Guidelines For Student Projects Lecture Notes, Slides 1-8
Guidelines For Student Projects Lecture Notes, Slides 1-8
Guidelines For Student Projects Lecture Notes, Slides 1-8
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
www.myreaders.info/html/projects.html
RC
www.myreaders.info
Title,
study,
Scope/
Design,
Implementation
Introduction,
Requirements,
Feasibility
Here students are in final year of B.Tech course in Computer Science &
Engineering. The projects are of 20 to 30 credits. The duration for the project
is one year. It is preferred that a project is implemented by team of two
students, but if necessary
it
students,
that depends on its scope, varied technology and the volume of work.
1. Title of the project
This should be carefully decided by the student after discussing with the
project supervisor or the guide.
The
student
and
guide
are
assumed
to
be
aware
about
general
[Start of T0 + 2 week]
mention why this project, what exists now, what is required and
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
3. Requirements
[Start of T0 + 3 week]
on
the
academic
needs,
the
current
technological
pursuits
and
using
any
technical
jargons
individuals.
Write about 10 or 15 important requirements and put them in order
according to their importance or preference based on some criteria.
Mention how well the end product would be matured, realized and usable.
Remember that each of these requirements are to be later analyzed so
as to generate general design inputs. From these general design inputs,
the designers would generated detail technical design specifications at
system / subsystem level.
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
4. Feasibility study
The
general
[Start of T0 + 5 week]
requirements
were
listed
in
project
must
be
section-3
and
therefore
the
feasibility
study
of
completed
within
weeks,
in
Capability
Index
(CI)
Mention
your
capability
to
synergies
the
Relative
Significance
Factor
(RSF)
Mention
about
the
analysis
that
to
Index
which
is
measure
of
successful
completion
of
system development.
(j) Inadequacy parameter (IP) :
High
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
doing
reduced.
the
project
feasibility,
the
uncertainties
and
ambiguities
are
Viability,
tools,
fabrications,
coding,
languages,
implementation,
operating
integration,
test
systems
and
platforms,
methods,
test
standards,
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
general
requirements
were
listed
in
section-3.
To
meet
in
these
section-4.
list
of
hardware
systems,
peripheral
devices,
interfaces,
the software
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
activities
listed
on
Y-axis
includes
all
important
activities
of
the project.
The body of the chart illustrates the start and completion date of
each activity. It should clearly indicate the spread of each activity,
their relative start and completion time, and how many tasks would
run in parallel.
The project activities include
Project start date, deciding the project : Title
Relevance and importance of the project : writing Introduction
Framing of project :
Requirements
Feasibility study
Freezing of Project :
Scope/Objectives
Requirements Analysis
Implementation
Project report
remaining
time
completion of project
is
for
detail
design,
implementation,
is over.
testing
and
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
detail
from
the
conceptual
architectural
layout,
level
block
indicate
schematic
every
(in
subsystem
section-6),
and
within
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
[Start of T0 + 39 week]
may vary by
weeks from one project to another, but the total time remains same.
few