Project: Pro.

-Number: Page:
Spirit of Saigon 280577-001 1
HCMC Condition:
Vietnam Position 1

This design only applies to the designated HALFEN product. The load bearing
capacity of third party products, appearing to be identical in construction, might
differ. For this reason the provider of the design does not extend warranty if non-
HALFEN products are used.

Channel & Design Method

Anchor channel HTA-CE 52/34 - FV - 300 / 2 (2 anchors)


T-bolt HSR 50/30 M16 8.8

Design method EN 1992-4, EOTA TR047 & HALFEN method

Base material & boundary conditions

Concrete C30/37 cracked


Surface reinforcement No dense reinforcement present
Edge reinforcement No edge reinforcement
Supplementary reinf.: None (for tension)
None (edge parallel to channel)
None (edge 90° to channel)

Slab thickness h = 700 mm


Edge distance c1,1 = 445 mm
Edge distance c1,2 = 155 mm
End distance e1 = 45 mm
End distance e2 = N/A
Concrete cover cnom = 20 mm

T-bolt loads

#1 #2 #3 #4
NcbEd 27,25 kN 0,00 kN 0,00 kN 0,00 kN
VcbEd,y 4,13 kN 0,00 kN 0,00 kN 0,00 kN
VcbEd,x 1,24 kN 0,00 kN 0,00 kN 0,00 kN
T-bolt spacing x1 = 45 mm 0 mm 0 mm 0 mm

Shear load: Without lever arm

Utilization 89,2% - All verifications successful!

Dipl.-Ing. Dirk Borgstede


21.01.2020
HALFEN GmbH | RDE
Project: Pro.-Number: Page:
Spirit of Saigon 280577-001 2
HCMC Condition:
Vietnam Position 1

Summary of results

Verification of T-bolts
Tension NRd,s = 83,73 kN NcbEd = 27,25 kN 32,5%
Shear without lever arm VRd,s = 50,24 kN VcbEd = 4,31 kN 8,6%
Shear with lever arm VRd,s,M = - VcbEd = - N/A
Combined load 11,3%

Steel verifications of channel


Channel lips | Tension NRd,s,l = 40,00 kN NEd,s,l = 27,25 kN 68,1%
Channel lips | Transverse shear VRd,s,l,y = 43,33 kN VEd,s,l,y = 4,13 kN 9,5%
Channel lips | Longitudinal shear VRd,s,l,x = 5,83 kN VEd,s,l,x = 1,24 kN 21,2%
Combined load 76,5%

Local flexure of channel MRd,s,flex = 2933 Nm MEd,s,flex = 1567 Nm 53,4%

Connection anchor - channel | Tension NRd,s,c = 31,11 kN NaEd = 17,69 kN 56,9%


Connection anchor - channel | Transv. Shear VRd,s,c,y = 43,33 kN VaEd,y = 2,68 kN 6,2%
Connection anchor - channel | Long. Shear VRd,s,c,x = 18,67 kN VaEd,x = 0,62 kN 3,3%
Combined load 35,4%

Anchor | Tension NRd,a,c = 31,11 kN NaEd = 17,69 kN 56,9%


Anchor | Transverse shear VRd,s,a,y = 43,33 kN VaEd,y = 2,68 kN 6,2%
Anchor | Longitudinal shear VRd,s,a,x = 18,67 kN VaEd,x = 0,62 kN 3,3%
Combined load 35,4%

Concrete verifications
Tension
Pull-Out failure NRd,p = 49,50 kN NaEd = 17,69 kN 35,7%
Concrete cone failure NRd,c = 21,39 kN NaEd = 17,69 kN 82,7%
Splitting failure NRd,c = - NaEd = - N/A
Concrete blow-out N/A

Transverse shear
Pry-out failure VRd,cp,y = 42,78 kN VaEd,y = 2,68 kN 6,3%
Concrete failure | Edge parallel to channel VRd,c,y = 16,05 kN VaEd,y = 2,68 kN 16,7%
Concrete failure | Edge 90° to channel VRd,c,90°,y= 10,96 kN VaEd,y = 2,68 kN 24,4%

Longitudinal shear
Pry-out failure VRd,cp,x = 96,15 kN VaEd,x = 1,24 kN 1,3%
Concrete failure | Edge 90° to channel VRd,c,x = 8,86 kN VaEd,x = 0,62 kN 7,0%
Concrete failure | Edge parallel to channel VRd,c,90°,x= 43,83 kN VaEd,x = 0,62 kN 1,4%

