IRRIGATION
Demand No: 40
POLICY NOTE
2011 -2012
K.V.RAMALINGAM
MINISTER FOR PUBLIC WORKS
Government of Tamil Nadu
2011
INDEX
Sl.
No.
Subject
Page
1 Water Resources Department 1
2 Special Initiative Schemes of
the Honble Chief Minister
4
3 Inter State River Water Issues 11
4 Construction of Groyne field
along Puduchery Coast
39
5 Draft Dam Safety Bill, 2010 41
6 Dam Rehabilitation and
Improvement Project (DRIP)
48
7 13
th
Finance Commission
Grants-in-Aid Programme
51
8 Irrigation Schemes 58
9 National Agriculture
Development Programme
Under Centrally Sponsored
Scheme
69
10 Part II Schemes
69
11 Flood Mitigation Schemes 77
12 Tamil Nadu Irrigated
Agriculture Modernisation and
Water - Bodies Restoration
and Management (TN
IAMWARM) Project
82
13 Jawaharlal Nehru National
Urban Renewal Mission.
(JNNURM)
86
14 Artificial Recharge Scheme 89
15 Participatory Irrigation
Management (PIM)
91
16 Linking of Rivers within the
State
94
17 Repairs, Renovation and
Restoration of Water Bodies in
the 51 Drought Prone Blocks
in Tamil Nadu
98
18 Irrigation Management
Training Institute (IMTI)
98
19 State Ground and Surface
Water Resources Data Centre
100
20 Institute for Water Studies
103
21 Directorate of Boilers 107
22 Providing last mile
connectivity through wide
area network connections to
Water Resources
Department.
110
PREFACE
Public Works Department is one of
the oldest Service Departments of the
Government, serving in the construction
field and maintenance of Irrigation
Structures for the past 153 years.
Many dams stand as a testimony to
our engineering skill. The organization
marches towards better service delivery to
the people by adopting to the present day
trend of e-governance. The concept of
artificial recharge, better water
management, restoration of water bodies,
water users participation in the projects to
derive maximum benefit is well
understood. The department is working
very hard to realise maximum irrigation
efficiency.
The necessity for intra-linking of
rivers for diversion of flood water and
enhancing the storage capacity of water
bodies to provide adequate water for
irrigation, drinking and other purposes
have been well taken. The Department is
taking all efforts for better service delivery
with this long term vision.
1
1. WATER RESOURCES DEPARTMENT
1.1. Introduction
Improving and sustaining the precious
water resources is the main objective of the
Water Resources Department. The Water
Resources Department of Tamil Nadu is
responsible for planning, developing and
managing the States water resources for
irrigation, maintenance, impounding and
regulation, flood control and diversion,
drainage, coastal protection, regulation of
ground and surface water and interlinking of
rivers.
Tamil Nadu has a long history of creation
and maintenance of irrigation structures
dating back to first century A.D. The most
famous irrigation structure Grand Anicut
built by Chola Rulers which is still
functioning is an example. The vast network
of irrigation systems created so far has
made it possible for agricultural
development of the nation.
1.2. The Public Works Department is divided into
two wings viz., the Water Resources
Department and the Buildings Organisation
(Public Works Department). The Water
2
Resources Department functions on river
basin framework. The State has been
sub-divided into four Regions, each headed
by a Chief Engineer, located in Chennai,
Trichy, Madurai and Coimbatore. These
Chief Engineers are the Basin Managers for
the defined basin boundaries in their
jurisdiction. Apart from this, three Chief
Engineers stationed in Chennai are carrying
out specialized functions and they are
designated as Plan Formulation; Operation
and Maintenance; Design, Research and
Construction Support. Further the Institute
for Water Studies and State Ground and
Surface Water Resources Data Centre are
headed by two Chief Engineers at Chennai.
The Engineer-in-Chief, Water Resources
Department, Public Works Department
coordinates the functions of these nine
Chief Engineers and acts as the Technical
Head of this Department.
1.3. Irrigation Systems and Status
There are 34 river basins in the State which
have been grouped into 17 major river
basins and 127 sub-basins. The average
rainfall of the State is 911.60 mm.
The total surface water potential of the
State has been estimated as 853 T.M.C.ft.
which includes 261 T.M.C.ft. contributed by
3
the neighbouring States and this has been
fully harnessed. There are 75 large
and 7 small dams in the State with
a combined storage capacity of
233.20 T.M.C.ft. Further, there are
39,202 tanks in the State, out of which
13,699 tanks are under the control of the
Water Resources Department.
The Government have taken initiatives to
improve the water use efficiency by means
of modernisation of irrigation systems,
improved service delivery, participation of
farmers, canal automation, water use
efficiency and performance evaluation
studies, building the capacity of Water
Resources Department officials and farmers.
1.4. Ground Water Resources
The ground water potential of the State has
been assessed as 754 T.M.C.ft. It is
estimated that out of this total available
resources in the State, 85% has been
developed for utilisation. Among the total
386 blocks in the State, 139 have been
classified as over-exploited, 33 as critical,
67 as semi-critical and 11 as saline. The
remaining 136 blocks are considered safe.
Therefore, it is necessary to curtail over
exploitation of ground water which can be
4
done only through continuous monitoring
and effective intervention. In this direction,
efforts are being taken to maintain the
quality of ground water. Also by the
constructions of Artificial Recharge
Structures, effective ground water recharge
is accomplished.
2. SPECIAL INITIATIVE SCHEMES OF
THE HONBLE CHIEF MINISTER
2.1. Intra Linking of Cauvery with Agniar,
South Vellar, Pambar, Manimuthar,
Kottakaraiyar, Vaigai and Gundar
The capacity of the proposed canals are
6300 cusecs. By implementing the scheme,
the flood water will be diverted to the tanks
in the Districts Pudukottai, Sivagangai,
Ramanathapuram and Virudhunagar. This
(i) Excavation of new link canal
from Kattalai Barrage to
Manimuthar river
Estimate amount Rs.3787 crore
(ii) Excavation of new link canal
from Manimuthar river to
Gundar
Estimate amount Rs.1379 crore
5
will be benefitted during South West
Monsoon period through the Anicuts already
in existence. It is also proposed to divert
the flood flows in the tributaries of Cauvery
namely Ariyar and Koraiyar (through which
the proposed canal passes) to avoid
inundation due to flood in Trichy Town.
Hence the proposal for Connecting Koraiyar
and Agniyar River to divert the flood surplus
of Koraiyar river to prevent inundation of
Trichy City is proposed to be taken up. The
Government of Tamil Nadu will take up
detailed investigation and the scheme will
be posed to Government of India for
financial assistance under Flood
Management Programme.
2.2. Inland Water Ways
Out of the five Inland Waterways notified
by the Government of India, the stretch of
132 Kms between Pulicat lake to
Puducherry falls in Tamil Nadu. The
Government proposes to make it a
navigable waterway with the help of
Government of India.
6
The Scheme involves the following
components.
1. The entire Buckingham Canal is
to be desilted.
2. The Drainage culverts are to be
modified.
3. The approach road and boat
jetty are to be created.
4. Creek area to be desilted
besides acquisition of patta land.
Once the project is completed, the
waterway will become an economical and
popular mode of transport for commercial
goods, passenger movement and tourism
development.
For this scheme, 90% Central assistance
has been sought for. The estimate cost of
the project is Rs.650 crore. The
Government of Tamil Nadu would undertake
detailed investigation and make all
necessary efforts to carry out the scheme.
7
2.3. Construction of Check Dam
Across River Cauvery near
Kambarasampettai Village in Srirangam
Taluk of Trichy District.
Construction of a check dam across river
Cauvery at upstream of Kambarasampettai
village in Srirangam Taluk of Trichy District
to benefit Combined Water Supply Scheme
for Ramanathapuram and Sivagangai
Districts.
By implementing this scheme, ground water
will be recharged in the Cauvery bed and
the surrounding areas. It is proposed to
give assured water supply for Combined
Water Supply Scheme for Ramanathapuram
and Sivagangai Districts. Administrative
Sanction has been accorded for an amount
of Rs.32 crore for implementation under
NABARD assistance.
