Ciscocm - Vmware Disk Size Reallocation v1.0
Ciscocm - Vmware Disk Size Reallocation v1.0
Ciscocm - Vmware Disk Size Reallocation v1.0
Introduction:
These release notes contain important information about installation procedures for the VM Dynamic Disk Size
Reallocation Cop file for Cisco Unified Communications Manager.
Note:
Before you install this update, Cisco recommends that you review the Important Notes section for information
about issues that may affect your system.
All snapshots have been removed. For additional information, see Working with snapshots (1009402).
The virtual machine is powered off.
CUCM 9.1 and earlier requires cop file (see below)
Note: In ESX 4.1, you can extend and add virtual disks to a virtual machine when it is powered on (after installing VMware
Tools). However, CUCM requires a reboot to recognize the changes.
Instructional Notes
If you have ESX 4.0 or newer:
1.
2.
3.
4.
5.
6.
7.
8.
(UCM 9.1 and earlier only) Install the ciscocm.vmware-disk-size-reallocation-1.0.cop.sgn COP file.
Shutdown guest VM
Open VMware Infrastructure (VI) Client and connect to VirtualCenter or the ESX host.
Right-click the virtual machine.
Click Edit Settings.
Select Virtual Disk.
Increase the size of the disk.
Power on guest VM.
Note: If this option is greyed out then the disk may be running on snapshots or the disk may be at the maximum allowed size
depending on the block size of the datastore
For further details on Virtual Disk Configuration, you can reference the vSphere Virtual Machine Administration Guide.
Previous Updates
N/A
Related Documentation:
To view documentation that supports your version Cisco Unified Communications Manager release, go to:
http://www.cisco.com/en/US/partner/products/sw/voicesw/ps556/products_documentation_roadmaps_list.html
Important Notes:
When upgrading to a new release of Cisco Unified Communications Manager, make sure that the updates in this release
are included in the version you are upgrading to. If an ES or SU is installed after this update that does not also contain the
fixes referenced in Updates in This Release then this update will need to be reapplied after the ES or SU is installed.
However when the disk size is increased, it will remain in effect for the life of the VM.
Installation Instructions:
As with any installation or upgrade, it is recommended that you apply this Update during off peak hours.
Applying this update will require a reboot.
This package will install on the following System Versions:
- 8.5.1.10000-xx or any higher version starting with 8.5.1.xxxxx
- 8.6.2.10000-xx or any higher version starting with 8.6.2.xxxxx
- 9.1.1.10000-xx or any higher version starting with 9.1.1.xxxxx
- 9.1.2.10000-xx or any higher version starting with 9.1.2.xxxxx
You can install a patch or upgrade version from a DVD (local source) or from a computer (remote source) that the server
being upgraded can access.
Note: Be sure to back up your system data before starting the software upgrade process. For more information, see the
Disaster Recovery System Administration Guide
ciscocm.vmware-disk-size-reallocation-1.0.cop