Content
1 Sharklet benefits
5 Summary
Page 2
Page 3
Attractive
2% savings
1%
0 1000 2000 3000
Sector length (nm)
Page 4
Washington Corfu
Madeira
Kathmandu
Lanzarote
Quito
Canberra
Page 5
36000
34000
32000
30000
Sector profile
Page 7
More
Fuel burn Attractive Lower CO2
reduction efficient
savings emissions
family
Page 8
Content
1 Sharklet
5 Summary
Page 9
Sharklets design
→Single piece design
→Multi-lug and tension bolt
→Innovative materials
→Lightning strikes protection
→New LED nav & strobe lights
y
x
z
y
Simple connection: tension bolts and barrel nuts; multi-lugs and pins
Page 11
Changes
No changes
Changes without assembly jigs modification
Minor design changes for adapted centre wing box reinforcement (A319/A320)
Page 12
y
Rib 11 Rib 27:
New large
x machined rib
concept
Introduction of
Fixed Leading Edge: support straps to
Bolting and rivet changes outboard of stringers
Slat 4
Ribs 12 to 26:
System penetrations maintained.
Thicker web features and taller stringer cut outs.
Larger cleats used to fit larger fasteners.
Page 13
No sharklets capability - Std & P/N Sharklets capability - Std & P/N MOD Certif
• Schedule
Page 15
Sharklets ramp-up
From 2014, every A320 Family delivery can benefit from Sharklets
Page 16
Content
1 Sharklet benefits
5 Summary
Page 17
• Others
• Spares support
• Transportation
• Supplier contract
Tech Pubs
• Minor adaptations for reinforced Aircraft and sharklet Aircraft
• AMM
• Removal / Installation tasks (sharklet, nav and strobe lights)
• Trial performed on Aircraft (see dedicated slide) : AMM validated with minor adaptations
needed.
• Sharklet removal / installation duration: around 6 h (excluding sealant curing time)
• Inspections for Schedule maintenance
• No or minor update identified on Aircraft structure
• New tasks for Rib 27 and sharklet inspections.
• Other minor adaptations
Page 19
GSE
• 7 specific tools considered for Sharklet Removal / installation
Hoist – Sharklet - 98D57356715
Scheduled Maintenance
• Reinforced a/c with WTF: no maintenance program change considered.
SRM
• Complete revalidation of existing SRM is ongoing for both
reinforced Aircraft and Sharklet Aircraft
• Objective is to complete all SRM task revalidation by end 2013
• Outlook today indicated 65% temporary & ADL revalidated for Sharklet
Aircraft A320 EIS:
• Nose Fwd fuselage (s11/12), Fwd fuselage (s13/14), Aft fuselage (s18), Aft Tail cone
(s19.1), PAX doors, landing gear doors, belly fairings, VTP,THS, rudder, elevator, pylons
• MMEL:
• Update of perfo charts
• Possible update due to introduction of LAF (Load Alleviation Function)
• Maintenance & Flight training: Minor update (mainly on Familiarization
training)
• No impact on crew qualification – same type rating
Page 24
Page 25
Page 26
• Sharklet transportation
• Airworthy box defined
→ (H)1186mm X (W)1722mm x (L)4572mm
Content
1 Sharklet benefits
5 Summary
Page 28
Production retrofit
New-build aircraft delivered with modified structure
To be retrofitted post-delivery:
• Flight computers functionality
• Sharklets
In-service retrofit
Retrofit:
• Wing structure reinforcement
• Sharklets
• Flight computer functionality
Page 29
Page 30
Page 31
9 Pre-requisites
(flight computers):
• FMGC
• SEC
• ELAC
• FAC
• FCDC
• FWC
Page 32
Content
1 Sharklet benefits
5 Summary
Page 33
Key messages
Sharklets ramp-up
Page 34
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS S.A.S. No intellectual property rights are granted by the
delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS S.A.S. This document and its content shall not be
used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting
grounds for these statements are not shown, AIRBUS S.A.S. will be pleased to explain the basis thereof.
AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.
Page 35