankment 5th layer 1 45 13.29 0.2 119.610 23925.586 Approved
143 RE-5 HW/370 15.10.2020 Km 95+135 to Km 95+300 RHS Embankment 11th layer 1 165 13.29 0.2 438.570 24364.156 Approved
144 RE-5 HW/371 15.10.2020 Km 95+150 to Km 95+224 LHS Embankment 16th layer 1 74 13.29 0.2 196.692 24560.848 Approved
145 RE-5 HW/372 16.10.2020 Km 95+090 to Km 95+150 LHS Embankment 9th layer 1 60 13.29 0.2 159.480 24720.328 Approved
146 RE-5 HW/373 16.10.2020 Km 95+045 to Km 95+090 LHS Embankment 6th layer 1 45 13.29 0.2 119.610 24839.938 Approved
147 RE-5 HW/374 16.10.2020 Km 95+135 to Km 95+300 RHS Embankment 12th layer 1 165 13.29 0.2 438.570 25278.508 Approved
148 RE-5 HW/375 16.10.2020 Km 95+150 to Km 95+224 LHS Embankment 17th layer 1 74 13.29 0.2 196.692 25475.200 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
149 RE-5 HW/376 17.10.2020 Km 95+090 to Km 95+150 LHS Embankment 10th layer 1 60 13.29 0.2 159.480 25634.680 Approved
150 RE-5 HW/378 17.10.2020 Km 95+000 to Km 95+045 LHS Embankment 5th layer 1 45 13.29 0.2 119.610 25754.290 Approved
151 RE-5 HW/380 19.10.2020 Km 95+090 to Km 95+150 LHS Embankment 11th layer 1 60 13.29 0.2 159.480 25913.770 Approved
152 RE-5 HW/382 19.10.2020 Km 95+000 to Km 95+045 LHS Embankment 6th layer 1 45 13.29 0.2 119.610 26033.380 Approved
153 RE-5 HW/383 19.10.2020 Km 94+960 to Km 95+000 LHS Embankment 1st layer 1 40 7.6 0.2 60.800 26094.180 Approved
154 RE-5 HW/384 20.10.2020 Km 95+090 to Km 95+150 LHS Embankment 12th layer 1 60 13.29 0.2 159.480 26253.660 Approved
155 RE-5 HW/385 20.10.2020 Km 95+045 to Km 95+090 LHS Embankment 7th layer 1 45 13.29 0.2 119.610 26373.270 Approved
156 RE-5 HW/387 20.10.2020 Km 95+090 to Km 95+135 RHS Embankment 8th layer 1 45 13.29 0.2 119.610 26492.880 Approved RA Bill-5
157 RE-5 HW/388 20.10.2020 Km 95+135 to Km 95+193 RHS Embankment 13th layer 1 58 13.29 0.2 154.164 26647.044 Approved
158 RE-5 HW/389 21.10.2020 Km 95+045 to Km 95+090 LHS Embankment 8th layer 1 45 13.29 0.2 119.610 26766.654 Approved
159 RE-5 HW/391 21.10.2020 Km 95+005 to Km 95+050 RHS Embankment 1st layer 1 45 6.4 0.2 57.600 26824.254 Approved
160 RE-5 HW/392 21.10.2020 Km 95+090 to Km 95+135 RHS Embankment 9th layer 1 45 13.29 0.2 119.610 26943.864 Approved
161 RE-5 HW/393 21.10.2020 Km 95+135 to Km 95+193 RHS Embankment 14th layer 1 58 13.29 0.2 154.164 27098.028 Approved
162 RE-5 HW/394 22.10.2020 Km 95+005 to Km 95+050 RHS Embankment 2nd layer 1 45 6.4 0.2 57.600 27155.628 Approved
163 RE-5 HW/395 22.10.2020 Km 95+090 to Km 95+135 RHS Embankment 10th layer 1 45 13.29 0.2 119.610 27275.238 Approved
164 RE-5 HW/396 22.10.2020 Km 95+135 to Km 95+193 RHS Embankment 15th layer 1 58 13.29 0.2 154.164 27429.402 Approved
165 RE-5 HW/397 23.10.2020 Km 95+005 to Km 95+050 RHS Embankment 3rd layer 1 45 6.4 0.2 57.600 27487.002 Approved
166 RE-5 HW/398 23.10.2020 Km 95+090 to Km 95+135 RHS Embankment 11th layer 1 45 13.29 0.2 119.610 27606.612 Approved
167 RE-5 HW/399 23.10.2020 Km 95+135 to Km 95+193 RHS Embankment 16th layer 1 58 13.29 0.2 154.164 27760.776 Approved
168 RE-5 HW/400 24.10.2020 Km 95+005 to Km 95+050 RHS Embankment 4th layer 1 45 6.4 0.2 57.600 27818.376 Approved
169 RE-5 HW/401 24.10.2020 Km 95+090 to Km 95+135 RHS Embankment 12th layer 1 45 13.29 0.2 119.610 27937.986 Approved
170 RE-5 HW/403 26.10.2020 Km 95+005 to Km 95+050 RHS Embankment 5th layer 1 45 6.4 0.2 57.600 27995.586 Approved
171 RE-5 HW/404 26.10.2020 Km 95+090 to Km 95+135 RHS Embankment 13th layer 1 45 13.29 0.2 119.610 28115.196 Approved
172 RE-5 HW/405 26.10.2020 Km 94+960 to Km 95+005 RHS Embankment 1st layer 1 45 6.68 0.2 60.120 28175.316 Approved RA Bill-5
173 RE-5 HW/406 31.10.2020 Km 94+870 to Km 94+914 LHS Embankment 27th layer 1 44 13.29 0.2 116.952 28292.268 Approved
174 RE-5 HW/407 31.10.2020 Km 94+820 to Km 94+870 LHS Embankment 23rd layer 1 50 13.29 0.2 132.900 28425.168 Approved
175 RE-5 HW/408 31.10.2020 Km 94+870 to Km 94+914 RHS Embankment 23rd layer 1 44 13.29 0.2 116.952 28542.120 Approved
176 RE-5 HW/409 31.10.2020 Km 94+830 to Km 94+870 RHS Embankment 19th layer 1 40 13.29 0.2 106.320 28648.440 Approved
177 RE-5 HW/410 02.11.2020 Km 94+870 to Km 94+914 LHS Embankment 28th layer 1 44 13.29 0.2 116.952 28765.392 Approved
178 RE-5 HW/411 02.11.2020 Km 94+840 to Km 94+870 LHS Embankment 24th layer 1 30 13.29 0.2 79.740 28845.132 Approved
179 RE-5 HW/412 02.11.2020 Km 94+870 to Km 94+914 RHS Embankment 24th layer 1 44 13.29 0.2 116.952 28962.084 Approved
180 RE-5 HW/413 02.11.2020 Km 94+830 to Km 94+870 RHS Embankment 20th layer 1 40 13.29 0.2 106.320 29068.404 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
181 RE-5 HW/414 03.11.2020 Km 95+150 to Km 95+224 LHS Embankment 18th layer 1 74 13.29 0.2 196.692 29265.096 Approved
182 RE-5 HW/415 03.11.2020 Km 95+045 to Km 95+090 LHS Embankment 9th layer 1 45 13.29 0.2 119.610 29384.706 Approved
183 RE-5 HW/416 03.11.2020 Km 94+960 to Km 95+000 LHS Embankment 2nd layer 1 40 7.52 0.2 60.160 29444.866 Approved
184 RE-5 HW/417 03.11.2020 Km 94+817 to Km 94+850 RHS Embankment Top layer 1 33 13.29 0.2 87.714 29532.580 Approved
185 RE-5 HW/418 03.11.2020 Km 94+870 to Km 94+914 RHS Embankment 25th layer 1 44 13.29 0.2 116.952 29649.532 Approved
186 RE-5 HW/419 03.11.2020 Km 94+850 to Km 94+870 RHS Embankment 21st layer 1 20 13.29 0.2 53.160 29702.692 Approved
187 RE-5 HW/420 04.11.2020 Km 95+150 to Km 95+224 LHS Embankment 19th layer 1 74 13.29 0.2 196.692 29899.384 Approved RA Bill-5
188 RE-5 HW/421 04.11.2020 Km 95+045 to Km 95+090 LHS Embankment 10th layer 1 45 13.29 0.2 119.610 30018.994 Approved
189 RE-5 HW/423 04.11.2020 Km 94+870 to Km 94+914 RHS Embankment 26th layer 1 44 13.29 0.2 116.952 30135.946 Approved
190 RE-5 HW/424 04.11.2020 Km 94+850 to Km 94+870 RHS Embankment 22nd layer 1 20 13.29 0.2 53.160 30189.106 Approved
191 RE-5 HW/425 05.11.2020 Km 95+180 to Km 95+224 LHS Embankment 20th layer 1 44 13.29 0.2 116.952 30306.058 Approved
192 RE-5 HW/428 05.11.2020 Km 94+771 to Km 94+820 LHS Embankment Top layer 1 49 13.29 0.2 130.242 30436.300 Approved
193 RE-5 HW/430 05.11.2020 Km 94+870 to Km 94+914 LHS Embankment 29th layer 1 44 13.29 0.2 116.952 30553.252 Approved
194 RE-5 HW/431 05.11.2020 Km 95+090 to Km 95+150 LHS Embankment 13th layer 1 60 13.29 0.2 159.480 30712.732 Approved
195 RE-5 HW/432 05.11.2020 Km 94+960 to Km 95+005 RHS Embankment 2nd layer 1 45 7.52 0.2 67.680 30780.412 Approved
196 RE-5 HW/433 05.11.2020 Km 95+005 to Km 95+050 RHS Embankment 6th layer 1 45 13.29 0.2 119.610 30900.022 Approved
197 RE-5 HW/434 05.11.2020 Km 95+090 to Km 95+135 RHS Embankment 14th layer 1 45 13.29 0.2 119.610 31019.632 Approved
198 RE-5 HW/435 05.11.2020 Km 95+135 to Km 95+193 RHS Embankment 17th layer 1 58 13.29 0.2 154.164 31173.796 Approved
199 RE-5 HW/437 06.11.2020 Km 95+000 to Km 95+045 LHS Embankment 7th layer 1 45 13.29 0.2 119.610 31293.406 Approved
200 RE-5 HW/439 06.11.2020 Km 94+960 to Km 95+000 RHS Embankment 3rd layer 1 40 7.02 0.2 56.160 31349.566 Approved
201 RE-5 HW/442 06.11.2020 Km 94+870 to Km 94+914 LHS Embankment 30th layer 1 44 13.29 0.2 116.952 31466.518 Approved
202 RE-5 HW/443 06.11.2020 Km 95+045 to Km 95+090 LHS Embankment 11th layer 1 45 13.29 0.2 119.610 31586.128 Approved
203 RE-5 HW/444 06.11.2020 Km 95+090 to Km 95+150 LHS Embankment 14th layer 1 60 13.29 0.2 159.480 31745.608 Approved RA Bill-5
204 RE-5 HW/446 06.11.2020 Km 95+180 to Km 95+224 LHS Embankment 21st layer 1 44 13.29 0.2 116.952 31862.560 Approved
205 RE-5 HW/447 06.11.2020 Km 95+050 to Km 95+090 RHS Embankment 7th layer 1 40 13.29 0.2 106.320 31968.880 Approved
206 RE-5 HW/450 07.11.2020 Km 95+000 to Km 95+045 LHS Embankment 8th layer 1 45 13.29 0.2 119.610 32088.490 Approved
207 RE-5 HW/451 07.11.2020 Km 94+960 to Km 95+000 LHS Embankment 4th layer 1 40 13.29 0.2 106.320 32194.810 Approved
208 RE-5 HW/453 07.11.2020 Km 95+045 to Km 95+090 LHS Embankment 12th layer 1 45 13.29 0.2 119.610 32314.420 Approved
209 RE-5 HW/455 07.11.2020 Km 95+090 to Km 95+150 LHS Embankment 15th layer 1 60 13.29 0.2 159.480 32473.900 Approved
210 RE-5 HW/456 07.11.2020 Km 95+180 to Km 95+224 LHS Embankment 22nd layer 1 44 13.29 0.2 116.952 32590.852 Approved
211 RE-5 HW/457 07.11.2020 Km 95+050 to Km 95+090 RHS Embankment 8th layer 1 40 13.29 0.2 106.320 32697.172 Approved
212 RE-5 HW/458 07.11.2020 Km 94+927 to Km 94+960 LHS Embankment 1st layer 1 33 7 0.2 46.200 32743.372 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
213 RE-5 HW/460 09.11.2020 Km 94+890 to Km 94+914 LHS Embankment 31st layer 1 24 13.29 0.2 63.792 32807.164 Approved
214 RE-5 HW/461 9.11.2020 Km 94+850 to Km 94+870 RHS Embankment 23rd Layer 1 20 13.29 0.2 53.160 32860.324 Approved
215 RE-5 HW/462 09.11.2020 Km 94+870 to Km 94+914 RHS Embankment 27th layer 1 44 13.29 0.2 116.952 32977.276 Approved
216 RE-5 HW/464 09.11.2020 Km 94+960 to Km 95+005 RHS Embankment 3rd layer 1 45 7 0.2 63.000 33040.276 Approved
217 RE-5 HW/465 09.11.2020 Km 95+005 to Km 95+050 RHS Embankment 7th layer 1 45 13.29 0.2 119.610 33159.886 Approved
218 RE-5 HW/466 09.11.2020 Km 95+050 to Km 95+090 RHS Embankment 9th layer 1 40 13.29 0.2 106.320 33266.206 Approved RA Bill-5
219 RE-5 HW/467 09.11.2020 Km 95+135 to Km 95+193 RHS Embankment 18th layer 1 58 13.29 0.2 154.164 33420.370 Approved
220 RE-5 HW/468 09.11.2020 Km 94+927 to Km 94+960 LHS Embankment 2nd layer 1 33 7.4 0.2 48.840 33469.210 Approved
221 RE-5 HW/469 09.11.2020 Km 95+090 to Km 95+135 RHS Embankment 15th layer 1 45 13.29 0.2 119.610 33588.820 Approved
222 RE-5 HW/472 10.11.2020 Km 94+850 to Km 94+870 RHS Embankment 24th Layer 1 20 13.29 0.2 53.160 33641.980 Approved
223 RE-5 HW/473 10.11.2020 Km 94+870 to Km 94+914 RHS Embankment 28th layer 1 44 13.29 0.2 116.952 33758.932 Approved
