Position 1 - HTA-CE 5234
Position 1 - HTA-CE 5234
Position 1 - HTA-CE 5234
-Number: Page:
Spirit of Saigon 280577-001 1
HCMC Condition:
Vietnam Position 1
This design only applies to the designated HALFEN product. The load bearing
capacity of third party products, appearing to be identical in construction, might
differ. For this reason the provider of the design does not extend warranty if non-
HALFEN products are used.
T-bolt loads
#1 #2 #3 #4
NcbEd 27,25 kN 0,00 kN 0,00 kN 0,00 kN
VcbEd,y 4,13 kN 0,00 kN 0,00 kN 0,00 kN
VcbEd,x 1,24 kN 0,00 kN 0,00 kN 0,00 kN
T-bolt spacing x1 = 45 mm 0 mm 0 mm 0 mm
Summary of results
Verification of T-bolts
Tension NRd,s = 83,73 kN NcbEd = 27,25 kN 32,5%
Shear without lever arm VRd,s = 50,24 kN VcbEd = 4,31 kN 8,6%
Shear with lever arm VRd,s,M = - VcbEd = - N/A
Combined load 11,3%
Concrete verifications
Tension
Pull-Out failure NRd,p = 49,50 kN NaEd = 17,69 kN 35,7%
Concrete cone failure NRd,c = 21,39 kN NaEd = 17,69 kN 82,7%
Splitting failure NRd,c = - NaEd = - N/A
Concrete blow-out N/A
Transverse shear
Pry-out failure VRd,cp,y = 42,78 kN VaEd,y = 2,68 kN 6,3%
Concrete failure | Edge parallel to channel VRd,c,y = 16,05 kN VaEd,y = 2,68 kN 16,7%
Concrete failure | Edge 90° to channel VRd,c,90°,y= 10,96 kN VaEd,y = 2,68 kN 24,4%
Longitudinal shear
Pry-out failure VRd,cp,x = 96,15 kN VaEd,x = 1,24 kN 1,3%
Concrete failure | Edge 90° to channel VRd,c,x = 8,86 kN VaEd,x = 0,62 kN 7,0%
Concrete failure | Edge parallel to channel VRd,c,90°,x= 43,83 kN VaEd,x = 0,62 kN 1,4%
Supplementary reinforcement
Tensile reinforcement NRd,re = - NaEd = - N/A
Shear reinforcement | Edge parallel to channel VRd,re,y = - VaEd,y = - N/A
Shear reinforcement | Edge 90° to channel VRd,re,x = - VaEd,x = - N/A
Combined load
Tension - Shear (x) - Shear (y) βN,c | βV,y,c | βV,x,c 89,2%
89%
Dipl.-Ing. Dirk Borgstede
21.01.2020
HALFEN GmbH | RDE
Project: Pro.-Number: Page:
Spirit of Saigon 280577-001 3
HCMC Condition:
Vietnam Position 1
Detailed results
Verification of T-bolts
or
(only applicable if Vx = 0)
Notes:
The cast-in channel has to installed surface flush.
For the required tightening torque please refer to the installation instructions.
Steel - steel contact has to be ensured in all instances.