FEASIBILITY/DETAILED PROJECT REPORTS

(COAL / LIGNITE / BAGASSE BASED)

STATUS AS ON AUGUST 25, 2009

Sl. Name of Project Capacity Scope of Work Date of Present


No. Award Status

1. Colgong Super 3000 Preparation of Techno- March Completed


Thermal Power MW economic Project 1976
Station Feasibility Report

2. Ray Super Thermal 2400 Preparation of Techno- March Completed


Power Station MW economic Project 1976
Feasibility Report

3. Indraprastha Thermal 1x200 Preparation of Techno- June198 Completed


Power Station MW economic Project 6
Extension at DESU/ Feasibility Report
I.P. Station

4. Ramagundam 2x210 Preparation of Detailed Nov. Completed


Thermal Power MW Project Report 1988
Station Extension

5. Delhi Electric Supply 200 MW Preparation of Techno- Nov. Completed


Undertaking economic Project 1977
Feasibility Report

6. Coast based Thermal 2x500 Preparation of Feasibility Aug. Completed


Power Station at MW Report 1989
Krishnapatnam in
Andhra Pradesh

7. Muddanur Thermal 2x210 Preparation of Feasibility Aug. Completed


Power Station Stage-II MW Report 1989
in Andhra Pradesh

8. Singareni Collieries 60 MW Preparation of Feasibility May Completed


Co. Ltd. – Captive Report 1989
Power Plant

9. Muzaffarpur Thermal 2x110 Preparation of Detailed Feb. Completed


Power Station MW Project Report and site 1978
investigations
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

10. Captive Power Plant 2x20 MW Preparation of Detailed Aug. Completed


of Heavy Engineering Project Report 1981
Corpn. Ltd.

11. Hindustan Zinc Preparation of Aug. Completed


Limited Feasibility-cum-Project 1985
Report for power
generation by utilising
system steam Pressure
difference between
generation and process
utility in the Waste Heat
Boiler of Roaster Plants

12. Tuticorin Thermal 1x500 Preparation of Feasibility Aug. Completed


Power Station Stage- MW Report 1991
IV

13. Barsingsar Lignite 2x120 Preparation of Detailed Aug. Draft


Thermal Power MW Project Report 1991 Report
Station in Rajasthan Submitted.
of Neyveli Lignite Project
Corporation offered for
privatisatio
n

14. Captive Power Plant 5 MW Preparation of Feasibility Dec. Completed


of M/s Raymond Report 1991
Woollen Mills Ltd.,
Chhindwara, U.P.

15. Muzaffarpur Thermal 2x250 Preparation of Detailed Dec.1992 Completed


Power Station MW Project Report
Extension Stage-II

16. Lignite based Power 250 MW Preparation of Feasibility April Completed


Station Near Ghogha Report and Project 1992
in Bhavnagar Distt., Report
Gujarat

17. Lignite based Power 250 MW Preparation of Feasibility May Completed


Station at Mangrol in Report and Project 1992
Surat Distt., Gujarat Report

18. Korba West Thermal 2x210 Updating of Feasibility June Completed


Power Station by MW Report 1992
Mukand Ltd.
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

19. Gouripore Thermal 2x67.5 Preparation of Project June Completed


Power Station by Birla MW Report 1992
Technical Services

20. Mangalore Thermal 2x150 Preparation of Project Dec. Completed


Power Station by MW Report 1992
Jaiprakash Industries

21. Singareni Collieries 2x110 Preparation of Feasibility Sept. Completed


Co. -Captive Power MW Report 1992
Plant

22. Ramagundam 2x250 Preparation of Detailed April Completed


Thermal Power MW Project Report 1993
Station Extension
Stage-II

23. Kothagudem Thermal 2x250 Preparation of Detailed May Completed


Power Station MW Project Report 1993
Extension Stage-V
Preparation of Feasibility Completed
24. DLF Energy Systems 1x10 MW Dec.
Report
– Captive Power Plant 1992
for Coal Washery
Preparation of Feasibility Completed
25. Metdist Limited, UK – 75 MW Aug.
Report
Captive Thermal 1993
Power Station for
Smelter Complex in
Gujarat

26. Ramagundam 2x250 Preparation of Detailed Oct. Completed


Thermal Power MW Project Report 1993
Station Extension
Stage-II by GVK
Industries

27. Krishnapatnam Coast 4x500 Preparation of Feasibility Dec. Draft


based Thermal Power MW Report 1993 Report
Station Stage-II submitted;
Project
offered for
Privatisatio
n
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

28. Raigarh Thermal 2x500 Preparation of Pre- March Completed


Power Station for MW Feasibility Report 1994
Jindal Strips Ltd.

