WELDING EXPERTS Explore the additional benefits of our multidisciplinary
approach, including:

PROVIDING WORLD- - Cost-savings


CLASS QUALITY Prefabrication leads to faster build times and to less labour
and material costs. Off-site construction does not
interrupt or shut-down pre-existing operations.
Stork is your prefabrication partner for greenfield
installations and brownfield modifications. We support - Increased Safety
EPC contractors in new build projects, but also owners Prefabrication occurs in ideal shop conditions. Products
and operators in brownfield modifications to their undergo complete testing prior to installation. Safety risks
existing installations. We combine prefabrication, detail are reduced for plant personnel due to fewer on-site
engineering and extra services into complete solutions hours.
for both onshore and offshore installations in the
chemical, power, oil & gas and other markets. - Improved project quality
Our efficient in-shop line fabrication results in better
Besides the specialized prefabrication of piping, we control and higher quality.
integrate multiple disciplines into the construction of
modules and skids. A modular approach using - Complete traceability
prefabrication ultimately leads to better quality and faster Our Business Process Management software (PRINCE)
completion times of your projects. gives a real-time project progress at any time and
guarantees full traceability of both prefabrication and
installation on-site.

- Reduced and predictable build times


Prefabrication occurs in parallel with civil and facilities
work on-site. Weather delays and interference through
bad access are eliminated by perfect in-shop conditions.

- One interface for prefabrication and installation


Stork can act as the complete solution provider from
prefabrication to installation on-site, offering you flawless
installation by a single source.

STORK TECHNICAL SERVICES


www.storktechnicalservices.com
www.stork.com
HOW WE ADD VALUE:
Highly qualified and trained experts Multidisciplinary approach
Educated in our very own welding school and with many Besides the prefabrication of piping, we offer multidisciplinary
years of experience, our welders are our most valuable assets. constructions, combining structural and equipment
Stork’s own Nondestructive Evaluation (NDE) operators apply installation, insulation, painting, electrical and instrumentation
the highest level of technical expertise to analyze material and other elements. By doing so, we minimize the number of
properties, and locate and characterize flaws within materials, interfaces for you as a project owner. Your benefit: flawless
fabricated parts and assemblies. installation by a single source.

High efficiency rotating welding processes Transport of all sizes - to all locations
Our fabrication shop uses semi-automatic and submerged arc Created in our indoor prefabrication facility [10.000m²], our
welding. Our capabilities include the fabrication and welding indoor assembly area [6000m²] or at our outdoor assembly
of all Carbon Steel. Stork is as one of the only manufacturers of area [3000m²], our prefab piping, modules and skids can
piping capable of working with low alloy Stainless Steel, Nikkel load-out on ships or barges including cranes, floating cranes
alloys, Duplex materials and Cr-Mo alloys. or Ro-Ro.

Transparency and traceability for world-class quality


Our own developed Business Process Management software HIGHLIGHTS
(PRINCE) provides a fully automated registration of our
production process. This gives a real-time project progress at Materials:
any time and guarantees full traceability on all welding - Steels: austenitic stainless, stainless, high strength
parameters. - Alloys: high temperature, high nickel,
titanium, copper
Certifications - proof of the pudding - Other: duplex & specials (353 MA, Sandvix MX)
Stork can act as a manufacturer for fabrication, installation and - Diameter: 1/2” up to 42”
testing for prefabricated piping, modules and skids according - Wall Thickness: 1.5mm up to 70mm
to Pressure Equipment Directive guidelines:
- Production according to PED-requirements (all categories) Fabrication:
- Composition of administrative procedures and mandatory - Highly efficient line fabrication
manuals; - Rotating welding processes (SAW, FCAW)
- CE certification of equipment - Qualified and trained welding experts (90 fte)
- 180.000 production hours per year

Facilities:
- Large stock area
- Indoor prefabrication facility [10.000m²]
- Indoor & Outdoor assembly area [6000m³ + 3000m²]
- Located in the centre of the harbour
- Lifting capacity with overhead cranes: 60 tons
- Indoor skid construction dimensions:
l 30m x w 20m x h 16m