Piping Symbols
Piping Symbols
Piping Symbols
gate valve
3-way thermostatic
globe valve
Munchkin heater
ball valve pressure gauge
swing-check valve
4-way motorized
mixing valve
flow-check valve
air separator
diaphragm-type
expansion tank
radiant manifold
Fig. 8-1
18
PIPING
zone valves
make-up water
P1
flow
purging bypass
valves valve
V1
OFF
anti-scald
mixing valve
T/P
Super Stor
Munchkin heater indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. Adjust flow bypass valve for the following minimum boiler flow rates in any operating mode:
Munchkin model 80M: 3 gpm
Munchkin model 140M: 5 gpm
Munchkin model 199M: 7 gpm
3. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
4. The minimum pipe size for connecting a Munchkin heater is 1.25 inches.
5. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.
6. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119¼F.
7. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
8. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
Fig. 5-2
22
PIPING
zone valves
flow
purging bypass
valves valve
V1
anti-scald
mixing valve
T/P
Super Stor
Munchkin heater indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. Adjust flow bypass valve for the following minimum boiler flow rates in any operating mode:
Munchkin model 80M: 3 gpm
Munchkin model 140M: 5 gpm
Munchkin model 199M: 7 gpm
3. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
4. The minimum pipe size for connecting a Munchkin heater is 1.25 inches.
5. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.
6. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119¼F.
7. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
8. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
Fig. 5-3
23
PIPING
zone
circulators
make-up water
closely zone
spaced purging
tees valves
P1
P2
T/P
Super Stor
Munchkin heater indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and
downstream of all closely spaced tees.
4. The ninimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges. The alternative is standard flanges
with full port ball valves for isolation.
7. The anti-scald mixing valve shown on the domestic water heater is optional.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
Fig. 5-4
24
PIPING
zone
circulators
make-up water
closely
spaced
tees
purging
valves
anti-scald
mixing valve
P1
P2
T/P
Super Stor
Munchkin heater indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119¼F.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
Fig. 5-5
25
PIPING
zone valves
make-up water
P2
closely differential
spaced pressure
tees bypass
valve
purging V1
valves
anti-scald
mixing valve
P1
T/P
Super Stor
Munchkin heater indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure
drop operates by itself.
3. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
4. The minimum pipe size for connecting a Munchkin heater is 1.25 inches.
5. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.
6. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119¼F.
7. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
8. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
9. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
Fig. 5-6
26
PIPING
zone valves
closely differential
spaced pressure
tees bypass
valve
purging V1
valves
anti-scald
mixing valve
P1
T/P
Super Stor
Munchkin heater indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure
drop operates by itself.
3. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
4. The minimum pipe size for connecting a Munchkin heater is 1.25 inches.
5. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.
6. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119¼F.
7. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
8. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
9. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
Fig. 5-7
27
PIPING
zone
circulators
make-up water
closely
spaced
tees
purging
valves
anti-scald
mixing valve
P2
P1
T/P
Super Stor
Munchkin heater indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119¼F.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
Fig. 5-8
28
PIPING
zone
circulators
make-up water
closely
spaced
tees
purging
valves
anti-scald
mixing valve
P2
P1
T/P
Super Stor
Munchkin heater indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119¼F.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
Fig. 5-9
29
PIPING
zone
circulators
make-up water
closely
spaced
tees
purging
valves
anti-scald
mixing valve
P2
PB1 PB2
T/P T/P
Super Stor
Munchkin heater Munchkin heater indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119¼F.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
Fig. 5-10
30
PIPING
gate valve
3-way thermostatic
globe valve
Munchkin heater
ball valve pressure gauge
swing-check valve
4-way motorized
mixing valve
flow-check valve
air separator
diaphragm-type
expansion tank
radiant manifold
Fig. 8-1
18
PIPING
zone
high limit safety valves
differential
pressure
make-up water purge e
g
bypass
r
u
valve
p
P1
DHW
temperature
sensor outdoor
temperature
sensor
OFF
T/P
P2
purge
thermal trap
Super Stor (w/ drain plug) Munchkin heater
indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges and integral flow check valves.