Supplementary reinforcement
Tensile reinforcement NRd,re = - NaEd = - N/A
Shear reinforcement | Edge parallel to channel VRd,re,y = - VaEd,y = - N/A
Shear reinforcement | Edge 90° to channel VRd,re,x = - VaEd,x = - N/A

Combined load
Tension - Shear (x) - Shear (y) βN,c | βV,y,c | βV,x,c 89,2%
89%
Dipl.-Ing. Dirk Borgstede
21.01.2020
HALFEN GmbH | RDE
Project: Pro.-Number: Page:
Spirit of Saigon 280577-001 3
HCMC Condition:
Vietnam Position 1

Detailed results

Verification of T-bolts

Tension EN 1992-4, 7.4.1.3 (1)

T-bolt No. 1 Load position x1 = 45 mm


NRk,s = 125,60 kN γMs,s = 1,50 NRd,s = 83,73 kN NcbEd = 27,25 kN
βcbN = 32,5%

Shear without lever arm EN 1992-4, 7.4.2.3.1

T-bolt No. 1 Load position x1 = 45 mm


VRk,s = 62,80 kN γMs,s = 1,25 VRd,s = 50,24 kN VcbEd = 4,31 kN
βcbV = 8,6%

Combined load EN 1992-4, 7.4.3.1

T-bolt No. 1 Load position x1 = 45 mm βN2 + βV2 = 11,33%

Shear with lever arm EN 1992-4, 7.4.2.3.2

T-bolt No. - Load position x1 = -


M0Rk,s = - MRk,s = - NcbEd = - NRd,s = -
αM = - la = - VRk,s,M = - γMs,s = -
VRd,s = - VcbEd = - βcbV,M = -

Dipl.-Ing. Dirk Borgstede


21.01.2020
HALFEN GmbH | RDE
Project: Pro.-Number: Page:
Spirit of Saigon 280577-001 4
HCMC Condition:
Vietnam Position 1

Steel verifications of channel

Channel lips | Tension EN 1992-4, 7.4.1.3 (1)

T-bolt No. 1 Load position x1 = 45 mm


NRk,s,l = 72,00 kN γMs,s = 1,80 NRd,s,l = 40,00 kN NEd,s,l = 27,25 kN
ψLN = 1,0 βN,s,l = 68,1%

Channel lips | Transverse shear EN 1992-4, 7.4.2.3.1

T-bolt No. 1 Load position x1 = 45 mm


VRk,s,l,y = 78,00 kN γMs,s = 1,80 VRd,s,l,y = 43,33 kN VEd,s,l,y = 4,13 kN
ψLV = 1,0 βV,s,l,y = 9,5%

Channel lips | Longitudinal shear EOTA TR 047, B.6.2.2.2.4

T-bolt No. 1 Load position x1 = 45 mm


VRk,s,l,x = 12,60 kN γMs,s = 1,80 γinst = 1,20 VRd,s,l,x = 5,83 kN
VEd,s,l,x = 1,24 kN βV,s,l,x = 21,2%

Channel lips | Combined load EOTA TR 047, B.6.3.1.3

T-bolt No. 1 Load position x1 = 45 mm

NRd,s,l = 40,00 kN MRd,s,flex = 2933 Nm VRd,s,l,y = 40,00 kN VRd,s,l,x = 5,83 kN


NEd,s,l = 27,25 kN MEd,s,flex = 1567 Nm VEd,s,l,y = 4,13 kN VEd,s,l,x = 1,24 kN
k13 = 2,0 βN/Vy/Vx : 76,48%

Local flexure of channel EN 1992-4, 7.4.1.3 (1)

T-bolt No. 1 Load position x1 = 45 mm


MRk,s,flex = 3373 Nm γMs,s = 1,15 MRd,s,flex = 2933 Nm MEd,s,flex = 1567 Nm
βN,s,flex = 53,4%

Dipl.-Ing. Dirk Borgstede


21.01.2020
HALFEN GmbH | RDE
Project: Pro.-Number: Page:
Spirit of Saigon 280577-001 5
HCMC Condition:
Vietnam Position 1

Steel verifications of channel

Connection anchor - channel | Tension EN 1992-4, 7.4.1.3 (1)

Anchor No. 1 Load position x1 = 45 mm


NRk,s,c = 56,00 kN γMs,s = 1,80 NRd,s,c = 31,11 kN NaEd = 17,69 kN
βN,s,c = 56,9%

Connection anchor - channel | Transverse shear EN 1992-4, 7.4.2.3.1 (1)

Anchor No. 1 Load position x1 = 45 mm


VRk,s,c,y = 78,00 kN γMs,s = 1,80 VRd,s,c,y = 43,33 kN VaEd,y = 2,68 kN
βV,s,c,y = 6,2%

