Seepex Manual BN-5-6LS-up-to-35-6LS-EN

Download as pdf or txt
Download as pdf or txt
You are on page 1of 84

Not Binding Operating

and Assembly Instruction


Progressive Cavity Pump
This operating and assembly instruction is only
for general information.

Type
BN 5-6LS XSto 35-6LS

Issue 24.02.2020
Index

1 Safety ....................................................................................................................................................
Safety....................................................................................................................................................
....................................................................................................................................................11
1.1 Notes on these instructions
1.2 Safety-related Information
1.3 Designated use
1.4 Foreseeable misuse
1.5 Structure of warning notes
1.5.1 Warning levels
1.5.2 Warning symbols
1.6 Qualification of the personnel
1.7 Tasks, notes for the owners, operators and technicians
1.8 Personal protective equipment
1.9 Safety and protective devices

2 Description of the machine ................................................................................................................... 9


machine...................................................................................................................
2.1 General description
2.2 Mode of action and pumping principle of the machine
2.3 Constructive design

3 Technical Data ....................................................................................................................................


Data....................................................................................................................................
....................................................................................................................................11

4 Transport, Intermediate storage, Disposal ..........................................................................................


Disposal..........................................................................................
..........................................................................................13
4.1 Safety
4.2 Transport
4.2.1 Dimensions, weight and centre of gravity
4.2.2 Symbol
4.2.3 Lashing points (AP) for lifting devices
4.2.4 Unpacking the machine
4.3 Temporary storage/corrosion protection
4.4 Disposal

5 Assembly / Installation ........................................................................................................................ 15


Installation........................................................................................................................
5.1 Mounting tools / lifting gear
5.2 Space requirement
5.3 Assembly of the complete mounted machine
5.4 Power supply of the machine
5.5 Pipelines

6 Commissioning / De-Commissioning .................................................................................................. 17


..................................................................................................17
De-Commissioning..................................................................................................
6.1 Commissioning report............................................................................................................ 17
Index

6.2 Measures before commissioning............................................................................................ 19


6.2.1 Checking pipelines
6.2.2 Protective devices on the pump
6.2.3 Electrical / hydraulic connections
6.2.4 Direction of rotation check
6.2.5 Additional devices - optional
6.3 Initial commissioning/repeated commissioning
6.3.1 Avoiding dry running of the pump
6.3.2 Pressure in the suction and pressure connection
6.4 De-commissioning
6.4.1 Switching off the pump
6.4.2 Emptying the pump
6.4.3 Dismantling the pump
6.4.4 Preservation/storage of the pump

7 Maintenance ....................................................................................................................................... 23
Maintenance.......................................................................................................................................
7.1 Preventative measures
7.1.1 Machine down-time
7.2 Lubrication
7.2.1 Joint grease
7.3 Inspection

8 Malfunctions, causes, rectification ...................................................................................................... 25


rectification......................................................................................................

9 Dismantling / Reassembly .................................................................................................................. 27


Reassembly..................................................................................................................
Dismantling / Reassembly of the machine
9.1 Dismantling
9.2 Reassembly
9.4 Mechanical seal ..................................................................................................................... 63
9.4.1 Safety
9.4.2 Application conditions and material version

10 Spare parts ......................................................................................................................................... 65


parts.........................................................................................................................................
10.1 Order template for spare parts............................................................................................... 67

11 Special tools ....................................................................................................................................... 71

12 Associated documents ........................................................................................................................


documents........................................................................................................................ 73
........................................................................................................................73

13 Appendix .............................................................................................................................................
.............................................................................................................................................75
Appendix.............................................................................................................................................
13.1 Manufacturer's documents / suppliers

Subsidiaries
Index
1. Safety

1. Safety

1.1 Notes on these instructions

1.1.1 General notes


 Always keep the operating and maintenance instructions close by the
machine.
 If problems cannot be solved with reference to the operating and
maintenance instructions, please contact SEEPEX.
Observe the following points in addition to these operating and maintenance
instructions:
 Prohibition, warning and mandatory signs, warning notes on the machine
 Relevant laws and ordinances
 Statutory provisions on accident prevention
 Corresponding harmonised standards and regulations

1.1.2 Validity of these instructions


• These operating and assembly instructions are valid exclusively for ma-
chines with the commission no. specified on the cover sheet.
• The operating and assembly instructions are correlated with the SEEPEX
machine by means of the commission no. on the type plate (TYS).

Figure similar

E / 06.09.2018 - OM.SAF.01EN - 1/8

1
1. Safety

1.1.3 Symbols, notes and abbreviations

1.1.3.1 Information symbols

Symbol Application
 Instruction/measure

 supplementary instruction/measure

 List item

Information

 Cross-reference

1.1.3.2 Abbreviations
Abbreviations facilitate readability in drawings.
Abbreviations are explained below:

Abbrevia- Designation Abbrevia- Designation


tion tion
ANT Drive K Terminal
AP Lashing points KF Kinetic ring grease
ATG Drive casing KUL Crank
CBH Feed hopper screw fit- P Dimension for stator re-
ting placement
CFL Flanged connection RTE Rotating unit
CTH Threaded connection S Support
DFL Flange seal SCH Screw fitting
ELT Feed hopper SCL Holding band loop
ERD Earth connection SEA Shaft sealing
FCO Flange cover SH Protective cover
FLS Flange bearing surface SHL Cutting lever
GC Anti-seize graphite pe- SSU Flush connection
troleum
GF Joint grease TSE Dry-running protection
device
GM Lubricant TYS Type plate
GS Soft soap ZA Sealing -/ centering sur-
face
HBD Holding band ZD Centering surface
HS Label

E / 06.09.2018 - OM.SAF.01EN - 2/8

2
1. Safety

1.2 Safety-related Information


SEEPEX machines are built in accordance with the state of the art. Neverthe-
less, there is a residual risk, because the machine works with:
• Mechanical movements that pose a danger
• Electrical voltages and currents

1.3 Designated use


SEEPEX machines are individually configured. The machine is allocated to the
operating and assembly instructions based on the commission no. The
commis-sion no. is indicated on the type plate of the machine and on the
cover sheet of the operating and assembly instructions.

Observe the following points to ensure compliance with the intended use:
 Use the machine only for conveying media in accordance with the technical
data ( chapter 3)
 Use the machine only within the performance data as specified in the tech-
nical data ( chapter 3)
 Make alterations and modifications to the machine only after obtaining the
approval of SEEPEX
 Use the machine only in commercial and industrial areas
 Do not use the machine in explosive areas

1.4 Foreseeable misuse


Any use other than the intended use or any different use of the machine will be
considered as improper use and can cause serious physical injury and damage
to property.

In particular, the following is not admissable:


 Conveyance of conveying products other than those specified in the techni-
cal data ( chapter 3)
 Operating the machine outside of the performance data specified in the tech-
nical data ( chapter 3)
 Operating the machine without safety and protection devices
 Mechanical or electrical bypassing of machines or machine parts
 Use of parts other than the original parts
 Alterations, modification and manipulation
 Non-compliance with instructions and prescribed operating, maintenance
and servicing conditions
 Non-compliance with the rules and regulations in the country of use and the
statutory provisions and accident prevention regulations when handling the
machine
 Operating the machine in explosive areas

1.5 Structure of warning notes


 For the protection of personnel and for the safe and efficient use of the ma-
chine, observe warning notes.
Preceding warning notes
Preceding warning notes are placed at the beginning of each chapter or sequence of actions, and relate to
the instructions following directly after.

E / 06.09.2018 - OM.SAF.01EN - 3/8

3
1. Safety

DANGER
Type and source of danger.
Possible consequences.
 Measures to avert the danger.

Preceding warning notes with warning or mandatory signs


Specific dangers are identified with additional warning or mandatory signs.
Example:

DANGER
Type and source of danger.
Possible consequences.
 Measures to avert the danger.

Embedded warning notes


Embedded warning notes describe immediately relevant dangers, and are shown within a sequence of ac-
tions. They are placed immediately before the danger.
Examples:

 Type and source of danger. Possible consequences. Meas-


ures to avert the danger.

Type and source of danger. Possible consequences.


 Measures to avert the danger.

1.5.1 Warning levels


Warning notes are identified by coloured warning symbols and signal word fields.
The different warning levels are identified by additional signal words, and de-
scribe the extent of the danger.

Personal injury

DANGER
DANGER indicates a dangerous situation which, if not avoided, will result in death or serious injury.

WARNING
WARNING indicates a dangerous situation which, if not avoided, may result in death or serious injury.

CAUTION
CAUTION indicates a dangerous situation which, if not avoided, may result in minor or
moderate injury.

E / 06.09.2018 - OM.SAF.01EN - 4/8

4
1. Safety

Property damage

NOTICE
NOTICE is used when the situation is not associated with personal injury.

1.5.2 Warning symbols


In these operating and assembly instructions and on the machine, there are
warning symbols.
 Ensure that these warning symbols are complied with.
 Warning symbols on the machine must be fully present and easily legible at
all times.

Warning symbols Hazard


Suspended load warning

Electric voltage warning

Hot surface warning

Warning for automatic start

E / 06.09.2018 - OM.SAF.01EN - 5/8

5
1. Safety

1.6 Qualification of the personnel

Detailed technical knowledge is essential for performing any work on the


machine, in order to be able to independently recognise and avoid potential
dangers.

Activity Person proven knowledge


 Instruction of person- Owner  Knowledge of safety regulations
nel  Knowledge of these operating and assembly in-
 Definition of respon- structions
sibilities
 Definition of respon-
sibilities
 Monitoring of ade-
quate qualification of
personnel
 Operation Operator  Instruction for the machine
 Operational monitor-  Before starting any activity, the operating and as-
ing sembly instructions must be read and
 Easy maintenance understood
work and trouble-  Knowledge of safety devices and
shooting regulations
 Electrical installation Electrical technician  Technical training, knowledge and experience
 Commissioning with the machine in relation to electrical compo-
 Maintenance nents
 Repair  Knowledge of the relevant standards and regula-
tions
 Decommissioning
 Safe handling of tools
 Assembly and dis-
mantling  Knowledge of these operating and assembly in-
structions
 Commissioning Mechanical technician  Technical training, knowledge and experience
 Maintenance with the machine in relation to mechanical com-
 Repair ponents
 Decommissioning  Knowledge of the relevant standards and regula-
tions
 Assembly and dis-
mantling  Safe handling of tools
 Knowledge of these operating and assembly in-
structions

E / 06.09.2018 - OM.SAF.01EN - 6/8

6
1. Safety

1.7 Tasks, notes for the owners, operators and technicians


 Do not work on the machine or plant unless it is at a standstill and de-
pressurised.
 Switch off the main switch and pull out the power plug before starting work
on live components.
 Observe the procedure for shutting down the machine (  chapter 6).
– Follow decommissioning procedure.
– Secure the machine against recommissioning.
 On completion of all work, attach all safety and protective devices
and make sure they are functioning.
 Refer to chapter Commissioning before recommissioning the machine
(  chapter 6).

1.8 Personal protective equipment


 Wear personal protective equipment and/or additional equipment for your
own safety.

Sign Meaning Scope of application


Wear safety Work in the area of the
shoes machine

Wear eye protection Work on the machine


during which parts may
be ejected at speed and
parts may be pressurised

Wear protective Possible contact with ag-


gloves gressive media, hot sur-
faces or sharp edges

Wear ear protection Sustained sound


pressure level
> C 75 dB (A)

E / 06.09.2018 - OM.SAF.01EN - 7/8

7
1. Safety

Sign Meaning Scope of application


Wear safety helmet Work with suspended
loads and overhead work

Wear protective clothing Possible contact with


aggressive media

1.9 Safety and protective devices


 Before commissioning, bolt SEEPEX machines to a suitable foundation to
ensure stability.
 Start-stop equipment must be clearly recognisable. In order to avoid errors,
the operator must arrange corresponding measures.

Protective devices protect those persons who are attempting to reach danger
areas without additional help and under the conditions defined for various
situations of reaching up, reaching under or reaching through.

 Equip pump with a protective device


• In order to prevent contact with hot surfaces
• In order to prevent contact with moving parts
– Use finger probe to check protective device.

E / 06.09.2018 - OM.SAF.01EN - 8/8

8
2
Description of the pump

2.1 General description


seepex pumps are members of the group of rotating displacement pumps.
• Characteristic features
– Special configuration/arrangement of the rotor and stator pumping elements.
– Motion sequence

2.2 Mode of action and pumping principle of the seepex pump


• Sealing bands are produced through geometric design/contact of both conveying elements.
• Sealing bands ensure a perfect fit between the suction and pressure side.
Result:
– Increased pump suction.
– Higher pressure build-up independent of speed possible.

2.3 Constructive design

No. Designation
ANT Drive
200 Lantern
307 Plug-in shaft
400 Coupling rod
SEA Shaft seal
500 Suction casing
600 Rotor
RTE Rotating unit
601 Stator
700 Pressure branch

Ausgabe Dokument Blatt


issue B / 12.11.2012 document OM.DES.01e sheet 1 (1) 9
10
3
Technical data

3.1 Data sheet

3.2 Characteristic Curves

3.3 Declaration

• Data sheet, characteristic curves and declarations are commission specific documents
and not part of this not binding operating and assembly instruction.

Ausgabe Dokument Blatt


issue A / 29.06.2017 document OM.TED.XXe sheet 1 (1) 11
12
4
Transport, Intermediate storage, Disposal
4.1 Safety

CAUTION

Damage to property/injuries due to incorrect transport


Slight injury or damage to property can occur
¾ Comply with the safety notes and transport notes on the packaging.
¾ Use suitable means of transport, lifting devices and tools.
¾ Use protective equipment.

4.2 Transport

4.2.1 Dimensions, weights and center of gravity


¾ Note the dimensional drawing (→ chapter 5.6).

4.2.2 Symbols
• Meaning of symbol

Top Fragile Against moisture Centre of gravity Lashing points


item protect

4.2.3 Sling points (AP) for lifting devices

WARNING

Warning of suspended load.


Death of serious injury can occur.
¾ Use the lashing points (AP) for lifting divices.
¾ Note the centre of gravity (→ dimensional drawing, chapter 5.6).

Lifting machine Industrial trucks

4.2.4 Unpacking the machine


¾ Comply with the symbols and notices on the packaging.
¾ Remove the screwed connection between the machine and packaging.
¾ Remove the machine with a lifting machine/industrial truck.

4.3 Temporary storage/Corrosion protection


• All seepex machines have corrosion protection applied as standard prior to transport.

Ausgabe Dokument Blatt


issue
D / 27.08.2012 document
OM.TRA.01e sheet
1 (2)
13
4
Transport, Intermediate storage, Disposal

NOTICE
Damage to property if corrosion protection is missing
Property damage can occur due to corrosion.
¾ Temporary storage must be in a dry, enclosed, frost-free room in order to provide protec-
tion against ambient influences.
¾ Contact seepex regarding the necessary corrosion protection for temporary storage.

4.4 Disposal

NOTICE
Environmental protection
Material damage can occur.
¾ Drain the pumping medium and dispose of it in accordance with the regulations.
¾ Dispose of the machine with regard to its composition and existing regulations.

Ausgabe Dokument Blatt


issue
D / 27.08.2012 document
OM.TRA.01e sheet
2 (2)
14
5
Assembly / Installation

5.1 Mounting tools / lifting gear

CAUTION

Pump falling over.


Slight injury or damage to property can occur.
 Adhere to the lifting tool’s starting point.
 Pay attention to the dimensions, weight and centre of gravity of the pump.
 Use suitable mounting tools/lifting gear.

5.2 Space requirement


The required space should be determined by considering the following factors:
• Dimensions and weight.
• Requisite transport and lifting equipment.
• Pipe routing – dismantling (dimension for stator replacement).

5.2.1 Dimension for stator replacement (P)

Range Dimension (P)


5-6LS 320 mm
W
10-6LS 350 mm
17-6LS 405 mm
35-6LS 510 mm
52-6LS 570 mm
70-6LS 605 mm
100-6LS 605 mm P

130-6LS 720 mm

5.3 Assembly of the complete mounted pump


 Assemble according to technical data (chapter 3.).
 Note dimensional drawing.

Tension-free mounting of the pump


 Balance unevenness with suitable supports.
• Applies to mounting on foundations/load-bearing elements.
• Total areas of all pump bearing areas are resting on the surface.

Correct position of the drives


• All drives are set up ready for operation and mounted.
• Correct displacements of the drive during transport/installation of the pump by adjusting/fix-
ing the drive.

CAUTION

Safety protection equipment.


Slight injury or damage to property may result.
 Connect safety protection equipment and activate.

Ausgabe Dokument Blatt


issue A / 15.05.2013 document OM.INS.09e sheet 1 (2) 15
5
Assembly / Installation
5.4 Power supply of the seepex pump

DANGER

Supply voltage and power frequency.


Death or serious injury will result.
 Heed type plate on the pump.
 Pay attention to manufacturer’s directions (chapter 13.).
 Pay attention to safety regulations.

5.5 Pipelines

5.5.1 Suction and pressure connection

• Refer to the dimensional drawing for the position, nominal width and standard.
• Note direction of rotation/flow direction.

5.5.2 Pipeline dimensions

• Adhere to specifications regarding pressure in the pressure respectively suction connec-


tion.
• Note technical data (chapter 3.).
• Nominal width of suction pipe = nominal width of suction connection of pumps.

5.5.3 Residue-free pipelines

NOTICE
Damage to property caused by residues from installation
Failure to comply invalidates the warranty.
 Keep all pipelines free from foreign bodies.
 Remove welding spatter, bolts, steel chips, etc.

5.5.4 Tension-free assembly

 Assemble pipelines and other components in a tension-free manner on the pump.

Ausgabe Dokument Blatt


issue A / 15.05.2013 document OM.INS.09e sheet 2 (2) 16
6
Commissioning / De-commissioning
Master Copy

6.1 Commissioning report

Send commissioning report online to From:


www.seepex.com\
Must be specified with every order!
Commission: Model: Contact person: .............................................
Tel.: ................................................................
_________________________ _____________________ Fax: ...............................................................
E-mail: ...........................................................

Customer Service: Germany Phone:+49 2041.996-231 Address of plant:


seepex GmbH Fax: +49 2041.996-431 .......................................................................
Postfach 10 15 64 Rest of Phone:+49 2041.996-224 .......................................................................
D-46215 Bottrop Europe Fax: +49 2041.996-424 .......................................................................
[email protected] Outside Phone:+49 2041.996-120 .......................................................................
Europe Fax: +49 2041.996-432 .......................................................................

Delivery date:
Date of installation:
Assembly check carried out on:

Please enter operational data:


Conveying liquid:
Temperature:
Fuse level/motor protection or power
consumption

Frequency control no

yes If yes:

Supplied by seepex

Supplied by customer

Frequency:
Speed:
Power
consumption:

________________________________ _______________________________________
Place, date Signature / company stamp

Ausgabe Dokument Blatt


issue
B / 17.03.2006 document
OM.COM.05e sheet
1 (1)
17
18
6
Commissioning / De-commissioning
6.2 Measures before commissioning
 Note the technical data (chapter 3.).

6.2.1 Checking pipelines


 Check flange screwed connections (SCH).

 Check threaded connections (G).

NOTICE
Ensure the liquid can flow through without obstruction.
Malfunction and/or irreparable damage to the pump.
 Open all shut-off elements before switching on the pump.

6.2.2 Protective devices on the pump

DANGER

Missing protective device.


Danger of pulling in and crushing.
 Equip the pump with a protective device. Protective devices provided for preventing con-
tact with surfaces or moving parts must be regarded as suitable if contact is not possible
in a test involving a test finger, with regard to the penetration possibility, strength and shock
resistance.
 Comply with national protection regulations.
 In pumps with an open suction flange/feed hopper, attach touch protection. These safety
clearances protect those persons who are attempting to reach danger areas without addi-
tional help and under the conditions defined for various situations of reaching up, reaching
under or reaching through
In shaft seals, touch protection is only necessary if there are components on the rotating
shaft.

6.2.3 Electrical/hydraulic connections

DANGER

Dangerous voltage.
Death or serious injury can occur.
 Note safety regulations.
 Disconnect motor from all sources of energy.
 Secure electrical connections against restarting.

Ausgabe Dokument Blatt


issue
C / 02.11.2012 document
OM.COM.01e sheet
1 (4)
19
6
Commissioning / De-commissioning
6.2.4 Direction of rotation check
flow direction
 The pump direction of rotation determines
the flow direction of the pumping medium.
 Note the direction of rotation arrow on the
type plate.
counter clockwise clockwise

6.2.5 Additional devices - optional


 Refer to additional devices (chapter 12.1).

6.3 Initial commissioning/repeated commissioning


 Start up the pump.

NOTICE
Dry running of the pump.
Malfunction and/or irreparable damage to the pump.
 Fill the suction casing with liquid in order to lubricate the pumping elements.

6.3.1 Avoid dry running of the pump

NOTICE
High temperature between rotor and stator.
Stator material burned.
Complete failure of the pump.
 Make sure that the suction-side conveying capacity does not cavitate.
 If this cannot be guaranteed on the machine side, assemble a seepex dry running
protection (TSE).

6.3.2 Pressure in the suction and pressure connection

CAUTION

High pressure.
Malfunction and/or irreparable damage to the shaft seal or pump.
 Maintain pressure in the suction connection in accordance with the technical data
(chapter 3.).

Recommendation:
 Assemble an oil-filled contact pressure gauge to monitor and deactivate the pump.

Ausgabe Dokument Blatt


issue
C / 02.11.2012 document
OM.COM.01e sheet
2 (4)
20
6
Commissioning / De-commissioning
6.4 De-commissioning
Protect the pump and additional devices against the following:
• Frost
• Deposit of solids
• Sedimentation from the liquid
• Corrosion of parts that come into contact with the medium

6.4.1 Switching off the pump

DANGER

Dangerous voltage.
Death or serious injury can occur.
 Note safety regulations.
 Disconnect motor from all sources of energy.
 Secure electrical connections against restarting.

6.4.2 Emptying the pump

CAUTION

Liquid draining out.


Minor injury or damage to property can occur.
 Wear suitable protective clothing.
 Refer to the technical data (chapter 3.) for the corresponding configuration of the pump
housing.

To drain the pump:


 If the pump housing has screwed plugs, remove the screwed plugs.
 Drain using a connection branch (suction casing, pressure branch) if the pump housing is
coated or the housing does not have screwed plugs.
 Drain the residual liquid from the pump housing.
 Drain the pipelines on the suction and pressure sides, or shut off behind the pump connec-
tions.

Ausgabe Dokument Blatt


issue
C / 02.11.2012 document
OM.COM.01e sheet
3 (4)
21
6
Commissioning / De-commissioning
6.4.3 Removing the pump

WARNING

Risk of pump tipping or falling.


Death or serious injury can occur.
 Support the drive unit to guarantee stability.

Pipeline dismantling

 Remove flange bolts (SCH) and flange


seals (DFL).
with/without base plate
 Remove bolts (SCH) from the pump feet.

Pipeline dismantling

 Remove threaded connections (G).


with/without base plate
 Remove bolts (SCH) from the pump feet.

6.4.4 Preservation/storage of the pump

NOTICE
Damage to property due to lack of corrosion protection.
Property damage can occur due to corrosion.
 Contact seepex to discuss suitable preservation measures.
– State the commission number of the pump.

Ausgabe Dokument Blatt


issue
C / 02.11.2012 document
OM.COM.01e sheet
4 (4)
22
7
Maintenance
7.1 Preventive measures

The maintenance personnel must have these operating instructions, follow them and also
require corresponding qualifications.

DANGER

Dangerous voltage.
Death or serious injury can occur.
 Note safety regulations.
 Disconnect pump from all sources of energy.
 Secure electrical connections against restarting.