29. Captive Power Plant 30 MW Preparation of Feasibility April Completed


for Nava Bharat Ferro and Project Report 1994
Alloys Ltd.

30. Captive Power Plant 1x67.5 Preparation of Pre- April Completed


for Orient Paper Mills MW Feasibility Report 1994
at Amlai, M.P.

31. Sabarmati Thermal 1x120 Preparation of Detailed Oct. Completed


Power Station of MW Project Report 1994
Ahmedabad Electricity
Co. Ltd.

32. Captive Power Plant 25 MW Preparation of Feasibility May Completed


for Binani Cement Report considering 1995
lignite/coal or naphtha/
HSD or furnace oil/
diesel as fuel and new or
old plant

33. Kothagudem Thermal 2x250 Preparation of Project Aug. Completed


Power Station MW Report 1995
Extension Stage-VI

34. Captive Power Plant 1x25 MW Preparation of Feasibility Oct. Completed


at Garhwa works for Report 1995
Bihar Caustic &
Chemicals Ltd.

35. North Madras Thermal 1x500 Preparation of Detailed Oct. Completed


Power Station of Tri- MW Project Report 1995
Sakthi Energy Private
Ltd.

36. Captive Power Plant 1x60 MW Preparation of Feasibility Dec. Completed


at Rajmundhry for Report 1995
A.P. Paper Mills Ltd.
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

37. Yamunanagar 2x350 Preparation of Project Feb. Completed


Thermal Power MW Report 1996
Station of United
Development Inc.,
Member of Eisenburg
Group of Companies,
Israel

38. Naraj Thermal Power 2x250 Preparation of Detailed Aug. Completed


Station of India Power MW Project Report 1995
Partners Pvt.Ltd.

39. Lignite based Power 3x120 Preparation of Detailed May Completed


Station near Ghogha MW Project Report
in Bhavnagar Distt.,
Gujarat

40. Sabarmati Thermal 2x30 MW Preparation of Feasibility March Completed


Power Station ‘C’ Report 1996
Phase I & II of The
Ahmedabad Electricity
Co. Ltd.

41. Vijayawada Thermal 1x500 Preparation of Detailed June Completed


Power Station of MW Project Report 1996
APSEB

42. Power Plant at Hazira 10 MW Preparation of Feasibility Oct. Completed


for KRIBHCO Report 1997

43. Goindwal Thermal 2x250 Preparation of Detailed March Completed


Power Station of GVK MW Project Report 1998
Industries

44. Sanjay Gandhi 1x500 Preparation of May Completed


Thermal Power MW Feasibility/ Project 1999
Station of MPEB Report

45. Coal based Thermal 4x250 Preparation of Detailed July 2000 Completed
Power Project at MW Project Report
Maithon Right Bank,
Dhanbad for BSES
Limited

46. Bagasse based 24 MW Preparation of Detailed June Completed


Cogeneration Plant at
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

Sameerwadi in Project Report 2001


Karnataka for
Godavari Sugar Mills
Ltd.

47. Coal based Green 2x500 Preparation of Detailed Dec. Completed


field Thermal Power MW Project Report 2001
Project at Kodarma in
Jharkand for Damodar
Valley Corporation

48. Coal based Green 2x500 Preparation of Detailed Dec. Completed


field Thermal Power MW Project Report 2001
Project at Maithon Left
Bank area in West
Bengal for Damodar
Valley Corporation

49. Coal based Captive 100 MW Preparation of Techno- Dec. Completed


Power Plant in Orissa commercial Feasibility 2001
for Jindal Steel & Report
Power Limited

50. Coal based Thermal 210 MW Preparation of Feasibility Dec. Completed


Power Station at Report 2001
Amarkantak Chachai,
Dist. Shahdol for
Madhya Pradesh
State Electricity Board

51 Coal based Power 50 MW Preparation of Feasibility Feb. Completed


Plant at Binani Zinc, Report 2002
Binanipuram, Kochi –
Binani Industries
Limited

52. IGCC Demonstration 100 MW Preparation of Feasibility May Completed


Plant at Dadri Station Report 2002
of Nexant, USA

53. Yamunanagar 2x250 Preparation of Detailed July 2002 Completed


Thermal Power MW Project Report
Project for Haryana
Power Generation
Corporation Limited
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

54. Biomass based Power 7.5 MW Preparation of Detailed Sept. Completed


Plant at Bellary, Project Report 2003
Karnataka – Shiv Sai
Power Systems Pvt.
Limited

55. Biomass Power Plant 6 MW Preparation of Feasibility Sept. Completed


at Bangalore of Report 2003
Mangalam Energy
Pvt. Ltd.

56. Captive Power Plant 10 MW Preparation of Feasibility Dec. Completed


at Korba of Aryan Report 2003
Coal Benefications
Pvt. Ltd.

57. Independent Power 2x60 MW Preparation of Feasibility Feb. Completed


Plant at Choudwar of Report 2004
Indian Charge
Chrome Ltd.

58. Power Plant at 1x60 MW Preparation of Feasibility Feb. Completed


Mundra SEZ, Dist. Report 2004
Kutch for Mundra
Special Economic
Zone Limited

59. Biomass based Power 5x7.5 Preparation of Project March Completed


Plants in Karnataka MW Report 2004
for Karnataka
Renewable Energy
Development Ltd.

60. Power Plant at 250 MW Preparation of Detailed June Completed


Mundra SEZ, Dist. Project Report 2004
Kutch for Mundra
Special Economic
Zone Limited

61. Super Thermal Power 2x500 Preparation of Feasibility June Completed


Project at Bhaiyathan MW Report 2004
for Chhattisgarh State
Electricity Board

62. Captive Power Plant 3x25 MW Preparation of Detailed June Completed


at Raigarh for Jindal Project Report 2004
Steel & Power Ltd.
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

63. Captive Power Plant 30 MW Preparation of Feasibility July 2004 Completed


at Korba of Aryan Report
Coal Benefications
Pvt. Ltd.

64. Coal/Flue Gas based 10 MW Preparation of Detailed Sept. Completed


Power Plant at Project Report 2004
Choudwar, Dist.
Cuttack in Orissa of
Indian Charge
Chrome Limited

65. Coal/Flue Gas based 25 MW Preparation of Detailed Oct. Completed


Power Plant at Project Report 2004
Choudwar, Dist.
Cuttack in Orissa of
Indian Charge
Chrome Limited

66. Thermal Power Plant 2x500 Preparation of Feasibility Dec. Completed


at Marwa of MW Report 2004
Chhattisgarh State
Electricity Board

67. Power Project in 330 MW Preparation of Pre- Jan. Completed


Rajasthan of Ranhill feasibility Report 2005
(India) Private Limited

68. Thermal Power Plant 100 MW Preparation of Detailed Feb. Completed


in Talcher area of Project Report 2005
Ferro Alloys
Corporation Ltd.

69. Combined Cycle Gas 2x500 Preparation of Pre- Feb. Completed


based Power Plant at MW feasibility Report 2005
Jhajjar for Tata Power
Co. Ltd.

70. Captive Power Plant 3x25 MW Preparation of Techno- May,


of Rawmet Ferrous economic feasibility 2005
Ind. Pvt. Ltd. report

71. Coal based 6-8 MW Preparation of Pre- June, Completed


Cogeneration Plant at feasibility Report 2005
Baddi of Mahavir
Spinning Mills Ltd.
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

(Vardhman Acrylics
Ltd.)

72. Thermal Power 1x250 Preparation of Detailed July 2005 Completed


Station at MW Project Report
Kothagudem, Stage-
VI of Andhra Pradesh
Power Generation
Corporation Limited

73. Thermal Power 2x500 Preparation of Detailed July 2005 Completed


Project at Marwa of MW Project Report
Chhattisgarh State
Electricity Board

74. Thermal Power 1x210 Preparation of Detailed July 2005 Completed


Station at Vijayawada, MW Project Report
Unit-7 of Andhra
Pradesh Power
Generation
Corporation Limited

75. Captive Power Plant 4x150 Preparation of Detailed Sept. Completed


for the New Expansion MW Project Report 2005
Project in Madhya
Pradesh of Hindalco +
Industries Ltd. 1x150
MW

76. Thermal Power 1x500 Preparation of Detailed Completed


Station at MW Project Report
Kothagudem, Stage-
VI of APGENCO

77. Thermal Power 1x250 Preparation of Feasibility Oct. Completed


Project at Akrimota, MW Report 2005
Phase-II of Gujarat
Mineral Development
Corporation Limited

78. Lignite based Power 500 MW Preparation of Feasibility Oct. Completed


Plant at Merta Road, Report 2005
Rajasthan of D S
Constructions Ltd.