2.4. Athikadavu-Avinashi Canal Scheme
This scheme envisages for diversion of flood
surplus of Bhavani River to feed 71 tanks
and 538 ponds. A Technical Expert
Committee was constituted under the
Chairmanship of Prof. Dr.A.Mohanakrishnan,
Advisor to Government (WR) to investigate
viability of the scheme and based on his
8
recommendation, detailed investigation is in
progress.
The carrying capacity of the canal is
2000 cusecs. The total quantity of water to
be diverted during 20 days surplus is
2 T.M.C.ft. and the water will be diverted
only when the Bhavanisagar dam surpluses.
The total length of the canal is 129.765 km.
The salient engineering features in the
proposal include 10 nos. of siphon
aqueducts, 2 nos. of super passages and
6 nos. of under tunnels for a length of
3700 m.
The details of canals are:
Main canal
Length of canal 35.20 Km
Number of tanks
benefitted
6
Number of ponds
benefitted
20
9
Avinashi Branch Canal
Length of canal 21.65 Km
Number of tanks
benefitted
3
Number of ponds
benefitted
94
Perundurai Branch Canal
Length of canal 72.915 Km
Number of tanks
benefitted
62(25 PWD tanks,
37 Union tanks)
Number of ponds
benefitted
424
The proposed Athikadavu-Avinashi flood
flow canal will benefit the Unions of
Karamadai, Annur, Avinashi, Bhavanisagar,
Nambiyur, Uthukkulli, Chennimalai and
Thiruppur. By implementing this scheme,
nearly 25,000 acres of irrigation land will be
benefitted. Tentative cost of the project is
Rs.1488 crore.
2.5. Krishna Water Supply Project
As per the Inter State Agreement with the
Government of Andhra Pradesh, a total
quantity of 12 T.M.C.ft. of Water per year is
to be realized at the Tamil Nadu border.
10
Accordingly, water is to be released from
Kandaleru Reservoir to Poondi Reservoir
every year for Chennai City Water Supply.
A total quantity of 53.735 T.M.C.ft. of water
has been received since its inception in
1996. During last year, a quantity of
4.661 T.M.C.ft. of water has been received
from 07.10.2010 to 27.01.2011. During this
year a quantity of 3.375 T.M.C.ft. of water
has been received from 24.06.2011 to
22.08.2011.
2.6. Proposal for additional storages for
Chennai City Water Supply
The Honble Chief Minister instructed to look
for additional storage facility to store more
water, as water is not being fully harnessed
by Tamil Nadu. As per the instruction of the
Honble Chief Minister, the existing reservoir
capacity of Chennai City will be augmented
by 4.2 T.M.C.ft. at a total cost of
Rs.1851 crore. The new storage capacity
will be created at Thervaikandigai,
Thirukandalam and Ramanjeri by 1 T.M.C.ft.
each. 0.9 T.M.C.ft. will be added by
restoring 6 tanks namely Nemam, Porur,
Iyanambakkam, Ambattur, Korattur and
Madavaram and a further 0.3 T.M.C.ft by
deepening the Cholavaram tank.
11
Existing Chennai City Water Supply
Reservoirs
Sl.
No.
Name of the
Reservoir
Water
Spread
Area
(Acres)
Capacity
in
T.M.C.ft.
1 Poondi 8,540 3.231
2 Redhills 13,345 3.300
3 Chembarambakkam 6,300 3.645
4 Cholavaram 1,340 0.881
TOTAL 29,525 11.057
In the First Phase, Restoration of
5 Tanks (Nemam, Porur, Iyanambakkam,
Chembarambakkam and Cholavaram) would
be taken up during 2011-2012 to create
additional storage of 1.12 T.M.C.ft. of
water.
3. INTER STATE RIVER WATER ISSUES
3.1. Cauvery Waters Issue
The Supreme Court in their order dated
04.05.1990 directed the Government of
India to constitute a Tribunal for
12
adjudication of the Cauvery Water Dispute.
The Government of India constituted the
Cauvery Water Disputes Tribunal in their
notification dated 02.06.1990. The Interim
Order on the first petition filed by Tamil
Nadu was pronounced by the Cauvery
Water Disputes Tribunal (CWDT) on
25.06.1991. This was published in the
Gazette of the Government of India after
the Supreme Court's opinion on the
Presidential Reference No. 1 of 1991.
A "Scheme for implementing the Interim
Order of the Tribunal was notified in the
Gazette by the Government of India on
11.08.1998. As per this Scheme, a Cauvery
River Authority (CRA) headed by the Prime
Minister of India has been constituted with
the Chief Ministers of all the Party States as
Members. To assist the Authority, a Cauvery
Monitoring Committee headed by the
Secretary to Government of India, Ministry
of Water Resources, with the Chief
Secretaries and Chief Engineers of the basin
States as Members, has also been
constituted.
The Tribunal after examining all the
documents and statistics of the case and
hearing the arguments put forth by the
party States, finally pronounced its final
13
decision on 05.02.2007 under section 5(2)
of the Inter State River Water
Disputes Act, 1956.
The salient features of the Award are:
The yield of the Cauvery at the Lower
Coleroon Anicut site on the basis of
50% dependability is 740 T.M.C.ft. as
per the report of the Cauvery Fact
Finding Committee.
Allocation made at 50% dependability
is as below:
in T.M.Cft
Tamil Nadu
At Billigundulu or any other
agreed point at the common
border between Karnataka and
Tamil Nadu
182
419
Flow available in Tamil Nadu
between Billigundulu and
Mettur Dam
25
Total flow at Mettur Dam 207
Flow available in Tamil Nadu
below Mettur Dam
212
Total for Tamil Nadu 419
14
Karnataka 270
Kerala
Kabini sub-basin 21
30
Bhavani sub-basin 6
Amaravathi sub-basin 3
Total for Kerala 30
Puducherry 7
Inevitable surplus 4
Environment Protection (At
Billigundulu or any other agreed
point at the common border between
Karnataka and Tamil Nadu)
10
Grand Total 740
As per the final order, the flow that
will be made available at Mettur
Dam will be 207 + 10 T.M.Cft.
for Environmental Protection
= 217 T.M.Cft., as against 205 - 6
(for Puducherry) = 199 T.M.Cft.as per
the interim order.
The use of Ground Water by any State
shall not be reckoned as use of water
of the river Cauvery.
The Tribunal has recommended for
constitution of a Cauvery Management
Board and Cauvery Water Regulation
15
Committee to effectively implement
the order.
The Government of Tamil Nadu filed a
petition in the Tribunal under section 5(3) of
the ISRWD Act seeking clarification and
explanation to the Tribunal's final orders in
respect of certain clauses. All the Party
States and the Government of India have
filed petitions in the Tribunal under section
5(3) of the Inter-State River Water Disputes
Act, 1956 seeking clarification and
explanation to the Tribunals final order in
respect of certain clauses. The other Party
States and the Government of India have
also filed petitions in the Tribunal under
section 5(3) of the said Act seeking
clarification.
The Government of Karnataka and Kerala
have filed Special Leave Petitions in the
Supreme Court in April, 2007, against the
final order of the Tribunal. A Special Leave
Petition was also filed by Tamil Nadu in the
Supreme Court in May, 2007, against
certain aspects of the order of the Tribunal.
Only after the Special Leave Petitions are
heard and disposed of, by the Hon'ble
Supreme Court, the petitions filed under
16
section 5(3) of the Act will be heard by the
Tribunal and a further report sent to the
Government of India. Thereafter, the final
order will be published in the Gazette of the
Government of India and it will be binding
all the Party States. Till then, the interim
order already passed by the Tribunal will be
in force.
Tamil Nadu has also filed an I.A. in the
Supreme Court in November 2008 against
the unilateral action contemplated by
Karnataka in proceeding with the execution
of the Sivasamudram Seasonal Power
Scheme and the Mekedatu Hydro Electric
Scheme and praying for directions to the
Central Government to take up all the Hydel
Schemes in Cauvery between KRS and
Mettur by the NHPC as a package deal, as
already contemplated by them. In this I.A.,
an additional affidavit was filed by Tamil
Nadu in August, 2009 objecting to the
unilateral action of Karnataka in taking up
the Sivasamudram Hydro Electric Project.
This is still pending in the Supreme Court of
India.
