1.1 INTRODUCTION
Operation management designs, operates, and improves productive systems—systems for
getting work done. The food you eat, the movies you watch, the stores in which you shop, and
the books you read are provided to you by the people in operations. Operations managers are
found in banks, hospitals, factories, and government. They design systems, ensure quality,
produce products, and deliver services. They work with customers and suppliers, the latest
technology, and global partners. They solve problems, reengineer processes, innovate, and
integrate. Operation is more than planning and controlling; it’s doing. Whether it’s superior
quality, speed-to-market, customization, or low cost, excellence in operations is critical to a
firm’s success.

Operation is often defined as a transformation process of inputs (such as material, machines,


labor, management, and capital) into outputs (goods and services). Requirements and feedback
from customers are used to adjust factors in the transformation process, which may in turn alter
inputs. In operations management, we try to ensure that the transformation process is performed
efficiently and that the output is of greater value than the sum of the inputs. Thus, the role of
operations is to create value. The transformation process itself can be viewed as a series of
activities along a value chain extending from supplier to customer.

The input–transformation–output process is characteristic of a wide variety of operating systems.


In an automobile factory, sheet steel is formed into different shapes, painted and finished, and
then assembled with thousands of component parts to produce a working automobile. In an
aluminum factory, various grades of bauxite are mixed, heated, and cast into ingots of different
sizes. In a hospital, patients are helped to become healthier individuals through special care,
meals, medication, lab work, and surgical procedures. Obviously, “operations” can take many
different forms.

TRANSFOR
INPUT MATION OUT PUT
PROCESS
Material Goods
Machines
Labor Services
Management
Capital

Feed back
Requirements

1.2 Historical Developments of Operations Management

In the late 1950s and early 1960s , scholars began to deal specifically with operations
management as opposed to industrial engineering or operations research. Writers such as Edward
Bowman and Robert Fetter (Analysis for Production and Operations Management, 1957) and
Elwood S. Buffa (Modern Production Management, 1961) noted the commonality of problems
faced by all production systems and emphasized the importance of viewing production
operations as a system. They also stressed the useful application of waiting-line theory,
simulation, and linear programming, which are now standard topics in the field. In 1973, Chase
and Aquilano's stressed the need “to put the management back in operations management.” Bob
Jacobs joined the team in 1997.The following are some theories which are developed in
operation management.

LEAN MANUFACTURING, JIT, AND TQC

The 1980s saw a revolution in the management philosophies and technologies by which
production is carried out. Just-in-time (JIT) production was the major breakthrough in
manufacturing philosophy. Pioneered by the Japanese, JIT is an integrated set of activities
designed to achieve high-volume production using minimal inventories of parts that arrive at the
workstation exactly when they are needed. The philosophy—coupled with total quality control
(TQC), which aggressively seeks to eliminate causes of production defects—is now a
cornerstone in many manufacturers' production practices, and the term “lean manufacturing” is
used to refer to the set of concepts Of course, the Japanese were not the first to develop a highly
integrated, efficient production system. In 1913, Henry Ford developed an assembly line to make
the Model-T automobile. Ford developed a system for making the Model-T that was constrained
only by the capabilities of the workforce and existing technology. Quality was a critical
prerequisite for Ford: The line could not run steadily at speed without consistently good
components. On-time delivery was also critical for Ford; the desire to keep workers and
machines busy with materials flowing constantly made scheduling critical. Product, processes,
material, logistics, and people were well integrated and balanced in the design and operation of
the plant.1