224 RE-5 HW/474 10.11.2020 Km 95+090 to Km 95+135 RHS Embankment 16th layer 1 45 13.29 0.2 119.610 33878.542 Approved
225 RE-5 HW/475 10.11.2020 Km 94+960 to Km 95+005 RHS Embankment 4th layer 1 45 3.2 0.2 28.800 33907.342 Approved
226 RE-5 HW/476 10.11.2020 Km 95+005 to Km 95+050 RHS Embankment 8th layer 1 45 13.29 0.2 119.610 34026.952 Approved
227 RE-5 HW/477 10.11.2020 Km 95+050 to Km 95+090 RHS Embankment 10th layer 1 40 13.29 0.2 106.320 34133.272 Approved
228 RE-5 HW/478 10.11.2020 Km 95+135 to Km 95+193 RHS Embankment 19th layer 1 58 13.29 0.2 154.164 34287.436 Approved
229 RE-5 HW/479 10.11.2020 Km 94+927 to Km 94+960 LHS Embankment 3rd layer 1 33 6.78 0.2 44.748 34332.184 Approved
230 RE-5 HW/482 11.11.2020 Km 94+850 to Km 94+870 RHS Embankment Top Layer 1 20 13.29 0.2 53.160 34385.344 Approved
231 RE-5 HW/483 11.11.2020 Km 94+870 to Km 94+914 RHS Embankment Top layer 1 44 13.29 0.2 116.952 34502.296 Approved
232 RE-5 HW/484 11.11.2020 Km 95+090 to Km 95+135 RHS Embankment 17th layer 1 45 13.29 0.2 119.610 34621.906 Approved
233 RE-5 HW/485 11.11.2020 Km 94+960 to Km 95+050 RHS Embankment 5th layer 1 90 6.6 0.2 118.800 34740.706 Approved
234 RE-5 HW/486 11.11.2020 Km 95+005 to Km 95+050 RHS Embankment 9th layer 1 45 13.29 0.2 119.610 34860.316 Approved RA Bill-5
235 RE-5 HW/487 11.11.2020 Km 95+050 to Km 95+090 RHS Embankment 11th layer 1 40 13.29 0.2 106.320 34966.636 Approved
236 RE-5 HW/488 11.11.2020 Km 95+135 to Km 95+193 RHS Embankment 20th layer 1 58 13.29 0.2 154.164 35120.800 Approved
237 RE-5 HW/489 11.11.2020 Km 94+927 to Km 94+960 LHS Embankment 4th layer 1 33 7.4 0.2 48.840 35169.640 Approved
238 RE-5 HW/494 25.11.2020 Km 94+820 to Km 94+914 LHS Embankment Top layer 1 94 13.29 0.2 249.852 35419.492 Approved
239 RE-5 HW/505 01.12.2020 Km 94+927 to Km 95+000 LHS Embankment 5th layer 1 73 13.29 0.2 194.034 35613.526 Approved
240 RE-5 HW/506 01.12.2020 Km 95+000 to Km 95+045 LHS Embankment 9th layer 1 45 13.29 0.2 119.610 35733.136 Approved
241 RE-5 HW/507 01.12.2020 Km 95+090 to Km 95+150 LHS Embankment 16th layer 1 60 13.29 0.2 159.480 35892.616 Approved
242 RE-5 HW/508 01.12.2020 Km 95+045 to Km 95+090 LHS Embankment 13th layer 1 45 13.29 0.2 119.610 36012.226 Approved
243 RE-5 HW/510 02.12.2020 Km 94+927 to Km 95+000 LHS Embankment 6th layer 1 73 13.29 0.2 194.034 36206.260 Approved
244 RE-5 HW/511 02.12.2020 Km 95+000 to Km 95+045 LHS Embankment 10th layer 1 45 13.29 0.2 119.610 36325.870 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
245 RE-5 HW/512 02.12.2020 Km 95+090 to Km 95+150 LHS Embankment 17th layer 1 60 13.29 0.2 159.480 36485.350 Approved
246 RE-5 HW/513 02.12.2020 Km 95+045 to Km 95+090 LHS Embankment 14th layer 1 45 13.29 0.2 119.610 36604.960 Approved
247 RE-5 HW/514 02.12.2020 Km 95+150 to Km 95+180 LHS Embankment 20th layer 1 30 13.29 0.2 79.740 36684.700 Approved
248 RE-5 HW/515 02.12.2020 Km 94+927 to Km 94+960 RHS Embankment 1st layer 1 33 6.78 0.2 44.748 36729.448 Approved
249 RE-5 HW/516 02.12.2020 Km 94+960 to Km 95+005 RHS Embankment 6thlayer 1 45 13.29 0.2 119.610 36849.058 Approved RA Bill-5
250 RE-5 HW/517 02.12.2020 Km 95+005 to Km 95+050 RHS Embankment 10th layer 1 45 13.29 0.2 119.610 36968.668 Approved
251 RE-5 HW/518 02.12.2020 Km 95+050 to Km 95+090 RHS Embankment 12th layer 1 40 13.29 0.2 106.320 37074.988 Approved
252 RE-5 HW/519 02.12.2020 Km 95+090 to Km 95+135 RHS Embankment 18th layer 1 45 13.29 0.2 119.610 37194.598 Approved
253 RE-5 HW/523 03.12.2020 Km 94+927 to Km 95+000 LHS Embankment 7th layer 1 73 13.29 0.2 194.034 37388.632 Approved
254 RE-5 HW/524 03.12.2020 Km 95+000 to Km 95+045 LHS Embankment 11th layer 1 45 13.29 0.2 119.610 37508.242 Approved
255 RE-5 HW/525 03.12.2020 Km 95+090 to Km 95+150 LHS Embankment 18th layer 1 60 13.29 0.2 159.480 37667.722 Approved
256 RE-5 HW/526 03.12.2020 Km 95+045 to Km 95+090 LHS Embankment 15th layer 1 45 13.29 0.2 119.610 37787.332 Approved
257 RE-5 HW/527 03.12.2020 Km 95+150 to Km 95+180 LHS Embankment 21st layer 1 30 13.29 0.2 79.740 37867.072 Approved
258 RE-5 HW/528 03.12.2020 Km 94+927 to Km 94+960 RHS Embankment 2nd layer 1 33 6.78 0.2 44.748 37911.820 Approved
259 RE-5 HW/529 03.12.2020 Km 94+960 to Km 95+005 RHS Embankment 7th layer 1 45 13.29 0.2 119.610 38031.430 Approved
260 RE-5 HW/530 03.12.2020 Km 95+005 to Km 95+050 RHS Embankment 11th layer 1 45 13.29 0.2 119.610 38151.040 Approved
261 RE-5 HW/531 03.12.2020 Km 95+050 to Km 95+090 RHS Embankment 13th layer 1 40 13.29 0.2 106.320 38257.360 Approved
262 RE-5 HW/532 03.12.2020 Km 95+090 to Km 95+135 RHS Embankment 19th layer 1 45 13.29 0.2 119.610 38376.970 Approved
263 RE-5 HW/534 04.12.2020 Km 95+000 to Km 95+045 LHS Embankment 12th layer 1 45 13.29 0.2 119.610 38496.580 Approved
264 RE-5 HW/535 04.12.2020 Km 95+090 to Km 95+150 LHS Embankment 19th layer 1 60 13.29 0.2 159.480 38656.060 Approved
265 RE-5 HW/536 04.12.2020 Km 95+045 to Km 95+090 LHS Embankment 16th layer 1 45 13.29 0.2 119.610 38775.670 Approved RA Bill-5
266 RE-5 HW/537 04.12.2020 Km 95+150 to Km 95+180 LHS Embankment 22nd layer 1 30 13.29 0.2 79.740 38855.410 Approved
267 RE-5 HW/541 05.12.2020 Km 95+090 to Km 95+150 LHS Embankment 20th layer 1 60 13.29 0.2 159.480 39014.890 Approved
268 RE-5 HW/542 05.12.2020 Km 94+927 to Km 94+960 RHS Embankment 3rd layer 1 33 6.7 0.2 44.220 39059.110 Approved
269 RE-5 HW/543 05.12.2020 Km 94+960 to Km 95+005 RHS Embankment 8th layer 1 45 13.29 0.2 119.610 39178.720 Approved
270 RE-5 HW/544 05.12.2020 Km 95+005 to Km 95+050 RHS Embankment 12th layer 1 45 13.29 0.2 119.610 39298.330 Approved
271 RE-5 HW/545 05.12.2020 Km 95+050 to Km 95+090 RHS Embankment 14th layer 1 40 13.29 0.2 106.320 39404.650 Approved
272 RE-5 HW/546 05.12.2020 Km 95+090 to Km 95+135 RHS Embankment 20th layer 1 45 13.29 0.2 119.610 39524.260 Approved
273 RE-5 HW/550 07.12.2020 Km 95+050 to Km 95+090 RHS Embankment 15th layer 1 40 13.29 0.2 106.320 39630.580 Approved
274 RE-5 HW/552 07.12.2020 Km 94+927 to Km 94+960 RHS Embankment 4thlayer 1 33 6.9 0.2 45.540 39676.120 Approved
275 RE-5 HW/556 08.12.2020 Km 95+045 to Km 95+090 LHS Embankment 17th layer 1 45 13.29 0.2 119.610 39795.730 Approved
276 RE-5 HW/557 08.12.2020 Km 94+960 to Km 95+000 LHS Embankment 9th layer 1 40 13.29 0.2 106.320 39902.050 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
277 RE-5 HW/558 08.12.2020 Km 95+000 to Km 95+045 LHS Embankment 13th layer 1 45 13.29 0.2 119.610 40021.660 Approved
278 RE-5 HW/559 08.12.2020 Km 95+090 to Km 95+150 LHS Embankment 21st layer 1 60 13.29 0.2 159.480 40181.140 Approved
279 RE-5 HW/560 08.12.2020 Km 95+150 to Km 95+180 LHS Embankment 23rd layer 1 30 13.29 0.2 79.740 40260.880 Approved
280 RE-5 HW/561 08.12.2020 Km 95+180 to Km 95+334 LHS Embankment Top layer 1 154 13.29 0.2 409.332 40670.212 Approved RA Bill-5
281 RE-5 HW/562 08.12.2020 Km 95+050 to Km 95+090 RHS Embankment 16th layer 1 40 13.29 0.2 106.320 40776.532 Approved
282 RE-5 HW/565 09.12.2020 Km 95+045 to Km 95+090 LHS Embankment 18th layer 1 45 13.29 0.2 119.610 40896.142 Approved
283 RE-5 HW/566 09.12.2020 Km 94+960 to Km 95+000 LHS Embankment 10th layer 1 40 13.29 0.2 106.320 41002.462 Approved
284 RE-5 HW/567 09.12.2020 Km 95+000 to Km 95+045 LHS Embankment 14th layer 1 45 13.29 0.2 119.610 41122.072 Approved
285 RE-5 HW/568 09.12.2020 Km 95+090 to Km 95+150 LHS Embankment 22nd layer 1 60 13.29 0.2 159.480 41281.552 Approved
286 RE-5 HW/569 09.12.2020 Km 95+150 to Km 95+180 LHS Embankment 24th layer 1 30 13.29 0.2 79.740 41361.292 Approved
287 RE-5 HW/573 10.12.2020 Km 94+927 to Km 94+960 RHS Embankment 5th layer 1 33 13.29 0.2 87.714 41449.006 Approved
288 RE-5 HW/574 10.12.2020 Km 94+960 to Km 95+005 RHS Embankment 9th layer 1 45 13.29 0.2 119.610 41568.616 Approved
289 RE-5 HW/575 10.12.2020 Km 95+005 to Km 95+050 RHS Embankment 13th layer 1 45 13.29 0.2 119.610 41688.226 Approved
290 RE-5 HW/576 10.12.2020 Km 95+050 to Km 95+090 RHS Embankment 17th layer 1 40 13.29 0.2 106.320 41794.546 Approved
291 RE-5 HW/577 10.12.2020 Km 95+090 to Km 95+135 RHS Embankment 21st layer 1 45 13.29 0.2 119.610 41914.156 Approved
292 RE-5 HW/582 11.12.2020 Km 94+927 to Km 94+960 RHS Embankment 6th layer 1 33 13.29 0.2 87.714 42001.870 Approved
293 RE-5 HW/583 11.12.2020 Km 94+960 to Km 95+005 RHS Embankment 10th layer 1 45 13.29 0.2 119.610 42121.480 Approved
294 RE-5 HW/584 11.12.2020 Km 95+005 to Km 95+050 RHS Embankment 14th layer 1 45 13.29 0.2 119.610 42241.090 Approved
295 RE-5 HW/585 11.12.2020 Km 95+050 to Km 95+090 RHS Embankment 18th layer 1 40 13.29 0.2 106.320 42347.410 Approved
296 RE-5 HW/586 11.12.2020 Km 95+090 to Km 95+135 RHS Embankment 22nd layer 1 45 13.29 0.2 119.610 42467.020 Approved RA Bill-5
297 RE-5 HW/588 12.12.2020 Km 94+960 to Km 95+000 LHS Embankment 11th layer 1 40 13.29 0.2 106.320 42573.340 Approved
298 RE-5 HW/589 12.12.2020 Km 95+000 to Km 95+045 LHS Embankment 15th layer 1 45 13.29 0.2 119.610 42692.950 Approved
299 RE-5 HW/590 12.12.2020 Km 95+045 to Km 95+090 LHS Embankment 19th layer 1 45 13.29 0.2 119.610 42812.560 Approved
300 RE-5 HW/591 12.12.2020 Km 95+090 to Km 95+150 LHS Embankment 23rd layer 1 60 13.29 0.2 159.480 42972.040 Approved
301 RE-5 HW/592 12.12.2020 Km 95+150 to Km 95+180 LHS Embankment 24th layer 1 30 13.29 0.2 79.740 43051.780 Approved
302 RE-5 HW/596 14.12.2020 Km 94+927 to Km 94+960 RHS Embankment 7th layer 1 33 13.29 0.2 87.714 43139.494 Approved
303 RE-5 HW/597 14.12.2020 Km 94+960 to Km 95+005 RHS Embankment 11th layer 1 45 13.29 0.2 119.610 43259.104 Approved
304 RE-5 HW/598 14.12.2020 Km 95+005 to Km 95+050 RHS Embankment 15th layer 1 45 13.29 0.2 119.610 43378.714 Approved
305 RE-5 HW/599 14.12.2020 Km 95+050 to Km 95+090 RHS Embankment 19th layer 1 40 13.29 0.2 106.320 43485.034 Approved
