SIL Assessments and Verifications - M+W Process Automation
SIL Assessments and Verifications - M+W Process Automation
SIL Assessments and Verifications - M+W Process Automation
Company Presentation
Doc.-Vers.: 16
Company Presentation
Doc.-Vers.: 16
Company Presentation
Doc.-Vers.: 16
IEC 61508
=> Manufacturers & Suppliers
IEC 61511
=> End Users & System Integrators
Company Presentation
Doc.-Vers.: 16
Who?
Seveso II Directive:
control of major-accident hazards involving dangerous substances
High level Seveso company
Low level Seveso company
Kind of substance
Amount of substances
Seveso locaties in Belgium:
173 H
194 L
Company Presentation
Doc.-Vers.: 16
Why?
Seveso Directive:
Take all necessary measures and show to inspecting authorities that all necessary
measures are fullfilled.
=> Which measures and why
High level of protection
=> Codes of good practise: IEC 61511
PAM:
Belgium: Seveso
MES 3-audit
Company Presentation
Doc.-Vers.: 16
What about?
Risk Reduction with:
Sensor
Company Presentation
SIS
Logic
Doc.-Vers.: 16
Actor
How?
Lifecycle concept
How do I build an SIS?
How do I keep my SIL / Risk reduction?
Company Presentation
Doc.-Vers.: 16
Without safeguards!
Risk = Probability x Severity
10
Company Presentation
Doc.-Vers.: 16
S
S
A
SIL
!
D
E
ESS
11
Company Presentation
Doc.-Vers.: 16
12
Company Presentation
Doc.-Vers.: 16
13
Company Presentation
Doc.-Vers.: 16
14
Company Presentation
Doc.-Vers.: 16
Functional requirements
Integrity requirements
General concept
PFD-calculations to determine
SIF specification
Test Interval
SIL
=> Safety
=> Availability
PFD-calculation
Design & Engineering
15
Company Presentation
Doc.-Vers.: 16
16
Trip setting
Diagnostics
Reset functions
Fail actions
Demands rates
...
Company Presentation
Doc.-Vers.: 16
Engineering
=> Functionality
17
Company Presentation
Doc.-Vers.: 16
SIL Verification
Architectural Constraints
HFT
SFF
PFDavg
Architecture
Diagnostic Coverage
Demand mode
Architectural Constraints
=> SIL
PFD (SIF)
18
Company Presentation
Doc.-Vers.: 16
Failure Rates
Sources:
19
Oreda
Exida
...
Company Presentation
Doc.-Vers.: 16
Architectural Constraints
How many hardware failures may occure without loss of the safety function?
1oo1
1oo2
1oo3
2oo3
20
Company Presentation
Doc.-Vers.: 16
Architectural Constraints
IEC 61508
=> 1oo1
=> 1oo2
21
Company Presentation
Doc.-Vers.: 16
Architectural Constraints
IEC 61511
=> 1oo2
=> 1oo2
22
Company Presentation
Doc.-Vers.: 16
Architectural Constraints
IEC 61511 Loophole
HFT may be reduced by one if:
Hardware of the device selected on prior use basis
Only process related parameters may be adjusted
Parameters protected
SILSIF < SIL 4
23
Company Presentation
Doc.-Vers.: 16
PFDavg: Architecture
1
PFD1oo1 DUTI
2
PFD1oo2
2DUTI2
1
DUTI
3
2
PFD 2oo2 DU TI
PFD 1oo3
PFD
24
2oo3
Company Presentation
3DU TI3
4
2
DU
1
DU TI
2
1
T I DU T I
2
2
Doc.-Vers.: 16
DC > 99%
Relay Systems
DC = 0
Final Elements
On/Off valve: DC=0
Partial Stroke testing: 60%
25
Company Presentation
Doc.-Vers.: 16
Separation of channels
Diversity
Environment
...
estimation:
Conservative (10%)
Exida
26
Company Presentation
Doc.-Vers.: 16
Test Interval
Demand Mode
Process => Normally Low Demand Mode
27
Company Presentation
=> PFD
Doc.-Vers.: 16
1
PFD1oo1 DUTI
2
SIL Verification
Architectural Constraints
PFD Calculations
28
Company Presentation
Doc.-Vers.: 16
29
Company Presentation
Doc.-Vers.: 16
Conclusion
30
Company Presentation
Doc.-Vers.: 16
Facility Solutions
Process Solutions
Product Solutions
3.306 Employees
825 Employees
224 Employees
Juergen Wild
Herbert Blaschitz
Electronics
Flat Panel Displays
Photovoltaic
Energy /
Renewable Energy
Juergen Wild
Others
Fac.Eng.GmbH
Real Estate
IT / Caatoosee (51%)
NumberAnzahl
of employees
der Mitarbeiter
of the M+W
der M+W
Group:
Group:
4.5244.524
Annual
- Gesamtumsatz
sales revenue
ca.
approx.
1,73 Mrd.
1,73billion
31
Company Presentation
Doc.-Vers.: 16
Automation
Chemicals
Pharmaceuticals
Food and Beverage
Biotech
Water / Waste Water
Oil and Gas
Energy
Automotive
Biotech
Pharmaceuticals
Chemicals
Food and Beverage
Cosmetics
Management:
Andreas Bieber, Franz Greisberger &
Henning Hammerstaedt
Regional Office B + NL
50 Employees
Locations B: Melsele, Wavre,
Locations NL: Breda
Management:
Dr. Tobias Luecke,
Hermann Schwarzkopf
Management:
Stephan Hoste
32
Company Presentation
Doc.-Vers.: 16
Consulting
Start-Up
Design
Basic
Engineering
Training
Detail
Engineering
Service
Specification
Validation
Control Cabinet
Mounting
Installation
33
Company Presentation
Doc.-Vers.: 16
Project Management
Supply
Management
Manufacturing
&
Business
Integration
Doc.-Vers.: 16