Term Project-108

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Term Project Steel Structure 2

Tuesday Class (8 AM)


Semester 108 – Academic Year 2017/2018

Given the following building

RF

3.3 m

2F

3
3.5 m
3.6 m 2
y
4.0 m
1F
x 1

A B C

3.8 m 4.2 m

Frame Axis A and B Frame Axis C

q = 20a kN/m
z
RF

q = 40d kN/m
3.3 m q = 35b kN/m q = 25c kN/m q = 20d kN/m

2F 2F

3.6 m 3.6 m

1F 1F
y y
4.0 m 3.5 m 4.0 m 3.5 m
Term Project Steel Structure 2
Tuesday Class (8 AM)
Semester 108 – Academic Year 2017/2018

Frame Axis 1, 2, 3 Note

z
q = 25b kN/m
RF L/2 L/2

q = 35a kN/m
3.3 m q = 50c kN/m

2F
L/5 3L/5 L/5

3.6 m

1F
x
3.8 m 4.2 m

You are required to do the following:


(1) Find the best and most economical dimension for each member using WF profile (ratio
between 0.8 – 0.9)
(2) Design the joint connection using moment resisting connection
(3) Draw the details of the connection for each joint

Design requirements and restrictions:


a) Yield stress of steel fy = 250 MPa , Ultimate stress of steel fu = 380 MPa, Modulus of elasticity E
= 2,15×105 MPa, given load is dead load with scale factor 1.4
b) Make further assumption as needed in the design process such as bolt diameter, bolt properties,
etc.

Due date of Term Project is on July 12th, 2018 (11.00 AM)

You might also like