Calibration Manual
Calibration Manual
Calibration Manual
<Normal>
No.
Identification No.
Document name
BHAJ01-001
BHAJ01-002
BHAJ01-003
BHAJ01-004
BHAJ01-005
BHAJ01-006
BHAJ01-007
BHAJ01-008
BHAJ01-009
10
BHAJ01-010
RV2 Adjustment
11
BHAJ01-011
12
BHAJ01-012
13
BHAJ01-013
Syringe Test
14
BHAJ01-014
15
BHAJ01-015
16
BHAJ01-016
Balance Test
17
BHAJ01-017
18
BHAJ01-018
UF Precision Test 1
19
BHAJ01-019
20
BHAJ01-020
21
BHAJ01-021
22
BHAJ01-022
Option
<Hot disinfection with citric acid ASSY, Dialysate flow ASSY and high flow ASSY>
No.
Identification No.
Document name
23
BHAJ00-023
24
BHAJ00-024
25
BHAJ00-025
RV2 Adjustment
26
BHAJ00-026
Option
Caution
Remove static electricity, using an earth-band when a board is maintained or changed.
Do not touch any point other than the mentioned point by a tester when a board is
maintained, connecting probes or IC clips of tester. It could be a cause of board breakdown,
depending on the touched place.
Do not touch any board, electric wiring or terminal except for a maintenance.
Do not touch any electric wiring or terminal which is not isolated.
Do not touch any board with wet hand.
Pull out a power plug from an outlet when the harness is removed from a Terminal block.
Use a tester which is True RMS TYPE to measure precise alternating current value.
* RMS: Root Mean Square
1-2
BHAJ01-001
02mmHg
Pressure gauge, piping components, pean pincer x 1, ceramic driver for adjustment,
syringe, tester
To calibrate 2 points of offset and gain if the error is out of range,
comparing device indication and manometer value.
Illustration
Procedure
Remove the cover of the upper left side.
For the two PV/PA placed in a row, the upper one is the
venous pressure sensor board (PV) and the lower is the
arterial pressure sensor board (PA).
Open the screen of Maintenance 1 Dialysis data display,
Pressure.
VR1
TP1
401
VR2
TP2
1-1
BHAJ01-001
Adjust the VR1 of the PV/PA board so that the displayed
value of pressure gauge indicates 3005mmHg when its
actual value is 300mmHg.
VR3
VR1
TP1
401
VR2
TP2
MAINTE
OPTION
ADJUST
BPM
MAINTE
1-2
BHAJ01-001
The Adjustment
menu is for the manufacturer to perform adjustment
and contains important
items related to device control. After using it,
be sure to hide it to prevent
uninformed personnel from changing the contents.
z How to hide the menu is the same as how to display it.
1-3
BHAJ01-002
Required jig
Purpose
Pressure gauge, piping components, pean pincer x 3, ceramic driver for adjustment,
syringe
To calibrate 2 points of offset and gain if the error is out of range,
comparing device indication and manometer value.
Illustration
Procedure
Draining water in the dialysate pressure sensor
Caution
z
dialysis data.
VR2
TP2
TP1
CN1
2-1
BHAJ01-002
Illustration
Procedure
Adjust the VR2 of the dialysate pressure sensor board so
that the dialysis pressure displayed value becomes 0
2mmHg during air release.
TP2
TP1
CN1
3-2
BHAJ01-003
T2/T3/T7250.2, 400.2
Required jig
Purpose
Illustration
Procedure
Caution
Ensure the breaker is turned off.
Remove the cover of the upper right face and the electric
cover.
Remove the connector for the temperature sensor to be
worked on, which is on the I/O board, and install the
temperature calibration device.
* Select based on the temperature sensor to be adjusted.
Temperature sensor
T2
T3
T7
Heater outlet
temperature
Dialysate
temperature
Coupler
temperature
Connector name
CN215
CN216
CN246
Resistance value
25
8.4940.024 k
40
8.9040.024 k
3-1
BHAJ01-003
Illustration
Procedure
Turn on the breaker and I/O switch to confirm the
indicated temperature with the Maintenance 1 Dialysate
data display and Temperature/concentration.