7.1.1 Pump down-time

NOTICE
Pump down-time.
Production failure due to wear.
 Acquisition of a set of wearing parts and a set of gaskets.

7.2 Lubrication

No. Denomination Lubricant Lubricant change in Fill volume


operating hours
1 Pin joint seepex special grease 10000 h *
*
2 Pin joint seepex special grease 10000 h *
*
3 Drive Refer to manufacturer's documentation (chapter 13._)
Rotor/stator Conveying medium --- ---
Shaft seal Conveying medium --- ---

* Type and filling quantities are commission specific information.

Ausgabe Dokument Blatt


issue
A / 29.06.2017 document
OM.WTG.XXe sheet
1 (2)
23
7
Maintenance
7.2.1 Joint grease

NOTICE
Other grease types.
Malfunction and/or irreparable damage to the joints or the pump.
 Exclusively use seepex special grease.

7.3 Inspection

Component Interval Action


Joints Every 10,000 operating hours Renew joint grease
Stator Every week Visual check for leaks
Shaft seal Every week Visual check for leaks
Drive unit Every 3000 operating hours, Comply with manufacturer's
at least every 6 months documentation

Ausgabe Dokument Blatt


issue
A / 29.06.2017 document
OM.WTG.XXe sheet
2 (2)
24
8
Malfunctions, causes, rectification
Refer to technical data (chapter 3.) for application range of the pump.

Malfunction Causes Rectification

Pump seized / pump does not pump


Conveying capacity is not achieved
Pressure head is not reached

Pump is loud when running


Pump pumping unevenly

Pump does not start up

Premature stator wear


Pump is not sucking

Motor gets too hot

Shaft seal is leaky


X X X Static friction between sta- Apply lubricant (liquid soap)
tor/rotor too great. between stator and rotor.
X Incorrect direction of rota- Check direction of rotation
tion. and swap over motor con-
nections if necessary.
X X X X X Suction pipe or shaft seal Eliminate leaks.
leaking.
X X X X Suction head too great. Check the suction head, if
necessary increase pipe
cross section on suction
pipe and use a larger filter,
open suction-side valve
fully.
X X X Viscosity of conveying Check/adapt (data sheet).
product too great.
X X X Pump rotation speed Correct rotation speed (data
incorrect. sheet).
X X Avoid air bubbles in the
conveying product.
X X X X X Pressure head too great. Check pressure head with
pressure gauge, reduce
pressure head by using
larger pressure pipe
crossed section or shorten-
ing the pressure pipe.
X X X X X Pump running partially/ Check there is adequate
completely dry. conveying product avail-
able on the suction side.
Dry running protection DRP.
X X Check coupling. If necessary, move pump in
relation to drive, check wear
on coupling gear, re-adjust
coupling if necessary.
X X Rotation speed too low. Increase rotation speed for
low-viscosity media/large
suction volume.

Ausgabe Dokument Blatt


issue
B / 11.09.2007 document
OM.REC.01e sheet
1 (2)
25
8
Malfunctions, causes, rectification

Malfunction Causes Rectification

Pump seized / pump does not pump


Conveying capacity is not achieved
Pressure head is not reached

Pump is loud when running


Pump pumping unevenly

Pump does not start up

Premature stator wear


Pump is not sucking

Motor gets too hot

Shaft seal is leaky


X X X Rotation speed too high. Reduce rotation speed for
high-viscosity media, risk
of cavitation.
X Joint play too large. Check mounting of cou-
pling rod bushing.
X X X X X Foreign objects in pump. Dismantle pump, remove
foreign bodies, replace
defective parts.
X X X X Stator/rotor worn. Dismantle pump and
renew defective parts.
X X X X Joint parts worn. Renew joint parts, use
seepex pin joint grease.
X X X X Suction pipe blocked. Clean the suction pipe.
X X X X X Temperature of pumping Check temperature, use
liquid too high. an undersize rotor.
X X X X X Gland packing too firm/ Loosen packing gland or
worn. tighten. Renew unusable
packing rings.
X X X X Solid content and/or grain Reduce pump speed,
size too great. install screen with permit-
ted mesh width. Increase
liquid proportion.
X X X X Sedimentation/gumming of Rinse through and clean
solids when pump station- the pump immediately.
ary.
X X X X X Conveying product hard- Heat the pump.
ens when the temperature
drops below a certain limit.
X X X X Stator swollen and unable Select a suitable stator
to withstand conveying material, use an under-
product. size rotor.
X X Bearings in pump drive Renew bearings.
housing or drive unit
defective.
X Mechanical seal defective. Check sliprings and O-
rings for wear/resistance,
renew if necessary.

Ausgabe Dokument Blatt


issue
B / 11.09.2007 document
OM.REC.01e sheet
2 (2)
26
9.1 Dismantling
All work steps and tools required for dismantling are specified in this chapter.

3-D ANIMATIONS

In addition to your SEEPEX operating and assembly instructions, 3-D anima-


tions of the individual dismantling steps are available.

Start animations

 For printed operating and assembly instructions, scan the


adjacent QR code.

27
28
9.1 Dismantling

9.1 Dismantling
9.1.1 Keep tools ready for the dismantling
Recommended tools
Keep the listed tools ready (not part of the delivery scope):

Illustration Denomination
Hammer

Set allen keys

Set ring spanners size 10 - size 30

Set fork spanners size 10 - size 30

Metal saw (WH)

Screwdriver (WS)

Chisel (WM)

Circlip pliers (WZ)

Recommended special tools

Special tools are not part of the delivery scope.


 Order special tools using the order form ( chapter 11).

Illustration Denomination
Assembly mandrel (W4)

Drift (W5)

A / 07.11.2019 - OM.SCT.BN.S01EN 2/35

29
9.1 Dismantling

Illustration Denomination
Mounting lever (W9)

Dismantling tool (W10)

Recommended auxiliary materials


Keep the auxiliary materials listed available (not included in the scope of delivery):
 Lubricant (GM)

NOTICE
Damage to property due to inadequate lubricants (GM).
Damage to components. Contamination of the conveying medium.
 Observe resistance to the materials used and the conveying medium.
 Use suitable lubricants (GM) only.

9.1.2 Prepare pump for dismantling


 Follow the instructions in the chapter Shut-down ( chapter 6).

9.1.3 Dismantle pump

Risk of injury due to lack of stability of


pump. Crushing of body parts due to the pump or
pump parts tipping or falling down.
 Fasten base plate (GPU) to secure pump.
– Recommendation: Fasten to suitable base
using a screw fitting (SCH).

A / 07.11.2019 - OM.SCT.BN.S01EN 3/35

30
9.1 Dismantling

9.1.3.1 Dismantle stator (601)


Dismantle dry-running protection device (TSE) (optional)

Damage to pump sided parts of the dry-


running protection device (TSE) during dismantling
the stator.
 Before dismantling the stator, remove all pump
sided parts of the dry-running protection device
(TSE).
– Observe the chapter Options and additional
accessories ( chapter 12.1).

WARNING
Leaking conveying medium.
Personal injury and/or material damage can occur.
 Take safety precautions to protect people and the environment.
 Wear suitable protective clothing.
 When handling hazardous substances, comply with applicable regulations.

 Dismantle screw fitting (637, 639).


 Remove upper adjusting segments (635).

 Remove upper stator half (601).

A / 07.11.2019 - OM.SCT.BN.S01EN 4/35

31
9.1 Dismantling

 Secure lower adjusting segments (635) to


prevent them from falling down.
 Dismantle screw fitting (637, 639).
 Remove adjusting segments (635).

 Remove lower stator half (601).

9.1.3.2 Dismantle rotor (600)

 Prop up rotor (600) with support (S).

 Slide circlip (643) onto rotor (600).


– Use tool (WZ).
 Slide support ring (682) towards rotor (600).

A / 07.11.2019 - OM.SCT.BN.S01EN 5/35

32
9.1 Dismantling

 Remove the lock washer (683).


– Use a suitable tool (WS).

 Remove rotor (600) from rotor head (640).


 Remove support (S).