Manufacturing strategy paradigm

The late 1970s and early 1980s saw the development of the manufacturing strategy paradigm by
researchers at the Harvard Business School. This work by professors William Abernathy, Kim
Clark, Robert Hayes, and Steven Wheelwright (built on earlier efforts by Wickham Skinner)
emphasized how manufacturing executives could use their factories' capabilities as strategic
competitive weapons. Central to their thinking was the notion of factory focus and
manufacturing trade-offs. They argued that because a factory cannot do extremely well on all
performance measures, its management must devise a focused strategy, creating a focused
factory that performs a limited set of tasks extremely well. This required trade-offs among such
performance measures as low cost, high quality, and high flexibility in designing and managing
factories. Ford seems to have realized this about 60 years before the Harvard professors.
Service quality and productivity
The great diversity of service industries—ranging from airlines to zoos, with many different
types in between—precludes identifying any single pioneer or developer that has made a
major impact in these areas. However, McDonald's unique approach to quality and
productivity has been so successful that it stands as a reference point in thinking about how
to deliver high-volume standardized services.

Total quality management and quality certification


Another major development was the focus on total quality management (TQM) in the late
1980s and 1990s. All operations executives are aware of the quality message put forth by the
so-called quality gurus(specialists): W. Edwards Deming, Joseph M. Juran, and Philip
Crosby. It's interesting that these individuals were students of Shewhart, Dodge, and Romig
in the 1930s (sometimes it takes a generation for things to catch on). Helping the quality
movement along is the Baldrige National Quality Award, which was started in 1987 under
the direction of the National Institute of Standards and Technology. The Baldrige Award
recognizes companies each year for outstanding quality management systems.

The ISO 9000 certification standards, created by the International Organization for
Standardization, now plays a major role in setting quality standards for global manufacturers.
Many European companies require that their vendors meet these standards as a condition for
obtaining contracts.

Business process reengineering

The need to become lean to remain competitive in the global economic recession in the 1990s
pushed companies to seek innovations in the processes by which they run their operations. The
flavor of business process reengineering (BPR) is conveyed in the title of Michael Hammer's
influential article in Harvard Business Review: “Reengineering Work: Don't Automate,
Obliterate.” The approach seeks to make revolutionary changes as opposed to evolutionary
changes (which are commonly advocated in TQM). It does this by taking a fresh look at what the
organization is trying to do in all its business processes, and then eliminating non–value-added
steps and computerizing the remaining ones to achieve the desired outcome.

Hammer actually was not the first consultant to advocate eliminating non–value-added steps and
reengineering processes. In the early 1900s, Frederick W. Taylor developed principles of
scientific management that applied scientific analysis to eliminating wasted effort from manual
labor. Around the same time, Frank and Lillian Gilbreth used the new technology of the time,
motion pictures, to analyze such diverse operations as bricklaying and medical surgery
procedures. Many of the innovations this husband-and-wife team developed, such as time and
motion study, are widely used today.

Six-sigma quality
Six Sigma is a process for developing and delivering virtually perfect products and services. The
word “sigma” is a familiar statistical term for the standard deviation, a measure of variability
around the mean of a normal distribution. In Six Sigma it is a measure of how much a given
product or process deviates from perfection, or zero defects. The main idea behind Six Sigma is
that if the number of “defects” in a process can be measured, then it can be systematically
determined how to eliminate them and get as close to zero defects as possible.

Supply chain management

The central idea of supply chain management is to apply a total system approach to managing the
flow of information, materials, and services from raw material suppliers through factories and
warehouses to the end customer. Recent trends such as outsourcing and mass customization are
forcing companies to find flexible ways to meet customer demand. The focus is on optimizing
core activities to maximize the speed of response to changes in customer expectations.

Electronic commerce

The quick adoption of the Internet and the World Wide Web during the late 1990s was
remarkable. The term electronic commerce refers to the use of the Internet as an essential
element of business activity. The Internet is an outgrowth of a government network called
ARPANET, which was created in 1969 by the Defense Department of the U.S. government. The
use of Web pages, forms, and interactive search engines has changed the way people collect
information, shop, and communicate. It has changed the way operations managers coordinate
and execute production and distribution functions.