(Gain adjustment) at 25
Adjust the adjustment VR on the temperature sensor
module board so that the indicated temperature becomes
25.00.2 when the knob of the temperature
calibration device is set to 25.
(Offset adjustment) at 40
Adjust the adjustment VR on the temperature sensor
module board so that the indicated temperature becomes
40.00.2 when the knob of the temperature
calibration device is set to 40.
Repeatoffset adjustment andgain adjustmentuntil
entering the standard value range.
Temperature
VR1
VR2
VR3
VR4
*
*
3-2
VR at 40
T2
VR3
VR4
T3
VR5
VR6
T7
VR1
VR2
VR5
VR6
VR at 25
sensor
BHAJ01-004
T4/T5/T6: 250.2400.2
Required jig
Purpose
Temperature calibration device (Code No. 0-506-001), ceramic driver for adjustment,
Phillips screwdriver
To calibrate 2 points of offset and gain if the error is out of range,
comparing device indication and manometer value.
<Illustration>
<Procedure>
Caution
Ensure that the breaker is turned off.
Remove the cover of the upper right face and the electric
cover.
Remove the connector for the temperature sensor to be
worked on, which is on the I/O board, install the
temperature calibration device.
* Select based on the temperature sensor to be adjusted.
Temperature sensor
T4
Connector name
CN217
compensation
T5
CN234
compensation
T6
CN239
compensation
Resistance value
25
8.4940.024 k
40
4.9040.024 k
CD1
CD2
CD3
-1
BHAJ01-004
<Illustration>
<Procedure>
memo
z Adjustment VR for T4/T5/T6 is on the conductivity
sensor module board, not on the temperature sensor
module board.
Turn on the breaker and I/O switch to confirm the
indicated temperature with the Maintenance 1 Dialysate
data display and Temperature/concentration.
(Gain adjustment) at 25
Adjust the adjustment VR on the conductivity sensor
module board so that the indicated temperature becomes
25.00.2 when the knob of the temperature
calibration device is set to 25.
(Offset adjustment) at 40
Adjust the adjustment VR on the conductivity sensor
module board so that the indicated temperature becomes
40.00.2 when the knob of the temperature
calibration device is set to 40.
VR1
Temperature
VR2
sensor
VR4
VR5
VR at 25
VR at 40
T4 (CD1)
VR4
VR5
T5 (CD2)
VR4
VR5
T6 (CD3)
VR4
VR5
*
VR3
VR configuration of
conductivity sensor module board
4-2
BHAJ01-005
1001.0mVAC
CD1
CD2/CD3
Concentration calibration device (Code No. 0-506-007), ceramic driver for adjustment,
Phillips screwdriver, tester
To calibrate 2 points of offset and gain if the error is out of range,
comparing device indication and manometer value.
<Illustration>
<Procedure>
Caution
z
Remove the cover of the upper right face and the electric cover for
the right face. Remove the connector for the conductivity sensor to
be worked on, which is on the I/O board, and install the concentration
calibration device.
*Select based on the conductivity sensor to be adjusted.
Conductivity sensor
Connector name
CD1
A+B conductivity
CN218
CD2
B conductivity (moni)
CN233
CD3
B conductivity (cont)
CN238
Conductivity
Resistance value
30mS
133.30.1
15mS
266.60.1
9mS
444.40.1
1.2mS
3333.31.0
CD1
CD2/CD3
CD1
CD2
CD3
5-1
BHAJ01-005
<Illustration>
<Procedure>
Turn on the breaker and I/O switch.
Adjustment of standard voltage waveform
Adjust the conductivity sensor to be worked on under the
following conditions.
Set the tester range to VAC.
Tester (+) probe
I/O board
WJ1
Standard
1001.0mVAC
Adjustment VR
Gain adjustment
Adjust the adjustment VR on the conductivity sensor
module board so that the tester voltage becomes standard
when the knob of the concentration calibration device
is aligned.Do not refer to the indicated conductivity
of screen as its compensated value by 25 degrees.
Offset adjustment
Adjust the adjustment VR on the conductivity sensor
module board so that the tester voltage becomes standard
when the knob of the concentration calibration device
Is aligned. Do not refer to the indicated conductivity
of screen as its compensated value by 25 degrees.
Repeatoffset adjustment andgain adjustmentuntil
entering the standard value range.
VR1
VR2
VR4
VR5
WJ1
Gain adjustment VR
Offset adjustment VR
adjusted.
Standard
Concentration
Conductivity
TP1
TP3
TP4
VR3
TP2
calibration device
Knob
30mS (gain)
5.000.02
15mS (offset)
2.500.02
9mS (gain)
1.500.02
1.2mS (offset)
0.200.02
CD1
CD2/CD3
5-2
Standard (VDC)
sensor
BHAJ01-006
Standard
Required jig
Purpose
<Illustration>
<Procedure>
Caution
Ensure that the breaker is turned off.
Remove the cover of the upper right face and the electric
cover.
Turn on the breaker and I/O switch.
Set the foam detection condition setting of Maintenance
2 Alarm setting to single 10.
Bubble detection condition setting
Single 10
50
100
6-1
BHAJ01-006
<Illustration>
<Procedure>
Voltage adjustment
Set the standard tube containing the hot water of
approximately 37 to the bubble detector.
Set the tester range to VDC.
Connect the tester (+) probe to TP1 on the bubble sensor
module board.
Connect the tester (-) probe to WJ1 on the I/O board.
Confirm
VR1
4.0V
or
more
is
obtained
when
VR1
TP1
module board
Detection confirmation
Set the device to the dialysis stand by process.
(To revolute blood pump)
Rotate the blood pump by 200mL/min. to circulate the hot
water of approximately 37 in the blood circuit.
Turn on the bubble detector operation switch and confirm
that the clamp is closed, blood pump stops and Bubble
alarm is detected when bubble of 0.03mL is infused
with a micro syringe.
Confirm that the TP1 voltage value becomes 0.2V or less
and Bubble alarm is detected when removing the tube
from the bubble sensor.
Set the foam detection condition setting of Maintenance
2 Alarm setting to the initial value.
* If ABD does not detect air with above condition,
replace the sensor or the board.
6-2
BHAJ01-007
Required jig
Purpose
Phillips screw driver, ceramic driver for adjustment, BLD-01 calibration cartridge
To confirm whether blood leak is detected properly or not.
To detect blood leak properly.
Flow chart
Self-diagnosis is acceptable with
150
ppmOK
150ppm or less.
Confirmation of
REAL
blood
150ppm or more
150ppm
Self-diagnosis is not
NG
acceptable.
Zero calibration
Within the standard
Confirmation by
filter
Adjustment of
REAL
blood
leakage REAL value
Completed
7-1
BHAJ01-007
<Illustration>
<Procedure>
Confirmation of blood leakage REAL value
1. Display Maintenance 1 Dialysis data display blood leakage screen.
2. Confirm the blood leakage REAL value with no dirt or bubbles on the
blood leakage cartridge window.
3. Procedure is completed if self-diagnosis is acceptable with 150ppm
or less.
If self-diagnosis is not acceptable, proceed to
Zero calibration.
If 150ppm or more, proceed to Zero calibration.
Zero calibration
Caution
z Make adjustment after making sure that no dirt is
attached by rinsing with water, disinfenctant and acid.
Compensation with the dirt attached may cause the blood
leakage detection value to deviate.
<Purpose>
Set the blood leakage REAL value to 30 to 40ppm with no
dirt or bubbles on the blood leakage cartridge window when
the blood leakage REAL value is 150ppm or more.
<Reason why the blood leakage REAL value should be
adjusted to 30 to 40ppm, not 0>
No blood leakage REAL values that are 0ppm or less shall
not be indicated, so if it is set to 0ppm, there is no
judging whether it is 0 or under 0. Therefore, 30 to 40ppm,
a little higher, shall be used for adjustment.