Tamil Nadu has also filed two Original Suits
in the Supreme Court, O.S.No.3 of 2001 on
19.09.2001 and O.S.No.3 of 2002 on
10.07.2002, praying mainly for passing a
decree of mandatory injunction directing the
17
Central Government to frame either a New
Scheme in substitution / replacement of the
1998 Scheme or an additional Scheme
making adequate provisions therein for all
matters necessary to give effect to the
Interim Order dated 25.06.1991 passed by
the Cauvery Water Disputes Tribunal. The
Supreme Court has ordered that these Suits
will be taken up after the SLPs are heard
and disposed of.
During the current year 2011-2012, the
Mettur Dam was opened for irrigation on
the 6
th
June, for the first time after
independence before the normal date of
12
th
June when the storage in the reservoir
was 87.2 T.M.C.ft. With the available
storage in the Mettur Dam and anticipated
inflows, it is hoped that the irrigation can be
carried on without much difficulty.
The Government on 25.7.2011 have filed an
I.A. in the Supreme Court for early hearing
of the Civil Appeals or alternatively issue
directions to the Cauvery Water Disputes
Tribunal for the quick disposal of the
clarification petition pending before them. It
is hoped that the Supreme Court of India
will take up this I.A. for hearing early.
18
3.2. Mullai Periyar Dam
After completion of the emergency and
medium term strengthening measures for
the Main Dam, the Central Water
Commission recommended on 29.04.1980
to raise the water level to 145 ft. But, the
Government of Kerala did not agree for
raising the water level from 136 ft. to
145 ft., even after the main dam has been
fully strengthened, they insisted that the
water level should continue to be
maintained at 136 ft.
In the Writ Petition filed in the Supreme
Court along with the connected matters, the
Supreme Court pronounced its judgement
on 27.2.2006 and permitted the
Government of Tamil Nadu to raise the
water level from the temporarily brought
down level of 136 ft. to initially 142 ft. and
also to carry out further strengthening
measures as suggested by the Central
Water Commission, to the Baby dam and
Earth dam. The Supreme Court has also
held that the State of Kerala and its officers
are restrained from causing any
obstructions for carrying out the balance
strengthening works. The Supreme Court in
the same order stated that after the
strengthening works are completed to the
satisfaction of the Central Water
19
Commission, independent Experts would
examine the safety angle before the water
level is permitted to be raised to 152 ft.
Soon after the Supreme Court pronounced
its judgement, the Kerala Government
passed amendment to The Kerala Irrigation
and Water Conservation Act, 2003 known as
Kerala Irrigation and Conservation
(Amendment) Act, 2006on 18.03.2006
patently to thwart the Supreme Courts
Order and fixed the FRL of Mullai Periyar
Dam as 136 ft. The Government of Tamil
Nadu filed a Civil Suit (O.S.No.3 of 2006) on
31.3.2006 in the Supreme Court praying to
declare "The Kerala Irrigation and Water
Conservation (Amendment) Act 2006" as
unconstitutional in its application and effect
on Mullai Periyar Dam.
As per the directions of the Supreme Court
on 25.9.2006 and the decision of the all
party meeting held on 23.10.2006, a
meeting of the Chief Ministers of both the
States in the presence of the Hon'ble
Minister for Water Resources, Government
of India, was held on 29.11.2006. In
continuation of that meeting, a Ministers'
level meeting was held on 18.12.2006
before the Hon'ble Minister for Water
Resources in New Delhi. No consensus was
reached in these meetings.
20
Later, as suggested by the Hon'ble Prime
Minister, a meeting of the Hon'ble Chief
Ministers of Tamil Nadu and Kerala was
again held in New Delhi on 19.12.2007
before the Hon'ble Union Minister for Water
Resources. No consensus was reached at
this meeting also.
The three Member Special Bench which
heard arguments from 21.10.2009 till
10.11.2009 viewed, among others, that
since certain substantial questions of law
are involved in the interpretation of the
Constitution to decide the Suit on the issues
framed, it would be necessary to place the
matter before the Chief Justice for
directions for placing before a Constitution
Bench.
The Constitution Bench which was later
formed, heard the Suit from 20.01.2010
onwards and on 18.02.2010 ordered the
formation of an Empowered Committee
consisting of 5 Members, including the
Chairman, Dr.A.S.Anand, Former Chief
Justice of India. The Committee has been
requested to analyse all the issues except
legal and submit a report as far as possible
within six months. The Hon'ble Supreme
Court in its order dated 06.04.2011 has
21
granted further six months time for the
Committee.
The Empowered Committee has so far met
9 times. The Governments of Tamil Nadu
and Kerala have submitted their respective
Memorandum before the committee. The
Empowered Committee has framed five
issues, in which the New dam proposal of
Kerala is one of the issues. The
Government of Tamil Nadu have submitted
before the Supreme Court as well as before
the Empowered Committee that in as much
as the dam has been strengthened on the
suggestions made by the Central Water
Commission and the concurrence of
Government of Kerala, functioning as a new
dam, there is no need for a new dam as
contended by the Government of Kerala.
Under the Empowered Committee, a
Committee to Co-ordinate (CTC) to carryout
the investigations, testing and studies (ITS)
on Mulla Periyar Dam under the
Chairmanship of Dr. C.D.Thatte, Member of
the Empowered Committee with Members
drawn from CWC, CWPRS, CSMRS and
representatives of the States has been
constituted. The Committee to
Co-ordinate (CTC) has proposed to conduct
several tests and technical studies, a few of
22
which have been completed and others at
various stages.
Tamil Nadu filed two Interlocutory
Applications (IA) in the Supreme Court: One
on 11.03.2011, (No. 14/2011), to restrain
the State of Kerala from proceeding with
the construction of a new dam; and another
on 01.04.2011 (No. 15/2011) inter alia, to
direct the State of Kerala to permit the
State of Tamil Nadu to take up the work of
relaying wearing coat on the top of the
Baby Dam, as part of maintenance work, to
which the Government of Kerala has
objected. Kerala filed its counter in May
2011. Rejoinder Affidavits to the Counter
Affidavit of Kerala have been filed on
02.08.2011 before the Hon'ble Supreme
Court of India.
On 01.08.2011 the State of Kerala filed an
Application for taking on Record 'The
Feasibility Report of a New Dam at Mullai
Periyar, July 2011' before the Empowered
Committee which was requested by the
Committee. Counter for this application on
behalf of Tamil Nadu, reiterating that there
is no need for a new dam, will be filed
before the Empowered Committee shortly.
23
The Government of Tamil Nadu will
effectively pursue the arguments before the
Constitution Bench of the Supreme Court of
the Empowered Committee to safeguard
their interests.
3.3. Palar
The Government of Tamil Nadu filed a
Original Suit on 10.02.2006 in the Supreme
Court to restrain the Government of Andhra
Pradesh from constructing a reservoir
across Palar at Ganeshapuram, Kuppam
Taluk, Chitoor district, Andhra Pradesh as it
would primarily affect number of drinking
water schemes along the river in Tamil
Nadu.
After hearing the case, the Supreme Court
in its order dated 07.01.2008 made it clear
that the Union of India may convene a
meeting between the two States to settle
the dispute.
Following this, a meeting at official level
was held by the Chairman, Central Water
Commission in New Delhi on 11.03.2008.
After deliberations it was decided that the
Government of Andhra Pradesh will not go
ahead with the project before the issue is
settled and both the States have been
24
asked to provide technical information.
Thereafter, a Study Group which was
constituted to go into the availability of
water in the Palar Basin has again
established that the Palar Basin is a deficit
basin. In the meantime the Supreme Court
framed issues (7 issues) to decide the Suit.
In its hearing on 28.3.2011, the Supreme
Court requested the Secretary, Ministry of
Water Resources to assist and help the
parties to arrive at an negotiated settlement
and submit a report.
The Secretary, Ministry of Water Resources
convened a meeting on 26.05.2011 at New
Delhi with the officials of the Government of
Tamil Nadu and Andhra Pradesh. During
that meeting it was insisted that
construction of reservoir across Palar by the
Government of Andhra Pradesh neither big
nor small is not acceptable to Government
of Tamil Nadu, as it will affect even the age
old usage for drinking water and irrigation.
This Government are taking all sincere
efforts to safeguard the interest of Tamil
Nadu.