79. Coal based Power 500 MW Preparation of Feasibility Oct. Completed


Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

Plant at Chupperbita, Report 2005


Jharkhand of D S
Constructions Ltd.

80. Parichha Thermal 2x250 Preparation of Detailed Oct. Completed


Power Station Extn. of MW Project Report 2005
UP Rajya Vidyut
Utpadan Nigam Ltd.

81. Power Plant at 2x330 Preparation of Feasibility Oct. Completed


Panipat of Weizmann MW Report 2005
Limited

82. Sasan Ultra Mega 5x800 Preparation of Feasibility Feb. Completed


Project at Sasan, MW Report 2006
Madhya Pradesh by
M/s Sasan Power Ltd.

83. Thermal Power 1000/ Preparation of Detailed Mar. Completed


Project at Hisar, 1200 Project Report 2006
Haryana MW

84. Coal based Mega Preparation of Pre- April Completed


Power Project at feasibility Report 2006
Matanhel-Jhajjar,
Haryana of North
Delhi Power Ltd. (Tata
Power Co. Ltd.)

85. Cogeneration Plant at 30 MW Preparation of Detailed May Completed


Sameerwadi of The Project Report 2006
Godavari Sugar Mills
Ltd.

86. Power Plant at Vill. & 4x250 Preparation of Detailed June Completed
Mouza – Palan & MW Project Report 2006
Harin Singha of
Durgapur Power
Limited

87. Coal based Power 5x250 Preparation of Feasibility Aug. Completed


Plant of Shri MW Report 2006
Ramrupuai Balaji
Steels Limited

88. Coal based Coastal 2x500 Preparation of Detailed Sept. Completed


Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

TPP in Maharashtra of MW/ Project Report 2006


Sunflag Iron & Steel 4x250
Co. Ltd. MW

89. Coal based Power 2x35 MW Preparation of Project Oct. Completed


Plant at Chandrapur, Report 2006
Maharashtra of B.S.
Ispat Ltd.
Completed
90. Coal based Power 2x50 MW Preparation of Project Oct.
Plant at Chandrapur, Report 2006
Maharashtra of
Gondwana Ispat Ltd.
Completed
91. Coal based Power 2x135 Preparation of Project Oct.
Plant at Chandrapur, MW Report 2006
Maharashtra of
Baidhyanath Power &
Mining Ltd.
Completed
92. Coal based Power 2x135 Preparation of Project Oct.
Plant at Chandrapur, MW Report 2006
Maharashtra of
Central Collieries Co.
Ltd.

93. Coal based Power 2x500 Preparation of Feasibility Dec. Completed


Plant of Bhaskar MW Report 2006
Group of Publications

94. Tilaiya Ultra Mega 5x800 Preparation of Feasibility Dec. Completed


Project at Tilaiya, MW Report and Project 2006
Jharkhand by M/s Report
Jharkhand Integrated
Power Ltd.

95. Coal based Power 100 MW Preparation of Detailed Jan. Completed


Plant at Nagpur of Project Report 2007
Grace Industries
Limited
Completed
96. Coal based Thermal 1X210 Preparation of Detailed Feb.
Power Plant at MW Project Report 2007
Rayalaseema Stage-
III of APGENCO
Completed
97. Coal based Thermal 2x660 Preparation of Detailed March
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

Power Plant at Jhajjar MW Project Report 2007


of HPGCL
Completed
98. Coal based Thermal 2x250 Preparation of Feasibility April
Power Plant in Dist. MW Report 2007
Sidhi of Aryan Coal
Benefications Pvt. Ltd.

