Deswik Sched

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Deswik.

Sched
Gantt Chart Scheduling
SCHEDULING SOLUTIONS
THAT SET US APART

A dynamic, modern approach to scheduling

From interactive Gantt charts to PERT network diagrams, Deswik.Sched is tailored for the
needs of mine planners. Encompassing both rate and duration-based scheduling, it easily
handles the massive datasets that modern detailed planning requires; integrating production,
ancillary and project activities with ease. Built around a powerful resource leveling engine, you
will understand your resourcing better than ever, setting priorities, constraints and objectives
designed to reflect the real world requirements of actual mining activities.

Unrestricted by timescales, long-term and short-term planning horizons sit seamlessly


together in a single schedule. By accessing the comprehensive suite of flexible reporting
options, you’ll generate more accurate output data in more meaningful ways, including
detailed Critical and Point to Point path analysis.

Intuitive and flexible, Deswik.Sched can handle the planning needs of any mining sector,
underground or open pit, coal or metal.
A Fresh Perspective
New problems demand new solutions

Leveraging decades of professional software development


experience and a proven history of building technical
mining applications, Deswik provides industry-leading tools
to ensure that mine plans are robust, transparent and
achievable. Our software is developed to take advantage
of the latest high performance technologies and cutting-
edge computing algorithms, all accessed through a flexible,
intuitive interface.

By avoiding the legacy issues faced by other older packages,


coupled with our outstanding customer support, we provide
complete solutions to meet the demands of modern mining.

Deswik is committed to delivering comprehensive tools and


quality support for all mining sectors.

Benefits
Delivering more value through effective mine planning

• Handle massive datasets with our in-built mining functionality and familiar Gantt chart interface. Integrate
production, ancillary and project activities with ease, using rate or duration-based scheduling.
• Perform multi-pass leveling and input path scheduling with our powerful and feature-rich resource leveling
engine.
• Mirror real world objectives with dependencies, priorities, targets, constraints and resource limitations.
• Develop detailed work calendars for scheduling and reporting from a shift basis through to Life of Mine plans
in excess of a hundred years.
• Use a flexible combination of manual scheduling tools for short-term and automated long-term scheduling.
• Assign resources from common pools based on task priorities and resource availabilities.
• Build detailed and specific production rates with easy formula builders.
• Quickly customize your user defined pivot-style reports and drill into the details of a schedule.
• Record multiple schedule baselines to show schedule changes over time. Automated tools will keep schedules up-
to-date.
• Operate Deswik.Sched as stand-alone, or integrate with Deswik.CAD and Deswik.IS.
• Use Deswik.SViz or our complimentary Deswik.vSched for quick 3D visualization of existing Deswik.CAD
designs.

Deswik.Sched
Comprehensive Scheduling Functionality
Intuitive and familiar, with a powerful visual interface

• Universal application – model open pit and underground mines in the same
schedule.
• Variety of configurable scheduler layouts, including:
-- Task and Resource Gantt charts
-- PERT network diagram
-- Linked Reporting and 3D solid animation viewers.
• Generate complex scheduling data through powerful spreadsheet style
formula tools, referencing data from a variety of sources, including lookup
tables, range lookups, curves and global constants.
• Innovative task and dependency options including:
-- Hammock tasks
-- Percentage overlap dependencies.

Optimized Resource Utilization


The right equipment in the right place at the right time

• Applies a proprietary algorithm across the scheduled tasks in order to


prevent over-allocation of resources by delaying lower priority tasks that
cannot be resourced.
• Tiered priority structure incorporating scheduling priorities, resource
priorities and resource input path.
• Sophisticated resource leveling functions including:
-- Fixed or preferential task grouping
-- Multilevel targeting and quantity constraints
-- Group constraints and blocking tasks
-- Task selection based on dead heading time.
• Multi-pass resource leveling allows complex process modeling.
• Interactive ‘stepwise’ troubleshooting of resource leveling process.

Integrated Reporting and Analysis


Better communication for greater understanding

• Unlimited options for pivot based reporting layout includes:


-- Task and resource filtering
-- Report based formulas
-- Incorporated graphing options.
• Live reports automatically recalculate when the Gantt time
period is adjusted.
• Comprehensive suite of schedule analysis tools including:
-- Critical path analysis between selected tasks
-- Dependency and conflict filtering.
Flexible Resourcing
Drive project value with better resource modeling

• Resources can have a specific rate or group of rates that will be applied
depending on the task they are assigned to, accounting for variations in:
-- Design and environmental factors
-- Geological and geotechnical factors
-- Other factors such as efficiency and mining priorities.
• Apply time variant fields to reduce production rates over specific periods.
• Manual or rules-based resource assignment for individual or pooled resources.
• Resource specific priorities and proximity de-rating for equipment working close
together.
• Incorporate resource-specific maintenance requirements including:
-- Maintenance events based on equipment hours
-- Retire and replace equipment based on a defined lifespan.

Schedule Integration
Bring your plan together

• Copy and paste reports and data directly into Microsoft Excel.
• Easy integration with a number of other scheduling packages.
• Extensive sub-projecting capabilities for multiple schedule inputs.
• Expand functionality with other Deswik modules including:
-- Deswik.CAD through Deswik.IS (Interactive Scheduler)
-- Deswik.Blend (Material Flow Modeling)
-- Deswik.LHS (Landform and Haulage).

Time Management
Account for every second

• Scheduled task duration is calculated in seconds,


allowing for infinitely customizable period reporting.
• Construct detailed time usage models using:
-- Detailed rules based resource calendars
-- Grid based time usage data
-- Comprehensive time based reporting fields.
• Integrate long, medium and short-term plans in one
schedule, set specified planning horizons.

“A powerful Gantt chart scheduler specifically designed to handle the challenges of mine planning”
Our industry leading software solutions include
Deswik.CAD - Design & Solids Modeling A powerful design platform with superior data handling. The next generation of planning tools for mining.

Deswik.Sched - Gantt Chart Scheduling A powerful Gantt chart scheduler specifically designed to handle the challenges of mine planning.

Deswik.IS - Interactive Scheduler Bridging the planning gap between designing and scheduling.

Deswik.LHS - Landform & Haulage Understand material movement like never before with scenario-based modeling and analysis.

Deswik.Blend - Material Flow Modeling Optimize your product value with material flow modeling for both coal and metals.

Deswik.Agg - Coal Seam Aggregation Simplifying complex aggregation processes to create fit for purpose Run-of-Mine reserves.

Deswik.SO - Stope Optimizer Underground stope shape optimization using the industry leading SSO v2.0.

Deswik.ASD - Auto Stope Designer Automatically create mineable stopes for narrow-vein vertical mining methods.

Deswik.OPDB - Open Pit Drill & Blast Fast, efficient drill and blast design for surface mining methods.

Deswik.UGDB - Underground Drill & Blast Fast, efficient drill and blast design for underground mining methods.

Deswik.SOT - Schedule Optimization Tool Realize more value from your resource with an NPV optimized schedule.

Deswik.MDM - Mining Data Management A spatial database and process workflow management tool.

Deswik.FM - File Manager Proactively manage data versioning with an integrated document management system.

Deswik Advanced Modules Advanced functionality tailored to the specialized demands of the specific mining sectors.

www.deswik.com | e: [email protected]

Version 1.3

You might also like