25
3.4. Parambikulam Aliyar Project - Review
of Agreement
The Parambikulam Aliyar Project, a multi-
valley, multi-purpose, mammoth project,
was planned, designed and executed by the
Government of Tamil Nadu as one of the
Second Five Year Plan Projects, with the
consent and co-operation of the
Government of Kerala for sharing mutual
benefits through the utilization of flows in
the rivers of Anamalayar, Nirar, Sholayar,
Parambikulam, Palar and Aliyar and the
streams flowing into them, for generation of
Hydro Electric Power, irrigation, drinking
water supply and industrial use in both the
States. An agreement therefore between
the Government of Tamil Nadu and Kerala
was entered into on 29.05.1970 with
retrospective effect from 09.11.1958. The
taluks of Pollachi, Palladam, Udumalapettai
and Dharapuram in the districts of
Coimbatore, Tiruppur and Erode are
benefitted. The Palakad District of Kerala
State is also benefitted. This Agreement
was due for review on 09.11.1988.
Accordingly, both the Governments
exchanged the documents for review on
21.09.1989 and since then held several
Inter- State discussions for continuation
after review for another 30 years.
26
In the Minister level meeting held between
Governments of Kerala and Tamil Nadu on
10.06.2002 at Chennai, a decision was
taken to constitute a Technical Committee
comprising of Engineers from both the
States to first identify the areas where
amendments may be required in the
Agreement and to facilitate the review at
the Government level. The Technical
Committee submitted its Report in May
2003. The Report was discussed in the
Minister level meeting held on 10.11.2003
at Chennai and on 4
th
January 2004 at
Thiruvananthapuram.
After prolonged correspondence, a meeting
at the Chief Secretary level was held on
30.05.2008 at Thiruvananthapuram. In that
meeting it was decided to exchange more
information and data pertaining to the
review of the Agreement and to have
another meeting at Chennai. Accordingly,
the meeting at Chennai was held on
27.02.2009 and it was decided to have a
meeting at the Secretary level to examine
all the issues in their entirety and work out
a single package that can be placed before
the Hon'ble Minister of the concerned
States. As per this decision, meetings at
Secretary level were held in
Thiruvananthapuram on 08.04.2009 and on
27
24.04.2009 and 25.04.2009 at Chennai.
The Chief Secretary level meeting was held
on 21.01.2011 at Thiruvananthapuram.
The following decisions were taken in that
meeting.
A) Anamalayar
Diversion of 2.5 T.M.C.ft. of water
from Anamalayar to Tamil Nadu.
Kerala informed that the site
proposed by it for the construction of
Reservoir is technically feasible for the
diversion of 2.5 T.M.C.ft. of water to
Tamil Nadu. But, so far, no Project
Report has been sent to Tamil Nadu.
It has been decided that Kerala will
send the Project Report to Tamil Nadu
and Tamil Nadu will send its views
within two months from the date of
receipt of Project Report.
B) Manacadavu
Kerala requested increase of their
share of water at Manacadavu weir
from 7.25 T.M.C.ft. to 12.00 T.M.C.ft.
28
C) Balancing reservoir above
Manacadavu Weir
Kerala are not agreeable to the
proposal of Tamil Nadu for
constructing a reservoir capacity of
about 0.5 T.M.C.ft above the existing
Manacadavu Weir to regulate the
flows to Kerala. It was explained that
Tamil Nadu can consider the increase
in supply at Manacadavu over
7.25 T.M.C.ft. if only Kerala give
concurrence for the balancing
reservoir.
D) Nirar - Nallar Straight Cut
Tamil Nadu reiterated that the
scheme has to be implemented. But
Kerala informed that this issue is
outside the scope of Agreement
review. However Kerala requested
Tamil Nadu to send the benefits that
Kerala could get out of this scheme
for their consideration.
It was considered that further discussions
may be held at Ministers level of both
States.
29
The Government is taking all the possible
steps to complete the review of this
Agreement quickly.
3.5. Neyyar Left Bank Canal Irrigation
Project
The Neyyar Irrigation Project both first and
second stages were planned and executed
by the Government of Kerala. Due to the
States' Reorganisation in 1956, a portion of
the ayacut localized to be served by this
project to an extent of 9200 acres lying in
the Vilavancode Taluk got transferred to
Madras State (Tamil Nadu) and forms part
of Kanyakumari District. The canal works
required to feed this ayacut were executed
by the State of Tamil Nadu at their cost with
the approval of the Central Government and
the Government of Kerala. The project is in
operation from the year 1965.
Eventhough the Government of Kerala
agreed on the sharing of cost etc., they did
not concede to the request of Tamil Nadu
for entering into an agreement on the lines
suggested by Tamil Nadu but kept pending
for long. In 1999, Kerala took the stand for
the first time that since Neyyar is not an
inter-state river, it would not be necessary
to conclude an inter State agreement
30
regarding the sharing of waters of this river.
The Government of India informed
this Government that due to the
non-cooperation from the Government of
Kerala, it could not convene the meeting for
resolving the issue, but suggested to
continue the bilateral talks between the two
Governments and Central Water
Commission will extend its help whenever
required.
Initially the State of Kerala was supplying
water to this area of Tamil Nadu through
the left bank canal of the project, even
though the supply made was very much
below the designed discharge of
150 cusecs. The adhoc supply was made
upto February, 2004 and after that the
Government of Kerala unilaterally stopped
the supply of water.
In 2007, Kerala stated that as per the
Resolution passed in the Kerala Legislative
Assembly on 18.10.2006, water will be
supplied to Tamil Nadu from the Neyyar
dam after realizing the value of the water so
given. Tamil Nadu are of the firm view that
since Neyyar is an inter State river, as per
Section 7 of the Inter State River Water
Disputes Act, 1956, the question of paying
any seigniorage or additional rate or fee (by
whatever name called) in respect of the use
31
of such water by any other State or the
inhabitants thereof will not arise.
The Government of Kerala reiterated that
Neyyar is not an inter State river,
eventhough Tamil Nadu has established
from the topo sheets of the Government of
India that the river Neyyar is an Inter State
river.
On 26
th
June 2008, the Government of
Kerala sent a draft agreement prepared by
them. As some clauses had to be changed
or added, a recasted draft was sent by the
Government of Tamil Nadu to the
Government of Kerala on 31
st
October 2008,
which was also not accepted by that
Government.
Again a fresh draft Agreement was sent by
the Government of Tamil Nadu to the
Government of Kerala on 19.05.2009 for
their concurrence. But, the Government of
Kerala, without considering it, sent their
draft Agreement on 11.01.2010. This was
found to be not acceptable to Tamil Nadu.
Subsequently, a team of technical officers of
both the Governments held discussion on
6.5.2011 at Thiruvananthapuram to find a
mutually acceptable agreement. But no
consensus was reached. The Government of
Tamil Nadu have also approached the
32
Government of India to advise the
Government of Kerala to conclude an
agreement.
Notwithstanding the arguments and
counter-arguments in this issue, the
Government of Tamil Nadu are genuinely
interested to have the Neyyar river issue
settled amicably and an agreement
acceptable to both the States execute at the
earliest. This Government is taking all
efforts in this regard.
3.6. Shenbagavalli Anicut
Shenbagavalli Anicut is a small diversion
anicut built at the junction of two
streams viz., Puliampattithodu and
Chokkampattithodu in Periyar basin lying in
Kerala State limits just to the west of Tamil
Nadu border. This anicut is reported to be in
existence since 1773 AD and it diverts flows
to mainly two tanks namely Kulasekaraperi
and Raisingperi in Sivagiri Taluk, through
which 10,924 acres are irrigated.
The Anicut needed repairs. Hence, with
reference to the estimates furnished by the
Government of Kerala a part of amount
Rs.5.15 lakhs (50% of estimated cost) for
repair work was deposited, to the
Government of Kerala in March 1986 but
33
was returned by them in December 2005 on
the pretext that Kerala could not undertake
the repair works of the Shenbagavalli Anicut
as it is situated in the core zone of the
Periyar Tiger Reserve.
The Government thereafter took up the
issue with the Government of Kerala for
carrying out the repair works on their own
to which the cost would be reimbursed by
the Government of Tamil Nadu or in the
alternative allow Tamil Nadu to carryout the
same. There had not been positive response
from the Government of Kerala. Hence, the
Government of Tamil Nadu has once again
taken up the issue with the Government of
India to advise the Government of Kerala on
1.8.2011 to co-operate for carrying out the
repair works to the Shenbagavalli Anicut
either by the Government of Kerala or by
Government of Tamil Nadu.
The Government are taking earnest efforts
to carry out the repair works and protect
the interests of the Agriculturists of that
area.
34
3.7. Inter Linking of Rivers
Mahanadhi Godavari Krishna
Pennar Palar Cauvery Vaigai
Gundar link
The National Water Development Agency
(NWDA) has prepared the feasibility report
for interlinking of Mahanadhi Godavari
Krishna Pennar Palar Cauvery Vaigai
Gundar link. It has assessed the overall
surplus from Mahanadhi and Godavari as
925 TMC after allowing for all future in-
basin requirements. It has proposed to
utilize this surplus for various purposes like
irrigation, drinking water, industrial use etc.
under the Peninsular Component. They
have assessed the benefits that would
accrue as about 3 Million hectares of
additional irrigation and substantial
additional Hydro Power, besides several
other intangible benefits. Under this
scheme, Tamil Nadu is expected to get
about 214 T.M.C. at the border and the
additional area that could benefit by
irrigation is estimated as 7.90 lakh hectares
(19.51 lakh acres)
Tamil Nadu have requested for enhancing
the quantum of water proposed to be
transferred to Tamil Nadu by atleast
another 100 TMC. Tamil Nadu also
35
suggested an alternative alignment for the
Pennar Palar Cauvery link, at a higher
contour so as to spread the benefits within
the State equitably to the most needed
areas.
Tamil Nadu in the 52
nd
Meeting of the
National Development Council held at New
Delhi on 09.12.2006, and in the discussion
with the Vice-Chairman, Planning
Commission, has emphasized the urgency
to start the linking of the Peninsular Rivers
in order to augment the water resources, so
as to re-vitalize the agricultural sector.
Tamil Nadu have also suggested to the
Government of India that the Parliament
can make a law, by virtue of the powers
conferred under the Article 248(1) read with
Entry 97 of List 1 (Union List) of the
Seventh Schedule of the Constitution, for
implementing the interlinking of major
rivers in the Country, so as to facilitate
early execution of Interlinking Rivers Project
(ILR).
For this Peninsular link, the National Water
Development Agency conducted a
consensus meeting of the concerned States
on 23.07.2010, wherein divergent views
were expressed by the States. The
36
Government are taking efforts to implement
the scheme.
3.8. Pamba - Achankoil - Vaippar Link
The National Water Development Agency
(NWDA) has formulated the Pamba -
Achankoil - Vaippar Link Project, which
envisages diversion of 22 T.M.C.ft. which is
only 20% of the surplus waters of Pamba
and Achankoil rivers of Kerala to Tamil Nadu
to irrigate an ayacut of 91,400 hectares in
the dry taluks of Sankarankoil, Kovilpatti,
Sivagiri, Srivilliputhur, Rajapalayam, Sathur
and Tenkasi Tamil Nadu and will also help to
generate peak power of 500 MW for Kerala.
The Government of Tamil Nadu have given
their acceptance to the proposal, where as
the Government of Kerala are not in favour
and keeps saying that they do not have
surplus to spare.
The Government of Tamil Nadu on
05.09.2006 requested the Honble Prime
Minister to prevail upon the Government of
Kerala for giving its concurrence, so that
the Pamba - Achankoil - Vaippar Link
project, which is beneficial to both the
States, could be taken up for
implementation.
37
The Government of Tamil Nadu had again
addressed the Government of India,
Ministry of Water Resources, on
25.09.2007, requesting them to treat
Pamba - Achankoil - Vaippar link as a
priority link under the Peninsular River
linkage and also direct the NWDA to
conduct a joint study with the Government
of Kerala as proposed earlier, if necessary,
to convince the Government of Kerala to
see that there is heavy surplus. However,
the Government of India are of the view
that implementation of interlinking of rivers
shall be by consensus amongst the State
Governments.
In the 24
th
Annual General Body meeting of
National Water Development Agency held at
New Delhi on 9
th
July 2008 requested the
Government of India to prevail upon the
Government of Kerala to get their
concurrence.
The same point has been reiterated in all
the subsequent Annual General Meetings
held during December, 2009 and Governing
Body meetings of the National Water
Development Agency held during
December, 2008, July and November, 2009.
The Government of Tamil Nadu have
requested the Government of India to take
38
necessary persuasive measures by
formation of a High Level Task Force to
come out these problems for speedy
implementation of the Peninsular River
Development proposals which include the
Pamba - Achankoil - Vaippar Link.
The Government of Tamil Nadu are actively
pursuing the matter with the Government of
India for implementation of this project.
3.9. Pandiyar - Punnampuzha Project
The West flowing Pandiar - Punnampuzha,
an interstate river, originates in the high
peaks of Nilgiris in Tamil Nadu, flows west
and finally drains into Arabian Sea.
In 1965 an understanding was reached
between Tamil Nadu and Kerala permitting
Government of Tamil Nadu to execute the
Pandiar - Punnampuzha Hydro Electric
Project utilising the west flowing waters of
Pandiar and Punnampuzha rivers within
Tamil Nadu in 171.38 sq. km. (66.20 Sq.
miles) with an average annual yield of
14 T.M.C.ft. with an installed capacity of
100 MW (2x50 MW) for the first stage and
150 MW in the next stage. The Planning
Commission also approved the proposal in
1968.
39
But on representation from the ryots of
Coimbatore district, the possibility of
diverting the waters of Pandiar -
Punnampuzha lying within Tamil Nadu to
Moyar arm of Bhavani River for use by
Tamil Nadu was investigated and this was
also found feasible. Tamil Nadu wanted
diversion of at least 7 T.M.C.ft. of water
eastward.
The Tamil Nadu Electricity Board on
29.11.2006 forwarded a modified proposal
of the Pandiar - Punnampuzha Hydro
Electric Project to the Kerala State
Electricity Board for its concurrence.
The Government will pursue with the
Government of Kerala for implementation of
the Pandiar - Punnampuzha scheme.
4. CONSTRUCTION OF GROYNE FIELD
ALONG PUDUCHERY COAST
Puduchery port was built in 1989, based on
the design evolved by the Central Water
and Power Research Station (CWPRS), Pune
with a provision for pumping the sand
deposited at the Southern side to Northern
side.
40
From 2001 onwards pumping of sand was
stopped and a sea wall and two groynes
were constructed by the Government of
Puduchery which cause shifting of erosion in
the north (in the bordering villages of
Tamil Nadu - Kottaikuppam, Nadukuppam,
Thandhiriyankuppam, Chinna Mudaliyar
Chavadi and Bommayarpalayam).
The Government of Puduchery has proposed
to form deep water port. If this scheme is
implemented, it will have catastrophic effect
on the shoreline of Villupuram District.
Hence, the Government of Tamil Nadu
would emphasize the following.
1. A technical feasibility study of
the proposed construction and
its subsequent effect on the
coast of Tamil Nadu.
2. Concurrence of the Government
of Tamil Nadu for the project.
3. Implementation of continuous
sand pumping of about
0.4 million cubic metre yearly as
recommended by Central Water
and Power Research Station
(CWPRS), Pune.
Necessary groynes in phased manner to
protect Tamil Nadu coast line would be
41
taken up under 13
th
Finance Commission
Programme.
5. DRAFT DAM SAFETY BILL, 2010
In order to provide proper surveillance,
inspection, operation and maintenance of all
large dams in the country, to ensure their
functioning Draft Dam Safety Act, 2002
was prepared and circulated by the Central
Water Commission in the year 2003 among
the States for consent. The draft act
contains nine clauses.
Subsequently, Central Water Commission
has revised the draft act with some
modifications and renamed it as Draft Dam
Safety Act, 2007 and informed in the
conference of Principal Secretaries /
Secretaries of Irrigation and Water
Resources of States held on 16.6.2008 at
New Delhi, that the revised Act will be
circulated to the States again. But this was
not circulated to the States for consent.
However, the Draft Dam Safety Act, 2007
has been obtained from Central Water
Commission, wherein the act contain twelve
clauses and it was found that many changes
have been made in the draft Act, 2002 and
additional sub clauses have been
introduced.