306 RE-5 HW/600 14.12.2020 Km 95+090 to Km 95+135 RHS Embankment 23rd layer 1 45 13.29 0.2 119.610 43604.644 Approved
307 RE-5 HW/601 14.12.2020 Km 94+960 to Km 95+000 LHS Embankment 12th layer 1 40 13.29 0.2 106.320 43710.964 Approved
308 RE-5 HW/602 14.12.2020 Km 95+000 to Km 95+045 LHS Embankment 16th layer 1 45 13.29 0.2 119.610 43830.574 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
309 RE-5 HW/603 14.12.2020 Km 95+045 to Km 95+090 LHS Embankment 20th layer 1 45 13.29 0.2 119.610 43950.184 Approved
310 RE-5 HW/604 14.12.2020 Km 95+090 to Km 95+150 LHS Embankment 24th layer 1 60 13.29 0.2 159.480 44109.664 Approved
311 RE-5 HW/605 14.12.2020 Km 95+150 to Km 95+170 LHS Embankment 26th layer 1 20 13.29 0.2 53.160 44162.824 Approved RA Bill-5
312 RE-5 HW/607 15.12.2020 Km 94+927 to Km 94+960 RHS Embankment 8th layer 1 33 13.29 0.2 87.714 44250.538 Approved
313 RE-5 HW/608 15.12.2020 Km 94+960 to Km 95+005 RHS Embankment 12th layer 1 45 13.29 0.2 119.610 44370.148 Approved
314 RE-5 HW/609 15.12.2020 Km 95+005 to Km 95+050 RHS Embankment 16th layer 1 45 13.29 0.2 119.610 44489.758 Approved
315 RE-5 HW/610 15.12.2020 Km 95+050 to Km 95+090 RHS Embankment 20th layer 1 40 13.29 0.2 106.320 44596.078 Approved
316 RE-5 HW/611 15.12.2020 Km 95+090 to Km 95+135 RHS Embankment 24th layer 1 45 13.29 0.2 119.610 44715.688 Approved
317 RE-5 HW/612 16.12.2020 Km 94+927 to Km 94+960 LHS Embankment 9th layer 1 33 13.29 0.2 87.714 44803.402 Approved
318 RE-5 HW/613 16.12.2020 Km 94+960 to Km 95+000 LHS Embankment 13th layer 1 40 13.29 0.2 106.320 44909.722 Approved
319 RE-5 HW/614 16.12.2020 Km 95+000 to Km 95+045 LHS Embankment 17th layer 1 45 13.29 0.2 119.610 45029.332 Approved
320 RE-5 HW/615 16.12.2020 Km 95+045 to Km 95+090 LHS Embankment 21st layer 1 45 13.29 0.2 119.610 45148.942 Approved
321 RE-5 HW/616 16.12.2020 Km 95+090 to Km 95+150 LHS Embankment 25th layer 1 60 13.29 0.2 159.480 45308.422 Approved
322 RE-5 HW/617 16.12.2020 Km 95+150 to Km 95+160 LHS Embankment 27th layer 1 10 13.29 0.2 26.580 45335.002 Approved
323 RE-5 HW/618 17.12.2020 Km 94+927 to Km 94+960 LHS Embankment 10th layer 1 33 13.29 0.2 87.714 45422.716 Approved
324 RE-5 HW/619 17.12.2020 Km 94+960 to Km 95+000 LHS Embankment 14th layer 1 40 13.29 0.2 106.320 45529.036 Approved
325 RE-5 HW/620 17.12.2020 Km 95+000 to Km 95+045 LHS Embankment 18th layer 1 45 13.29 0.2 119.610 45648.646 Approved
326 RE-5 HW/621 17.12.2020 Km 95+045 to Km 95+090 LHS Embankment 22nd layer 1 45 13.29 0.2 119.610 45768.256 Approved
327 RE-5 HW/622 17.12.2020 Km 95+090 to Km 95+150 LHS Embankment 26th layer 1 60 13.29 0.2 159.480 45927.736 Approved
RA Bill-5
328 RE-5 HW/624 17.12.2020 Km 95+250 to Km 95+345 RHS Embankment Top layer 1 95 13.29 0.2 252.510 46180.246 Approved
329 RE-5 HW/625 18.12.2020 Km 95+193 to Km 95+250 RHS Embankment 13th layer 1 57 13.29 0.2 151.506 46331.752 Approved
330 RE-5 HW/628 19.12.2020 Km 94+927 to Km 94+960 RHS Embankment 9th layer 1 33 13.29 0.2 87.714 46419.466 Approved
331 RE-5 HW/629 19.12.2020 Km 94+960 to Km 95+005 RHS Embankment 13th layer 1 45 13.29 0.2 119.610 46539.076 Approved
332 RE-5 HW/630 19.12.2020 Km 95+005 to Km 95+050 RHS Embankment 17th layer 1 45 13.29 0.2 119.610 46658.686 Approved
333 RE-5 HW/631 19.12.2020 Km 95+050 to Km 95+090 RHS Embankment 21st layer 1 40 13.29 0.2 106.320 46765.006 Approved
334 RE-5 HW/632 19.12.2020 Km 95+090 to Km 95+135 RHS Embankment 25th layer 1 45 13.29 0.2 119.610 46884.616 Approved
335 RE-5 HW/633 19.12.2020 Km 95+193 to Km 95+250 RHS Embankment 14th layer 1 57 13.29 0.2 151.506 47036.122 Approved
336 RE-5 HW/635 21.12.2020 Km 94+927 to Km 94+960 RHS Embankment 10th layer 1 33 13.29 0.2 87.714 47123.836 Approved
337 RE-5 HW/636 21.12.2020 Km 94+960 to Km 95+005 RHS Embankment 14th layer 1 45 13.29 0.2 119.610 47243.446 Approved
338 RE-5 HW/637 21.12.2020 Km 95+005 to Km 95+050 RHS Embankment 18th layer 1 45 13.29 0.2 119.610 47363.056 Approved
339 RE-5 HW/639 21.12.2020 Km 95+090 to Km 95+135 RHS Embankment 26th layer 1 45 13.29 0.2 119.610 47482.666 Approved
340 RE-5 HW/640 21.12.2020 Km 95+135 to Km 95+193 RHS Embankment 21st layer 1 58 13.29 0.2 154.164 47636.830 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
341 RE-5 HW/641 21.12.2020 Km 95+193 to Km 95+250 RHS Embankment 15th layer 1 57 13.29 0.2 151.506 47788.336 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
342 RE-5 HW/642 22.12.2020 Km 94+927.77 to Km 94+960 LHS Embankment 11th layer 1 32.23 13.29 0.2 85.667 47874.004 Approved
RA Bill-6
343 RE-5 HW/643 22.12.2020 Km 94+960 to Km 95+000 LHS Embankment 15th layer 1 40 13.29 0.2 106.320 47980.324 Approved
344 RE-5 HW/644 22.12.2020 Km 95+000 to Km 95+045 LHS Embankment 19th layer 1 45 13.29 0.2 119.610 48099.934 Approved
345 RE-5 HW/645 22.12.2020 Km 95+045 to Km 95+090 LHS Embankment 23rd layer 1 45 13.29 0.2 119.610 48219.544 Approved
346 RE-5 HW/646 22.12.2020 Km 95+090 to Km 95+150 LHS Embankment 27th layer 1 60 13.29 0.2 159.480 48379.024 Approved
347 RE-5 HW/647 22.12.2020 Km 95+135 to Km 95+193 RHS Embankment 22nd layer 1 58 13.29 0.2 154.164 48533.188 Approved
348 RE-5 HW/648 22.12.2020 Km 95+193 to Km 95+250 RHS Embankment 16th layer 1 57 13.29 0.2 151.506 48684.694 Approved
349 RE-5 HW/649 23.12.2020 Km 94+927.77 to Km 94+960 LHS Embankment 12th layer 1 32.23 13.29 0.2 85.667 48770.361 Approved
350 RE-5 HW/650 23.12.2020 Km 94+960 to Km 95+000 LHS Embankment 16th layer 1 40 13.29 0.2 106.320 48876.681 Approved
351 RE-5 HW/651 23.12.2020 Km 95+000 to Km 95+045 LHS Embankment 20th layer 1 45 13.29 0.2 119.610 48996.291 Approved
352 RE-5 HW/652 23.12.2020 Km 95+045 to Km 95+090 LHS Embankment 24th layer 1 45 13.29 0.2 119.610 49115.901 Approved
353 RE-5 HW/653 23.12.2020 Km 95+090 to Km 95+150 LHS Embankment 28th layer 1 60 13.29 0.2 159.480 49275.381 Approved
354 RE-5 HW/658 25.12.2020 Km 94+927.77 to Km 94+960 LHS Embankment 13th layer 1 32.23 13.29 0.2 85.667 49361.048 Approved
355 RE-5 HW/659 25.12.2020 Km 94+960 to Km 95+000 LHS Embankment 17th layer 1 40 13.29 0.2 106.320 49467.368 Approved
356 RE-5 HW/660 25.12.2020 Km 95+000 to Km 95+045 LHS Embankment 21st layer 1 45 13.29 0.2 119.610 49586.978 Approved
357 RE-5 HW/661 25.12.2020 Km 95+045 to Km 95+090 LHS Embankment 25th layer 1 45 13.29 0.2 119.610 49706.588 Approved
358 RE-5 HW/662 26.12.2020 Km 94+927.77 to Km 94+960 RHS Embankment 11th layer 1 32.23 13.29 0.2 85.667 49792.256 Approved
RA Bill-6
359 RE-5 HW/663 26.12.2020 Km 94+960 to Km 95+005 RHS Embankment 15th layer 1 45 13.29 0.2 119.610 49911.866 Approved
360 RE-5 HW/664 26.12.2020 Km 95+005 to Km 95+050 RHS Embankment 19th layer 1 45 13.29 0.2 119.610 50031.476 Approved
361 RE-5 HW/665 26.12.2020 Km 95+050 to Km 95+090 RHS Embankment 23rd layer 1 40 13.29 0.2 106.320 50137.796 Approved
362 RE-5 HW/666 26.12.2020 Km 95+090 to Km 95+135 RHS Embankment 27th layer 1 45 13.29 0.2 119.610 50257.406 Approved
363 RE-5 HW/667 28.12.2020 Km 94+927.77 to Km 94+960 RHS Embankment 12th layer 1 32.23 13.29 0.2 85.667 50343.073 Approved
364 RE-5 HW/668 28.12.2020 Km 94+960 to Km 95+005 RHS Embankment 16th layer 1 45 13.29 0.2 119.610 50462.683 Approved
365 RE-5 HW/669 28.12.2020 Km 95+005 to Km 95+050 RHS Embankment 20th layer 1 45 13.29 0.2 119.610 50582.293 Approved
366 RE-5 HW/670 28.12.2020 Km 95+050 to Km 95+090 RHS Embankment 24th layer 1 40 13.29 0.2 106.320 50688.613 Approved
367 RE-5 HW/671 28.12.2020 Km 95+090 to Km 95+135 RHS Embankment 28th layer 1 45 13.29 0.2 119.610 50808.223 Approved
368 RE-5 HW/672 29.12.2020 Km 94+927.77 to Km 94+960 RHS Embankment 13th layer 1 32.23 13.29 0.2 85.667 50893.890 Approved
369 RE-5 HW/673 29.12.2020 Km 94+960 to Km 95+005 RHS Embankment 17th layer 1 45 13.29 0.2 119.610 51013.500 Approved
370 RE-5 HW/674 29.12.2020 Km 95+005 to Km 95+050 RHS Embankment 21st layer 1 45 13.29 0.2 119.610 51133.110 Approved
371 RE-5 HW/675 29.12.2020 Km 95+050 to Km 95+090 RHS Embankment 25th layer 1 40 13.29 0.2 106.320 51239.430 Approved
372 RE-5 HW/676 29.12.2020 Km 95+090 to Km 95+110 RHS Embankment 29th layer 1 20 13.29 0.2 53.160 51292.590 Approved
373 RE-5 HW/677 30.12.2020 Km 94+927.77 to Km 94+960 RHS Embankment 14th layer 1 32.23 13.29 0.2 85.667 51378.258 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
374 RE-5 HW/678 30.12.2020 Km 94+960 to Km 95+005 RHS Embankment 18th layer 1 45 13.29 0.2 119.610 51497.868 Approved
375 RE-5 HW/679 30.12.2020 Km 95+005 to Km 95+050 RHS Embankment 22nd layer 1 45 13.29 0.2 119.610 51617.478 Approved
376 RE-5 HW/680 30.12.2020 Km 95+050 to Km 95+090 RHS Embankment 26th layer 1 40 13.29 0.2 106.320 51723.798 Approved
377 RE-5 HW/681 01.01.2021 Km 95+135 to Km 95+193 RHS Embankment 23rd layer 1 58 13.29 0.2 154.164 51877.962 Approved
378 RE-5 HW/682 01.01.2021 Km 95+193 to Km 95+250 RHS Embankment 17th layer 1 57 13.29 0.2 151.506 52029.468 Approved
379 RE-5 HW/683 01.01.2021 Km 94+927.77 to Km 94+960 LHS Embankment 14th layer 1 32.23 13.29 0.2 85.667 52115.135 Approved
380 RE-5 HW/684 01.01.2021 Km 94+960 to Km 95+000 LHS Embankment 18th layer 1 40 13.29 0.2 106.320 52221.455 Approved
381 RE-5 HW/685 01.01.2021 Km 95+000 to Km 95+045 LHS Embankment 22nd layer 1 45 13.29 0.2 119.610 52341.065 Approved
382 RE-5 HW/686 01.01.2021 Km 95+045 to Km 95+090 LHS Embankment 26th layer 1 45 13.29 0.2 119.610 52460.675 Approved
RA Bill-6
383 RE-5 HW/688 02.01.2021 Km 95+193 to Km 95+250 RHS Embankment 18th layer 1 57 13.29 0.2 151.506 52612.181 Approved
384 RE-5 HW/691 04.01.2021 Km 95+135 to Km 95+193 RHS Embankment 24th layer 1 58 13.29 0.2 154.164 52766.345 Approved
385 RE-5 HW/692 04.01.2021 Km 95+193 to Km 95+250 RHS Embankment 19th layer 1 57 13.29 0.2 151.506 52917.851 Approved