99. Talwandi Sabo 4x500 Preparation of Feasibility May Completed


Thermal Power MW/ Report and Project 2007
Project at Talwandi 3x660 Report
Sabo, Punja by M/s MW/
Talwandi Sabo Power 3x600
Ltd. MW

100. Rajpura Thermal 2x660 Preparation of Feasibility May Completed


Power Project at MW Report and Project 2007
Rajpura, Punjab by Report
M/s Nabha Power Ltd.

101. Captive Power Plant 200 MW Preparation of Techno- July 2007 Completed
in Orissa of Visa Steel economic Feasibility
Limited Report
Completed
102. Kakatiya TPP, Stage- 1x500 + Preparation of Detailed Aug.
II of APGENCO 20% MW Project Report 2007
Completed
103. Rayalaseema TPP, 1x500 + Preparation of Detailed Aug.
Stage-III of 20% MW Project Report 2007
APGENCO
Coal based Power
104. 1320 Preparation of Detailed Aug. Completed
Plant in Karnataka of
MW Project Report 2007
Jewagri Power Private
(2x660
Limited
MW)
Coal based Power
105. 4x125 Preparation of Pre- Aug. On going
Plant at Ghatikhalllage
MW feasibility Report 2007
in Athagarh Tehsil in
Cuttack of Aarti Steels
Limited

Washery Rejects
106. 2x135 Preparation of Detailed Sept. Completed
based TPP at Korba
MW Project Report 2007
District, Chhattisgarh
of Maruti Clean Coal
& Power Ltd.
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status
Coal based Captive
107. 35 MW Preparation of Techno- Sept. Completed
Power Plant at Ras Al
Economic Feasibility 2007
Khimah Cement Plant
Report
in UAE of Star
Cement Co. L.L.C,
UAE
Coal based Power
108. 4x350 Preparation of Techno Dec. Completed
Plant in Dist. Shadol,
MW Economic Feasibility 2007
Madhya Pradesh of
Report and Detailed
Prakash Industries
Project Report
Limited
IPP at Champa-
109. 4x350 Preparation of Techno Feb. On going
Janjgir, Chhattisgarh
MW Economic Feasibility 2008
of Prakash Industries
Report and Detailed
Limited
Project Report
CPP at Champa,
110. 3x350 Preparation of Techno Feb. Completed
Chhattisgarh of
MW Economic Feasibility 2008
Prakash Industries
Report and Detailed
Limited
Project Report
Merchant Power Plant
111. 2x250 Preparation of Detailed March Completed
of SCCL of The
MW Project Report 2008
Singareni Collieries
Company Ltd.
Chandrapura Thermal
112. 3x140 Preparation of Detailed March On going
Power Station of M/s
MW Feasibility Report 2008
Damodar Valley
Corpn.
Durgapur Thermal
113. 1x210 Preparation of Detailed March On going
Power Station of M/s
MW + Feasibility Report 2008
Damodar Valley
1x140M
Corporation
W
Mejia TPS Phase-I &
114. Preparation of Feasibility March On going
II of M/s Damodar
Report, DPR 2008
Valley Corporation
115. Coal fired Power 2x300 Preparation of Feasibility May Completed
Project in UAE of M/s MW Report 2008
Emirates Trading
Agency L.L.C

116. Cogeneration Power 10-12 Preparation of Detailed July 2008 Completed


Plant at Sakarwadi of MW Project Report
M/s Somaiya Organo-
Chemicals
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

117. Captive Power Plant 2x660 Preparation of Detailed Aug. Draft


at Village Padore, MW Project Report 2008 Report
Distt. Anuppur, submitted
Madhya Pradesh of
M/s Prakash Mega
Power Limited

118. Power Plant in 2x660 Preparation of Detailed Aug. Draft


Karnataka of M/s MW Project Report 2008 Report
Atlas Power India submitted
Private Limited

111 Cogeneration Plant at 1x60 MW Preparation of Detailed Aug. In


9. Mirwah Gorchani Project Report 2008 progress
Mirpurkhas, Pakistan
of M/s Al.abbas Sugar
Mills Ltd., Pakistan
120. Gidderbaha Thermal 4x660 Preparation of Feasibility Sept. In
Power Project in MW Report and Project 2008 progress
District Muktsar, Report
Punjab of M/s PFC
Consulting Limited
121. Barsingsar TPS 1x250 Preparation of Feasibility Sept. Draft
Extension of M/s Neyveli MW Report 2008 Report
Lignite Corporation submitted
Limited