42
Some of the modifications and additional
clauses introduced in the draft Act, 2007
are not acceptable to the Government of
Tamil Nadu, namely clause 4(4), which
reads that
Responsibilities for maintenance and
safety of dams shall rest of the
owners of dam. However, overall
responsibility of the safety shall rest
with the State Government in whose
territory the dam is situated.
It was felt that this sub clause seems to
create interstate problems in respect of
maintenance of interstate dams, to the dam
owned by one by one state but lying in
another neighbouring state.
The Government of Tamil Nadu having such
dams Viz. 1) Mullai Periyar Dam,
2) Parambikulam Dam, 3) Thunakadavu
Dam and 4) Peruvaripallam Dam.
Hence, Tamil Nadu Government has lodged
its strong objection and requested to delete
the provision 4(4) and to defer the proposal
of introducing the bill before the Parliament,
until a consensus is arrived among all the
states. Subsequently, the Draft Dam Safety
Bill, 2010 was approved by the Central
43
Cabinet and introduced in the Lok Sabha
and the same was referred to
Parliamentary Standing Committee on
Water Resources for examination. The
Parliamentary Standing Committee has
uploaded the Dam Safety Bill, 2010 in the
parliament website and invited suggestions
/memoranda from individuals/ organizations
/institutions etc. This draft bill contain
10 chapters and 49 clauses.
The contents of the Draft Dam Safety Bill,
2010 have been examined by the
Government of Tamil Nadu and the
Government has requested modifications in
the Bill. A letter requesting the
modifications as required by the
Government of Tamil Nadu was written by
the Honble Chief Minister to the Honble
Prime Minister.
In this bill, sub-clause 26 (1) reads as
Without prejudice to the provisions of
this Act, all specified dams, shall fall
under the jurisdiction of the State
Dam Safety Organisation or State
Dam Safety Cell, as the case may be,
of the State in which dam is
situated in matters related to dam
inspections, analysis of information,
reports or recommendations
44
regarding safety status, and remedial
measures to be undertaken to
improve dam safety; and in all such
matters full co-operation shall be
extended by the concerned Non-State
Dam Safety Organisation or the
Non-State Dam Safety Cell and the
owner of the specified dam.
Since this clause will create interstate
problem in respect of interstate dams
similar to the sub-clause 4(4) of the Draft
Dam Safety Act, 2007 earlier objected.
It is suggested to revise the clauses as
follows:-
Without prejudice to the provisions of
this Act, all specified dams shall fall
under the jurisdiction of the State
Dam Safety Organisation or State
Dam Safety Cell, as the case may be,
of the State owning the dam and
under whose control the dam
is operated and maintained in
matters related to dam inspections,
analysis of information, reports or
recommendations regarding safety
status, and remedial measures to be
undertaken to improve dam safety
45
Similarly clause 26(2) reads as:
The authorized representative of the
Central Dam Safety Organization,
concerned State Dam Safety
Organization or State Dam Safety Cell
as the case may be for the purposes
of making any inspection or
investigation necessary for the
implementation of the provisions of
the Act, may enter upon any part of
the specified dam or its site as and
when required and apply such
investigation methods as may be
considered necessary.
It is suggested to modify the clause as
below:
The authorized representative of the
Central Dam Safety Organization,
concerned State Dam Safety
Organization or State Dam Safety Cell
as the case may be, in respect of
dams referred to in sub-clause (1)
above, for the purposes of making
any inspection or investigation
necessary for the implementation of
the provisions of the Act, may enter
upon any part of the specified dam or
its site as and when required and
46
apply such investigation methods as
may be considered necessary.
Similar modifications will have to be made
in sub-clause 26(3), sub-clause 26(4) and
clause 13.
In case, after making inspection or
investigation under sub-section is of the
opinion that certain remedial measures are
required to be taken, he shall report such
remedial measures to the Officer-in-Charge
of such specified dam and the Non-State
Dam Safety Organisation and Non-State
Dam Safety Cell, as the case may be and to
the concerned State Dam Safety
Organisation and State Dam Safety Cell, as
the case may be, in respect of dams
referred to in sub-clause (1) above.
The Central Dam Safety Organisation and
concerned State Dam Safety Organisation
or State Dam Safety Cell, as the case may
be, in respect of dams referred to in
sub-clause (1) above in cases of dams
being found to be endangered on account of
their age, degeneration, degradation,
structural or other impediments, shall
suggest such remedial measures on such
operational parameters (including
maximum reservoir level, maximum
47
spillway discharge, and maximum
discharges through other outlets) as it may
consider necessary.
In addition to this, the following clause is
suggested to be added as clause 26(6)
26(6): Notwithstanding anything
contained in any other law, the Dam
maintenance officials/personnel shall
have right to enter into the Forests
and Wild Life Sanctuary area to carry
out dam safety, maintenance and
rehabilitation measures.
In the event of Dam Safety Bill, 2010
passed in Parliament it will be detrimental
to the interests of Tamil Nadu since, the
control of our Dams will automatically go to
Kerala State in whose territory these Dams
are situated, though they are owned by
Tamil Nadu State. This will create a number
of practical problems for the safety,
operations and maintenance of the Dams.
Hence, the above modifications and
additions are suggested for incorporation in
the Dam Safety Bill, 2010.
Accordingly the Secretary, Ministry of
Parliament Affairs, Government of India,
the Secretary, Ministry of Water Resources,
48
Government of India, the Director (W&L),
Lok Sabha Secretariat, Parliament Standing
Committee and the Chairman, Central
Water Commission, Government of India
have been requested on 27.7.2011 to place
the above said modifications before the
Parliamentary Standing Committee on
Water Resources to take a decision in
consonance with the decision of this
Government before enacting the Dam
Safety Act, 2010.
Above all, Honble Chief Minister has
addressed the Honble Prime Minister of
India regarding necessity for modifications
and additions to be incorporated to the Dam
Safety Bill, 2010 to safeguard the interest
of Tamil Nadu. In response to our Honble
Chief Ministers request the Honble Prime
Minister of India has directed the Ministry of
Water Resources to look into the matter.
6. DAM REHABILITATION AND
IMPROVEMENT PROJECT (DRIP)
To ensure the strength and to safeguard
and maintain the health status of dams due
to certain general factors like ageing and
possible low compliance with Dam safety
standards and practices etc, Dam
Rehabilitation and Improvement Project
with World Bank assistance has been
49
proposed. The project is for six years from
2011-2012.
Tamil Nadu is one among the four States
selected by the World Bank for participation
in this project. About 223 large dams in the
four participating states with substantial
need for rehabilitation and improvements
are to be included in the project. It is
proposed to execute the project at a cost of
Rs.745.49 crore, in Tamil Nadu.
Cost of the project for Tamil Nadu
(Rs.in Crore)
a. Water Resources
Department
: 469.94
b. Tamil Nadu Generation
of Electricity and
Development
Corporation / Tamil
Nadu Electricity Board
: 260.14
c. Agricultural Engineering
Department
: 15.41
Total : 745.49
66 Water Resources Department dams at a
cost of Rs.469.94 crore are proposed to be
rehabilitated. During the first year 12 Water
Resources Department dams in 7 Districts
are proposed to be taken up for
rehabilitation.
50
The three main components of the Project
are:
(a) Rehabilitation and Improvement
of Dams and associated
appurtenances.
(b) Dam Safety institutional
strengthening.
(c) Project Management.
An Empowered Committee under the
Chairpersonship of Chief Secretary has been
constituted on 19.11.2010 for speedy
implementation of the project. The funding
pattern between the World Bank and State
is in the ratio of 80:20.
The Project will be carried out in phased
manner as follows:
Phase WRD Dams
I 12
II 21
III 20
IV 13
Total 66
51
During the year 2011-2012, under Phase I
the rehabilitation works for the following
12 Water Resources Department dams are
proposed to be taken up.
Sl.
No.
WRD Dams
Phase I
Rs.in
lakh
1 Vidur 231.40
2 Rajathopekanar 73.47
3 Mordhana 275.00
4 Gomukinadhi 203.76
5 Manimuthar 1346.95
6 Adavinainarkoil 142.02
7 Vadakkupachayar 160.00
8 Kodumudiyar 125.00
9 Nambiar 130.00
10 Poigaiyar 76.00
11 Siddhamalli 427.68
12 Kodaganar 360.00
Total 3551.28
The implementation of this project will
commence early.