386 RE-5 HW/693 05.01.2021 Km 95+135 to Km 95+193 RHS Embankment 25th layer 1 58 13.29 0.2 154.164 53072.015 Approved
387 RE-5 HW/694 05.01.2021 Km 95+193 to Km 95+230 RHS Embankment 20th layer 1 37 13.29 0.2 98.346 53170.361 Approved
388 RE-5 HW/695 06.01.2021 Km 95+135 to Km 95+193 RHS Embankment 26th layer 1 58 13.29 0.2 154.164 53324.525 Approved
389 RE-5 HW/696 06.01.2021 Km 95+193 to Km 95+230 RHS Embankment 21st layer 1 37 13.29 0.2 98.346 53422.871 Approved
390 RE-5 HW/698 06.01.2021 Km 95+090 to Km 95+180 LHS Embankment Top layer 1 90 13.29 0.2 239.220 53662.091 Approved
391 RE-5 HW/701 08.01.2021 Km 95+135 to Km 95+250 RHS Embankment Top layer 1 115 13.29 0.2 305.670 53967.761 Approved
392 RE-5 HW/730 26.03.2021 Km 94+927.77 to Km 94+960 LHS Embankment 15th layer 1 32.23 13.29 0.2 85.667 54053.428 Approved
393 RE-5 HW/731 26.03.2021 Km 94+960 to Km 95+000 LHS Embankment 19th layer 1 40 13.29 0.2 106.320 54159.748 Approved
394 RE-5 HW/732 26.03.2021 Km 95+000 to Km 95+045 LHS Embankment 23rd layer 1 45 13.29 0.2 119.610 54279.358 Approved
395 RE-5 HW/733 26.03.2021 Km 95+045 to Km 95+090 LHS Embankment 27th layer 1 45 13.29 0.2 119.610 54398.968 Approved
396 RE-5 HW/738 29.03.2021 Km 94+927.77 to Km 94+960 LHS Embankment 16th layer 1 32.23 13.29 0.2 85.667 54484.636 Approved
397 RE-5 HW/739 29.03.2021 Km 94+960 to Km 95+000 LHS Embankment 20th layer 1 40 13.29 0.2 106.320 54590.956 Approved
398 RE-5 HW/740 29.03.2021 Km 95+000 to Km 95+045 LHS Embankment 24th layer 1 45 13.29 0.2 119.610 54710.566 Approved RA Bill-7
399 RE-5 HW/741 29.03.2021 Km 95+045 to Km 95+090 LHS Embankment 28th layer 1 45 13.29 0.2 119.610 54830.176 Approved
400 RE-5 HW/744 31.03.2021 Km 94+927.77 to Km 94+960 LHS Embankment 17th layer 1 32.23 13.29 0.2 85.667 54915.843 Approved
401 RE-5 HW/745 31.03.2021 Km 94+960 to Km 95+000 LHS Embankment 21st layer 1 40 13.29 0.2 106.320 55022.163 Approved
402 RE-5 HW/746 31.03.2021 Km 95+000 to Km 95+045 LHS Embankment 25th layer 1 45 13.29 0.2 119.610 55141.773 Approved
403 RE-5 HW/747 31.03.2021 Km 95+045 to Km 95+090 LHS Embankment 29th layer 1 45 13.29 0.2 119.610 55261.383 Approved
404 RE-5 HW/750 01.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 18th layer 1 32.23 13.29 0.2 85.667 55347.050 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
405 RE-5 HW/751 01.04.2021 Km 94+960 to Km 95+000 LHS Embankment 22nd layer 1 40 13.29 0.2 106.320 55453.370 Approved
406 RE-5 HW/752 01.04.2021 Km 95+000 to Km 95+045 LHS Embankment 26th layer 1 45 13.29 0.2 119.610 55572.980 Approved
407 RE-5 HW/753 01.04.2021 Km 95+045 to Km 95+090 LHS Embankment 30th layer 1 45 13.29 0.2 119.610 55692.590 Approved
408 RE-5 HW/754 01.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 15th layer 1 32.23 13.29 0.2 85.667 55778.258 Approved
409 RE-5 HW/755 01.04.2021 Km 94+960 to Km 95+005 RHS Embankment 19th Layer 1 45 13.29 0.2 119.610 55897.868 Approved
410 RE-5 HW/756 01.04.2021 Km 95+005 to Km 95+050 RHS Embankment 23rd Layer 1 45 13.29 0.2 119.610 56017.478 Approved
411 RE-5 HW/757 01.04.2021 Km 95+050 to Km 95+090 RHS Embankment 27th Layer 1 40 13.29 0.2 106.320 56123.798 Approved
412 RE-5 HW/762 02.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 16th layer 1 32.23 13.29 0.2 85.667 56209.465 Approved
413 RE-5 HW/763 02.04.2021 Km 94+960 to Km 95+005 RHS Embankment 20th Layer 1 45 13.29 0.2 119.610 56329.075 Approved
414 RE-5 HW/764 02.04.2021 Km 95+005 to Km 95+050 RHS Embankment 24th Layer 1 45 13.29 0.2 119.610 56448.685 Approved
415 RE-5 HW/765 02.04.2021 Km 95+050 to Km 95+090 RHS Embankment 28th Layer 1 40 13.29 0.2 106.320 56555.005 Approved
416 RE-5 HW/766 03.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 19th layer 1 32.23 13.29 0.2 85.667 56640.672 Approved
417 RE-5 HW/767 03.04.2021 Km 94+960 to Km 95+000 LHS Embankment 23rd layer 1 40 13.29 0.2 106.320 56746.992 Approved
418 RE-5 HW/768 03.04.2021 Km 95+000 to Km 95+045 LHS Embankment 27th layer 1 45 13.29 0.2 119.610 56866.602 Approved
419 RE-5 HW/769 03.04.2021 Km 95+045 to Km 95+070 LHS Embankment 31st layer 1 25 13.29 0.2 66.450 56933.052 Approved
420 RE-5 HW/770 03.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 17th layer 1 32.23 13.29 0.2 85.667 57018.720 Approved
RA Bill-7
421 RE-5 HW/771 03.04.2021 Km 94+960 to Km 95+005 RHS Embankment 21st Layer 1 45 13.29 0.2 119.610 57138.330 Approved
422 RE-5 HW/772 03.04.2021 Km 95+005 to Km 95+050 RHS Embankment 25th Layer 1 45 13.29 0.2 119.610 57257.940 Approved
423 RE-5 HW/773 03.04.2021 Km 95+050 to Km 95+090 RHS Embankment 29th Layer 1 40 13.29 0.2 106.320 57364.260 Approved
424 RE-5 HW/776 13.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 20th layer 1 32.23 13.29 0.2 85.667 57449.927 Approved
425 RE-5 HW/777 13.04.2021 Km 94+960 to Km 95+000 LHS Embankment 24th layer 1 40 13.29 0.2 106.320 57556.247 Approved
426 RE-5 HW/778 13.04.2021 Km 95+000 to Km 95+045 LHS Embankment 28th layer 1 45 13.29 0.2 119.610 57675.857 Approved
428 RE-5 HW/780 13.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 18th layer 1 32.23 13.29 0.2 85.667 57761.524 Approved
429 RE-5 HW/781 13.04.2021 Km 94+960 to Km 95+005 RHS Embankment 22nd Layer 1 45 13.29 0.2 119.610 57881.134 Approved
430 RE-5 HW/782 13.04.2021 Km 95+005 to Km 95+050 RHS Embankment 26th Layer 1 45 13.29 0.2 119.610 58000.744 Approved
431 RE-5 HW/783 13.04.2021 Km 95+050 to Km 95+080 RHS Embankment 30th Layer 1 30 13.29 0.2 79.740 58080.484 Approved
432 RE-5 HW/784 14.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 21st layer 1 32.23 13.29 0.2 85.667 58166.152 Approved
433 RE-5 HW/785 14.04.2021 Km 94+960 to Km 95+000 LHS Embankment 25th layer 1 40 13.29 0.2 106.320 58272.472 Approved
434 RE-5 HW/786 14.04.2021 Km 95+000 to Km 95+045 LHS Embankment 29th layer 1 45 13.29 0.2 119.610 58392.082 Approved
435 RE-5 HW/787 14.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 19th layer 1 32.23 13.29 0.2 85.667 58477.749 Approved
436 RE-5 HW/788 14.04.2021 Km 94+960 to Km 95+005 RHS Embankment 23rd Layer 1 45 13.29 0.2 119.610 58597.359 Approved
437 RE-5 HW/789 14.04.2021 Km 95+005 to Km 95+050 RHS Embankment 27th Layer 1 45 13.29 0.2 119.610 58716.969 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
438 RE-5 HW/790 14.04.2021 Km 95+050 to Km 95+070 RHS Embankment 31st Layer 1 20 13.29 0.2 53.160 58770.129 Approved
439 RE-5 HW/791 15.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 22nd layer 1 32.23 13.29 0.2 85.667 58855.796 Approved
440 RE-5 HW/792 15.04.2021 Km 94+960 to Km 95+000 LHS Embankment 26th layer 1 40 13.29 0.2 106.320 58962.116 Approved
441 RE-5 HW/793 15.04.2021 Km 95+000 to Km 95+045 LHS Embankment 30th layer 1 45 13.29 0.2 119.610 59081.726 Approved
442 RE-5 HW/794 15.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 20th layer 1 32.23 13.29 0.2 85.667 59167.394 Approved
443 RE-5 HW/795 15.04.2021 Km 94+960 to Km 95+005 RHS Embankment 24th Layer 1 45 13.29 0.2 119.610 59287.004 Approved
444 RE-5 HW/796 15.04.2021 Km 95+005 to Km 95+050 RHS Embankment 28th Layer 1 45 13.29 0.2 119.610 59406.614 Approved
446 RE-5 HW/800 16.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 23rd layer 1 32.23 13.29 0.2 85.667 59492.281 Approved
447 RE-5 HW/801 16.04.2021 Km 94+960 to Km 95+000 LHS Embankment 27th layer 1 40 13.29 0.2 106.320 59598.601 Approved
448 RE-5 HW/802 16.04.2021 Km 95+000 to Km 95+045 LHS Embankment 31st layer 1 45 13.29 0.2 119.610 59718.211 Approved
449 RE-5 HW/804 16.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 21st layer 1 32.23 13.29 0.2 85.667 59803.878 Approved
450 RE-5 HW/805 16.04.2021 Km 94+960 to Km 95+005 RHS Embankment 25th Layer 1 45 13.29 0.2 119.610 59923.488 Approved
451 RE-5 HW/806 16.04.2021 Km 95+005 to Km 95+050 RHS Embankment 29th Layer 1 45 13.29 0.2 119.610 60043.098 Approved
452 RE-5 HW/808 17.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 24th layer 1 32.23 13.29 0.2 85.667 60128.766 Approved
453 RE-5 HW/809 17.04.2021 Km 94+960 to Km 95+000 LHS Embankment 28th layer 1 40 13.29 0.2 106.320 60235.086 Approved
454 RE-5 HW/810 17.04.2021 Km 95+000 to Km 95+045 LHS Embankment 32nd layer 1 45 13.29 0.2 119.610 60354.696 Approved
RA Bill-7
455 RE-5 HW/812 17.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 22nd layer 1 32.23 13.29 0.2 85.667 60440.363 Approved
456 RE-5 HW/813 17.04.2021 Km 94+960 to Km 95+005 RHS Embankment 26th Layer 1 45 13.29 0.2 119.610 60559.973 Approved
457 RE-5 HW/814 17.04.2021 Km 95+005 to Km 95+050 RHS Embankment 30th Layer 1 45 13.29 0.2 119.610 60679.583 Approved
458 RE-5 HW/816 19.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 25th layer 1 32.23 13.29 0.2 85.667 60765.250 Approved
459 RE-5 HW/817 19.04.2021 Km 94+960 to Km 95+000 LHS Embankment 29th layer 1 40 13.29 0.2 106.320 60871.570 Approved
460 RE-5 HW/818 19.04.2021 Km 95+000 to Km 95+045 LHS Embankment 33rd layer 1 45 13.29 0.2 119.610 60991.180 Approved
461 RE-5 HW/819 19.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 23rd layer 1 32.23 13.29 0.2 85.667 61076.848 Approved
462 RE-5 HW/820 19.04.2021 Km 94+960 to Km 95+005 RHS Embankment 27th Layer 1 45 13.29 0.2 119.610 61196.458 Approved
463 RE-5 HW/821 19.04.2021 Km 95+005 to Km 95+050 RHS Embankment 31st Layer 1 45 13.29 0.2 119.610 61316.068 Approved
464 RE-5 HW/823 20.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 26th layer 1 32.23 13.29 0.2 85.667 61401.735 Approved
465 RE-5 HW/824 20.04.2021 Km 94+960 to Km 95+000 LHS Embankment 30th layer 1 40 13.29 0.2 106.320 61508.055 Approved
466 RE-5 HW/825 20.04.2021 Km 95+000 to Km 95+045 LHS Embankment 34th layer 1 45 13.29 0.2 119.610 61627.665 Approved
467 RE-5 HW/826 20.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 24th layer 1 32.23 13.29 0.2 85.667 61713.332 Approved