1. Operate the device for more than 5 minutes by T WTR
rinsing operation.
2. Remove the front cover.
3. Remove the blood leakage sensor cartridge, confirm
there is no bubble within the cartridge, then return the
cartridge to the original position.
Caution
z When removing the blood leakage sensor cartridge, do
7-2
BHAJ01-007
<Illustration>
<Procedure>
not lose O-rings at the both ends. These O-rings prevent
the dialysate from entering the board when there is a
leak on the cartridge.
4. Display Maintenance 1 Dialysis data display blood
leakage screen.
5. Adjust the adjustment VR1 so that the blood leakage REAL
value becomes 30 to 40ppm.
Caution
z
Adjustment VR2
OFFSET
(GAIN)
Caution
z
Caution
z
7-3
BHAJ01-007
<Illustration>
<Procedure>
cartridge with the simulation blood leakage filter.
* The blood leakage REAL value at this time is to
be (B).
3. Confirm the value obtained by (B) (A) is in the range
of 80ppm from the standard value indicated on the
simulation blood leakage filter.
4.
The
procedure
is
completed
if
Adjustment
VR2 (GAIN)
7-4
BHAJ01-007
<Illustration>
<Procedure>
4. Adjust the adjustment VR1 so that the blood leakage REAL
value becomes the standard value indicated on the
simulation blood leakage filter +8010ppm.
Adjustment VR1
(OFFSET)
7-5
BHAJ01-008
(Standard model)
Required jig
Purpose
<Illustration>
<Procedure>
Adjustment of reducing valve
Remove the cover of the upper right face and the front
cover.
Set the device to the preparation stand by process.
Attach a pressure gauge to out side of reducing valve.
Turn ON the V1 and V10 manually with Maintenance 4
Operation status.
Confirm the dialysate pressure value. If it is outside the
range of 0.034 to 0.038MPa (257 to 287mmHg), adjust the
reducing valve with a hexagon wrench of 5mm, aiming at
0.037MPa (280mmHg).
After adjustment, open V4 manually for approximately 2
seconds to let out the pressure contained in the device.
When the reducing valve has been adjusted, repeat the
above-mentioned procedure to confirm the reproductivity
of the pressure value.
Adjustment of fill-up pressure
Remove the front cover and the cover for the lower left
face.
Install the piping components and pressure gauge at the
confluence part of the P4 discharge and the mainstream.
8-1
BHAJ01-008
<Illustration>
<Procedure>
Configuration of RV1
Left face
8-2
BHAJ01-009
(Standard model)
<Illustration>
<Procedure>
Remove the front cover.
Adjustment by stopwatch
Operate in the preparation process.
Display Maintenance 4 Operation status.
Measure with a stopwatch the time from the changeover of
A/B chamber until FS1 is turned on (no dialysate flow).
Adjust the needle valve (NV1) so that the measurement time
is within the standard range (45 to 48 seconds).
Adjustment by flowmeter
Install the flowmeter to the drainage line and operate in
the preparation state.
Caution
Flow rate is different at pump flashing and completion
of filling.
Note that the reading position of the flow against the
float depends on the manufacturer and type of the
flowmeter. For our genuine flowmeter, top face of the
float is to be the reading point.
9-1
BHAJ01-010
(Standard model)
<Illustration>
<Procedure>
When normal
Remove the front cover and the cover for the lower left
face.
Fully open NV2 and adjust RV2 so that the dialysate flow
at that time becomes 700mL/min.
NV2
Fix the lock nut with a monkey wrench after completing the
RV2 adjustment.
Adjust NV2 so that the flow rate for using dialysate flow
can be obtained. (Normally 500L/min)
<Bypass flow>
Adjust the flow for bypass to 500mL/min with PC1.
Configuration of RV2
Left face
RV2 is attached to the OUT side line of AS2.