7. 13
TH
FINANCE COMMISSION GRANTS-
IN-AID PROGRAMME
The 13
th
Finance Commission constituted by
the Government of India has recommended
the following schemes for a period of
4 years from 2011-2012 to 2014-2015.
52
7.1. State Specific Grants
7.1.1. Coastal Protection
For Coastal Protection, Government of
India have recommended a grant of
Rs.200 crore for protecting the
coastline of Tamil Nadu from sea
erosion in nine districts. During this
year, the following 24 coastal
protection works for an amount of
Rs.50 crore would be taken up.
SL.
NO.
NAME OF WORK
ESTIMATE
AMOUNT
(Rs. in
lakh)
1 Construction of RMS wall
at Devanampattinam
(LS 800m - LS 1220m)
in Cuddalore Taluk of
Cuddalore District.
179.80
2 Construction of Sea wall
from LS 1850m to
2470m and LS 2710m to
LS 3090m (1000m) in
Chinnamudaliyarchavadi
village in Vanur Taluk of
Villupuram District.
280.25
53
3 Construction of series of
2 Groynes (3 & 4) in
Mudaliyarchavadi in
Vanur Taluk of
Villupuram District.
826.40
4 Construction of RMS wall
at Devanampattinam (LS
1220m - LS 2140m) in
Cuddalore Taluk of
Cuddalore District.
390.00
5 Collecting field bed levels
along the coast covering
required stretch and
seaward covering
breaker zone and
collection of other details
like tidal current, along
shore current etc.
at Mudaliyarchavadi,
Bommaiyarpalayam and
Sodhanaikkuppam in
Vanur Taluk of
Villupuram District
and Thazhanguda to
Devanampattinam in
Cuddalore Taluk of
Cuddalore District.
42.00
6 Construction of RMS wall
at Palayar village in
Sirkali Taluk of
Nagapattinam District to
a length of 1000m
up to +3.25m.
596.50
54
7 Construction of RMS wall
at Akkarapettai village in
Sirkali Taluk of
Nagapattinam District to
a length of 1000m
up to +3.66m.
517.90
8 Construction of RMS wall
at Kallar village in Sirkali
Taluk of Nagapattinam
District to a length of
700m up to +3.66m.
364.90
9 Collecting field bed levels
along the coast covering
required stretch and
seaward covering
breaker zone and
collection of other details
like tidal current, along
shore current etc.
at Vanagirikuppam,
Thirumullaivasal in
Sirkali Taluk of
Nagapattinam District
and Seruthur,
Samanthanpettai in
Sirkali Taluk of
Nagapattinam District.
42.00
10 Construction of RMS wall
for a length of 230m in
Vivekanander colony at
Saveriyarpuram Village
of Thoothukudi District.
102.40
55
11 Construction of RMS wall
for a length of 525m &
Reformation for a length
of 300m of existing RMS
wall at Leepuram in
Agastheeswaram Taluk
in Kanyakumari District.
260.80
12 Construction of RMS wall
for a length of 205m and
Reformation for a length
of 245m of existing RMS
wall at Chinnamuttam in
Agastheeswaram Taluk
in Kanyakumari District.
133.60
13 Reformation of existing
RMS wall for a length of
110m at Vavathurai in
Agastheeswaram Taluk
in Kanyakumari District.
23.20
14 Reformation of RMS wall
for a length of 260m
near Church and west
side of Poothurai in
Vilavancode Taluk in
Kanyakumari District.
78.50
15 Reformation of RMS wall
for a length of 270m
Erayumanthurai West
Vilavancode Taluk in
Kanyakumari District.
72.80
56
16 Construction of RMS wall
for a length of 450m at
Gap between Poothurai
and Thoothur
Vilavancode Taluk in
Kanyakumari District.
187.90
17 Construction of RMS wall
for a length of 50m at
Chinnathurai in
Vilavancode Taluk in
Kanyakumari District.
16.00
18 Construction of RMS wall
to a length of 250m at
Colachel in Kalkulam
Taluk in Kanyakumari
District.
106.00
19 Construction of RMS wall
for a length of 250m at
Kadiapattinam in
Kalkulam Taluk in
Kanyakumari District.
67.00
20 Reformation of existing
RMS wall for a length of
180m at Melamanakudy
in Agastheeswaram
Taluk in Kanyakumari
District.
41.00
21 Construction of Groynes
at Uvari in Radhapuram
Taluk of Tirunelveli
District.
489.20
57
22 Reformation of existing
RMS wall for a length of
570m at Puthenthurai in
Agastheeswaram Taluk
in Kanyakumari District.
124.00
23 Reformation of RMS wall
for a length of 420m at
Kodimunai in Kalkulam
Taluk in Kanyakumari
District.
116.70
24 Collecting field bed levels
along the coast covering
required stretch and
seaward covering
breaker zone and
collection of other details
like tidal current,
alongshore current etc.
at Punnakayal Village of
Thiruchendur Taluk of
Thoothukudi District and
at Idinthakarai, Uvari in
Radhapuram Taluk
Tirunelveli District.
25.00
Total 5083.85
7.1.2. Restoration of Traditional Water
Bodies
For Restoration of Traditional Water
Bodies, Government of India
have recommended a grant of
58
Rs.200 crore. During this year,
Restoration of 163 Traditional Water
Bodies for an amount of
Rs.50 crore would be taken up.
7.1.3. Water Sector Management
The 13
th
Finance Commission
constituted by the Government of
India has recommended the formation
of State Water Regulatory
Authority and has earmarked
Rs.192 crore. Release of the grant is
incumbent upon setting up Water
Regulatory Authority by March 2012.
Each Water Regulatory Authority is to
be mandated, inter alia, to regulate
water tariff charges for Surface and
Sub surface water used for domestic,
agriculture, industrial and other
purposes. SWaRMA (State Water
Resources Management Agency) has
been formed.
8. IRRIGATION SCHEMES
8.1. The following irrigation schemes
are proposed to be completed
during 2011-2012 with State
Government Fund under Medium
and Minor Irrigation system at a
59
cost of Rs.423.47 crore
benefitting 2,30,424 Hectares.
Sl.
No.
Name of work Project
Cost
(Rs. in
crore)
Ayacut
benefitted
(Hectares)
1 Irrigation Facilities to
58 Villages in
Usilampatti Taluk in
Madurai District.
74.60 925
2 Tank across
Mathalapallam River in
Dharmapuri District.
14.15 446
3 Bathalapalli Reservoir
Project across Malattar
in Vellore District.
29.55 1,717
4 Construction of Platinum
Jubilee Memorial and
Celebration of Platinum
Jubilee of Stanley
Reservoir at Mettur.
1.05 -
5 Providing a new Trash
Rack arrangement at
about 130m U/s of the
Tunnel entry at
Thekkady Head Sluice in
the Leading Channel of
Periyar Lake for
maximum drawal of
water from Mullai
Periyar Dam to Vaigai
Dam.
0.60
-
60
6 Improvements to New
Veeranam lake for
water supply in
Cuddalore District.
106.35 1816
7 Rehabilitation of
Contour Canal from LS
0/000 km to LS
49/300 km in Thirupur
and Coimbatore
Districts.
184.50 1,71,995
8 Construction of bridge,
retaining wall and road
with B.T. surface from
Kalimar Bridge to
Symon colony bridge at
Colachel in
Kanyakumari District.
2.94
9 Rehabilitation and
Gunitting the South
Branch and North
Branch vents of lower
anicut in Thanjavur
District.
6.21 53,418
10 Providing Walking path
and Landscaping
arrangements in both
banks of Grand Anicut
Canal from Irwin
Bridge @ LS 13 / 6797
to LS 14 / 0170
Nagapattinam Road
Bridge in Thanjavur
Town.
2.35 -
61
11 Modernisation of
Thirumeni Eri and its
feeder channel at
Thirumakkottai Village
in Mannargudi Taluk of
Thiruvarur District.
1.17 107
Total 423.47 2,30,424
8.2. The following irrigation schemes are
proposed to be taken up during 2011-
2012 with State Government Fund
under Medium and Minor Irrigation
system at a cost of Rs.19.46 crore
benefitting 2,103 Hectares.
Sl.
No.