122. Orissa Ultra Mega 5x800 Preparation of Feasibility Dec. In


Power Project of M/s MW Report and Project 2008 progress
Orissa Integrated Report
Power Ltd.
Draft
123. Sanjay Gandhi TPS 2x500 Preparation of Feasibility Dec.
Report
Units at Birsingpur, MW/ Report and Detailed 2008
submitted
Umaria of M/s M.P. 1x500 Project Report
Power Generating Co. MW/
Ltd. 2x250
MW
Draft
124. Amarkantak TPS 1x250 Preparation of Feasibility Dec.
Report
Extn. Unit-6 at MW Report and Detailed 2008
submitted
Chachai, Anuppur of Project Report
M/s M.P. Power
Generating Co. Ltd.
125. Akaltara Ultra Mega 5x800 Preparation of Feasibility Jan. In
Power Project of M/s MW Report and Project 2009 progress
Sl. Name of Project Capacity Scope of Work Date of Present
No. Award Status

Akaltara Power Report


Limited
126. Coal based Power 150-200 Preparation of Feasibility Feb. In
Plant in Uttar Pradesh MW Report 2009 progress
of M/s MOSER BAER
127. Bansagar Super 2x800 Preparation of Feasibility March In
Thermal Power MW Report and Detailed 2009 progress
Station of M/s M.P. Project Report
Power Generating Co.
Ltd.
128. Power Plant at Village 40 MW Preparation of Feasibility March In
Joratarai, Tahsil & Report 2009 progress
Dist. Rajnandgaon,
Chhattisgarh of M/s
Akshay Ispat Udyog
Pvt. Ltd.
129. Captive Power Plant 2x40 MW Preparation of Detailed April In
at Jharsuguda, Orissa Project Report 2009 progress
of M/s Action Ispat &
Power (P) Ltd.
130. Additional 3rd Unit at 1x(250- Preparation of Detailed April In
DCRTPP, Yamuna 300) MW Project Report 2009 progress
Nagar of M/s HPGCL

131. Kothapeta Ultra Mega 5x800 Preparation of Feasibility June In


Power Project in MW Report and Project 2009 progress
Andhra Pradesh of Report
M/s PFC Consulting
Limited

132. Power Plant at Village 3x150 Preparation of Detailed June In


Sakharwahi, Dist. MW Project Report 2009 progress
Chandrapur,
Maharashtra of M/s
B.S. Ispat Ltd.

