PROJECT TEST REPORT NO

BUILDING / AREA TEST DATE

ROOM REFERENCE TEST TIME

REPORT SUMMARY

S.NO PERFORMED TESTS ASSESSMENT

1 PRE COMMISSIONING CHECK

2 CONTINUITY TEST REPORT

3 INSULATION RESISTANCE TEST REPORT

4 HIGH POT TEST REPORT

5 TORQUE VERIFICAION CHECK

6 COMMISSIONING CHECK

CABLE DETAILS
11 KV CABLE DETAILS

FROM TO

SUBSTATION

CABLE SIZE
CABLE
LENGTH

1. PRECOMMISSIONING CHECK
SUBJECT NAME COMPANY DESIGNATION SIGN & DATE

TESTED BY  

WITNESSED  
/
REVIEWED BY

APPROVED BY  

Page 1 of 6
PROJECT TEST REPORT NO

BUILDING / AREA TEST DATE

ROOM REFERENCE TEST TIME

S.NO DESCRIPTION ACCEPTANCE


1 The installation completeness of 11KV Cables will be ensured from the status of
approved installation inspection request.
2 Cable sizes as per approved Drawings/Specs
3 Check the completion of cable termination
4 Check all labeling / tags are Correct
5 Check for no physical damage
6 Check the Certificates / License of the technicians of the Engineer
7 Check all the cable support and clamp fixed properly
8 Ensure all the cable entry holes are sealed and closed properly
9 Check the panel earthing and cable gland earth is connected to Earth bus
10 Check the panels are kept tidy and clean

TESTING EQUIPMENT DETAILS

CALIBRATION
EQUIPMENT NAME MAKE & MODEL SERIAL NUMBER VERIFIED
VALIDITY
Insulation Tester MEGGER-MIT-510/2

Digital multi meter FLUKE-87V

DC Dielectric Test Set MEGGER

SUBJECT NAME COMPANY DESIGNATION SIGN & DATE

TESTED BY  

WITNESSED  
/
REVIEWED BY

APPROVED BY  

Page 2 of 6
PROJECT TEST REPORT NO

BUILDING / AREA TEST DATE

ROOM REFERENCE TEST TIME

2. CONTINUITY TEST

PHASE CONTINUITY PASS / FAIL


R- PHASE
Y- PHASE
B-PHASE

3. INSULATION RESISTANCE TEST

MINIMUM
TEST VOLTAGE DURATION INSULATION
COMBINATION ACCEPTANCE
(V) (MIN.) RESISTANCE
VALUE

R-EARTH 5KV 1 >22 MΩ

Y-EARTH 5KV 1 >22 MΩ

B-EARTH 5KV 1 >22 MΩ

R-Y 5KV 1 >22 MΩ

Y-B 5KV 1 >22 MΩ

B-R 5KV 1 >22 MΩ

SUBJECT NAME COMPANY DESIGNATION SIGN & DATE

TESTED BY  

WITNESSED  
/
REVIEWED BY

APPROVED BY  

Page 3 of 6
PROJECT TEST REPORT NO

BUILDING / AREA TEST DATE

ROOM REFERENCE TEST TIME

4. HV PRESSURE TEST:

TEST MINIMUM INSULATION RESISTANCE


DURATION
COMBINATION VOLTAGE ACCEPTANCE
(MIN.) BEFORE HV AFTER HV
(V) VALUE

R-EARTH (Y+B+E) 5KV 1 >22 MΩ

Y-EARTH (R+B+E) 5KV 1 >22 MΩ

B-EARTH (R+Y+E) 5KV 1 >22 MΩ

Leakage
TEST Max Leakage current @ Gradual increase current
DURATION Acceptance
COMBINATION VOLTAGE (µA)@
(MIN.) Pass / Fail
DC (KV) Steady
µA@4KV µA@8KV µA@12KV µA@18KV Injection
R-(Y+B+E) 18KV 5
Y-(B+R+E) 18KV 5
B-(R+Y+E) 18KV 5
NOTE : Acceptance limit should be less than < 100mA

SUBJECT NAME COMPANY DESIGNATION SIGN & DATE

TESTED BY  

WITNESSED  
/
REVIEWED BY

APPROVED BY  

Page 4 of 6
PROJECT TEST REPORT NO

BUILDING / AREA TEST DATE

ROOM REFERENCE TEST TIME

5. TORQUE TEST REPORT

FEEDER REF :
PHASE
BOLT SIZE TORQUE APPLIED MARKING
R-PHASE ** ** **
Y- PHASE ** ** **
B-PHASE ** ** **
Applied torque should be as per the Manufacturer standards

6. COMMISSIONING REPORT

CHECK R Y B
LINE INDICATOR ** ** **
VOLT METER ** ** **
MFM ** ** **
RELAY ** ** **
SEQUENCE ** ** **

Note: ** Test will be carried out on Separate Inspection.

SUBJECT NAME COMPANY DESIGNATION SIGN & DATE

TESTED BY  

WITNESSED  
/
REVIEWED BY

APPROVED BY  

Page 5 of 6
PROJECT TEST REPORT NO

BUILDING / AREA TEST DATE

ROOM REFERENCE TEST TIME

11KV CABLE TEST REPORTS

SUBJECT NAME COMPANY DESIGNATION SIGN & DATE

TESTED BY  

WITNESSED  
/
REVIEWED BY

APPROVED BY  