468 RE-5 HW/827 20.04.2021 Km 94+960 to Km 95+005 RHS Embankment 28th Layer 1 45 13.29 0.2 119.610 61832.942 Approved
469 RE-5 HW/828 20.04.2021 Km 95+005 to Km 95+050 RHS Embankment 32nd Layer 1 45 13.29 0.2 119.610 61952.552 Approved
470 RE-5 HW/831 21.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 27th layer 1 32.23 13.29 0.2 85.667 62038.220 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
471 RE-5 HW/832 21.04.2021 Km 94+960 to Km 95+000 LHS Embankment 31st layer 1 40 13.29 0.2 106.320 62144.540 Approved
472 RE-5 HW/833 21.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 25th layer 1 32.23 13.29 0.2 85.667 62230.207 Approved
473 RE-5 HW/834 21.04.2021 Km 94+960 to Km 95+005 RHS Embankment 29th Layer 1 45 13.29 0.2 119.610 62349.817 Approved
474 RE-5 HW/835 21.04.2021 Km 95+005 to Km 95+050 RHS Embankment 33rd Layer 1 45 13.29 0.2 119.610 62469.427 Approved
475 RE-5 HW/836 22.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 26th layer 1 32.23 13.29 0.2 85.667 62555.094 Approved
476 RE-5 HW/837 22.04.2021 Km 94+960 to Km 95+005 RHS Embankment 30th Layer 1 45 13.29 0.2 119.610 62674.704 Approved
477 RE-5 HW/838 22.04.2021 Km 95+005 to Km 95+050 RHS Embankment 34th Layer 1 45 13.29 0.2 119.610 62794.314 Approved
478 RE-5 HW/839 22.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 28th layer 1 32.23 13.29 0.2 85.667 62879.982 Approved
479 RE-5 HW/840 22.04.2021 Km 94+960 to Km 95+000 LHS Embankment 32nd layer 1 40 13.29 0.2 106.320 62986.302 Approved
480 RE-5 HW/841 23.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 29th layer 1 32.23 13.29 0.2 85.667 63071.969 Approved
481 RE-5 HW/842 23.04.2021 Km 94+960 to Km 95+000 LHS Embankment 33rd layer 1 40 13.29 0.2 106.320 63178.289 Approved
483 RE-5 HW/844 23.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 27th layer 1 32.23 13.29 0.2 85.667 63263.957 Approved
484 RE-5 HW/845 23.04.2021 Km 94+960 to Km 95+005 RHS Embankment 31st Layer 1 45 13.29 0.2 119.610 63383.567 Approved
486 RE-5 HW/847 24.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 30th layer 1 32.23 13.29 0.2 85.667 63469.234 Approved RA Bill-7
487 RE-5 HW/848 24.04.2021 Km 94+960 to Km 95+000 LHS Embankment 34th layer 1 40 13.29 0.2 106.320 63575.554 Approved
489 RE-5 HW/850 24.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 28th layer 1 32.23 13.29 0.2 85.667 63661.221 Approved
490 RE-5 HW/851 24.04.2021 Km 94+960 to Km 95+005 RHS Embankment 32nd Layer 1 45 13.29 0.2 119.610 63780.831 Approved
491 RE-5 HW/853 26.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 31st layer 1 32.23 13.29 0.2 85.667 63866.499 Approved
494 RE-5 HW/856 26.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 29th layer 1 32.23 13.29 0.2 85.667 63952.166 Approved
495 RE-5 HW/857 26.04.2021 Km 94+960 to Km 95+005 RHS Embankment 33rd Layer 1 45 13.29 0.2 119.610 64071.776 Approved
496 RE-5 HW/859 29.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 32nd layer 1 32.23 13.29 0.2 85.667 64157.443 Approved
499 RE-5 HW/862 30.04.2021 Km 94+927.77 to Km 94+960 LHS Embankment 33rd layer 1 32.23 13.29 0.2 85.667 64243.111 Approved
502 RE-5 HW/865 30.04.2021 Km 94+927.77 to Km 94+960 RHS Embankment 30th layer 1 32.23 13.29 0.2 85.667 64328.778 Approved
503 RE-5 HW/866 30.04.2021 Km 94+960 to Km 95+005 RHS Embankment 34th Layer 1 45 13.29 0.2 119.610 64448.388 Approved
504 RE-5 HW/868 01.05.2021 Km 94+927.77 to Km 94+960 RHS Embankment 31st layer 1 32.23 13.29 0.2 85.667 64534.055 Approved
506 RE-5 HW/870 03.05.2021 Km 94+927.77 to Km 94+960 RHS Embankment 32nd layer 1 32.23 13.29 0.2 85.667 64619.723 Approved
512 RE-5 HW/879 04.05.2021 Km 94+927.77 to Km 94+960 RHS Embankment 33rd layer 1 32.23 13.29 0.2 85.667 64705.390 Approved
512 RE-5 HW/860 29.04.2021 Km 94+960 to Km 95+000 LHS Embankment 36th layer 1 40 13.29 0.2 106.320 64811.710 Approved
512 RE-5 HW/863 30.04.2021 Km 94+960 to Km 95+000 LHS Embankment 37th layer 1 40 13.29 0.2 106.320 64918.030 Approved
512 RE-5 HW/873 03.05.2021 Km 94+960 to Km 95+000 LHS Embankment 38th layer 1 40 13.29 0.2 106.320 65024.350 Approved RA Bill-8
512 RE-5 HW/876 04.05.2021 Km 94+960 to Km 95+000 LHS Embankment 39th layer 1 40 13.29 0.2 106.320 65130.670 Approved
512 RE-5 HW/884 05.05.2021 Km 94+960 to Km 95+000 LHS Embankment 40th layer 1 40 13.29 0.2 106.320 65236.990 Approved
ITEM No-5.Construction of embankment with approved materials deposited at site from borrow pits /selected earth graded and compacted to meet requirement of table 300-2 and as per section 3100 /3104 of MORTH.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
512 RE-5 HW/889 06.05.2021 Km 94+927.77 to Km 94+960 LHS Embankment 37th layer 1 32.23 13.29 0.2 85.667 65322.657 Approved
512 RE-5 HW/893 07.05.2021 Km 94+927.77 to Km 94+960 LHS Embankment 38th layer 1 32.23 13.29 0.2 85.667 65408.325 Approved
512 RE-5 HW/895 07.05.2021 Km 94+927.77 to Km 94+960 RHS Embankment 36th layer 1 32.23 13.29 0.2 85.667 65493.992 Approved RA Bill-8
512 RE-5 HW/899 08.05.2021 Km 94+927.77 to Km 94+960 LHS Embankment 39th layer 1 32.23 13.29 0.2 85.667 65579.659 Approved
512 RE-5 HW/902 10.05.2021 Km 94+927.77 to Km 94+960 LHS Embankment 40th layer 1 32.23 13.29 0.2 85.667 65665.327 Approved
Withheld Quanitity 7737.149 73402.476
Total Qty 73402.476
Due to change in foundation levels based on RE wall designs, RE walls Qty has varies from RO approved qty-53281 cum to 64840 cum. For the progress of balance work - 50% of
Note
exceeded qty (i.e) 11557x50%=5779 cum, is released in RA bill No 7. So keeping the same till completion.
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in the State of
Tamilnadu on Build Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:08
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 16.05.2021 to 04.10.2021
ITEM No-6.Crash Barrier and Friction slab M40 Grade
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
1 RE-6 STR/292 11.12.2020 Km 94+816 to Km 94+865 RHS Friction Slab 1 49 1.81 0.25 22.173 22.173 Approved
2 RE-6 STR/296 16.12.2020 Km 94+865 to Km 94+914.230 RHS Friction Slab 1 49.23 1.81 0.25 22.277 44.449 Approved
3 RE-6 STR/294 15.12.2020 Km 94+770.924 to Km 94+810 LHS Friction Slab 1 39.076 1.81 0.25 17.682 62.131 Approved RA Bill-5
4 RE-6 STR/301 19.12.2020 Km 94+816 to Km 94+840 LHS Friction Slab 1 24 1.81 0.25 10.860 72.991 Approved
5 RE-6 STR/302 21.12.2020 Km 94+840 to Km 94+914 LHS Friction Slab 1 74 1.81 0.25 33.485 106.476 Approved
6 RE-6 Str/348 22.01.2021 Km 95+300 to Km 95+344.5 RHS Friction Slab 1 44.5 1.81 0.25 20.136 126.612 Approved
7 RE-6 Str/354 27.01.2021 Km 95+270 to Km 95+300 RHS Friction Slab 1 30 1.81 0.25 13.575 140.187 Approved
8 RE-6 Str/360 29.01.2021 Km 95+240 to Km 95+270 RHS Friction Slab 1 30 1.81 0.25 13.575 153.762 Approved
9 RE-6 Str/364 30.01.2021 Km 95+290 to Km 95+334 LHS Friction Slab 1 44 1.81 0.25 19.910 173.672 Approved
10 RE-6 Str/379 04.02.2021 Km 95+240 to Km 95+290 LHS Friction Slab 1 50 1.81 0.25 22.625 196.297 Approved
11 RE-6 Str/293 12.12.2020 Km 94+816.55 to Km 94+865 RHS Haunch 1 48.55 0.308 area 14.953 211.251 Approved
12 RE-6 Str/298 17.12.2020 Km 94+865 to Km 94+914 RHS Haunch 1 49 0.308 area 15.092 226.343 Approved
13 RE-6 Str/299 17.12.2020 Km 94+771 to Km 94+810 LHS Haunch 1 39 0.308 area 12.012 238.355 Approved
14 RE-6 Str/313 25.12.2020 Km 94+810 to Km 94+860 LHS Haunch 1 50 0.308 area 15.400 253.755 Approved
15 RE-6 Str/314 26.12.2020 Km 94+860 to Km 94+914 LHS Haunch 1 54 0.308 area 16.632 270.387 Approved
16 RE-6 Str/349 23.01.2021 Km 95+300 to Km 95+344.5 RHS Haunch 1 44.5 0.308 area 13.706 284.093 Approved
17 RE-6 Str/359 29.01.2021 Km 95+270 to Km 95+300 RHS Haunch 1 30 0.308 area 9.240 293.333 Approved RA Bill-6
18 RE-6 Str/362 30.01.2021 Km 95+240 to Km 95+270 RHS Haunch 1 30 0.308 area 9.240 302.573 Approved
19 RE-6 Str/380 04.02.2021 Km 95+300 to Km 95+334 LHS Haunch 1 34.00 0.3080 area 10.472 313.045 Approved
20 RE-6 Str/316 29.12.2020 Km 94+817 to Km 94+833 RHS Crash Barrier 1 16.000 0.288 area 4.608 317.653 Approved
21 RE-6 Str/322 01.01.2021 Km 94+833 to Km 94+858 RHS Crash Barrier 1 25.000 0.288 area 7.200 324.853 Approved
22 RE-6 Str/334 05.01.2021 Km 94+858 to Km 94+880 RHS Crash Barrier 1 22.000 0.288 area 6.336 331.189 Approved
23 RE-6 Str/341 08.01.2021 Km 94+880 to Km 94+910 RHS Crash Barrier 1 30.000 0.288 area 8.640 339.829 Approved
24 RE-6 Str/347 22.01.2021 Km 94+771 to Km 94+800 LHS Crash Barrier 1 29.000 0.288 area 8.352 348.181 Approved
25 RE-6 Str/356 28.01.2021 Km 94+800 to Km 94+830 LHS Crash Barrier 1 30.000 0.288 area 8.640 356.821 Approved
26 RE-6 Str/363 30.01.2021 Km 94+830 to Km 94+860 LHS Crash Barrier 1 30.000 0.288 area 8.640 365.461 Approved
27 RE-6 Str/395 17.02.2021 Km 94+885 to Km 94+910 LHS Crash Barrier 1 25.000 0.288 area 7.200 372.661 Approved
28 RE-6 Str/376 17.02.2021 Km 94+860 to Km 94+885 LHS Crash Barrier 1 25.000 0.288 area 7.200 379.861 Approved
Str/396 Dated 19.02.2021 19.02.2021 Km 95+210 to Km 95+240 LHS Friction Slab 1 30 1.81 0.25 13.575 393.436 Approved
Str/397 Dated 20.02.2021 20.02.2021 Km 95+150 to Km 95+210 LHS Friction Slab 1 60 1.81 0.25 27.150 420.586 Approved
Str/401 Dated 24.02.2021 24.02.2021 Km 95+220 to Km 95+240 RHS Friction Slab 1 20 1.81 0.25 9.050 429.636 Approved
Str/427 Dated 23.04.2021 23.04.2021 Km 95+160 to Km 95+220 RHS Friction Slab 1 60 1.81 0.25 27.150 456.786 Approved
Str/434 Dated 05.05.2021 05.05.2021 Km 95+110 to Km 95+160 RHS Friction Slab 1 50 1.81 0.25 22.625 479.411 Approved
Str/435 Dated 06.05.2021 06.05.2021 Km 95+070 to Km 95+110 RHS Friction Slab 1 40 1.81 0.25 18.100 497.511 Approved
Str/439 Dated 07.05.2021 07.05.2021 Km 95+040 to Km 95+070 RHS Friction Slab 1 30 1.81 0.25 13.575 511.086 Approved
RA Bill -7
ITEM No-6.Crash Barrier and Friction slab M40 Grade