10-1
BHAJ01-010
<Illustration>
<Procedure>
Bypass flow
Adjust the flow to 500ml/min when its bypass.
After adjustment, apply paste 1401C to PC1 to fix
it.
Configuration of PC1
(Bypass flow)
Right face
10-2
BHAJ01-011
P3 actual flow: 13.3 to 15.3g (per 1 round) P4 actual flow17.5 to 18.5g (per 1 round)
Electric scale, container (approximately 2L)
Measure discharge volume and
calculate the coefficient value, to infuse precise solution.
<Illustration>
<Procedure>
Remove the front cover.
To uniform the suction amount of the concentrate solution,
rotate the P3 and P4 spindle to the position shown in the
figure.
Face up the white circle part.
P4 flow
Normal
0.130
0.60
Normal + B powder
0.130
0.30
11-1
BHAJ01-011
<Illustration>
<Procedure>
Operate the device in the preparation state.
Set the container containing water to the electric
scale and perform zero reset.
Put the A dialysate (P3) concentration solution
connector in the container and measure the suction
amount of the A dialysate for 3 rounds continuously.
Take out the A dialysate (P3) concentration solution
connector from the container and read the value on the
electric scale.
Measure the B dialysate (P4) similarly.
P4 theoreti
cal value
cal value
Normal
109.846
30
Normal + B powder
109.846
60
11-2
BHAJ01-012
12.
Standard
Required jig
Purpose
<Illustration>
Clamp
<Procedure>
Set the pressure gauge, piping components (with no water),
syringe to the clamp.
Pressure gauge
Shut off the adjusting tool for leakage test with a forceps
as in the left figure.
Clamp
Pressure gauge
This value E indicates the leakage amount from the piping components.
12-1
BHAJ01-013
Required jig
Purpose
components
Stroke: For syringe injection rate verification.
Overload: To verify whether the syringe is stopped at the specified pressure or not.
<Illustration>
<Procedure>
Stroke test
Syringe ratio of Maintenance 6 Device calibration
is to be 100%.
Move the pusher of heparin pump to the right end and
measure the position with the caliper square. Distance
A
Press the heparin pump flow display section and set the
HP injection speed to 9.9mL/hour.
Make sure the blood pump is running. (Without blood pump
revolution, the syringe pump does not work.)
Start up time measurement by a stopwatch simultaneously
with turning on the blood pump operation switch.
Memo
z The heparin pump operates in conjunction with the blood
pump.
z Measurement with the actual injection amount is
impossible due to individual difference of syringe.
Therefore, normality of the heparin pump injection
amount should be confirmed by obtaining the pusher
travel distance per 1 minute in the stroke test and
confirming the obtained distance is within the
standard range.
Turn OFF the heparin pump operation switch after operation
for 30 minutes then measure the pusher travel distance
with the caliper square.
Distance B
Travel distance per 1 minute =
Calculate (distance A [mm]Distance B[mm]) operation
time [min].
Confirm the travel distance per 1 minute is 0.494 to
0.546mm/min.
If out of the standard range, refer to BHTS**-003.
13-1
BHAJ01-013
Caution
z After the test, return the syringe ratio to the
original value.
Overload adjustment
Remove the cover for the upper left face.
Front
Weak
Strong
13-2
BHAJ01-014
<Illustration>
<Procedure>
Set the test tools to the blood circuit and operate the
blood pump at 350mL/min.
Discharge pressure to be 0.10Mpa (1.0kgf/cm2) or more.
Caution
z Specification of the blood circuit set here is as
follows. If a blood circuit not complying with the
specification, it will not be covered by the warranty.
z
14-1
BHAJ01-015
Difference between the set flow and actual flow: within 10%
Blood circuit, electric scale, stopwatch container
Adjustment of difference between the set flow and actual flow
<Illustration>
<Procedure>
Set the blood circuit.
Use the electric scale to measure the actual flow per one
minute by the given flow setting.
Adjust VR3 on the I/O board so that the difference between
the set flow rate and the actual flow rate becomes within
10%.