133. Power Plant at 1x80 MW Preparation of Detailed July 2009 In


Raigarh, Chhattisgarh Project Report progress
of M/s Monnet Ispat &
Energy Ltd.
FEASIBILITY/DETAILED PROJECT REPORTS
(COMBINED CYCLE GAS BASED)
Feasibility/Detailed Project Reports (Combined Cycle Gas based):
Sl. Name of Project Capacit Scope of Work Date of Present
No y Award Status
.
1. 600 MW Gas based 600 MW Preparation of Feasibility June Completed
Combined Cycle Power study and Project Report 1988
Station at Gandhinagar
2. 30 MW Gas based 30 MW Preparation of a Project June Completed
Combined Cycle Power Report 1988
Station at Ankleshwar
Sl. Name of Project Capacit Scope of Work Date of Present
No y Award Status
.
3. 210 MW Gas based 210 MW Preparation of Detailed Feb. Completed
Combined Cycle Power Project Report 1989
Station at Jagdishpur
4. 600 MW Gas based 600 MW Preparation of Detailed Feb. Completed
Combined Cycle Power Project Report 1989
Station in Western U.P.
5. Gas based Combined 135 MW Preparation of Feasibility Nov. Completed
Cycle Power Station at Report 1989
Ankleshwar
6. Utran Gas based 135 MW Preparation of a Project Nov. Completed
Combined Cycle Power Report 1989
Station Extn.
7. Gas based Combined 200 MW Preparation of a Project Jan. Completed
Cycle Power Station at Report 1990
Gandinagar
8. Gas based Combined 300 MW Preparation of Feasibility May Completed
Cycle Power Station in Report and Detailed 1990
North Gujarat Project Report
9. Gas based Combined 615 MW Preparation of a Project June Completed
Cycle Power Station at Report 1990
Pipavav
10. Gas based Combined 600 MW Preparation of Feasibility July 1990 Completed
Cycle Power Station at Report and Detailed
Shahjahanpur Project Report
11. Gas based Combined 600 MW Preparation of Feasibility July 1990 Completed
Cycle Power Station at Report and DPR
Aonla
12. Gas based Combined 2x615 Preparation of Feasibility Aug. Completed
Cycle Power Station at MW Report and DPR 1990
Sinor
13. Gas based Combined 400 MW Preparation of Detailed Aug. Completed
Cycle Power Station at Project Report 1990
Jegurupadu near
Rajahmundry
14. Delhi Electric Supply 2x60 Preparation of techno- Nov. Completed
Undertaking MW economic Feasibility 1977
Report for 2x60 MW Gas
Turbines
15. Delhi Electric Supply 3x60 Preparation of techno- May Completed
Sl. Name of Project Capacit Scope of Work Date of Present
No y Award Status
.
Undertaking MW economic Feasibility 1984
Report for 3x60 MW Gas
Turbines
16. Gas based Power Plant 3 MW Preparation of Feasibility Sept. Completed
at Ramgarh in Rajasthan Report 1989
17. Gas based Captive 3 MW Preparation of Feasibility April Completed
Power Station for Report 1991
Sodium Metal Pvt. Ltd.,
Gujarat
18. Gas based Combined 400 MW Updating of Project March Completed
Cycle Power Station at Report for setting up the 1992
Jegurupadu Project by GVK
Industries
19. Gas based Combined 200 MW Project Report for setting Oct. Completed
Cycle Power Station at up the Project by GVK 1992
Jegurupadu Industries Ltd.
20. Gas based Combined 615 MW Preparation of Project April Completed
Cycle Power Station at Report 1993
Pipavav
21. Naphtha based 120-150 Preparation of Detailed April Completed
Combined Cycle Power MW Project Report 1995
Station at Khandwa of
Subhash Projects &
Marketing Ltd.
22. Gas based Combined 160 MW Preparation of Detailed Oct. Completed
Cycle Power Station Project Report 1995
Extension at Vijjeswaram
23. Naphtha based 330 MW Preparation of Detailed Jan. Completed
Combined Cycle Power Project Report 1995
Station at Jhabua of
Kedia Power Ltd.
24. Gas based Combined 286 MW Preparation of Detailed Nov. Completed
Cycle Power Station at Project Report 1994
Amguri of India Power
Partners Pvt. Ltd.
25. Naphtha based 130 MW Preparation of Detailed Aug. Completed
Combined Cycle Power Project Report 1995
Station at Mandya of
India Power Partners
Pvt. Ltd.
Sl. Name of Project Capacit Scope of Work Date of Present
No y Award Status
.

26. Naphtha based 2x25 Preparation of Detailed March Completed


Combined cycle Power MW Project Report 1996
Plant at Bahadurgarh of
SUL Power Partners
27. Naphtha based 1000 Preparation of Pre- Feb. Completed
Combined Cycle Power MW Feasibility Report 1996
Plant at Kuttapalli of
Kedia Power Ltd.
28. Utran Gas based 300 MW Preparation of Detailed May Completed
Combined Cycle Power Project Report 1998
Station Extension
29. Power Project in Gujarat 200 MW Preparation of Pre- May Completed
for KRIBHCO Feasibility Report 1998

30. Gas based Combined 160 MW Preparation of Detailed May Completed


Cycle Power Project at Project Report 1998
Hazira for Gujarat State
Petroleum Corporation
31. Gas based Combined 615 MW Preparation of Pre- Sept. Completed
Cycle Power Project at Feasibility study Report 1998
Pipavav for KRIBHCO
32. Gas based Combined 100 MW Preparation of Detailed Nov. Completed
Cycle Power Project at Project Report 1999
Dhuvaran of Gujarat
State Electricity
Corporation Ltd.
33. Combined Cycle Power 105 MW Preparation of Detailed April Completed
Project at Ago-Oja, Project Report 2001
IIorin, Nigeria of BC
Projects Ltd., UK
34. LNG/Natural Gas based 156 MW Preparation of Project March Completed
Combined Cycle Power Report 2001
Project Expansion at
Hazira of Guj.State
Energy Gen. Ltd.