Service science

A direct response to the growth of services is the development of a major industry and
university program called Service Science Management and Engineering (SSME). SSME aims
to apply the latest concepts in information technology to continue to improve service
productivity of technology-based organizations. An interesting question raised by Jim
Spohrer, leader of the IBM team that started the effort, is where will the labor go, once
productivity improves in the service sector? “The short answer is new service sector industries
and business—recall the service sector is very diverse and becoming more so every day.
Consider the growth of retail (franchises, ecommerce, Amazon, eBay), communication
(telephones, T-Mobile, Skype), transportation (airlines, FedEx), financial (discount ebrokers,
Schwab), as well as information (television, CNN, Google) services. Not to mention all the
new services in developing nations of the world. The creative capacity of the service sector for
new industries and business has scarcely been tapped.

1.3 Manufacturing versus service operations

Organizations can be classified in two broad categories as either manufacturing or service.


Manufacturing organizations produce physical, tangible items which can be stored as inventory
before delivery to the customer. Service organizations produce intangible items that cannot be
produced ahead of time. One of the key developments in operation management is the increasing
importance of service operations as service industry accounts for an increasing proportion of the
output of industrialized economies.
1.3.1 Manufacturing operations: converts input like materials, labor & capital into some
tangible outputs. The objective of each process is to change the shape or physical characteristics
of the raw-materials or inputs.

1.3.2 Service operations: Non-manufacturing or service operations also transform a set of inputs


into a set of outputs, but the outputs are not tangible. Features intangibility non inventor ability
customer involvement controlled flexibility.

Intangibility is not tangible like the physical goods. It cannot be seen physically, but it can be
felt. Non-inventoriability as opposed to physical goods services is not inventoriable, because a
service is produced and consumed simultaneously. In this sense a service does not exist, however
the result of service last for some time.

Customer involvement besides the quality aspects, the inventoriability of services also means
that the customer may be directly involved in operations, where the production and consumption
takes place simultaneously. So the service and the service provider both are there with the
customer. Controlled flexibility is a characteristic of a firm’s operations that enables it to react to
customer needs quickly & efficiently. But where there is flexibility the possibility of chaotic
situation can be found in the production & delivery system. In service operations as there are
intangible objects, it is very much controlled here.

Classifications of services: classifications of services brings tangible actions to peoples bodies:


ex: hair cutting, restaurant, health care etc. tangible actions to peoples goods: ex: laundry,
repairing centers, tailor etc. intangible actions directed to peoples mind: ex: training, information
services, broadcasting etc. intangible actions directed to peoples intangible assets: ex: banking,
insurance & accounting etc. based on tangible & intangible nature of services.

Differences: physical nature of products productivity measuring customer contact location &
size maintenance & repair. Generally, Distinction between manufacturing and service operations
is based on the following features:

 The nature and consumption of output.


 Nature of work (jobs).
 Degree of consumer contact.
 Uniformity of output.
 Quality assurance.
 Measurement of performance.
Table 1 provides an overview of the different manufacturing and service operations.

TABLE 1

Differences between manufacturing and service operations

Characteristic Manufacturing Service


Output Tangible Intangible
Consumer contact Low High
Nature of work Capital intensive Labor intensive
Uniformity of output High Low
Difficulty of quality assurance Low High
Measurement of performance Easy Difficult

Similarities: despite many differences, there are a lot of similarities between manufacturing &
service operations. There is an interdependency of products & services, for ex: customers want
both good food as well as good service at a restaurant. Again though service providers cannot
inventory their outputs, but must inventory their inputs, for ex: hospitals must maintain an
adequate supply of medications, nurses & doctors. While buying a car we not only buy a product
but also a guarantee. Hospital cares involves medication, bandages & x-ray films & so on, so
despite a lot of differences both product & service are part of each other.