On Maintenance 4 Operation status, the blood pump
rotation number BP REAL value is displayed. Take it as
a guide to rotate VR3.
After adjustment, use the electric scale again to measure
the actual flow per one minute by the given flow setting
and confirm that it is within the standard.
Caution
z
15-1
BHAJ01-016
24 to 60g/h
Blood circuit, dialyzer, electric scale, container (approximately 2L), stopwatch
To confirm removed water volume when UF pump is stopped.
<Illustration>
<Procedure>
Dialysate display offset of Maintenance 6 Device
calibration is to be 0.
Set the blood circuit and dialyzer and operate them in the
preparation process.
Caution
z Ensure that the venous side of the blood circuit is
installed with a needle.
16-1
BHAJ01-016
<Illustration>
<Procedure>
Take out the arterial and venous end of the blood circuit
from the container and wait until there is no drop.
Caution
z Ensure that the drops are put in the container.
16-2
BHAJ01-016
<Illustration>
<Procedure>
Shutoff pressure adjustment
Standard model
BHAJ**-008
BHAJ**-023
RV2 adjustment
Standard model
BHAJ**-010
BHAJ**-025
16-3
BHAJ01-017
0.700 to 0.800mL/STROKE
Blood circuit, dialyzer, electric scale, container (approximately 5L), stopwatch
Measure discharge volume of pump and
calculate the coefficient value, to execute precise ultra-filtration.
<Illustration>
<Procedure>
Set the blood circuit and operate them in the preparation
process.
Caution
z Ensure that the venous side of the blood circuit is
installed with a needle.
Set the UF speed to 5.00L/h and set the target UF volume
to 2.50L/h or more.
Set the UF upper limit alarm setting value of Maintenance
2 Alarm setting to 100%. (Default value: 30%)
Change the UFP flow set value of Maintenance 6 to 0.750mL.
Wait until the dialysate temperature enters the range of
36.50.5 with the setting at 36.5.
Take out the arterial and venous end of the blood circuit
from the container and wait until there is no drop.
Caution
z Ensure that the drops are put in the container.
17-1
BHAJ01-017
<Illustration>
<Procedure>
Press the dialysis SW and start up the dialysis operation.
Start up the stopwatch simultaneously with the UF start.
memo
z When the UF speed dot display changes from lighting to
blinking, the UF starts.
17-2
BHAJ01-018
<Illustration>
<Procedure>
Set the blood circuit and operate it in the preparation
process.
Caution
z Ensure that the venous side of the blood circuit is
installed with a needle.
Set the UF speed to the given value.
memo
z Change the UF upper limit alarm setting value of
Maintenance 2 Alarm setting when performing with
high UF.
Wait until the dialysate temperature enters the range of
36.50.5 with the setting at 36.5.
Take out the arterial and venous end of the blood circuit
from the container and wait until there is no drop.
Caution
z Ensure that the drops are put in the container.
18-1
BHAJ01-018
<Illustration>
<Procedure>
Press the dialysis SW and start up the dialysis operation.
Start up the stopwatch simultaneously with the UF start.
memo
z When the UF speed dot display changes from lighting to
blinking, the UF starts.
18-2
BHAJ01-019
<Illustration>
<Procedure>
Set the blood circuit and operate it in the preparation
process.
Caution
z Ensure that the venous side of the blood circuit is
installed with a needle.
Set the UF speed to the given value.
19-1
BHAJ01-019
<Illustration>
<Procedure>
Press the dialysis SW and start up the dialysis operation.
Start up the stopwatch simultaneously with the UF start.
memo
z When the UF speed dot display changes from lighting to
blinking, the UF starts.
19-2
Balance test
: BHAJ**-017
BHAJ**-018
BHAJ02-020
1000mmHg
Required jig
Purpose
<Illustration>
<Procedure>
Turn ON the gas purge switch in the Preparation process
(after Standby process automatically). And while A or B
chamber is being filled with flesh dialysate (while FS1
is OFF), adjust the pinch cock (PC2) so that the dialysate
pressure at that time becomes -100 to 0 mmHg.