Connection anchor - channel | Longitudinal shear EOTA TR 047, B.6.2.2.2.3

Anchor No. 1 Load position x1 = 45 mm


VRk,s,c,x = 33,60 kN γMs,s = 1,80 VRd,s,c,x = 18,67 kN VaEd,x = 0,62 kN
βV,s,c,x = 3,3%

Connection anchor - channel | Combined load EOTA TR 047, B.6.3.1.4

Anchor No. 1 Load position x1 = 45 mm

NRd,s,a = 31,11 kN VRd,s,a,y = 43,33 kN VRd,s,a,x = 18,67 kN k14 = 2,0


NaEd = 17,69 kN VaEd,y = 2,68 kN VaEd,x = 0,62 kN
NRd,s,c = 31,11 kN VRd,s,c,y = 43,33 kN VRd,s,c,x = 18,67 kN
NaEd = 17,69 kN VaEd,y = 2,68 kN VaEd,x = 0,62 kN βN/Vy/Vx : 35,4%

Dipl.-Ing. Dirk Borgstede


21.01.2020
HALFEN GmbH | RDE
Project: Pro.-Number: Page:
Spirit of Saigon 280577-001 6
HCMC Condition:
Vietnam Position 1

Steel verifications of channel

Anchor | Tension EN 1992-4, 7.4.1.3 (1)

Anchor No. 1 Load position x1 = 45 mm


NRk,s,a = 56,00 kN γMs,a,N = 1,80 NRd,s,a = 31,11 kN NaEd = 17,69 kN
βN,s,a = 56,9%

Anchor | Transverse shear EN 1992-4, 7.4.2.3.1 (2)

Anchor No. 1 Load position x1 = 45 mm


VRk,s,a,y = 78,00 kN γMs,a,y = 1,80 VRd,s,a,y = 43,33 kN VaEd,y = 2,68 kN
βV,s,a,y = 6,2%

Anchor | Longitudinal shear EOTA TR 047, B.6.2.2.2.2

Anchor No. 1 Load position x1 = 45 mm


VRk,s,a,x = 33,60 kN γMs,a,x = 1,80 VRd,s,a,x = 18,67 kN VaEd,x = 0,62 kN
βV,s,a,x = 3,3%

Anchor | Combined load EOTA TR 047, B.6.3.1.4

Anchor No. 1 Load position x1 = 45 mm

NRd,s,a = 31,11 kN VRd,s,a,y = 43,33 kN VRd,s,a,x = 18,67 kN k14 = 2,0


NaEd = 17,69 kN VaEd,y = 2,68 kN VaEd,x = 0,62 kN
NRd,s,c = 31,11 kN VRd,s,c,y = 43,33 kN VRd,s,c,x = 18,67 kN
NaEd = 17,69 kN VaEd,y = 2,68 kN VaEd,x = 0,62 kN βN/Vy/Vx : 35,4%

Dipl.-Ing. Dirk Borgstede


21.01.2020
HALFEN GmbH | RDE
Project: Pro.-Number: Page:
Spirit of Saigon 280577-001 7
HCMC Condition:
Vietnam Position 1

Concrete verifications | Tension loads

Pull-Out failure EN 1992-4, 7.4.1.4

Anchor No. 1 Load position x1 = 45 mm

NRk,p = 74,25 kN γMs,c = 1,50 NRd,p = 49,50 kN NaEd = 17,69 kN


k2 = 7,5 Ah = 330 mm2 fck = 30 MPa βN,p = 35,7%

Concrete cone failure EN 1992-4, 7.4.1.5

Anchor No. 1 Load position x1 = 45 mm

N0Rk,c = 91,98 kN k1 = 8,7 fck = 30 MPa hef = 155 mm


ψch,s,N = 0,816 ψch,e,N = 0,771 ψch,c,N = 0,554 ψch,re,N = 1,000
NRk,c = 32,09 kN γMs,c = 1,50 NRd,c = 21,39 kN NaEd = 17,69 kN
βN,c = 82,7%

Splitting failure EN 1992-4, 7.4.1.6

Anchor No. - Load position x1 = -

N0Rk = - ψh,sp = - hmin = - hef = -


ψch,s,N = - ψch,e,N = - ψch,c,N = - ψch,re,N = -
NRk,sp = - γMs,c = - NRd,sp = - NEd,sp = -
βN,c = -

Cracked concrete - No splitting verification necessary!

Concrete blow-out EN 1992-4, 7.4.1.7

c 1 , c 2 ≥ 0.5 x h ef Verification for blow-out failure not necessary!

