MST- ATTACHMENT TO THE Ref SHBC-B1-ZAZLAL-MST-BM-01142

1142 MATERIAL SUBMITTAL FORM


Rev: 01 Date 18-Aug-2020
PROJECT: Expansion of Farwaniah Hospital PROJECT ID
OWNER: Ministry of Health - MOH 315 PM 59
Project Manager: Project Management International Systems - PMI Contract #: 45-43/2013/2014/‫م خ ع‬/‫ص‬
Supervision: Gulf Consult – GC BLD #: B1&B2 Zone #: ALL
Contractor: Sayed Hamid Behbehani & Sons Co. Subject: Material Approval for Hess
Screen, Electric, Wall Mounted,
Item Code: MS2308, Model:
481500, Good Lite
ACTION: XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
PMI COMMENTS
As there neither sufficient data were submitted regarding provided its functionality principle nor its
supplied components, please confirm whether the proposed achieve the contractual demands or
not, if not what is the substitute?
1- The item incorporates the original Hess Pattern and by using complimentary red and green
filters found in the Diplopia Goggles, Foster Torch and illuminated pattern on the Screen, the
eyes are dissociated
2- The item is produced from high impact polystyrene.
3- The item has push button hand control
4- The item has full diagnostic charts and Hess Recording Charts.
5- Chin rest to be Provided
6- Score sheet be provided
7- Will the screen, where the examiner point the laser to a position on it, be provided?
8- Will this item handle the pediatric cases (pediatric glasses) ? if no, why although there will be
a pediatric patients come to treatment?
9- In general; is it possible to supply the following item: Lees Screen from ophthalmedica
company in UK as it adhere with the contract requirements.

Signatory in
accordance with
the Matrix for Ahmad Hantush
Administration & Project Manager Director of Engineering
Communication Project Executive The Engineer
Department
PMI MOH MOH MOH
Date:
Received by
Contractor
Name Signature Date
COPIES TO : Gulf Consult MOH (THE ENGINEER) -
PMI Transmittal Cover Only

Corrections or comments made relative to submittals during this review do not relieve the Contractor from compliance with the requirements of the drawingsProject Management
and specifications. International
This check is only Systems
for review of general
conformance with the design concept of the project and general compliance with the information given in the Contract Documents. The Contractor is responsible for confirming and correlating all quantities and
dimensions, selecting fabrication processes and techniques of constructions; coordinating his work with that of other trades and performing his work in a safe and satisfactory manner.

Project Management International Systems

Page 1 of 1
Corrections or comments made relative to submittals during this review do not relieve the Contractor from compliance with the requirements of the drawings and specifications. This check is only for review of general
conformance with the design concept of the project and general compliance with the information given in the Contract Documents. The Contractor is responsible for confirming and correlating all quantities and
dimensions, selecting fabrication processes and techniques of constructions; coordinating his work with that of other trades and performing his work in a safe and satisfactory manner.