 Remove circlip (643), support ring (682) and


O-ring (642) from the rotor (600).

9.1.3.3 Dismantle pressure branch (700)

 Dismantle screw fitting (SCH).


 Remove pressure branch (700).

A / 07.11.2019 - OM.SCT.BN.S01EN 6/35

33
9.1 Dismantling

 Dismantle screw fitting (720, 721).


 Remove segment retainer (671).
 Remove O-ring (731) from the centering device
of pressure branch (700).

9.1.3.4 Dismantle suction casing (500)

 Remove screw fitting (506, 507, 509).


 Remove suction casing (500) and casing gasket
(501).

 Dismantle screw fitting (622, 623).


 Remove segment retainer (672).
 Remove O-ring (561) from the centering device
of suction casing (500).

9.1.3.5 Dismantle rotating unit (RTE)


Dismantle flush connection (SSU) (optional)

 Remove flush connection (SSU) from the casing


of the shaft sealing (SEA).

A / 07.11.2019 - OM.SCT.BN.S01EN 7/35

34
9.1 Dismantling

 Raise/reposition splash ring (310) to remove


plug-in shaft pin (309).

 Eject plug-in shaft pin (309).


– Use a suitable tool (WS).

 Assemble tool (W10) as contact surface


for mounting lever (W9).

 Pull off rotating unit (RTE) with shaft seal (SEA)


from output shaft of drive (ANT).
– Use tool (W9).

A / 07.11.2019 - OM.SCT.BN.S01EN 8/35

35
9.1 Dismantling

 Dismantle tool (W10).

 Remove splash ring (310) and shaft seal casing


(SEA) from plug-in shaft (307).
– See dismantling of shaft seal (SEA)
( chapter 9.4).

9.1.3.6 Remove rotor head (640), coupling rod (400), plug-in shaft (307)

Dismantle holding band (406, 407)

 Parts can be ejected at speed.


Risk of injury to eyes. Wear safety goggles.
 Disconnect holding band loop (SCL).
– Use suitable tools (WH).
 Press out parts of the holding band loop (SCL).
 Remove holding band (406, 407).

Separate joint - rotor side

 Pull back universal joint sleeve (405).

A / 07.11.2019 - OM.SCT.BN.S01EN 9/35

36
9.1 Dismantling

 Push retaining sleeve (401) off the rotor head


(640).
– Use a suitable tool (WM).

 Knock out coupling rod pin (402).


– Use tool (W5).

 Bend rotor head (640).


 Knock out guide bushings (403).
– Use tool (W5).

 Remove rotor head (640) and retaining sleeve


(401) from coupling rod (400).

 For easier dismantling, apply lubricant (GM) to


the interior of the universal joint sleeve (405) and
the outer surface of the coupling rod (400).
 Remove universal joint sleeve (405) from
coupling rod (400).

A / 07.11.2019 - OM.SCT.BN.S01EN 10/35

37
9.1 Dismantling

Separate joint - drive side

 For easier dismantling, apply lubricant (GM) to


the interior of the universal joint sleeve (405) and
the outer surface of the coupling rod (400).
 Remove universal joint sleeve (405) from
coupling rod (400).

 Push retaining sleeve (401) off the plug-in shaft


(307).
– Use a suitable tool (WM).
 Remove retaining sleeve (401).

 Eject coupling rod pins (402).


– Use tool (W5).

 Bend the coupling rod (400).


 Knock guide bushing (403).
– Use tool (W5).

 Remove coupling rod (400) from plug-in shaft


(307).

A / 07.11.2019 - OM.SCT.BN.S01EN 11/35

38
9.1 Dismantling

9.1.3.7 Dismantle lantern (200) and drive (ANT)

 Dismantle screw fitting (210, 212, 213).


 Remove drive (ANT) from lantern (200).
 Dismantle screw fitting (SCH).
 Remove lantern (200) from base plate (GPU).

A / 07.11.2019 - OM.SCT.BN.S01EN 12/35

39
9.2 Reassembly
All work steps and tools required for reassembly are specified in this chapter.

3-D ANIMATIONS

In addition to your SEEPEX operating and assembly instructions, 3-D anima-


tions of the individual assembly steps are available.

Start animations

 For printed operating and assembly instructions, scan the


adjacent QR code.

40
9.2 Reassembly

9.2 Reassembly
9.2.1 Keep tools ready for assembly
Recommended tools
Keep the listed tools ready (not part of the delivery scope):

Illustration Denomination
Hammer

Set allen keys

Set ring spanners size 10 - size 30

Set fork spanners size 10 - size 30

Screwdriver (WS)

Pliers (WFZ)

Centre punch (WK)

Spirit level (WW)

Circlip pliers (WZ)

Belt shears (WBS)

Cartridge gun (WF)

Recommended special tools

Special tools are not part of the delivery scope.


 Order special tools using the order form ( chapter 11).

A / 07.11.2019 - OM.SCT.BN.S01EN 14/35

41
9.2 Reassembly

Illustration Denomination
Mounting tool (W3)

Assembly mandrel (W4)

Drift (W5)

Mounting lever (W9)

Dismantling tool (W10)

Feeler gauge (W30)

Recommended auxiliary materials


Keep the auxiliary materials listed available (not included in the scope of delivery):
 Soft soap (GS)
 Anti-seize graphite petroleum (GC)
 SEEPEX joint grease (GF)

NOTICE
Damage to property due to inadequate lubricants (GM).
Damage to components. Contamination of the conveying medium.
 Observe resistance to the materials used and the conveying medium.
 Use suitable lubricants (GM) only.

9.2.2 Prepare components parts for assembly

9.2.2.1 Prepare rotor head (640) for assembly


 Remove any damage.
 Clean rotor head (640).

A / 07.11.2019 - OM.SCT.BN.S01EN 15/35

42
9.2 Reassembly

Malfunction of the joints. Malfunction and/


or destruction of the joints. Renew coupling rod pin
(402) and guide bushings (403) together.
 Drive in guide bushings (403)
(Depth X = 2/3).
– Use tool (W4).

9.2.2.2 Prepare coupling rod (400) for assembly

 Clean coupling rod (400).


Malfunction of the joints. Malfunction and/
or destruction of the joints
 Check coupling rod bushings (404) for wear.
– In the event of wear, replace coupling rod
(400), including the coupling rod bushings
(404).

9.2.2.3 Prepare plug-in shaft (307) for assembly


 Remove any damage.
 Clean plug-in shaft (307).

Malfunction of the joints. Malfunction and/


or destruction of the joints. Renew coupling rod pin
(402) and guide bushings (403) together.
 Drive in guide bushings (403)
(depth X = 2/3).
– Use tool (W4).

9.2.2.4 Prepare holding band (406, 407)


 Use prefabricated double-band holding bands only.

A / 07.11.2019 - OM.SCT.BN.S01EN 16/35

43
9.2 Reassembly

 Check the holding band (406, 407)


– Bent-over holding band (406, 407) is in
contact with holding band loop (SCL) to
avoid damaging universal joint sleeve (405).
– Press on holding band (406, 407) using tool
(WFZ) if necessary.

9.2.3 Assemble pump

Risk of injury due to lack of stability of


the pump. Crushing of body parts due to the pump or
pump parts tipping or falling down.
 Fasten base plate (GPU) to secure pump.
– Recommendation: Fasten to suitable base
using a screw fitting (SCH).

9.2.3.1 Assemble lantern (200) and drive (ANT)

 Assemble lantern (200) with screw fitting (SCH)


on base plate (GPU).
 Clean flange bearing surfaces (FLS), centering
surface (ZD) and output shaft of the drive (ANT).
 Assemble drive (ANT) with screw fitting (210,
212, 213) on lantern (200).

A / 07.11.2019 - OM.SCT.BN.S01EN 17/35

44
9.2 Reassembly

9.2.3.2 Assemble rotor head (640), coupling rod (400), plug-in shaft (307)

Connect rotor head (640) with coupling rod (400)

 Fill rotor head (640) with SEEPEX joint grease


(GF).
– Use tool (WF).
 Slide coupling rod (400) into rotor head (640).
 Push on retaining sleeve (401).