1.4. Operations Decision Making

At the operational level hundreds of decisions are made in order to achieve local outcomes that
contribute to the achievement of a company’s overall strategic goal. These local outcomes are
usually not measured directly in terms of profit, but instead are measured in terms of quality,
cost-effectiveness, efficiency, productivity, and so forth. Achieving good results for local
outcomes is an important objective for individual operational units and individual operations
managers. However, all these decisions are interrelated and must be coordinated for the purpose
of attaining the overall company goals. Decision making is analogous to a great stage play, in
which all the actors, the costumes, the music, the orchestra, and the script must be choreographed
and staged by the director, the stage managers, the author, and the conductor so that everything
comes together for the performance.

For many topics in operations management, there are quantitative models and techniques
available that help managers make decisions. Some techniques simply provide information that
the operations manager might use to help make a decision; other techniques recommend a
decision to the manager. Some techniques are specific to a particular aspect of operations
management; others are more generic and can be applied to a variety of decision-making
categories.

These different models and techniques are the “tools” of the operations manager. Simply having
these tools does not make someone an effective operations manager, just as owning a saw and a
hammer does not make someone a carpenter. An operations manager must know how to use
decision-making tools. How these tools are used in the decision-making process is an important
and necessary part of the study of operations management.

Decision analysis with and without probabilities

In this supplement we demonstrate a quantitative technique called decision analysis for decision
making Situations in which uncertainty exists. Decision analysis is a generic technique that can
be applied to a number of different types of operational decision-making areas.

Many decision-making situations occur under conditions of uncertainty. For example, the
demand for a product may not be 100 units next week but may vary between 0 and 200 units,
depending on the state of the market, which is uncertain. Decision analysis is a set of quantitative
decision-making techniques to aid the decision maker in dealing with a decision situation in
which there is uncertainty. However, the usefulness of decision analysis for decision making is
also a beneficial topic to study because it reflects a structured, systematic approach to decision
making that many decision makers follow intuitively without ever consciously thinking about it.
Decision analysis represents not only a collection of decision-making techniques but also an
analysis of logic underlying decision making.

Decision making without probabilities


A decision-making situation includes several components the decisions themselves and the
events that may occur in the future, known as states of nature. Future states of nature may be
high or low demand for a product or good or bad economic conditions. At the time a decision is
made, the decision maker is uncertain which state of nature will occur in the future and has no
control over these states of nature.

When probabilities can be assigned to the occurrence of states of nature in the future, the
situation is referred to as decision making under risk. When probabilities cannot be assigned to
the occurrence of future events, the situation is called decision making under uncertainty.

To facilitate the analysis of decision situations, they are organized into payoff tables. A payoff
table is a means of organizing and illustrating the payoffs from the different decisions, given the
various states of nature, and has the general form shown in Table.

State of nature
decision a b
1 Payoff 1a Payoff 1b
2 Payoff 2a Payoff 2b

Each decision, 1 or 2, in the table will result in an outcome, or payoff, for each state of nature
that will occur in the future. Payoffs are typically expressed in terms of profit, revenues, or cost
(although they may be expressed in terms of a variety of quantities). For example, if decision 1 is
to expand a production facility and state of nature a is good economic conditions, payoff 1a
could be $100,000 in profit.

Once the decision situation has been organized into a payoff table, several criteria are available
to reflect how the decision maker arrives at a decision, including maximax, maximin, minimax
regret, Hurwitz, and equal likelihood. These criteria reflect different degrees of decision-maker
conservatism or liberalism. On occasion they result in the same decision; however, they often
yield different results. These decision-making criteria are demonstrated by the following
example.

Example
The Southern Textile Company is contemplating the future of one of its plants located in
South Carolina. Three alternative decisions are being considered:
(1) Expand the plant and produce lightweight, durable materials for possible sale to the military,
a market with little foreign competition;
(2) Maintain the status quo at the plant, continuing production of textile goods that are subject to
heavy foreign competition; or
(3) Sell the plant now. If one of the first two alternatives is chosen, the plant will still be sold at
the end of the year. The amount of profit that could be earned by selling the plant in a year
depends on foreign market conditions, including the status of a trade embargo bill in Congress.