The alternative is standard flanges with full port ball valves and a separate flow check valve.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119 F.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
10. Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure
drop operates by itself.
Fig. 8-2
19
PIPING
zone
high limit safety valves
OFF
differential
pressure
make-up water purge e
g
bypass
r
u
valve
p
OFF
DHW
temperature P1
sensor outdoor
temperature
sensor
T/P
P2
purge
thermal trap
Super Stor (w/ drain plug) Munchkin heater
indirect DHW tank
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges and integral flow check valves.
The alternative is standard flanges with full port ball valves and a separate flow check valve.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119 F.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
10. Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure
drop operates by itself.
Fig. 8-3
20
PIPING
3-way
(manually-set)
mixing valve
purge
differential
pressure
e bypass
make-up water g
r balancing valve
u
p valve
anti-scald
mixing valve
DHW
temperature P1
sensor outdoor
temperature
sensor
OFF
T/P
P2
purge
thermal trap
Super Stor (w/ drain plug)
indirect DHW tank Munchkin heater
NOTES:
1. This drawing is meant to show s ystem piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges and integral flow check valves.
The alternative is standard flanges with full port ball valves and a separate flow check valve.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119 F.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
10. Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure
drop operates by itself.
11. Adjust 3-way manually-set mixing valve to yield proper supply temperature to lower temperature load.
Fig. 8-4
21
PIPING
make-up water
zone
circulators
high limit safety
DHW
temperature P1
sensor outdoor
temperature
sensor
OFF
T/P
P2
purge
thermal trap
Super Stor (w/ drain plug)
indirect DHW tank Munchkin heater
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream a nd downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges and integral flow check valves.
The alternative is standard flanges with full port ball valves and a separate flow check valve.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119 F.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
Fig. 8-5
22
PIPING
make-up water
zone
circulators
high limit safety
DHW
temperature P1
sensor outdoor
temperature
sensor
T/P
P2
purge
thermal trap
Super Stor (w/ drain plug)
indirect DHW tank Munchkin heater
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Sup er Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges and integral flow check valves.
The alternative is standard flanges with full port ball valves and a separate flow check valve.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119 F.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
Fig. 8-6
23
PIPING
3-way
(manually-set)
mixing valve
vent
air handler
balancing
valve
e
make-up water purge g
r
u
p
DHW
temperature P1
sensor outdoor
temperature
sensor
OFF
T/P
P2
purge
thermal trap
Super Stor (w/ drain plug)
indirect DHW tank Munchkin heater
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream a nd downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges and integral flow check valves.
The alternative is standard flanges with full port ball valves and a separate flow check valve.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119 F.
8. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
10. Adjust 3-way manually-set mixing valve to yield proper supply temperature to lower temperature load.
Fig. 8-7
24
PIPING
medium temperature
vent manifold station
air handler
(higher temp.)
vent
low temperature
manifold station
DHW
temp.
P1
outdoor
sensor temperature
sensor
OFF
T/P
P2
purge
thermal trap
Super Stor (w/ drain plug)
indirect DHW tank Munchkin heater
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Sup er Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges and integral flow check valves.
The alternative is standard flanges with full port ball valves and a separate flow check valve.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119 F.
8. Do not use valve actuators on manifolds supplied by manually-set 3-way mixing vaalves.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
10. Adjust 3-way manually-set mixing valve to yield proper supply temperature to lower temperature load.
Fig. 8-8
25
PIPING
3-way manually-set
mixing valve
vent
air handler
(higher temp.)
vent
low temperature
manifold station
variable
speed
injection
mixing
purge
DHW
temp.
P1
outdoor
sensor temperature
sensor
OFF
T/P
P2
purge
thermal trap
Super Stor (w/ drain plug)
indirect DHW tank Munchkin heater
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream a nd downstream
of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5. The minimum pipe size for connecting a Munchkin heater shall be 1.25 inches.
6. All pumps are shown with isolation flanges and integral flow check valves.
The alternative is standard flanges with full port ball valves and a separate flow check valve.
7. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119 F.
8. Follow all instructions for installation of injection mixing system.
9. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
10. Adjust 3-way manually-set mixing valve to yield proper supply temperature to lower temperature load.
Fig. 8-9
26