Dipl.-Ing. Dirk Borgstede


21.01.2020
HALFEN GmbH | RDE
Project: Pro.-Number: Page:
Spirit of Saigon 280577-001 8
HCMC Condition:
Vietnam Position 1

Concrete verifications | Transverse shear loads

Pry-out failure EN 1992-4, 7.4.2.4

Anchor No. 1 Load position x1 = 45 mm

NRk,c = 32,09 kN k8 = 2,0 VRk,cp,y = 64,18 kN γMs,c = 1,50


VRd,cp,y = 42,78 kN a
V Ed,y = 2,68 kN βV,cp,y = 6,3%

Concrete edge failure | Edge parallel to channel EN 1992-4, 7.4.2.5

Anchor No. 1 Load position x1 = 45 mm

V0Rk,c,y = 139,56 kN k12 = 7,5 fck = 30 MPa c1 = 445 mm


ψch,s,V = 0,692 ψch,c,V = 0,291 ψch,h,V = 0,855 ψch,re,V = 1,00
ψch,90°,V = 1,00 VRk,c,y = 24,08 kN γMs,c = 1,50 VRd,c,y = 16,05 kN
VaEd,y = 2,68 kN βV,c,y = 16,7%

Concrete edge failure | Edge 90° to channel EN 1992-4, 7.4.2.5 (6)

Anchor No. 1 Load position x1 = 45 mm

V0Rk,c,y = 6,58 kN k12 = 7,5 fck = 30 MPa c1 = 80 mm


ψch,s,V = 1,000 ψch,c,V = 1,000 ψch,h,V = 1,000 ψch,re,V = 1,00
ψch,90°,V = 2,50 VRk,c,y = 16,44 kN γMs,c = 1,50 VRd,c,90°,y= 10,96 kN
VaEd,y = 2,68 kN βV,90°,y = 24,4%

Dipl.-Ing. Dirk Borgstede


21.01.2020
HALFEN GmbH | RDE
Project: Pro.-Number: Page:
Spirit of Saigon 280577-001 9
HCMC Condition:
Vietnam Position 1

Concrete verifications | Longitudinal loads

Pry-out failure EOTA TR 047, B.6.2.2.3

Anchor No. 2 Load position x1 = 45 mm

NRk,c = 72,11 kN k8 = 2,0 VRk,cp,x = 144,22 kN γMs,c = 1,50


VRd,cp,x = 96,15 kN VaEd,x = 1,24 kN βV,cp,x = 1,3%

Concrete edge failure | Edge 90° to channel EOTA TR 047, B.6.2.2.4.2

Anchor No. 1 Load position x1 = 45 mm

V0Rk,c = 13,30 kN k9 = 1,7 da = 12 mm α = 0,139


hef = 155 mm β = 0,068 fck = 30 MPa c1 = 80 mm
ψs,V = 1,000 ψh,V = 1,000 ψre,V = 1,00 A0c,V = 28800 mm2
Ac,V = 28800 mm2 VRk,c,x = 13,30 kN γMs,c = 1,50 VRd,c,x = 8,86 kN
VaEd,x = 0,62 kN βV,c,x = 7,0%

Concrete edge failure | Edge parallel to channel EOTA TR 047, B.6.2.2.4.3

Anchor No. 1 Load position x1 = 45 mm

V0Rk,c = 129,29 kN k9 = 1,7 da = 12 mm α = 0,059


hef = 155 mm β = 0,049 fck = 30 MPa c1 = 445 mm
ψs,V = 0,720 ψh,V = 1,000 ψre,V = 1,00 A0c,V = 891113 mm2
Ac,V = 629119 mm2 VRk,c,x = 65,74 kN γMs,c = 1,50 VRd,c,x = 43,83 kN
VaEd,x = 0,62 kN βV,c,x = 1,4%

Dipl.-Ing. Dirk Borgstede


21.01.2020
HALFEN GmbH | RDE
Project: Pro.-Number: Page:
Spirit of Saigon 280577-001 10
HCMC Condition:
Vietnam Position 1

Concrete verifications | Combined loads EOTA TR 047, B.6.3.1.5

Anchor No. 1 Load position x1 = 45 mm

or

(only applicable if Vx = 0)

βN,c = 82,7% βV,c,y = 24,4% βV,c,x = 7,0% βc,comb 1 = 89,2%


βc,comb 2 = N/A

Notes:
The cast-in channel has to installed surface flush.
For the required tightening torque please refer to the installation instructions.
Steel - steel contact has to be ensured in all instances.

Dipl.-Ing. Dirk Borgstede


21.01.2020
HALFEN GmbH | RDE