35. Gas based Power Plants 10-15 Preparation of Detailed July 2002 Completed
at Hazira, Vaghodia & MW Feasibility Reports
Khera for Gas Authority
Sl. Name of Project Capacit Scope of Work Date of Present
No y Award Status
.
of India Ltd.
36. Natural Gas/ LNG based 370 MW Preparation of Detailed Oct. Completed
Combined Cycle Power Project Report & 2002
Project at Utran of Comprehensive Report
Gujarat State Electricity for Railway siding and
Corporation Ltd. approach Road

37. Natural Gas/ LNG based 107 MW Preparation of Feasibility June Completed
Combined Cycle Power Report & Detailed Project 2003
Project at Utran of Report
Gujarat State Electricity
Corporation Ltd.
38. Gas based Power 6 MW Preparation of Feasibility July 2003 Completed
Station (s) at Katargam Report
Water Works, Head
Water Works & Sarthana
Water Works of Surat
Municipal Corporation
39. Natural Gas based CPP 60 MW Preparation of Feasibility Nov. Completed
at DLF City, Gurgaon of Report 2003
DLF Universal Ltd.
40. Dhuvaran CCPP Stage-II 395 MW Preparation of Pre- May Completed
for Gujarat State feasibility Report, 2005/
Electricity Corporation Detailed Project Report & Oct.
Ltd. EIA Studies 2007
41. Gas based Combined 600 MW Preparation of Feasibility Oct. Completed
Cycle Power Plant at Report 2005
Panipat of Weizmann
Limited
42. Gas based CCPP near 1000 Preparation of Project April Completed
Kakinada, A.P. of MW Report 2006
Suryachakra Power
Corpn. Ltd.
43. Gas based Simple Cycle 51 MW Preparation of Detailed April Completed
Power Plant at Project Report 2007
Sharourah in Saudi
Arabia – Saudi Electricity
Company
44. Gas based Simple Cycle 131 MW Preparation of Detailed April Completed
Power Plant at Tihama in Project Report 2007
Saudi Arabia – Saudi
Sl. Name of Project Capacit Scope of Work Date of Present
No y Award Status
.
Electricity Company
45. Gas based Simple Cycle 263.084 Preparation of Detailed April Completed
Power Plant at Jazan in MW Project Report 2007
Saudi Arabia – Saudi
Electricity Company
46. Gas based Combined 108 MW Preparation of Feasibility Sept. Completed
Cycle Power Plant at Report 2007
Rithala, New Delhi –
North Delhi Power Ltd.
47. Basin Bridge Gas 4x30 Preparation of Detailed April Completed
Turbine Power Station of MW Project Report 2008
Tamil Nadu Electricity
Board

FEASIBILITY/DETAILED PROJECT REPORTS


(DIESEL / HYDEL)

Sl. Name of Project Capacity Scope of Work Date of Present


No Award Status
.
Completed
1. Diesel based Power 100 MW Preparation of detailed May
Station in Andhra project report 1989
Pradesh
Completed
2. Fertiliser Corporation of Preparation of pre- March
India Ltd. feasibility report for 1988
captive power plants at
Gorakhpur (60 MW),
Ramagundam (60 MW)
and Talcher (30 MW)
Completed
3. Installation of 13 300 kW Preparation of detailed Decembe
Mini/Micro Hydel Power to 750 project reports for 13 r 1988
Stations on Miyagam and Kw schemes of sizes varying
Vadodara Branch Canal from 300 kW to 750 Kw
of Narmada Main Canal
Completed
4. Diesel based Captive 30 MW Preparation of feasibility March
Power Station at report and market survey 1992
Talanagari, U.P.
Completed
5. Diesel Power Plant at 100 MW Preparation of detailed June
Ghaziabad of Modi project report 1995
Rubber Ltd.
Completed
6. Diesel Power Plant at 130 MW Preparation of detailed April
Mandya of India Power project report 1995
Partners Pvt. Ltd.
Completed
7. Diesel Power Plant at 130 MW Preparation of detailed
Chandausi of India project report
Power Partners Pvt. Ltd.
Completed
8. Diesel Power Plant at 100 MW Preparation of detailed Novembe
Gwalior of Tomen project report r 1994
Corporation