FOREMAT

Name of the Contractor: ELITE ENGINEERING & CONSTRUCTION (HYD) PVT


LTD LIMITED Nature of the Job: Painting Date: 17.07.18

Activity: Tower crane operation

Risk

Non-Significant (NS)
Assessment

Legal Yes/No

Significant (S) /
existing Control
Measure
Sr. No. Activity Hazard Risk ( Probable Outcome) Existing Control

Probability(P)

Risk(R) : P*S
Severity(S)
No approach/ 1. approach staircase is kept safe & free from material stacking
Shifting of No access , Improper
1 Fall / hit 2. Usage of builders P3 S3 B S
materials shifting of materials hoist for shifting materials.
1 .Keep in a dry, Cool and well ventilated place.
2 .Keep away from heat.
3 .Keep away from sun light.
Volatile 4 .Do not handle or store near an open flame, heat or other source of
ignition.
2 Storage of Materials ,Spill or Vapour and Mist,Land 5. Thoroughly clean area where spill occurred. P3 S3 B S
Materials leakage ,Empty Pollution,Poison 6. Follow label warnings even after container is emptied since empty
containers containers may retain product residues.
7. Do not reuse empty container without professional cleaning for food,
clothing, or products for human or animal consumption, or where skin
contact can occur.

1. Do not get this material in your eyes.


Eye irritation,Skin 2. Wear safety goggles,mask,handgloves
3 Handling of Potential health Contacts,Inhalation, 3. Do not get this material on your skin, or on your clothing P3 S4 A S
Materials effects 4. Wear suitable respiratory equipment.
Ingestion 5. Wash hands after handling and before eating.
1. Empty containers must be handled with care due
Empty
4 Acess block,Land polution
to product residue. 2.Do not P3 S3 B S
Container
heat or cut empty container with electric or gas
disposal
torch.

Probability (P) P/S S1 S2 S3 S4


P1: Improbable P1 - - D C
P2 : Remote P2 - D C B
P3 : Possible P3 D C B A
P4 : Probable P4 D B A A

Severity (s) A : Hazards must be avoided (or the level of risk reduced significantly and reliable by controls)
S1 : Negligible B : Hazards should be avoided (or the level of risk reduced significantly and reliable by controls)
S2 : Minor C : Risk to be controlled as far as reasonably practicable
S3 : Sever D : Risk is controlled as far as reasonably practicable .
S4 : Extreme -- : Acceptable risk
LEGAL : If activity come under legal implecation (significant) than additional control measures is to be taken and has to be reviewed period

S : Significant

NS : Non - Significant.

Preapared By : HIRA Team ____________________________________________________________________________________

_________________________ _________________________ ______________________


Reviewd By :
Contractor Project Manager : PMC Project Manager : Regional Safety Manag
Approved By:
________________________________________________

GPL Project Manager


HAZARD IDENTIFICATION & RISK ASSESSMENT

Ref No.:
Job Location: Godrej Azure Project, Padur EEC/EHS/R
A/01

Risk
Assessment

Non-Significant (NS)
existing

Ref. Of WI/ SOP :-


Legal Yes/No

Significant (S) /
Control
Measure
Additional Control Measure Remark

Probability(P)

Risk(R) : P*S
Severity(S)
1. Ensure all personnel have undergone Site Safety
Induction.

2. Tool Box Talks to be conducted before starting the


activity P3 S1 D NS WI- 18
3. Ensure no man movement underneath the
working area.
4. Proper supervision until the task complete.
5.Provide proper PPES for the workers
1. Ensure all personnel have undergone Site Safety
Induction.

2. Tool Box Talks to be conducted before starting the


activity P2 S2 D NS WI- 18
3. Ensure no man movement underneath the
working area.
4. Ensure proper stacking of materials .
5. Proper supervision until the task complete.
6.Provide proper PPES for the workers

1. Ensure all personnel have undergone Site Safety


Induction.

2. Ensure all personnel are trained and competent


for height work.
3. Tool Box Talks to be conducted before starting the P3 S2 C NS WI- 18
activity
4. Ensure no man movement underneath the
working area.
5. Ensure proper stacking of materials .
6. Proper supervision until the task complete.
7.Provide proper PPES for the workers
1. Ensure all personnel have undergone Site Safety
Induction.

2. Tool Box Talks to be conducted before starting the P2 S2 D NS WI- 18


activity
3. Proper supervision until the task complete.
4.Provide proper PPES for the workers

controls)
y controls)

measures is to be taken and has to be reviewed periodically.

_____________________________

Regional Safety Manager: