Deswik Sched
Deswik Sched
Deswik Sched
Sched
Gantt Chart Scheduling
SCHEDULING SOLUTIONS
THAT SET US APART
From interactive Gantt charts to PERT network diagrams, Deswik.Sched is tailored for the
needs of mine planners. Encompassing both rate and duration-based scheduling, it easily
handles the massive datasets that modern detailed planning requires; integrating production,
ancillary and project activities with ease. Built around a powerful resource leveling engine, you
will understand your resourcing better than ever, setting priorities, constraints and objectives
designed to reflect the real world requirements of actual mining activities.
Intuitive and flexible, Deswik.Sched can handle the planning needs of any mining sector,
underground or open pit, coal or metal.
A Fresh Perspective
New problems demand new solutions
Benefits
Delivering more value through effective mine planning
• Handle massive datasets with our in-built mining functionality and familiar Gantt chart interface. Integrate
production, ancillary and project activities with ease, using rate or duration-based scheduling.
• Perform multi-pass leveling and input path scheduling with our powerful and feature-rich resource leveling
engine.
• Mirror real world objectives with dependencies, priorities, targets, constraints and resource limitations.
• Develop detailed work calendars for scheduling and reporting from a shift basis through to Life of Mine plans
in excess of a hundred years.
• Use a flexible combination of manual scheduling tools for short-term and automated long-term scheduling.
• Assign resources from common pools based on task priorities and resource availabilities.
• Build detailed and specific production rates with easy formula builders.
• Quickly customize your user defined pivot-style reports and drill into the details of a schedule.
• Record multiple schedule baselines to show schedule changes over time. Automated tools will keep schedules up-
to-date.
• Operate Deswik.Sched as stand-alone, or integrate with Deswik.CAD and Deswik.IS.
• Use Deswik.SViz or our complimentary Deswik.vSched for quick 3D visualization of existing Deswik.CAD
designs.
Deswik.Sched
Comprehensive Scheduling Functionality
Intuitive and familiar, with a powerful visual interface
• Universal application – model open pit and underground mines in the same
schedule.
• Variety of configurable scheduler layouts, including:
-- Task and Resource Gantt charts
-- PERT network diagram
-- Linked Reporting and 3D solid animation viewers.
• Generate complex scheduling data through powerful spreadsheet style
formula tools, referencing data from a variety of sources, including lookup
tables, range lookups, curves and global constants.
• Innovative task and dependency options including:
-- Hammock tasks
-- Percentage overlap dependencies.
• Resources can have a specific rate or group of rates that will be applied
depending on the task they are assigned to, accounting for variations in:
-- Design and environmental factors
-- Geological and geotechnical factors
-- Other factors such as efficiency and mining priorities.
• Apply time variant fields to reduce production rates over specific periods.
• Manual or rules-based resource assignment for individual or pooled resources.
• Resource specific priorities and proximity de-rating for equipment working close
together.
• Incorporate resource-specific maintenance requirements including:
-- Maintenance events based on equipment hours
-- Retire and replace equipment based on a defined lifespan.
Schedule Integration
Bring your plan together
• Copy and paste reports and data directly into Microsoft Excel.
• Easy integration with a number of other scheduling packages.
• Extensive sub-projecting capabilities for multiple schedule inputs.
• Expand functionality with other Deswik modules including:
-- Deswik.CAD through Deswik.IS (Interactive Scheduler)
-- Deswik.Blend (Material Flow Modeling)
-- Deswik.LHS (Landform and Haulage).
Time Management
Account for every second
“A powerful Gantt chart scheduler specifically designed to handle the challenges of mine planning”
Our industry leading software solutions include
Deswik.CAD - Design & Solids Modeling A powerful design platform with superior data handling. The next generation of planning tools for mining.
Deswik.Sched - Gantt Chart Scheduling A powerful Gantt chart scheduler specifically designed to handle the challenges of mine planning.
Deswik.IS - Interactive Scheduler Bridging the planning gap between designing and scheduling.
Deswik.LHS - Landform & Haulage Understand material movement like never before with scenario-based modeling and analysis.
Deswik.Blend - Material Flow Modeling Optimize your product value with material flow modeling for both coal and metals.
Deswik.Agg - Coal Seam Aggregation Simplifying complex aggregation processes to create fit for purpose Run-of-Mine reserves.
Deswik.SO - Stope Optimizer Underground stope shape optimization using the industry leading SSO v2.0.
Deswik.ASD - Auto Stope Designer Automatically create mineable stopes for narrow-vein vertical mining methods.
Deswik.OPDB - Open Pit Drill & Blast Fast, efficient drill and blast design for surface mining methods.
Deswik.UGDB - Underground Drill & Blast Fast, efficient drill and blast design for underground mining methods.
Deswik.SOT - Schedule Optimization Tool Realize more value from your resource with an NPV optimized schedule.
Deswik.MDM - Mining Data Management A spatial database and process workflow management tool.
Deswik.FM - File Manager Proactively manage data versioning with an integrated document management system.
Deswik Advanced Modules Advanced functionality tailored to the specialized demands of the specific mining sectors.
www.deswik.com | e: [email protected]
Version 1.3