The following payoff table describes this decision situation.


State of nature
Decision Good competitive conditions Poor Competitive conditions
Expand $800,000 $500,000
Maintain status quo 1,300,000 -150,000
Sell now 320,000 320,000

Determine the best decision using each of the decision criteria.


1. Maximax
2. Maximin
3. Minimax regret
4. Hurwicz
5. Equal likelihood

Solution
1. Maximax
The decision is selected that will result in the maximum of the maximum payoffs. This is how
this criterion derives its name—the maximum of the maxima. The maximax criterion is very
optimistic. The decision maker assumes that the most favorable state of nature for each decision
alternative will occur. Thus, for this example, the company would optimistically assume that
good competitive conditions will prevail in the future, resulting in the following maximum
payoffs and decisions:
Expand: $800,000
Status quo: 1,300,000 ← Maximum
Sell: 320,000
Decision: Maintain status quo
2. Maximin
The maximin criterion is pessimistic. With the maximin criterion, the decision maker selects
the decision that will reflect the maximum of the minimum payoffs. For each decision
alternative, the decision maker assumes that the minimum payoff will occur; of these, the
maximum is selected as follows:
Expand: $500,000 ← Maximum
Status quo: _150,000
Sell: 320,000
Decision: Expand

3. Minimax Regret Criterion


The decision maker attempts to avoid regret by selecting the decision alternative that minimizes
the maximum regret. A decision maker first selects the maximum payoff under each state of
nature; then all other payoffs under the respective states of nature are subtracted from these
amounts, as follows:
Good competitive conditions Poor competitive conditions
$1,300,000-800,000=500,000 500,000-500,000=0
1,300,000-1,300,000=0 500,000-(-150,000) =650,000
1,300,000-320,000=980,000 500,000-320,000=180,000

These values represent the regret for each decision that would be experienced by the decision
maker if a decision were made that resulted in less than the maximum payoff. The maximum
regret for each decision must be determined, and the decision corresponding to the minimum of
these regret values is selected as follows:

Expand: $500,000 ← Minimum


Status quo: 650,000
Sell: 980,000
Decision: Expand

4. Hurwicz
A compromise is made between the maximax and maximin criteria. The decision maker is
neither totally optimistic (as the maximax criterion assumes) nor totally pessimistic (as the
maximin criterion assumes). With the Hurwicz criterion, the decision payoffs are weighted by a
coefficient of optimism, a measure of the decision maker’s optimism. The coefficient of
optimism, defined as α, is between 0 and 1 (i.e., 0 < α <1). If α= 1, the decision maker is
completely optimistic; if α = 0, the decision maker is completely pessimistic. (Given this
definition, 1 - α is the coefficient of pessimism.) For each decision alternative, the maximum
payoff is multiplied by α and the minimum payoff is multiplied by 1 - α . For our investment
example, if α equals 0.3 (i.e., the company is slightly optimistic) and 1 – α= 0.7, the following
decision will result:

Expand: $800,000(0.3) + 500,000(0.7) =$590,000 ← Maximum


Status quo: 1,300,000(0.3) _ 150,000(0.7) = 285,000
Sell: 320,000(0.3) +320,000(0.7) = 320,000
Decision: Expand
5. Equal Likelihood
The equal likelihood (or La Place) criterion weights each state of nature equally, thus
assuming that the states of nature are equally likely to occur. Since there are two states of nature
in our example, we assign a weight of 0.50 to each one. Next, we multiply these weights by each
payoff for each decision and select the alternative with the maximum of these weighted values.