 Insert coupling rod pin (402).

 Knock the guide bushings (403) in.


– Use tool (W5).

 Slide retaining sleeve (401) onto rotor head


(640).
– Use tool (W4).

A / 07.11.2019 - OM.SCT.BN.S01EN 18/35

45
9.2 Reassembly

Secure retaining sleeve (401) - rotor-side

 Secure retaining sleeve (401) at a distance of


180° by means of material deformation at the
rotor head (640).
– Use a suitable tool (WK).

Assemble universal joint sleeve (405) - rotor-side

 For simpler assembly of the universal joint


sleeve (405), moisten the outer surface of
coupling rod (400) with SEEPEX joint grease
(GF).
 Fill interior of universal joint sleeve (405) with
SEEPEX joint grease (GF).
– Filling grade SEEPEX joint grease (GF) find
in the document Maintenance
( chapter 7).
– Use tool (WF).
 Slide universal joint sleeve (405) onto joint.

Damage of universal joint sleeve due to


sharp tools. Leak in universal joint sleeve.
 Ventilate inner area of joint by lifting the universal
joint sleeve (405).
– Use a suitable tool (WS).

Assemble holding band - rotor-side

 Slide holding bands (406, 407) loosely onto


universal joint sleeve (405).

A / 07.11.2019 - OM.SCT.BN.S01EN 19/35

46
9.2 Reassembly

 Tighten holding band (406, 407) - rotor-side


– Insert holding band (406, 407) into
tool (W3).
– Clamp holding band firmly using eccentric
lever (EX).
– Turn crank (KUL) until the holding band
(406, 407) is tensioned and is in contact with
holding band loop (SCL).
– Carefully pull the holding band (406, 407)
together until it is in contact with the
universal joint sleeve around the circumfer-
ence.

Correct
The holding band (406, 407) has drawn in the out
shape of the universal joint sleeve and is firmly
seated.

False
Holding band (406, 407) too loose, can slip off.

Incorrect
The holding band (406, 407) is too tight, universal
joint sleeve will be damaged/sheared off.

 Cant up the holding band (406, 407).


 Swivel mounting tool (W3) approx. 60°
upwards.
 Loosen crank (KUL) by a half turn.
 Swivel cutting lever (SH) forward until the pres-
sure piece is lying behind the holding band loop
(SCL).

A / 07.11.2019 - OM.SCT.BN.S01EN 20/35

47
9.2 Reassembly

Shear off holding band (406, 407) for material


design stainless steel, corrosion-resistant steel
Universal joint sleeve can be damaged by
hammering and striking. Joint grease (GF) can leak
out. Avoid hammering or striking the universal joint
sleeve.
 Refer to the technical data ( chapter 3) for the
material design.
 Shear off holding band (406, 407) below holding
band loop (SCL).
– Strike cutting lever (SH) with the palm of your
hand.
 Straighten the holding band (406, 407) carefully
if it lifts up at the sheared-off end.

Cut off holding band (406, 407) for material


design stainless steel, heat-resistant steel
Universal joint sleeve can be damaged by
hammering and striking. Joint grease (GF) can leak
out. Avoid hammering or striking the universal joint
sleeve.
 Refer to the technical data ( chapter 3) for the
material design.
 Cut off holding band (406, 407) below holding
band loop (SCL).
– Use tool (WBS).
 File down and deburr any projecting edges.

 The holding band (406, 407) must lie in the


groove of the universal joint sleeve (405).
 Replace the holding band (406, 407) if the
holding band (406, 407) slips back through the
loop.

A / 07.11.2019 - OM.SCT.BN.S01EN 21/35

48
9.2 Reassembly

Connect coupling rod (400) and plug-in shaft (307)

 For easier assembly of the universal joint sleeve


(405), lubricate the outer surface of coupling rod
(400) with SEEPEX joint grease (GF).
 Slide holding bands (406, 407) and universal
joint sleeve (405) onto coupling rod (400).

 Fill interior of joint head with SEEPEX


joint grease (GF).
– Use tool (WF).
 Slide the retaining sleeve (401) and plug-in shaft
(307) onto the coupling rod (400).

 Insert coupling rod pin (402).

 Knock the guide bushings (403) in.


– Use tool (W5).

A / 07.11.2019 - OM.SCT.BN.S01EN 22/35

49
9.2 Reassembly

 Slide retaining sleeve (401) onto plug-in shaft


(307).
– Use tool (W4).

Secure retaining sleeve (401) - drive side

 Secure retaining sleeve (401) at a distance of


180° by means of material deformation at plug-in
shaft (307).
– Use a suitable tool (WK).

Assemble universal joint sleeve (405) - drive side

 Fill the inside of universal joint sleeve (405) with


SEEPEX joint grease(GF).
– For filling grade of SEEPEX joint grease
(GF), refer to the maintenance document
( chapter 7).
– Use tool (WF).
 Slide universal joint sleeve (405) onto joint.

A / 07.11.2019 - OM.SCT.BN.S01EN 23/35

50
9.2 Reassembly

Damage of universal joint sleeve due to


sharp tools. Leak in universal joint sleeve.
 Ventilate inner area of joint by lifting the universal
joint sleeve (405).
– Use a suitable tool (WS).

Assemble holding band - drive-side

 Slide holding bands (406, 407) loosely onto


universal joint sleeve (405).

 Tighten holding band (406, 407) - drive-side.


– Insert holding band (406, 407) into
tool (W3).
– Clamp holding band firmly using eccentric
lever (EX).
– Turn crank (KUL) until the holding band
(406, 407) is tensioned and is in contact with
holding band loop (SCL).
– Carefully pull the holding band (406, 407)
together until it is in contact with the
universal joint sleeve around the circumfer-
ence.

Correct
The holding band (406, 407) has drawn in the out
shape of the universal joint sleeve and is firmly
seated.

A / 07.11.2019 - OM.SCT.BN.S01EN 24/35

51
9.2 Reassembly

False
Holding band (406, 407) too loose, can slip off.

Incorrect
The holding band (406, 407) is too tight, universal
joint sleeve will be damaged/sheared off.

 Cant up the holding band (406, 407).


 Swivel mounting tool (W3) approx. 60°
upwards.
 Loosen crank (KUL) by a half turn.
 Swivel cutting lever (SH) forward until the pres-
sure piece is lying behind the holding band loop
(SCL).

Shear off holding band (406, 407) for material


design stainless steel, corrosion-resistant steel
Universal joint sleeve can be damaged by
hammering and striking. Joint grease (GF) can leak
out. Avoid hammering or striking the universal joint
sleeve.
 Refer to the technical data ( chapter 3) for the
material design.
 Shear off holding band (406, 407) below holding
band loop (SCL).
– Strike cutting lever (SH) with the palm of your
hand.
 Straighten the holding band (406, 407) carefully
if it lifts up at the sheared-off end.

A / 07.11.2019 - OM.SCT.BN.S01EN 25/35

52
9.2 Reassembly

Cut off holding band (406, 407) for material


design stainless steel, heat-resistant steel
Universal joint sleeve can be damaged by
hammering and striking. Joint grease (GF) can leak
out. Avoid hammering or striking the universal joint
sleeve.
 Refer to the technical data ( chapter 3) for the
material design.
 Cut off holding band (406, 407) below holding
band loop (SCL).
– Use tool (WBS).
 File down and deburr any projecting edges.

 The holding band (406, 407) must lie in the


groove of the universal joint sleeve (405).
 Replace the holding band (406, 407) if the
holding band (406, 407) slips back through the
loop.

9.2.3.3 Assemble rotating unit (RTE)

 Slide shaft seal casing (SEA) onto plug-in shaft


(307).
– See chapter Shaft seal reassembly
( chapter 9.4).

 Moisten inner surface of splash ring (310) and


outer surface of plug-in shaft (307) with anti-
seize graphite petroleum (GC) for easier
assembly of the splash ring (310).
 Slide splash ring (310) onto plug-in shaft (307).
– Observe fitting position of splash ring (E)
(lettering „SEA“).

