Instalasi Elektrikal
WAKATOBI Alt 2
MATERIAL JASA
No Uraian Pekerjaan / Material Vol Sat
Harga Sat. Jumlah Harga Sat. Jumlah
A Pekerjaan Sisi TM
1 Kabel Hubung dari Gardu PLN ke G. Konsumen 100 Mtr 455,000 45,500,000 65,000 6,500,000
Kabel NA2XSEBY 3x240mm - - -
2 Circuit Breaker, Type : IM SM-6 (Schneider) 1 Unit 36,100,000 36,100,000 2,500,000 2,500,000
- LBS 24 kV 630A 16kA CIT operating mechanism - - -
- 3 phase busbar 630 A - - -
- 3 neon indicator - - -
- Earthing switch - - -
- Heater 220Vac / 50w - - -
3 Cubicle Outgoing Type QM, SM-6 (Schneider) 1 Unit 49,000,000 49,000,000 2,500,000 2,500,000
- LBS 24 kV 630A 16kA CIT operating mechanism
3 phase busbar 630 A - -
3 neon indicator - -
Earthing switch - -
Heater 220Vac / 50w - -
4 Fuse TM 1 Set 3,500,000 3,500,000 350,000 350,000
5 End Plate 2 Pcs 2,000,000 4,000,000 - -
6 Trafo Dist. 315 kVA, 20 kV, 400V/231V, 3P, 50HZ, 1 Unit 85,000,000 85,000,000 12,000,000 12,000,000
ONAN, Dyn-5 (Trafindo) - - -
7 Kabel dari Cubicle Outgoing ke Incoming Trafo - - -
N2XSY 3x1x35 mm 45 Mtr 175,000 7,875,000 65,000 2,925,000
8 Terminasi Indoor 240mm 2 Set 5,560,000 11,120,000 1,500,000 3,000,000
9 Terminasi Single Core 1x35mm 1 Set 3,300,000 3,300,000 1,250,000 1,250,000
10 Elastimold 1 Set 3,300,000 3,300,000 1,250,000 1,250,000
11 Kabel Ladder TM & TR 12 Mtr 350,000 4,200,000 32,500 390,000
Ukuran : 300x100x3000 mm - - -
Tebal : 2 mm - - -
Material : Hot Rolled Mild Steel Sheet - - -
- Fitting & Accessories 1 Lot 937,500 937,500 - -
12 Instalasi Grounding (TM & TR ) 2 Titik - 9,500,000 19,000,000
13 Material Bantu 1 Lot 1,500,000 1,500,000
Sub A 255,332,500 51,665,000
B Pekerjaan Sisi TR
1 Kabel NYY 1X150mm 50 Mtr 228,000 11,400,000 65,000 3,250,000
2 Panel Junction 630A 1 Unit 48,395,308 48,395,308 1,500,000 1,500,000
3 Panel Capasitor Bank 200 kVAR 1 Unit 79,525,272 79,525,272 1,500,000 1,500,000
4 Material Bantu Untuk Instalasi TR 1 Lot 750,000 750,000 -
Sub B 140,070,580 6,250,000
C Transportasi
1 Transportasi & Akomodasi 1 Lot 125,000,000 125,000,000
2 Angkutan Material Ke Wakatobi 1 Lot 47,000,000 47,000,000
Sub C - 172,000,000
SUB JUMLAH 395,403,080 229,915,000
JUMLAH TOTAL 625,318,080
Hormat Kami
PT. BISMA BELIS
Meyki Hardiyanto
Marketing
RENCANA ANGGARAN BIAYA
PANEL JUNCTION 630 A
Outgoing
7 - MCCB 3P 250A NSX250N 2 PCs
8 - Cu Busbar 1 Lot
9 - Door switch + Lampu TL 1 Bh
10 - Assembling + Setting Panel 1 Lot
11 - Accessories 1 Lot
( Duct, Bolt, Cable Lug, Vynil, Cable Spiral, Cable NYAF, Terminal Block, etc )