Expand: $800,000(0.50) + 500,000(0.50) = $650,000 ← Maximum


Status quo: 1,300,000(0.50) _ 150,000(0.50) = 575,000
Sell: 320,000(0.50) + 320,000(0.50) = 320,000
Decision: Expand

The decision to expand the plant was designated most often by four of the five decision criteria.
The decision to sell was never indicated by any criterion. This is because the payoffs for
expansion, under either set of future economic conditions, are always better than the payoffs for
selling. Given any situation with these two alternatives, the decision to expand will always be
made over the decision to sell. The sell decision alternative could have been eliminated from
consideration under each of our criteria. The alternative of selling is said to be dominated by the
alternative of expanding. In general, dominated decision alternatives can be removed from the
payoff table and not considered when the various decision-making criteria are applied, which
reduces the complexity of the decision analysis.

Different decision criteria often result in a mix of decisions. The criteria used and the resulting
decisions depend on the decision maker. For example, the extremely optimistic decision maker
might disregard the preceding results and make the decision to maintain the status quo, because
the maximax criterion reflects his or her personal decision-making philosophy.

Decision making with probabilities


For the decision-making criteria we just used we assumed no available information regarding the
probability of the states of nature. However, it is often possible for the decision maker to know
enough about the future states of nature to assign probabilities that each will occur, which
decision is making under conditions of risk. The most widely used decision-making criterion
under risk is expected value, computed by multiplying each outcome by the probability of its
occurrence and then summing these products according to the following formula:

n
EV(x) =∑ p ( xi ) xi
i=0

Where
p (xi) = probability of outcome i
Xi = outcome i

Assume that it is now possible for the Southern Textile Company to estimate a probability of
0.70 that good foreign competitive conditions will exist and a probability of 0.30 that poor
conditions will exist in the future. Determine the best decision using expected value.
Solution
The expected values for each decision alternative are computed as follows.
EV (expand) =$800,000(0.70) + 500,000(0.30) = $710,000
EV (status quo) = 1,300,000(0.70) _ 150,000(0.30) =865,000 ← Maximum
EV (sell) = 320,000(0.70) +320,000(0.30) = 320,000
The decision according to this criterion is to maintain the status quo, since it has the highest
expected value.

1.5 Measure of productivity


The most common measure of competitiveness is productivity. Increases in productivity allow
wages to grow without producing inflation, thus raising the standard of living. Productivity
growth also represents how quickly an economy can expand its capacity to supply goods and
services.

Productivity is calculated by dividing units of output by units of input.


Productivity= output
Input
Output can be expressed in units or dollars in a variety of scenarios, such as sales made, products
produced, customers served, meals delivered, or calls answered. Single-factor productivity
compares output to individual inputs, such as labor hours, investment in equipment, material
usage, or square footage. Multifactor productivity relates output to a combination of inputs, such
as (labor +capital) or (labor + capital + energy + materials). Capital can include the value of
equipment, facilities, inventory, and land. Total factor productivity compares the total quantity of
goods and services produced with all the inputs used to produce them. These productivity
formulas are summarized in the following Table.
Single factor productivity
Output output output
Input materials capital

Multifactor productivity

Output output
Labor+materials+overhead labor+energy+capital
Total factor productivity
Goods and Services produced
All inputs used to produce them
Example:
Osborne Industries is compiling the monthly productivity report for its Board of Directors.
From the following data, calculate (a) labor productivity, (b) machine productivity, and (c) the
Multifactor productivity of dollars spent on labor, machine, materials, and energy. The average
Labor rate is $15 an hour, and the average machine usage rate is $10 an hour.

Units produced 100,000


Labor hours 10,000
Machine hours 5,000
Cost of materials $35,000
Cost of energy $15,000

Solution
(a) Labor productivity = output = 100,000 = 10units/hour
Labor hours 10,000
(b) Machine productivity = output 100,000 =20 units/hour
Machine hours 5,000
(c) Multifactor productivity = Output
Labor costs + machine costs + material costs + energy costs
100,000
(10000x15)+ (5000x10) +35000+15000
= 100,000
250,000
= 0.4 units per dollar spent