A / 07.11.2019 - OM.SCT.BN.S01EN 26/35

53
9.2 Reassembly

 Moisten output shaft of drive (ANT) with anti-


seize graphite petroleum (GC) for easier
assembly of the rotating unit (RTE).
 Push rotating unit (RTE) onto output shaft of the
drive (ANT).

 Moisten plug-in shaft pin (309) with anti-seize


graphite petroleum (GC) and insert into the plug-
in shaft (307).

 Note position of splash ring (310).


 Insert splash ring collar at a distance of 0.5 mm
from the lantern (200).

A / 07.11.2019 - OM.SCT.BN.S01EN 27/35

54
9.2 Reassembly

Assemble the flush connection (SSU) (optional)

 Assemble flush connection (SSU).

9.2.3.4 Prepare suction casing (700) for assembly

 Clean sealing/centering surface (ZA).


 Moisten O-ring (561) with soft soap (GS) and
insert it into the seal face/centering device (ZA)
of the suction casing (500).

9.2.3.5 Assemble suction casing (500)

 Push on suction casing gasket (501).


 Assemble and align suction casing (500) with
screw fitting (506, 507, 509) on lantern (200).
– Use spirit level (WW).
 Tighten screw fitting (506, 507, 509).

A / 07.11.2019 - OM.SCT.BN.S01EN 28/35

55
9.2 Reassembly

 Assemble and align segment retainer (672) with


screw fitting (622, 623) on suction casing (500).
– Use spirit level (WW).
 Tighten screw fitting (622 623).

9.2.3.6 Prepare pressure branch (700) for assembly

 Clean the sealing / centering surface (ZA).


 Apply soft soap (GS) to the O-ring (731) and
place it on the sealing / centering surface (ZA) of
the pressure branch (700).

 Assemble and align segment retainer (671) with


screw fitting (720, 721) on pressure branch
(700).
– Use spirit level (WW).
 Tighten screw fitting (720 721).

9.2.3.7 Assemble pressure branch (700)

 Align pressure branch (700) on base plate


(GPU).
– Assemble pressure branch (700) with screw
fitting (SCH.1) on base plate (GPU).
– If required, loosen screw fitting (SCH.2) on
lantern (200).
– Use at least 2 adjusting segments (635)
opposite each other for the alignment. To
secure, gently tighten hexagon nuts (639).
 Tighten screw fittings (SCH.1, SCH.2) on pres-
sure branch (700) and lantern (200).

A / 07.11.2019 - OM.SCT.BN.S01EN 29/35

56
9.2 Reassembly

 Dismantle screw fitting (639) and remove


adjusting segments (635).

9.2.3.8 Assemble rotor (600)

 Insert O-ring (642) into circumferential groove of


the rotor (600).

 Slide circlip (643) and support ring (682) onto


rotor (600).
– Observe the fitting position of support ring
(682).

 Moisten inner surface of rotor head (640) with


anti-seize graphite petroleum (GC).
 Slide rotor (600) into rotor head (640).
– Note position of the groove (X).
 Prop up rotor (600) with support (S).

A / 07.11.2019 - OM.SCT.BN.S01EN 30/35

57
9.2 Reassembly

 Press rotor (600) into the rotor head (640).


– Use tool (W9).
– Protect segment retainer (671) against
possible damage and deformation.

 Insert lock washer (683) into the rotor head


(640).

 Slide on support ring (682) onto the rotor head


(640).
 Secure support ring (682) with circlip (643).
– Use tool (WZ).
 Remove support (S) from rotor (600).

9.2.3.9 Assemble stator (601)

NOTICE
Moisten stator outer surfaces with soft soap (GS).
Damage to stator halves (601).
 For easier assembly, only coat seal faces, stator internal surfaces of stator halves (601) and
rotor (600) with soft soap (GS).

A / 07.11.2019 - OM.SCT.BN.S01EN 31/35

58
9.2 Reassembly

 Attach the lower half of the stator (601).


 Press the stator half (601) onto the tapered
surfaces of the segment retainer (671, 672) and
align it.

Avoid damage to the stator surfaces. The


tapered surfaces of stator halves (601) must contact
the tapered surfaces of the segment retainers (671,
672).

 Observe the segment order.


– * = A-A, B-B, C-C, D-D

 Fix the lower adjusting segments (635) with


screw fitting (637, 639) to the segment retainers
(671, 672).
– Observe segment allocation (A-A).

 Tighten the screws (637, 639) until the adjusting


segments (635) minimal (X) interlock with the
guide of the segment retainer (671, 672).

A / 07.11.2019 - OM.SCT.BN.S01EN 32/35

59
9.2 Reassembly

 Attach the upper stator half (601).

 Align the long side of the upper half of the stator


(601.o) to the lower half of the stator (601.u).

 Fix the upper adjusting segments (635) with


screw fitting (637, 639) to the segment retainers
(671, 672).
– Observe the segment order (A-A, B-B, C-C,
D-D).

 Tighten the screws (637, 639) until the adjusting


segments (635) minimal (X) interlock with the
guide of the segment retainer (671, 672).

A / 07.11.2019 - OM.SCT.BN.S01EN 33/35

60
9.2 Reassembly

Assembling the dry-running protection device (TSE) (optional)

 Assemble dry-running protection device (TSE).


– Refer to chapter Options and Additional
accessories ( chapter 12.1).

9.2.3.10Smart Stator setting

NOTICE
Motor overload due to excessive compression between rotor and stator.
Damage to pump and drive can occur.
 Do not exceed drive power consumption value established with new rotor and stator.
 Observe commissioning report ( chapter 6.1).

NOTICE
Gap between stator halves due to inappropriate setting.
Possible leakage at stator.
 Set stator halves according to specified basic and precision setting.

Adjusting segments (635) - Basic setting

 Tighten adjusting segments (635) by means of


hexagon nuts (639) at first in 180° steps.
– Observe the order: 1-1’, 2-2, 3-3’, 4-4’.
– Set identical gap dimensions (SM) on all
adjusting segments.

A / 07.11.2019 - OM.SCT.BN.S01EN 34/35

61
9.2 Reassembly

 Tighten adjusting segments (635) by means of


hexagon nuts (639) in max. 90° steps.
– Observe the order: 1-1’, 2-2, 3-3’, 4-4’.
– Set identical gap dimensions (SM) on all
adjusting segments.
– Use tool (W30). Attachment point to be at the
centre of the gap.

A / 07.11.2019 - OM.SCT.BN.S01EN 35/35

62
9
Dismantling / Reassembly
9.4 / 9.5 Shaft sealing

9.4.1 Safety

WARNING

Shaft seal is leaky.


Leakage may escape into the atmosphere.
 Take safety measures to protect persons and the environment.
 Wear suitable protective clothing.
 Dispose of leakage appropriately.
 Note applicable regulations when handling hazardous substances.

9.4.2 Operating conditions and material combination


• Adjust to the relevant application
– Design variants you will find at http://www.seepex.com/en/service/downloads/.

Ausgabe Dokument Blatt


issue
A / 29.06.2017 document
OM.SEA.XXe sheet
1 (1)
63
64
10
Spare parts
10.1 Spare parts list

10.2 Sectional drawing and parts list

Ausgabe Dokument Blatt


issue
B / 29.03.2011 document
OM.SZG.02e sheet
1 (1)
65
66
10. Spare parts

Ordering spare parts


10. Spare parts

Commission number ........................................................... The commission number and type are


printed on the type plate of your SEEPEX
machine.
Type ......................................................................................

Request After placing the order, you will receive an


order confirmation and deadline before
the parts are shipped.
Order

Your data

First Name .............................................................................

Surname ................................................................................

Company ...............................................................................

Department ............................................................................

Street .....................................................................................

Postcode, City .......................................................................

Telephone ..............................................................................

Fax ........................................................................................

E-mail ....................................................................................

Our contact data

Customer Service
Fax +49.2041.996-5350
[email protected]

B / 19.12.2016 - OM.WPS.34EN - 1/4

67
10. Spare parts

Order spare parts or complete packages tailored to your pump type.

Spare parts

Plug-in shaft and shaft seal

No. Component Qty.

301 Packing ring (set) *

307 Plug-in shaft

309 Plug-in shaft pin

310 Splash ring

311 Flushing ring *

330 Mechanical seal *

Coupling rod and joint parts

No. Component Qty.

400 Coupling rod + Coupling rod bushing

401 Retaining sleeve

402 Coupling rod pin

403 Guide bushing

405 Universal joint sleeve

406 Holding band

407 Holding band

B / 19.12.2016 - OM.WPS.34EN - 2/4

68
10. Spare parts

Pumping elements

No. Component Qty.

600 Rotor

601 Stator half

640 Rotor head

642 O-ring

643 Clirclip

682 Support ring

683 Locking plate

Miscellaneous parts

No. Component Qty.

501 Casing gasket

503 Sealing ring

511 Seal *

517 Sealing ring *

706 Sealing ring

098 Joint grease (GF) = 300 g (~ 315 cm³)


for the required grease quantity refer to chapter 10

Complete packages

Small wearing parts package

consisting of: Qty.

1 x Rotor (600)
2 x Stator half (601)
1 x O-ring (642)
1 x Clirclip (643)
1 x Support ring (682)
1 x Locking plate (683)

B / 19.12.2016 - OM.WPS.34EN - 3/4

69
10. Spare parts

Large wearing parts package

consisting of: Qty.

1 x Packing ring (set) (301) *


1 x Plug-in shaft (307)
1 x Splash ring (310)
1 x Flushing ring (311) *
1 x Mechanical seal (330) *
1 x Coupling rod (400)
2 x Retaining sleeve (401)
2 x Coupling rod pin (402)
4 x Guide bushing (403)
2 x Universal joint sleeve (405)
2 x Holding band (406)
2 x Holding band (407)
1 x Casing gasket (501)
1 x Rotor (600)
2 x Stator half (601)
1 x Rotor head (640)
1 x O-ring (642)
1 x Clirclip (643)
1 x Support ring (682)
1 x Locking plate (683)
Joint grease (098)
* according to pump design

__________________________________ _______________________________________
Place, date Signature, company stamp

B / 19.12.2016 - OM.WPS.34EN - 4/4

70
11. Special tools

Ordering special tools


11. Special tools

Commission number ........................................................... The commission number and type are


printed on the type plate of your SEEPEX
machine.
Type ......................................................................................

Request After placing the order, you will receive an


order confirmation and deadline before
the parts are shipped.
Order

Your data

First Name .............................................................................

Surname ................................................................................

Company ...............................................................................

Department ............................................................................

Street .....................................................................................

Postcode, City .......................................................................

Telephone ..............................................................................

Fax ........................................................................................

E-mail ....................................................................................

Our contact data

Customer Service
Fax +49.2041.996-5350
[email protected]

B / 16.06.2017 - OM.STO.30EN - 1/2

71
11. Special tools

Your order
Order special tools tailored to your pump type.

Tool no. Denomination For assembly of Order no.

W1 Packing puller Packing* PKZ

W3 Mounting tool Holding band MHB

W4 Assembly mandrel Joint MTD

W5 Drift Joint DHS

W9 Mounting lever General MHL

W10 Dismantling tool Plug-in shaft AZV

W29 Hoisting device incl. tension belt Rotor SST, SCT MVR

W30 Feeler gauge Adjusting segment ESL

*see sectional drawing and parts list ( Chapter 10.2)

__________________________________ _______________________________________
Place, date Signature, company stamp

B / 16.06.2017 - OM.STO.30EN - 2/2

72
12
Associated documents

12.1 Accessories/Technical information

• Accessories and technical information are commission specific


documents not part of this not binding operating and assembly instruction.

Ausgabe Dokument Blatt


issue A / 29.06.2017 document OM.ZUG.XXd sheet 1 (1) 73
74
13
Appendix
13.1 Manufacturer's and supplier's documents

• Manufacturer's and supplier's documents are commission specific documents


and not part of this not binding operating and assembly instruction.

Ausgabe Dokument Blatt


issue
A / 29.06.2017 document
OM.MDS.XXe sheet
1 (1)
75
76
77
SEEPEX GmbH
Scharnhölzstraße 344
46240 Bottrop
Postfach 10 15 64
46215 Bottrop
Germany

Tel +49.2041.996-0
Fax +49.2041.996-400
[email protected]
www.seepex.com

Great Britain Austria Belgium Denmark


SEEPEX UK Ltd. SEEPEX GmbH SEEPEX GmbH SEEPEX Nordic A/S
3 Armtech Row Vertriebsbüro Österreich Bureau België Krakasvej 7C
Houndstone Business Park Obermüllergasse 18 Industriezone Klein Gent-Link 21 3400 Hillerød
Yeovil Somerset BA22 8RW 3003 Gablitz Welvaartstraat 14-1 bus 15 Tel +45.49.192200
Tel +44.1935.472376 Tel +43.2231.61085 2200 Herentals Fax + 45.49.193200
Fax +44.1935.479836 Fax +43.2231.6108520 Tel +32.14.501471 [email protected]
[email protected] [email protected] Fax +32.14.501461
[email protected]

France Hungary Irland Italy


SEEPEX France SARL SEEPEX GmbH SEEPEX UK Ltd. SEEPEX Italia S.r.l.
1, Rue Pelloutier Magyarországi iroda Branch Office Ireland Via Alberto da Giussano 23
77183 Croissy Beaubourg Hecskó Tamás okl.vill.mérn. 29 Lackenfune 20145 Milano (MI)
Tel +33.1.64114450 Éva utca 5. Dungarvan Tel +39.02.36569360
Fax + 33.1.64114489 7632 Pécs Co. Waterford Fax +39.02.92877855
[email protected] Tel +36.205806134 Tel +353.860450439 [email protected]
Fax +36.72952587 [email protected]
[email protected]

Poland Sweden The Netherlands Russia


SEEPEX GmbH SEEPEX Nordic A/S SEEPEX GmbH SEEPEX Ltd. Ugreshskaya
Przedstawicielstwo w Polsce Hamndalsvägen 58 Bureau Nederland Str. 2 Bldg. 23
ul. Romana Maya 1 61633 Åby Visbystraat 13 115088 Moscow
61-371 Poznan Tel +46.1166940 7418 BE Deventer Tel +7.495.2874830
Tel +48.61.6469270 Fax +46.1166941 Tel +31.570.516644 Fax +7.495.2874830
Fax +48.61.6469271 [email protected] Fax +31.570.516077 [email protected]
[email protected] [email protected]

USA China India UAE


SEEPEX Inc. SEEPEX Pumps (Shanghai) Co., Ltd. SEEPEX India Pvt. Ltd. SEEPEX Middle East (Branch)
511 Speedway Drive Xuanzhong Rd. 399, Building 13 Office No. 305. Dubai Airport Freezone
Enon Nanhui Industrial Area Raheja Arcade Building Building 4EA, Office 717
Ohio 45323 201300 Shanghai Sector 11, C.B.D. Belapur PO BOX 371159
Tel +1.937.8647150 Tel +86.21.38108888 Navi Mumbai 400614 Tel +971.4.256.6400
Fax + 1.937.8647157 -Hour Help Tel +91.22.40240434/35 [email protected]
[email protected] Fax +86.21.38108899 Fax +91.22.40240436
[email protected] [email protected]

Japan Malaysia
Australia
日本シーペックス株式会社 SEEPEX (M) Sdn. Bhd.
5-2-44 Onna, Atsugi-shi, No. 2, Jalan 51/203A SEEPEX Australia Pty. Ltd.
Kanagawa-ken, 243-0032 Kaw. Perindustrian Tiong Nam Unit 3, 4 Bounty Close
Tel +81.46.2595931 Seksyen 51 Tuggerah Business Park
Fax +81.46.2595941 46050 Petaling Jaya NSW 2259
[email protected] Selengor Darul Ehsan Tel +61.2.43554500
Tel +60.3.88009988 Fax +61.2.43554022
[email protected] [email protected]

More SEEPEX sales partnes in Europe,


America, Asia, Africa and Oceania
you willl find on our website.

78

You might also like