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
Str/399 Dated 22.02.2021 22.02.2021 Km 95+150 to Km 95+210 LHS Haunch 1 60 0.308 area 18.480 529.566 Approved
Str/400 Dated 22.02.2021 22.02.2021 Km 95+210 to Km 95+260 LHS Haunch 1 50 0.308 area 15.400 544.966 Approved
Str/392 Dated 09.02.2021 09.02.2021 Km 95+260 to Km 95+300 LHS Haunch 1 40 0.308 area 12.320 557.286 Approved
Str/429 Dated 28.04.2021 28.04.2021 Km 95+180 to Km 95+220 RHS Haunch 1 40 0.308 area 12.320 569.606 Approved
RA Bill -7
Str/440 Dated 07.05.2021 07.05.2021 Km 95+110 to Km 95+180 RHS Haunch 1 70 0.308 area 21.560 591.166 Approved
Str/403 Dated 01.03.2021 01.03.2021 Km 95+300 to Km 95+334 LHS Crash Barrier 1.00 34.000 0.288 area 9.792 600.958 Approved
Str/404 Dated 02.03.2021 02.03.2021 Km 95+270 to Km 95+300 LHS Crash Barrier 1.00 30.000 0.288 area 8.640 609.598 Approved
Str/405 Dated 02.03.2021 02.03.2021 Km 95+240 to Km 95+270 LHS Crash Barrier 1.00 30.000 0.288 area 8.640 618.238 Approved
Str/406 Dated 06.03.2021 06.03.2021 Km 95+210 to Km 95+240 LHS Crash Barrier 1.00 30.000 0.288 area 8.640 626.878 Approved
Str/407 Dated 08.03.2021 08.03.2021 Km 95+180 0 to Km 95+210 LHS Crash Barrier 1.00 30.000 0.288 area 8.640 635.518 Approved
Str/408 Dated 10.03.2021 10.03.2021 Km 95+160 0 to Km 95+180 LHS Crash Barrier 1.00 20.000 0.288 area 5.760 641.278 Approved
Str/409 Dated 15.03.2021 15.03.2021 Km 95+310 to Km 95+344.5 RHS Crash Barrier 1.00 34.500 0.288 area 9.936 651.214 Approved
Str/410 Dated 16.03.2021 16.03.2021 Km 95+280 to Km 95+310 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 659.854 Approved
Str/411 Dated 19.03.2021 19.03.2021 Km 95+250 to Km 95+280 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 668.494 Approved
Str/412 Dated 20.03.2021 20.03.2021 Km 95+220 to Km 95+250 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 677.134 Approved
45 RE-6 Str/449 18.06.2021 Km 95+000 to Km 95+040 RHS Friction Slab 1 40 1.81 0.25 18.100 695.234 Approved
46 RE-6 Str/471 19.06.2021 Km 95+050 to Km 95+150 LHS Friction Slab 1 100 1.81 0.25 45.250 740.484 Approved
47 RE-6 Str/477 26.07.2021 Km 95+000 to Km 95+050 LHS Friction Slab 1 50 1.81 0.25 22.625 763.109 Approved
48 RE-6 Str/486 09.08.2021 Km 94+927 to Km 95+000 LHS Friction Slab 1 73 1.81 0.25 33.033 796.141 Approved
49 RE-6 Str/456 28.06.2021 Km 94+927 to Km 95+000 RHS Friction Slab 1 73 1.81 0.25 33.033 829.174 Approved
50 RE-6 Str/448 17.06.2021 Km 95+040 to Km 95+110 RHS Haunch 1 70 0.308 area 21.560 850.734 Approved
51 RE-6 Str/458 30.06.2021 Km 94+927 to Km 95+040 RHS Haunch 1 113 0.308 area 34.804 885.538 Approved
52 RE-6 Str/476 23.07.2021 Km 95+050 to Km 95+150 LHS Haunch 1 100 0.308 area 30.800 916.338 Approved
53 RE-6 Str/481 31.07.2021 Km 95+000 to Km 95+050 LHS Haunch 1 50 0.308 area 15.400 931.738 Approved
54 RE-6 Str/488 13.08.2021 Km 94+927 to Km 95+000 LHS Haunch 1 73 0.308 area 22.484 954.222 Approved
55 RE-6 Str/450 18.06.2021 Km 95+190 to Km 95+220 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 962.862 Approved
56 RE-6 Str/454 24.06.2021 Km 95+160 to Km 95+190 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 971.502 Approved
57 RE-6 Str/457 29.06.2021 Km 94+130 to Km 95+160 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 980.142 Approved
58 RE-6 Str/460 01.07.2021 Km 95+100 to Km 95+130 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 988.782 Approved
RA Bill-8
59 RE-6 Str/467 08.07.2021 Km 95+070 to Km 95+100 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 997.422 Approved
60 RE-6 Str/468 10.07.2021 Km 95+040 to Km 95+070 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 1006.062 Approved
61 RE-6 Str/469 12.07.2021 Km 95+010 to Km 95+040 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 1014.702 Approved
62 RE-6 Str/470 19.07.2021 Km 94+970 to Km 95+010 RHS Crash Barrier 1.00 40.000 0.288 area 11.520 1026.222 Approved
63 RE-6 Str/475 22.07.2021 Km 94+950 to Km 94+970 RHS Crash Barrier 1.00 20.000 0.288 area 5.760 1031.982 Approved
64 RE-6 Str/478 26.07.2021 Km 95+130 to Km 95+160 RHS Crash Barrier 1.00 30.000 0.288 area 8.640 1040.622 Approved
65 RE-6 Str/480 30.07.2021 Km 95+100 to Km 95+130 LHS Crash Barrier 1.00 30.000 0.288 area 8.640 1049.262 Approved
66 RE-6 Str/482 02.08.2021 Km 95+070 to Km 95+100 LHS Crash Barrier 1.00 30.000 0.288 area 8.640 1057.902 Approved
67 RE-6 Str/487 11.08.2021 Km 95+040 to Km 95+070 LHS Crash Barrier 1.00 30.000 0.288 area 8.640 1066.542 Approved
68 RE-6 Str/489 16.08.2021 Km 95+000 to Km 95+040 LHS Crash Barrier 1.00 40.000 0.288 area 11.520 1078.062 Approved
69 RE-6 Str/490 24.08.2021 Km 94+970 to Km 95+000 LHS Crash Barrier 1.00 30.000 0.288 area 8.640 1086.702 Approved
70 RE-6 Str/492 28.08.2021 Km 94+950 to Km 94+970 LHS Crash Barrier 1.00 20.000 0.288 area 5.760 1092.462 Approved
71 RE-6 Str/494 30.08.2021 Km 94+927 to Km 94+950 LHS Crash Barrier 1.00 23.000 0.288 area 6.624 1099.086 Approved
ITEM No-6.Crash Barrier and Friction slab M40 Grade
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
72 RE-6 Str/497 31.08.2021 Km 94+927 to Km 94+950 RHS Crash Barrier 1.00 23.000 0.288 area 6.624 1105.710 Approved
Total Qty 1105.710
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in the State of Tamilnadu on Build Operation
and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:08
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 16.05.2021 to 04.10.2021
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
1 RE-7 Str/151 22.05.2020 Km 94+817 to Km 94+914 RHS Rewall levelling pad 1 97 0.45 0.15 6.548 6.548 Approved
2 RE-7 Str/152 23.05.2020 Km 94+771 to Km 94+914 LHS Rewall levelling pad 1 143 0.45 0.15 9.653 16.200 Approved
3 RE-7 Str/173 10.07.2020 Km 94+928 to Km 95+050 LHS Rewall levelling pad 1 122 0.45 0.15 8.235 24.435 Approved
4 RE-7 Str/178 14.07.2020 Km 95+180 to Km 95+335 LHS Rewall levelling pad 1 155 0.45 0.15 10.463 34.898 Approved
RA Bill-4
5 RE-7 Str/183 18.07.2020 Km 95+050 to Km 95+180 LHS Rewall levelling pad 1 130 0.45 0.15 8.775 43.673 Approved
6 RE-7 Str/187 22.07.2020 Km 94+927 to Km 95+050 RHS Rewall levelling pad 1 123 0.45 0.15 8.303 51.975 Approved
7 RE-7 Str/201 31.07.2020 Km 95+050 to Km 95+200 RHS Rewall levelling pad 1 150 0.45 0.15 10.125 62.100 Approved
8 RE-7 Str/202 01.08.2020 Km 95+200 to Km 95+345 RHS Rewall levelling pad 1 145 0.45 0.15 9.788 71.888 Approved
9 RE-7 Str/273 24.11.2020 Km 94+816.55 to Km 94+850 RHS PCC Below Friction Slab 1 33 1.91 0.100 6.389 78.276 Approved
10 RE-7 Str/276 27.11.2020 Km 94+850 to Km 94+914 RHS PCC Below Friction Slab 1 64 1.91 0.100 12.224 90.500 Approved
11 RE-7 Str/278 28.11.2020 Km 94+770.924 to Km 94+820 LHS PCC Below Friction Slab 1 49 1.91 0.100 9.374 99.874 Approved RA Bill-5
12 RE-7 Str/282 01.12.2020 Km 94+820 to Km 94+880 LHS PCC Below Friction Slab 1 60 1.91 0.100 11.460 111.334 Approved
13 RE-7 Str/284 02.12.2020 Km 94+880 to Km 94+914 LHS PCC Below Friction Slab 1 34 1.91 0.100 6.494 117.828 Approved
14 RE-7 Str/331 04.01.2021 Km 95+300 to Km 95+344.5 RHS PCC Below Friction Slab 1 45 1.91 0.100 8.500 126.327 Approved
15 RE-7 Str/333 05.01.2021 Km 95+265 to Km 95+300 RHS PCC Below Friction Slab 1 35 1.91 0.100 6.685 133.012 Approved
16 RE-7 Str/355 27.01.2021 Km 95+240 to Km 95+265 RHS PCC Below Friction Slab 1 25 1.91 0.100 4.775 137.787 Approved
17 RE-7 Str/340 08.01.2021 Km 95+290 to Km 95+334 LHS PCC Below Friction Slab 1 44 1.91 0.100 8.404 146.191 Approved RA Bill-6
18 RE-7 Str/357 28.01.2021 Km 95+240 to Km 95+290 LHS PCC Below Friction Slab 1 50 1.91 0.100 9.550 155.741 Approved
19 RE-7 Str/365 30.01.2021 Km 95+190 to Km 95+240 LHS PCC Below Friction Slab 1 50 1.91 0.100 9.550 165.291 Approved
20 RE-7 Str/369 02.02.2021 Km 95+190 to Km 95+240 RHS PCC Below Friction Slab 1 50 1.91 0.100 9.550 174.841 Approved
21 RE-7 Str/367 02.02.2021 Km 95+150 to Km 95+190 LHS PCC Below Friction Slab 1 40 1.91 0.100 7.640 182.481 Approved
22 RE-7 Str/388 06.02.2021 Km 95+150 to Km 95+190 RHS PCC Below Friction Slab 1 40 1.91 0.100 7.640 190.121 Approved
Km 95+120 to Km 95+150-Friction Slab
23 RE-7 Str/422 21.04.2021 RHS PCC Below Friction Slab 1.00 30 1.91 0.100 5.730 195.851 Approved
PCC
Km 95+100 to Km A2
95+120-Friction Slab
24 RE-7 Str/424 22.04.2021 RHS PCC Below Friction Slab 1.00 20 1.91 0.100 3.820 199.671 Approved
PCC
Km 95+070 to Km A2
95+100-Friction Slab
25 RE-7 Str/431 29.04.2021 RHS PCC Below Friction Slab 1.00 30 1.91 0.100 5.730 205.401 Approved RA Bill-7
PCC A2
Km 95+040 to Km 95+070-Friction Slab
26 RE-7 Str/432 30.04.2021 RHS PCC Below Friction Slab 1.00 30 1.91 0.100 5.730 211.131 Approved
PCC
Km 95+000 to Km A2
95+040-Friction slab
27 RE-7 Str/438 07.05.2021 RHS PCC Below Friction Slab 1.00 40 1.91 0.100 7.640 218.771 Approved
PCC
Km 94+970 to Km A2
95+000-Friction slab
28 RE-7 Str/443 08.05.2021 RHS PCC Below Friction Slab 1.00 30 1.91 0.100 5.730 224.501 Approved
PCC
Km 94+927 to Km A2
94+970-Friction slab
29 RE-7 Str/444 10.05.2021 RHS PCC Below Friction Slab 1.00 43 1.91 0.100 8.213 232.714 Approved
PCC A2
Km 95+000 to Km 95+150-Friction slab
30 RE-7 Str/446 21.05.2021 LHS PCC Below Friction Slab 1.00 150 1.91 0.100 28.650 261.364 Approved
PCC
Km 94+927 to Km A2
95+000-Friction slab RA Bill-8
31 RE-7 Str/464 05.06.2021 LHS PCC Below Friction Slab 1.00 73 1.91 0.100 13.943 275.307 Approved
PCC A2
Total Qty 275.307
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in the State of Tamilnadu on
Build Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:08
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 16.05.2021 to 04.10.2021
ITEM No-8.Providing, cutting, bending and fixing TMT/HYSD bar reinforcement in RE Wall crash barrier & friction slab complete as per drawings and Technical Specification Section 1600.
Sr No BOQ Code RFI No. Date Section Approved Side Activity Layer L B D Total Cum Qty Status Remark
1 RE-8 STR/292 11.12.2020 Km 94+816 to Km 94+865 RHS HYSD for Crash Barrier 1.00 49 0.137 t/m 6.718 6.718 Approved
2 RE-8 STR/296 16.12.2020 Km 94+865 to Km 94+914.230 RHS HYSD for Crash Barrier 1.00 49.23 0.137 t/m 6.749 13.467 Approved
3 RE-8 STR/294 15.12.2020 Km 94+770.924 to Km 94+810 LHS HYSD for Crash Barrier 1.00 39.076 0.137 t/m 5.357 18.824 Approved RA Bill-5
4 RE-8 STR/301 19.12.2020 Km 94+816 to Km 94+840 LHS HYSD for Crash Barrier 1.00 24 0.137 t/m 3.290 22.115 Approved
5 RE-8 STR/302 21.12.2020 Km 94+840 to Km 94+914 LHS HYSD for Crash Barrier 1.00 74 0.137 t/m 10.145 32.260 Approved
6 RE-8 Str/360 29.01.2021 Km 95+240 to Km 95+270 RHS HYSD for Crash Barrier 1.00 30.000 0.137 t/m 4.113 36.373 Approved
7 RE-8 Str/364 30.01.2021 Km 95+290 to Km 95+334 LHS HYSD for Crash Barrier 1.00 44.000 0.137 t/m 6.032 42.405 Approved
8 RE-8 Str/354 27.01.2021 Km 95+270 to Km 95+300 RHS HYSD for Crash Barrier 1.00 30.000 0.137 t/m 4.113 46.518 Approved
RA Bill-6
9 RE-8 Str/348 22.01.2021 Km 95+300 to Km 95+344.5 RHS HYSD for Crash Barrier 1.00 44.500 0.137 t/m 6.101 52.619 Approved
10 RE-8 Str/379 04.02.2021 Km 95+240 to Km 95+290 LHS HYSD for Crash Barrier 1.00 50.000 0.137 t/m 6.855 59.473 Approved
11 RE-8 Str/376 03.02.2021 Km 94+860 to Km 94+885 LHS HYSD for Crash Barrier 1.00 25.000 0.288 t/m 7.200 66.673 Approved
12 RE-8 Str/396 19.02.2021 Km 95+210 to Km 95+240 LHS HYSD for Crash Barrier 1 30 0.137 t/m 4.113 70.786 Approved
13 RE-8 Str/397 20.02.2021 Km 95+150 to Km 95+210 LHS HYSD for Crash Barrier 1 60 0.137 t/m 8.226 79.012 Approved
14 RE-8 Str/401 24.02.2021 Km 95+220 to Km 95+240 RHS HYSD for Crash Barrier 1 20 0.137 t/m 2.742 81.754 Approved
15 RE-8 Str/427 23.04.2021 Km 95+160 to Km 95+220 RHS HYSD for Crash Barrier 1 60 0.137 t/m 8.226 89.980 Approved RA Bill-7
16 RE-8 Str/434 05.05.2021 Km 95+110 to Km 95+160 RHS HYSD for Crash Barrier 1 50 0.137 t/m 6.855 96.835 Approved
17 RE-8 Str/435 06.05.2021 Km 95+070 to Km 95+110 RHS HYSD for Crash Barrier 1 40 0.137 t/m 5.480 102.315 Approved
18 RE-8 Str/439 07.05.2021 Km 95+040 to Km 95+070 RHS HYSD for Crash Barrier 1 30 0.137 t/m 4.110 106.425 Approved
19 RE-8 Str/449 18.06.2021 Km 95+000 to Km 95+040 RHS HYSD for Crash Barrier 1 40 0.137 t/m 5.480 111.905 Approved
20 RE-8 Str/471 19.06.2021 Km 95+050 to Km 95+150 LHS HYSD for Crash Barrier 1 100 0.137 t/m 13.700 125.605 Approved
21 RE-8 Str/477 26.07.2021 Km 95+000 to Km 95+050 LHS HYSD for Crash Barrier 1 50 0.137 t/m 6.850 132.455 Approved RA Bill-8
22 RE-8 Str/486 09.08.2021 Km 94+927 to Km 95+000 LHS HYSD for Crash Barrier 1 73 0.137 t/m 10.001 142.456 Approved
23 RE-8 Str/456 28.06.2021 Km 94+927 to Km 95+000 RHS HYSD for Crash Barrier 1 73 0.137 t/m 10.001 152.457 Approved
Total Qty 152.457
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in the State of Tamilnadu on Build
Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 28.02.2022
ITEM No-9.Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
1 RE-9 HW/422 04.11.2020 Km 94+817 to Km 94+850-Sub Grade 1st layer RHS 1.00 33 13.290 0.200 87.714 87.714
2 RE-9 HW/426 05.11.2020 Km 94+817 to Km 94+850-Sub Grade 2nd layer RHS 1.00 33 13.290 0.150 65.786 153.500
3 RE-9 HW/438 06.11.2020 Km 94+817 to Km 94+850-Sub Grade Top layer RHS 1.00 33 13.290 0.150 65.786 219.285
4 RE-9 HW/440 06.11.2020 KM 94+771 to Km 94+820-Sub Grade 1st layer LHS 1.00 49 13.290 0.200 130.242 349.527
5 RE-9 HW/452 07.11.2020 KM 94+771 to Km 94+820-Sub Grade 2nd layer LHS 1.00 49 13.290 0.150 97.682 447.209
6 RE-9 HW/490 24.11.2020 Km 94+850 to Km 94+914-Sub Grade 1st layer RHS 1.00 64 13.290 0.200 170.112 617.321
7 RE-9 HW/492 25.11.2020 Km 94+850 to Km 94+914-Sub Grade 2nd layer RHS 1.00 64 13.290 0.150 127.584 744.905
8 RE-9 HW/493 25.11.2020 KM 94+771 to Km 94+820-Sub Grade Top layer LHS 1.00 49 13.290 0.150 97.682 842.586
Approved RA Bill-5
9 RE-9 HW/495 26.11.2020 Km 94+850 to Km 94+914-Sub Grade Top layer RHS 1.00 64 13.290 0.150 127.584 970.170
10 RE-9 HW/496 26.11.2020 Km 94+820 to Km 94+914-Sub Grade 1st layer LHS 1.00 94 13.290 0.200 249.852 1220.022
11 RE-9 HW/500 27.11.2020 Km 94+820 to Km 94+914-Sub Grade 2nd layer LHS 1.00 94 13.290 0.150 187.389 1407.411
12 RE-9 HW/502 28.11.2020 Km 94+820 to Km 94+914-Sub Grade Top layer LHS 1.00 94 13.290 0.150 187.389 1594.800
13 RE-9 HW/570 09.12.2020 Km 95+180 to Km 95+334-Sub Grade 1st layer LHS 1.00 154 13.290 0.200 409.332 2004.132
14 RE-9 HW/626 18.12.2020 Km 95+180 to Km 95+334-Sub Grade 2nd layer LHS 1.00 154 13.290 0.150 306.999 2311.131
15 RE-9 HW/627 18.12.2020 Km 95+250 to Km 95+345-Sub Grade 1st layer RHS 1.00 95 13.290 0.200 252.510 2563.641
16 RE-9 HW/627 18.12.2020 Km 95+250 to Km 95+345-Sub Grade 2nd layer RHS 1.00 95 13.290 0.150 189.383 2753.024
17 RE-9 HW/687 02.01.2021 Km 95+250 to Km 95+344.59-Sub Grade Top layer RHS 1.00 94.59 13.290 0.150 188.565 2941.589
18 RE-9 HW/697 06.01.2021 Km 95+180 to Km 95+334.292-Sub Grade Top layer LHS 1.00 154.292 13.290 0.150 307.581 3249.170
19 RE-9 HW/699 07.01.2021 Km 95+090 to Km 95+180-Sub Grade 1st layer LHS 1.00 90 13.290 0.200 239.220 3488.390
20 RE-9 HW/700 08.01.2021 Km 95+090 to Km 95+180-Sub Grade 2nd layer LHS 1.00 90 13.290 0.150 179.415 3667.805
Approved RA Bill-6
21 RE-9 HW/702 09.01.2021 Km 95+090 to Km 95+180-Sub Grade Top layer LHS 1.00 90 13.290 0.150 179.415 3847.220
22 RE-9 HW/703 09.01.2021 Km 95+135 to Km 95+250-Sub Grade 1st layer RHS 1.00 115 13.290 0.200 305.670 4152.890
23 RE-9 HW/704 11.01.2021 Km 95+135 to Km 95+250-Sub Grade 2nd layer RHS 1.00 115 13.290 0.150 229.253 4382.142
24 RE-9 HW/706 30.01.2021 Km 95+135 to Km 95+250-Sub Grade Top layer RHS 1.00 115 13.290 0.150 229.253 4611.395
25 RE-9 Km 95+344.59 to Km 95+430-Sub Grade 1st Layer RHS 1.00 85.41 13.290 0.200 227.020 4838.415
HW/690 02.01.2021
26 RE-9 Km 95+334.292 to Km 95+430-Sub Grade 1st Layer LHS 1.00 95.708 13.290 0.200 254.392 5092.806
27 RE-9 Km 95+344.59 to Km 95+430-Sub Grade 2nd Layer RHS 1.00 85.41 13.290 0.150 170.265 5263.071
HW/705 29.01.2021
HW/705 29.01.2021
28 RE-9 Km 95+334.292 to Km 95+430-Sub Grade 2nd Layer LHS 1.00 95.708 13.290 0.150 190.794 5453.865
29 RE-9 HW/728 25.03.2021 Km 95+344.59 to Km 95+430-Sub Grade Top Layer RHS 1.00 85.41 13.290 0.150 170.265 5624.130
30 RE-9 HW/729 25.03.2021 Km 95+334.292 to Km 95+430-Sub Grade Top Layer LHS 1.00 95.708 13.290 0.150 190.794 5814.924
31 RE-9 HW/803 16.04.2021 Km 95+045 to Km 95+090-Sub Grade 1st layer LHS 1.00 45 13.290 0.200 119.610 5934.534
32 RE-9 HW/807 16.04.2021 Km 95+050 to Km 95+135-Sub Grade 1st layer RHS 1.00 85 13.290 0.200 225.930 6160.464
33 RE-9 HW/811 17.04.2021 Km 95+045 to Km 95+090-Sub Grade 2nd layer LHS 1.00 45 13.290 0.150 89.708 6250.171
34 RE-9 HW/815 17.04.2021 Km 95+050 to Km 95+135-Sub Grade 2nd layer RHS 1.00 85 13.290 0.150 169.448 6419.619
35 RE-9 HW/822 19.04.2021 Km 95+050 to Km 95+135-Sub Grade Top layer RHS 1.00 85 13.290 0.150 169.448 6589.066
36 RE-9 HW/852 24.04.2021 Km 95+005 to Km 95+050-Sub Grade 1st layer RHS 1.00 45 13.290 0.200 119.610 6708.676
37 RE-9 HW/874 03.05.2021 Km 95+000 to Km 95+045-Sub Grade 1st layer LHS 1.00 45 13.290 0.200 119.610 6828.286
38 RE-9 HW/877 04.05.2021 Km 95+000 to Km 95+045-Sub Grade 2nd layer LHS 1.00 45 13.290 0.150 89.708 6917.994 Approved RA Bill-7
39 RE-9 HW/878 04.05.2021 Km 95+045 to Km 95+090-Sub Grade Top layer LHS 1.00 45 13.290 0.150 89.708 7007.701
40 RE-9 HW/881 04.05.2021 Km 95+005 to Km 95+050-Sub Grade 2nd layer RHS 1.00 45 13.290 0.150 89.708 7097.409
41 RE-9 HW/885 05.05.2021 Km 95+000 to Km 95+045-Sub Grade Top layer LHS 1.00 45 13.290 0.150 89.708 7187.116
42 RE-9 HW/887 05.05.2021 Km 94+960 to Km 95+005-Sub Grade 1st layer RHS 1.00 45 13.290 0.200 119.610 7306.726
43 RE-9 HW/888 05.05.2021 Km 95+005 to Km 95+050-Sub Grade Top layer RHS 1.00 45 13.290 0.150 89.708 7396.434
44 RE-9 HW/892 06.05.2021 Km 94+960 to Km 95+005-Sub Grade 2nd layer RHS 1.00 45 13.290 0.150 89.708 7486.141
45 RE-9 HW/896 07.05.2021 Km 94+960 to Km 95+005-Sub Grade Top layer RHS 1.00 45 13.290 0.150 89.708 7575.849
46 RE-9 HW/900 08.05.2021 Km 94+960 to Km 95+000-Sub Grade 1st layer LHS 1.00 40 13.290 0.200 106.320 7682.169
47 RE-9 HW/903 10.05.2021 Km 94+960 to Km 95+000-Sub Grade 2nd layer LHS 1.00 40 13.290 0.150 79.740 7761.909
48 RE-9 HW/904 10.05.2021 Km 94+927.7 to Km 94+960-Sub Grade 1st layer RHS 1.00 32.3 13.290 0.200 85.853 7847.762
49 RE-9 HW/906 11.05.2021 Km 94+960 to Km 95+000-Sub Grade Top layer LHS 1.00 40 13.290 0.150 79.740 7927.502
50 RE-9 HW/907 11.05.2021 Km 94+927.7 to Km 94+960-Sub Grade 2nd layer RHS 1.00 32.3 13.290 0.150 64.390 7991.892
51 RE-9 HW/909 12.05.2021 Km 94+927.7 to Km 94+960-Sub Grade Top layer RHS 1.00 32.3 13.290 0.150 64.390 8056.282
52 RE-9 HW/910 13.05.2021 Km 94+927.7 to Km 94+960-Sub Grade 1st layer LHS 1.00 32.3 13.290 0.200 85.853 8142.136
53 RE-9 HW/911 14.05.2021 Km 94+927.7 to Km 94+960-Sub Grade 2nd layer LHS 1.00 32.3 13.290 0.150 64.390 8206.526 Approved RA Bill-8
54 RE-9 HW/912 15.05.2021 Km 94+927.7 to Km 94+960-Sub Grade Top layer LHS 1.00 32.3 13.290 0.150 64.390 8270.916
55 RE-9 Km 95+337.40 to Km 95+440-GSB Top -Shoulder Filling LHS 1 102.6 1.000 0.200 20.520 8291.436
56 RE-9 Km 95+341.50 to Km 95+440-GSB Top -Shoulder Filling RHS 1 98.5 1.000 0.200 19.700 8311.136
HW/942 07.12.21 Approved RA Bill-9
57 RE-9 Km 95+337.40 to Km 95+440- WMM Top -Shoulder Filling LHS 1 102.6 1.000 0.250 25.650 8336.786
58 RE-9 Km 95+341.50 to Km 95+440-WMM Top -Shoulder Filling RHS 1 98.5 1.000 0.250 24.625 8361.411
Total Qty 8361.411
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in the
State of Tamilnadu on Build Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 28.02.2022
ITEM No-10.Constructing Granular Sub-base (GSB) with approved materials conforming to Grading-I (Table 400-1) with all lifts and leads all complete as per Technical Specifications Clause 401.
