Well Plan Checklist: Guidance Notes Halliburton Management System
Well Plan Checklist: Guidance Notes Halliburton Management System
Well Plan Checklist: Guidance Notes Halliburton Management System
Contents
1. PROGRAM OF WORK
4. FINANCIAL AUTHORITY
7. SUPPORTING NOTES
Note
The check list uses drop down menus to enter responses. When using drop down menus under
forms, the document has to be locked and text changes are not possible. If text has to be added,
or the document changed, them the document must be unlocked first, changes made and then
locked again to use the drop down lists.
To unlock the document, select “toolbar” and choose “forms”. There is an icon, shaped like a
lock, at the right of this toolbar which locks and unlocks the document.
GUIDANCE NOTES
1.1 Have the final versions of the following documents been fully approved
and distributed:
- Well Planning Data Package (PDDP) Select
- Geological and Pressure Forecast Select
- Drilling Program Select
- Wall Chart Select
- Directional Plots Select
- Time/Depth Graphs Select
- Cost/Depth Graphs Select
- Site Survey Report Select
- Top Hole forecast & Shallow Gas Assessment Select
1.2 Have all draft versions of the above documents been withdrawn from the
Select
wellsite?
1.3 Does the program of work fully comply with both Lead contractor and
Select
client policies and standards?
If NO, have the necessary Change Requests been completed and
Select
approved?
Please reference all relevant Change Requests in Section 7.
1.4 Does the program of work fully accommodate all the well objectives
Select
given in the PDDP?
If NO, has any compromise in well objectives been discussed and agreed
Select
with the client?
1.5 If the well is of restricted status, have all tight hole procedures been
Select
followed?
GUIDANCE NOTES
2.3 Has written consent to the program of work been received from the
Select
RGAG?
Does the consent cover all planned operations? Select
If NO, what further consents are required:
- plug back & sidetrack Select
- complete Select
- abandon/suspend Select
- other [please specify]: Select
Are any conditions attached to the RGAG consent? Select
If YES, have all conditions been satisfied? Select
2.4 Has written consent to the location of the drilling unit been received from
Select
the RGAG?
Are any conditions attached to the RGAG consent? Select
If YES, have all conditions been satisfied?
Select
2.5 Has Notification of the use of POBM been submitted to RGAG? Select
Has a seabed survey been requested by RGAG? Select
2.6 Has PDDP been revised after submission of above and require
Select
resubmission?
2.7 Select
GUIDANCE NOTES
3.2 Has the duty holder verbally confirmed that the planned operations
Select
comply with the installation safety case?
In the following sections, please indicate which potential hazards are relevant to the planned
work, and what action has been taken to mitigate the risk:
d. Scour
- monitoring program in place? Select
- contingency arrangements prepared? Select
a. Shallow gas
- rig re-location outside the anomaly investigated? Select
- shallow gas procedures in place? Select
d. Wellbore collision
- minimum allowable proximity stated in work instructions? Select
- adjacent well plugging requirements agreed & in place? Select
e. H2S
- H2S procedures in place? Select
- H2S kit organized? Select
- all well & rig materials suitable for sour service Select
f. Lost circulation
- well control consequences considered? Select
- contingency arrangements in place? Select
- if YES, have the OIM and Drilling Supervisor been informed, and
Select
suitable procedures established to safeguard well control?
GUIDANCE NOTES
6.1 Has a formal casing string design been carried out & included Select
on the wellfile?
6.2 Is the casing program based on a field standard provided in the Well
Select
Design Manual
If YES, has it been confirmed that the specific well conditions fall within
Select
the design envelope?
6.3 Have the effects of casing wear been considered in the design? Select
6.5 Has the wellbore Survey Program been prepared in accordance with both
Select
Directional company and client standards?
6.7 Have relevant stuck pipe avoidance procedures been included in the
Select
Drilling Program?
6.8 In the event that the well is suspended prior to completion, does the well
Select
design allow later abandonment by wellhead removal only?
GUIDANCE NOTES
7 SUPPORTING NOTES
Item Ref. Remarks
GUIDANCE NOTES
7 SUPPORTING NOTES
Item Ref. Remarks