PC2
20-1
BHAJ01-021
495 to 515mL
Pean pinch, container (approximately 2L), electric scale
<Illustration>
<Procedure>
Remove the cover for the lower left face.
Operate the device in the preparation process (prepara
tion completion process).
Remove the V21 connector.*1
Shut off the silicon tube at the AS1 air vent side with
a pean pinch.
Sequence step
<MAINTE4>FLOWCHARTSTP
V1 V9b V28b
V4 V10 V29
BP Setting
value
88.8 rpm
REAL
REAL
Value
V8a
V27a
P1
V8b
V27b
P2
V9a
V28a
P3
P4
88.8 rpm
OFF
ON
Device calibration.
21-1
BHAJ01-021
<Illustration>
<Procedure>
Hi-ceramic pump
flashing time
flow
NO flow
45-48sec
Chamber A
Chamber B
3sec
Chamber A
21-2
BHAJ01-022
22.
Standard
250.2, 400.2
Required jig
Temperature calibration device (Code No. 0-506-001), ceramic driver for adjustment,
Phillips screwdriver
Purpose
To calibrate 2 points of offset and gain if the error is out of range, comparing device
indication and dummy resistance value.
<Illustration>
<Procedure>
Caution
z
Remove the cover of the upper right face and the electric
cover at the right face.
Remove the connector CN214 for the temperature sensor
to be worked on, which is on the I/O board, and install
the temperature calibration device.
Temperature calibration device dummy resistance value
Temperature
Resistance value
25
8.4940.024 k
4.9040.024 k
40
2-1
BHAJ00-023
Required jig
Purpose
<Illustration>
<Procedure>
Adjustment of reducing valve
Remove the cover of the bottom right face and the front
cover.
Set the device to the preparation stand by process.
Attach a pressure sensor to the out side of reducing valve.
Turn ON the V1 and V10 manually with Maintenance 4
Operation status.
Confirm the dialysate pressure value. If it is outside the
range of 0.034 to 0.038MPa (257 to 287mmHg), adjust the
reducing valve with a hexagon wrench of 5mm, aiming at
0.037MPa (280mmHg).
After adjustment, open V4 manually for approximately 2
seconds to let out the pressure contained in the device.
When the reducing valve has been adjusted, repeat the
above-mentioned procedure to confirm the reproductivity
of the pressure value.
Adjustment of fill-up pressure
Remove the front cover and the cover for the lower left
face.
Install the piping components and pressure gauge at the
confluence part of the P4 discharge and the mainstream.
23-1
BHAJ00-023
<Illustration>
<Procedure>
Configuration of RV1
Left face
23-2
BHAJ00-024
<Illustration>
<Procedure>
Remove the front cover.
Adjustment by stopwatch
Operate in the preparation process.
Display Maintenance 4 Operation status.
Measure with a stopwatch the time from the changeover of
A/B chamber until FS1 is turned on (no dialysate flow).
Adjust the needle valve (NV1) so that the measurement time
is within the standard range (32 to 34 seconds).
(Concentration pump stops after 30 secs from moving.)
Adjustment by flowmeter
Install the flowmeter to the drainage line and operate in
the preparation state.
Caution
Flow rate is different at pump flashing and completion
of filling.
Note that the reading position of the flow against the
float depends on the manufacturer and type of the
flowmeter. For our genuine flowmeter, top face of the
float is to be the reading point.
24-1
BHAJ00-025
Required jig
Purpose
<Illustration>
<Procedure>
ConfiguratioUNSETf RV2
(Bypass flow)
Right face
ConfiguratioUNSETf PC1,PC3
25-1
BHAJ00-025
<Illustration>
<Procedure>
1.Adjustment preparation
Remove the front cover and the cover for the lower left
face.
Install the pressure gauge to V4 IN side.