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
1 RE-10 Km 94+730 to Km 94+767-Gsb 1st layer RHS 1.00 37 13.475 0.130 64.815 64.815
2 RE-10 HW/712 17.02.2021 Km 94+767 to Km 94+808.5-Gsb 1st layer RHS 1.00 41.5 13.207 0.130 71.252 136.067
3 RE-10 Km 94+808.5 to Km 94+910.75-Gsb 1st layer RHS 1.00 102.25 12.940 0.130 172.005 308.071
4 RE-10 Km 94+730 to Km 94+768.5-Gsb 1st layer LHS 1.00 38.5 13.207 0.130 66.101 374.173
HW/713 17.02.2021
5 RE-10 Km 94+768.5 to Km 94+910.75-Gsb 1st layer LHS 1.00 142.25 12.940 0.130 239.293 613.465
Approved RA Bill-6
6 RE-10 Km 94+730 to Km 94+767-Gsb 2nd layer RHS 1.00 37 9.650 0.130 46.417 659.882
7 RE-10 HW/714 19.02.2021 Km 94+767 to Km 94+808.5-Gsb 2nd layer RHS 1.00 41.5 11.165 0.130 60.235 720.117
8 RE-10 Km 94+808.5 to Km 94+910.75-Gsb 2nd layer RHS 1.00 102.25 12.680 0.130 168.549 888.666
9 RE-10 Km 94+730 to Km 94+768.5-Gsb 2nd layer LHS 1.00 38.5 11.165 0.130 55.881 944.547
HW/715 19.02.2021
10 RE-10 Km 94+768.5 to Km 94+910.75-Gsb 2nd layer LHS 1.00 142.25 12.680 0.130 234.485 1179.032
11 RE-10 HW/722 23.03.2021 Km 95+170 to Km 95+337.5-GSB 1st layer LHS 1.00 167.5 12.940 0.130 281.769 1460.800
12 RE-10 HW/723 23.03.2021 Km 95+220 to Km 95+341.5-GSB 1st layer RHS 1.00 121.5 12.940 0.130 204.387 1665.188
13 RE-10 HW/726 25.03.2021 Km 95+170 to Km 95+337.5-GSB 2nd layer LHS 1.00 167.5 12.680 0.130 276.107 1941.295
14 RE-10 HW/727 25.03.2021 Km 95+220 to Km 95+341.5-GSB 2nd layer RHS 1.00 121.5 12.680 0.130 200.281 2141.575
Approved RA Bill-7
15 RE-10 HW/734 27.03.2021 Km 95+337.5 to Km 95+430-GSB 1st Layer LHS 1.00 92.5 13.195 0.130 158.670 2300.245
16 RE-10 HW/735 27.03.2021 Km 95+341.5 to Km 95+430-GSB 1st Layer RHS 1.00 88.5 13.195 0.130 151.808 2452.054
17 RE-10 HW/742 30.03.2021 Km 95+337.5 to Km 95+430-GSB Top Layer LHS 1.00 92.5 11.215 0.130 134.860 2586.914
18 RE-10 HW/743 30.03.2021 Km 95+341.5 to Km 95+430-GSB Top Layer RHS 1.00 88.5 11.215 0.130 129.029 2715.942
19 RE-10 HW/918 09.08.2021 Km 94+934.25 to Km 95+220-GSB 1st Layer RHS 1.00 285.75 12.180 0.130 452.457 3168.399
20 RE-10 HW/919 10.08.2021 Km 94+934.25 to Km 95+170-GSB 1st Layer LHS 1.00 235.75 12.180 0.130 373.287 3541.686
Approved RA Bill-8
21 RE-10 HW/920 13.08.2021 Km 94+934.25 to Km 95+220-GSB 2nd Layer RHS 1.00 285.75 10.250 0.130 380.762 3922.447
22 RE-10 HW/921 14.08.2021 Km 94+934.25 to Km 95+170-GSB 2nd Layer LHS 1.00 235.75 10.250 0.130 314.137 4236.584
23 RE-10 HW/935 29.11.2021 Km 95+430 to Km 95+440-GSB 1st Layer BHS 2.00 10 11.000 0.130 28.600 4265.184
Approved RA Bill-9
24 RE-10 HW/936 30.11.2021 Km 95+430 to Km 95+440-GSB 2nd Layer BHS 2.00 10 9.500 0.130 24.700 4289.884
Total Qty 4289.884
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in the State of
Tamilnadu on Build Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 28.02.2022
ITEM No-11.Constructing Wet Mix Macadam (WMM) to full width for widening with approved material complete as per Technical Specification Clause 406.
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
1 1 70.924 10.505 0.125 93.132 93.132
RE-11 HW/718 08.03.2021 Km 94+700 to Km 94+910-WMM 1st layer LHS
1 139.076 11.56 0.125 200.965 294.097
2 1 116.55 10.505 0.125 153.045 447.142
RE-11 HW/719 08.03.2021 Km 94+700 to Km 94+910-WMM 1st layer RHS
1 93.45 11.56 0.125 135.035 582.177
Approved RA Bill-7
3 1 70.924 10.125 0.125 89.763 671.940
RE-11 HW/724 24.03.2021 Km 94+700 to Km 94+910-WMM 2nd layer LHS
1 139.076 11.427 0.125 198.653 870.593
4 1 116.55 10.125 0.125 147.509 1018.101
RE-11 HW/725 24.03.2021 Km 94+700 to Km 94+910-WMM 2nd layer LHS
1 93.45 11.427 0.125 133.482 1151.583
5 RE-11 HW/913 19.05.2021 Km 95+170 to Km 95+430-WMM 1st layer LHS 1 260 11.35 0.125 368.875 1520.458
6 RE-11 HW/914 19.05.2021 Km 95+220 to Km 95+430-WMM 1st Layer RHS 1 210 11.35 0.125 297.938 1818.395
7 RE-11 HW/922 16.05.2021 Km 94+934.25 to Km 95+220-WMM 1st layer RHS 1 285.75 11.35 0.125 405.408 2223.803
8 RE-11 HW/923 17.05.2021 Km 94+934.25 to Km 95+170-WMM 1st layer LHS 1 235.75 11.35 0.125 334.470 2558.274 Approved RA Bill-8
9 RE-11 HW/928 06.09.2021 Km 94+934.25 to Km 95+220-WMM 2nd layer RHS 1 285.75 11.45 0.125 408.980 2967.253
10 RE-11 HW/929 14.09.2021 Km 95+220 to Km 95+430-WMM 2nd Layer RHS 1 210 11.45 0.125 300.563 3267.816
11 RE-11 HW/930 14.09.2021 Km 94+934.25 to Km 95+430-WMM 2nd layer LHS 1 495.75 11.45 0.125 709.542 3977.358
12 RE-11 HW/937 30.11.2021 Km 95+430 to Km 95+440-WMM 1st layer BHS 2 10 9.25 0.125 23.125 4000.483
Approved RA Bill-9
13 RE-11 HW/938 30.11.2021 Km 95+430 to Km 95+440-WMM 2nd Layer BHS 2 10 9 0.125 22.500 4022.983
Total Qty 4022.983
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in
the State of Tamilnadu on Build Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 28.02.2022
ITEM No-12.Construction of cement concrete kerb with top and bottom width 115 and 165 respectively, 250mm above FRL in M20 Grade PCC on M10 Grade foundation 150mm thick, foundation having 50mm
projection beyond kerb stone, kerb stone laid with kerb laying machine
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
1 RE-12 STR/508 22.09.2021 Km 95+180 to Km 95+375 RHS 1 195 195.000 195.000
ITEM No-15.Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous
binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
RE-15 Km 94+700 to Km 94+727.25 LHS 1 27.25 8.85 0.08 19.293 19.293
1 RE-15 HW/955 23.12.2021 Km.94+727.25 to 94+768.5 LHS 1 41.25 10.175 0.08 33.5775 52.871
RE-15 Km.94+768.5 to 94+914 LHS 1 145 11.5 0.08 133.4 186.271
RE-15 Km 94+927.77 to Km 95+341.5 LHS 1 413.73 11.5 0.08 380.6316 566.902
2 RE-15 HW/956 23.12.2021 Km.95+341.5 to 95+382.5 LHS 1 41.25 10.175 0.08 33.5775 600.480
RE-15 Km.95+382.5 to 95+440 LHS 1 57.5 8.85 0.08 40.71 641.190
Approved RA Bill-9
RE-15 Km.94+700 to 94+767.25 RHS 1 67.25 8.85 0.08 47.613 688.803
3 RE-15 HW/958 25.12.2021 Km.94+767.25 to 94+808.5 RHS 1 41.25 10.175 0.08 33.5775 722.380
RE-15 Km.94+808.5 to 94+910.50 RHS 1 102 11.5 0.08 93.84 816.220
RE-15 Km.94+931.270 to 95+341.5 RHS 1 410.23 11.5 0.08 377.4116 1193.632
4 RE-15 HW/959 25.12.2021 Km.95+341.5 to 95+382.75 RHS 1 41.25 10.175 0.08 33.5775 1227.209
RE-15 Km.95+382.75 to 95+440 RHS 1 57.25 8.85 0.08 40.533 1267.742
Total Qty 1267.742
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in
the State of Tamilnadu on Build Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 28.02.2022
ITEM No-16.Providing Dense Graded Bituminous Macadam (DBM) course Grading II of Table 500-10 using VG-30 grade bitumen with bitumen content of 4.50% in one or two layers complete as per Technical
Specification Clause 507.
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
RE-16 Km 94+700 to Km 94+727.25-DBM 1st layer RHS 1 27.25 8.75 0.055 13.114 13.114
1 RE-16 HW/961 29.12.2021 Km 94+727.25 to Km 94+768.5-DBM 1st layer RHS 1 41.25 10.125 0.055 22.971 36.085
RE-16 Km 94+768.5 to Km 94+910.5-DBM 1st layer RHS 1 141.5 11.5 0.055 89.499 125.584
RE-16 Km 94+931.27 to Km 95+341.5-DBM 1st layer RHS 1 383.23 11.5 0.055 242.393 367.977
2 RE-16 HW/963 29.12.2021 Km 94+341.5 to Km 95+382.75-DBM 1st layer RHS 1 41.25 10.125 0.055 22.971 390.948
RE-16 Km 94+382.75 to Km 95+440-DBM 1st layer RHS 1 57.25 8.75 0.055 27.552 418.500
RE-16 Km 94+700 to Km 94+727.25-DBM 1st layer LHS 1 27.25 8.75 0.055 13.114 431.614
3 RE-16 HW/981 04.01.2022 Km 94+727.25 to Km 94+768.5-DBM 1st layer LHS 1 41.25 10.125 0.055 22.971 454.585
RE-16 Km 94+768.5 to Km 94+910.5-DBM 1st layer LHS 1 141.5 11.5 0.055 89.499 544.083
RE-16 Km 94+931.27 to Km 95+337.5-DBM 1st layer LHS 1 406.23 11.5 0.055 256.940 801.024
4 RE-16 HW/983 04.01.2022 Km 95+337.5 to Km 95+378.25-DBM 1st layer LHS 1 41.25 10.125 0.055 22.971 823.995
RE-16 Km 95+378.25 to Km 95+440-DBM 1st layer LHS 1 61.75 8.75 0.055 29.717 853.712
Approved RA Bill-9
RE-16 Km.94+700 to 94+767.25 DBM 2nd layer RHS 1 67.25 8.75 0.055 32.364 886.076
5 RE-16 HW/989 06.01.2022 Km.94+767.25 to 94+808.5 DBM 2nd layer RHS 1 41.25 10.125 0.055 22.971 909.047
RE-16 Km.94+808.5 to 94+910.50 DBM 2nd layer RHS 1 102 11.5 0.055 64.515 973.562
RE-16 Km 94+931.27 to Km 95+341.5-DBM 2nd layer RHS 1 410.23 11.5 0.055 259.470 1233.033
6 RE-16 HW/991 06.01.2022 Km 94+341.5 to Km 95+382.75-DBM 2nd layer RHS 1 41.25 10.125 0.055 22.971 1256.004
RE-16 Km 94+382.75 to Km 95+440-DBM 2nd layer RHS 1 57.25 8.75 0.055 27.552 1283.555
RE-16 Km 94+700 to Km 94+727.25-DBM 2nd layer LHS 1 27.25 8.75 0.055 13.114 1296.670
7 RE-16 HW/995 08.01.2022 Km 94+727.25 to Km 94+768.5-DBM 2nd layer LHS 1 41.25 10.125 0.055 22.971 1319.641
RE-16 Km 94+768.5 to Km 94+910.5-DBM 2nd layer LHS 1 142 11.5 0.055 89.815 1409.456
RE-16 Km 94+931.27 to Km 95+337.5-DBM 2nd layer LHS 1 406 11.5 0.055 256.795 1666.251
8 RE-16 HW/1001 08.01.2022 Km 95+337.5 to Km 95+378.25-DBM 2nd layer LHS 1 41.25 10.125 0.055 22.971 1689.222
RE-16 Km 95+378.25 to Km 95+440-DBM 2nd layer LHS 1 61.25 8.75 0.055 29.477 1718.698
Total Qty 1718.698
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in
the State of Tamilnadu on Build Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 31.01.2022
ITEM No-17.Providing and laying Bituminous Concrete wearing coat using CRMB-60 with bitumen content of 5.4% complete as per Technical Specifications Clauses 501 and 509.
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
ITEM No-18.Pavement marking with hot applied reflectorised thermoplastic paints complete as per drawing and Technical Specifications Clause 803.
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
ITEM No-19.Pavement marking with hot applied reflectorised thermoplastic paints complete as per drawing and Technical Specifications Clause 803.
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
ITEM No-20.Providing and fixing of road stud 100 x 100 mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm
upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973.
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
ITEM No-21.Planting of low height flowering plants and shrubs in two rows in central median as per technical specification
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
ITEM No-22.Supply and erection of 12 meters long octagonal type steel pole with all foundation accessories.And Supply installation & energising of flood light fitting with 1X150 watt HPSV Tubular lamp.
Sr No BOQ Code RFI No. Date Section Approved Side Nos L B D Total Cum Qty Status Remark
1 RE-22 12 Meters long longitudinal type steel pole BHS 6 6 6.000
HW/944 16.12.2021 Approved RA Bill-9
2 RE-22 150 Watt HPSV Tubular lamp BHS 8 8 14.000
Total Qty 14.000
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-47 in
the State of Tamilnadu on Build Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:09
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 01.11.2021 to 31.01.2022
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
Sr No BOQ Code RFI No. Date Section Approved Side Nos L B D Total Cum Qty Status Remark
1 RE-25 HW/996 Dated 08.01.2022 08.01.2022 Km 94+671 to Km 94+771 LHS 1 100 100 100.000
2 RE-25 HW/997 Dated 08.01.2022 08.01.2022 Km 94+717 to Km 94+817 RHS 1 100 100 200.000
Approved RA Bill-9
3 RE-25 HW/998 Dated 08.01.2022 08.01.2022 Km 95+334 to Km 95+434 LHS 1 100 100 300.000
4 RE-25 HW/999 Dated 08.01.2022 08.01.2022 Km 95+341 to Km 95+441 RHS 1 100 100 400.000
Total Qty 400.000
Design, Construction, Developement, Finance, Operation and Maintenance of Kumarapalayam to Chengapalli section of NH-47 from KM 53+525 to KM 102+035 on NH-
47 in the State of Tamilnadu on Build Operation and transfer (BOT Basis)
VUP at KM:94+921
RA BILL NO:05
SUMMARY OF BILL OF QUANTITIES
Consessionaire :M/s Kumarapalayam Tollways Ltd COS:BLACK SPOT No - TN-079 Period from 20.02.2021 to 15.05.2021
Extra ITEM 9B .Exacavation for hard rock needing controlled blasting with all safety measures to avoid spillage upto for levelling pad of RE wall including all leads and lift as per specifications
Sr No BOQ Code RFI No. Date Section Approved Side Layer L B D Total Cum Qty Status Remark
1 RE-9B Str/148 19.05.2020 Km 95+050 to Km 95+105 RHS 1 Quantity as per level sheet 41.335 41.335
2 RE-9B Str/149 20.05.20 Km 95+190 to Km 95+340 RHS 1 Quantity as per level sheet 77.272 118.607 Approved RA Bill-5
3 RE-9B Str/150 22.05.20 Km 95+190 to Km 95+340 LHS 1 Quantity as per level sheet 74.966 193.573
Total Qty 193.573