MAINTE
OPTION
ADJUST
BPM
MAINTE
<ADJUST5>DEBUG
Flow
rate feedback
FS5
FS5 output
value
Reduced
Flow
UNSET
8888
888
FS5
FS5 output
value
Voltage
888
8888
888.8
sec
Supply time
P2P2
control
voltage
8.8
Preparation
flow
888
Rinse
flow
888
25-2
BHAJ00-025
<Illustration>
<Procedure>
2. Adjustment at dialysate flow of 300mL/min
Set the P2 control voltage to 1.2V.
<ADJUST5>DEBUG
Flow
rate feedback
FS5
FS5 output
value
Reduced
Flow
UNSET
8888
888
FS5
FS5 output
value
Voltage
888
8888
888.8
sec
Supply time
P2P2
control
voltage
8.8
Preparation
flow
888
Rinse
flow
888
25-3
BHAJ00-025
<Illustration>
Confirm the CONV
800 to 840mL/min.
<Procedure>
FL value is
in
the
range
of
value40mL/min.
Change the coefficient 1 in the FS5 output value =
coefficient 1 x voltage + coefficient 2 so that the
FS5 output value is in the range of CONV FL
value40mL/min if it is out of range.
(If deviated to the positive side, input the negative
value. If deviated to the negative side, input the
positive value.)
Caution
z When the coefficient 1 is changed, confirm the
FS5 output value at 2. Adjustment when the
dialysate flow is 300mL/min too.
Fix the lock nut with a monkey wrench after completing
the RV2 adjustment.
Set the Flow rate feedback of Maintenance 5 to SET.
Hide the Adjustment menu.
Caution
z The Adjustment menu is for the manufacturer to
make adjustment. It includes important items
concerning device control. After using the
Adjustment menu, be sure to hide it to prevent
uninformed personnel from changing the contents.
How to hide it is the same as how to display it.
After adjustment, press the dialysate flow display
sectioUNSETpen the dialysate flow setting window, and
set the value to the usual dialysate flow rate.
After adjustment, apply paste 1401C to PC3 to fix it.
25-4
BHAJ00-025
<Illustration>
<Procedure>
<Bypass flow>
Run the device in the process of completed preparation.
Set the Flow rate feedback of Adjustment 5 to
UNSET.
Adjust P2 control voltage to get the CONV FL
value in the range of 80040 ml/min when its UNSETt
bypass.
For the converted flow rate, confirm after passing more than 2
rounds.
25-5
BHAJ00-026
P3 actual flow: 13.3 to 15.3g (per 1 round) P4 actual flow17.5 to 18.5g (per 1 round)
Electric scale, container (approximately 2L)
Measure discharge volume and
calculate the coefficient value, to infuse precise solution.
<Illustration>
<Procedure>
Remove the front cover.
To uniform the suction amount of the concentrate solution,
rotate the P3 and P4 spindle to the position shown in the
figure.
Face up the white circle part.
P3 flow
P4 flow
0.180
0.60
0.180
0.30
disinfection
Hot water citric acid
disinfection + B Powder
26-1
BHAJ00-026
<Illustration>
<Procedure>
Operate the device in the preparation state.
Set the container containing water to the electric
scale and perform zero reset.
Put the A dialysate (P3) concentration solution
connector in the container and measure the suction
amount of the A dialysate for 3 rounds continuously.
Take out the A dialysate (P3) concentration solution
connector from the container and read the value on the
electric scale.
Measure the B dialysate (P4) similarly.
Based on the measured value, calculate the coefficient by
the following formula.
P3 = (measured value 3)P3 theoretical value
P3 = (measured value )P3 theoretical value
P3 theoreti
P4 theoreti
cal value
cal value
79.333
30
79.333
60
disinfection
Hot water citric acid
disinfection + B powder
Input the obtained coefficient to Maintenance 6 Device
calibration and measure for 3 rounds each suction amount
again.
Based on the measured value, calculate the coefficient by
the following formula.
Measured value 3 = suction amount per 1 round
If the calculation result is within the standard range,
regarded as passed.
If out of standard range, perform measurement again.
Return the chamber volume of Maintenance 5 Device
calibration to the original value.
26-2