Name of work Project
Cost
(Rs. in
crore)
Ayacut
benefitted
(Hectares)
1. Formation of Flood
carrier canal from
Kanjampatti odai of
Vilathikulam Taluk in
Thoothukudi district to
feed Sayalkudi and
other tanks in
Kamuthi and Kadaladi
Taluks of
Ramanathapuram
District.
18.00 1,731
62
2. Rehabilitation and
modernisation of
Kakkanallur anicut
under Gadana System
in Ambasamudram
Taluk of Tirunelveli
District.
0.63 331
3. Augmenting water
supply to
Thiruthiyamalai Eri
from Ayyar river in
Thiruthiyamalai village
in Musiri Taluk of
Trichi District.
0.83 41
Total 19.46 2,103
8.3. NABARD Assisted Schemes
26 Schemes sanctioned under RIDF XII at a
project cost of Rs.12.90 crore have been
completed. 143 Schemes have been
sanctioned under RIDF-X, XI, XIII, XV & XVI
for Rs.879.30 crore out of which
113 schemes have been completed.
30 schemes are in progress which includes
10 flood protection works schemes.
63
8.3.1. The following 20 schemes in
progress will be completed
during 2011-2012 benefitting
91,037 Hectares
Sl.
No.
Scheme Project
Cost (Rs.
in crore)
Ayacut
benefitted
(hectare)
RIDF X
1. Excavation of supply
channel from
Badethalav tank to
Vennampalli in
Krishnagiri District.
13.50 543
RIDF XI
2. Construction of Anicut
across Vilangudi Odai in
Perambalur District.
0.35 70
RIDF XIII
3.
Rehabilitation of Grand
Anicut Canal (GAC)
from 58.67 km to
92.20km in Orathanadu
in Thanjavur District.
28.58 27,591
4. Rehabilitation of Grand
Anicut from 0.75 km to
58.67km and
Modernisation of
Kallaperambur Eri in
Thanjavur District.
130.34 2,430
64
RIDF - XV
5. Excavation of supply
channel from Jerthalav
channel at LS 5690m to
feed Totlampatti tank,
Papparapatti tank and
15 other tanks in
Palacode and
Pennagaram Taluks of
Dharmapuri District.
6.29 330
6. Rehabilitation and
Improvements to
Neikkarapatti Tank
supply channel in
Kondalampatti village of
Salem Taluk and
District.
2.70 90
7. Rehabilitation of
Arakkankottai and
Thadapalli Channels in
Gobi Taluk of Erode
District.
17.45 9,917
8. Rehabilitation of
Thovalai Channel and
Radhapuram channel
including tanks in
Kanyakumari District.
22.50
12,087
9. Increasing the carrying
capacity of
Palayamparavoo
channel and
PT Rajan Channel in
Cumbum valley of Theni
District.
10.08 3,070
65
10. Construction of Bed
Dam across Vaigai river
near Manthivalasai to
feed Kalari Channel and
RMC feeding tanks in
Ramanathapuram
District.
14.20 4,007
11. Modernisation of
Ramnathapuram Big
Tank in
Ramanathapuram
District.
9.73 1,604
RIDF - XVI
2. Reconstruction of
Mylapudur anicuts
across Nambiyar River
in Anaikulam village of
Radhapuram Taluk in
Tirunelveli District.
8.00 252
13. Restoration of Athoor
anicut channel of Athoor
Taluk in Dindigul
District.
8.50 421
14. Reconstruction of
collapsed d/s talus
apron and renewing and
repairing the worn out
steel shutters in the
Virahanur regulator
across Vaigai River in
Madurai District.
5.00 16,766
15. Rehabilitation of Nilayur
Channel for increasing
the carrying capacity to
feed extension channel
in Madurai District.
23.50 4,023
66
16. Construction of anicut
across Mudiyanur to
feed Athani tank in
Athani village of
Aranthangi Taluk in
Pudukottai District.
1.00 238
17. Construction of anicut
across Vellar River in
Thandalai village to feed
Mumbalai and Vadakku
Manamelkudi tanks of
Manamelkudi Taluk in
Pudukottai District.
2.50 154
18. Improvements to
Panangudi and Kuyavan
channels off taking from
Malattar River of Lalgudi
Taluk in Trichy District.
3.00 448
19. Reconstruction of
Neenjal Madavu anicut
near Chengalpattu Taluk
and rehabilitation of
Ponvilanthakalathur
Tank in Kancheepuram
District.
9.00 2,105
20. Formation of a tank
across the Nallathangal
Odai near Kothayam
village of Oddanchatram
Taluk in Dindigul
District.
6.97 327
Total 329.21 91,037
67
8.3.2. Schemes to be taken up during
2011-2012
4 Schemes at a cost of Rs.37.50 crore
are to be commenced during the year
2011-2012 which would benefit an
ayacut of 6,209 Hectare.
Sl.
No.
Scheme
Project
Cost
(Rs. in
crore)
Ayacut
benefitted
(Hectare)
RIDF XVI
1. Rehabilitation of South
Main Channel and its
system tanks of
Srivaikuntam anicut in
Thoothukudy District.
10.00 5,164
2. Formation of a new tank
across Kallar Odai near
Viswakudi in
Thondamanthurai village
of Veppanthattai Taluk in
Perambalur District.
19.00 348
3. Construction of
anicut across
Kamandalanaganathi
River near Sevur village
to feed Irumbedu and
Patyur tanks of Arni
Taluk in Thiruvannamalai
District.
2.00 351
68
4. Excavation of a new
supply canal from
Baleguli tank to feed 28
tanks of Pochampalli
Taluk in Krishnagiri
District
6.50 346
Total 37.50 6,209
8.3.3. Minor irrigation tanks under
NABARD RIDF
27 minor irrigation tanks at a Project
cost of Rs.5.58 crore were taken up
and completed under RIDF XIII.
8.3.4. Rehabilitation of masonries:
443 works have been taken up at a
cost of Rs.33.50 crore for
rehabilitating the damaged masonries
in Cauvery Delta for the year
2009-2010 and 390 works have been
completed. 48 works are in progress
and the remaining 5 works to be
taken up.
69
9. NATIONAL AGRICULTURE
DEVELOPMENT PROGRAMME UNDER
CENTRALLY SPONSORED SCHEME
The Government of India sponsored
National Agriculture Development
Programme (NADP) aims at achieving 4%
annual growth in agriculture sector during
XI Plan period by ensuring holistic
development of Agriculture and allied
sectors is being implemented in the State
from the year 2007-2008.
For the year 2010-2011, 3 works for a value
of Rs.2.08 crore have been sanctioned
under National Agriculture Development
Programme. Under this scheme, it is
proposed to rehabilitate and modernise the
irrigation structures for improving irrigation.
10. PART II SCHEMES
For the year 2011-2012 the following
40 schemes at an estimate cost of
Rs.684.32 lakhs have been proposed to be
taken for the execution.
70
Sl.
No.
Name of Scheme
Estimate
Amount
(Rs.in lakh)
1 Construction of Assistant
Engineer Quarters at
Kurinjipadi in Kurinjipadi
Taluk of Cuddalore
District.
15.00
2 Construction of Irrigation
Assistant Quarters
4 Numbers at Kurinjipadi
in Kurinjipadi Taluk of
Cuddalore District.
18.00
3 Construction of Irrigation
Assistant Quarters
4 Numbers at
Thiruvathigai Anicut in
Panruti Taluk of Cuddalore
District.
18.00
4 Construction of
Superintending Engineer's
Quarters in P.W.D.
Complex at Katpadi in
Katpadi Taluk of Vellore
District.
30.00
5 Construction of Assistant
Executive Engineer's
Quarters in P.W.D.
Complex at Katpadi in
Katpadi Taluk of Vellore
District.
18.00
71
6 Construction of Assistant
Engineers / Junior
Engineers Quarters at
Gudiyatham in
Gudiyatham Taluk of
Vellore District.
11.00
7 Construction of Assistant
Engineers/Junior Engineer
Quarters at Vaniyambadi
in Vaniyambadi Taluk of
Vellore District.
11.00
8 Construction of Section
Office at Gudiyatham in
Gudiyatham Taluk of
Vellore District.
7.00
9 Construction of Section
Office at Sholingar in
Walajah Taluk of Vellore
District.
7.00
10 Construction of section
office building for Mettur
canal Section at Ammapet
in Bhavani Taluk of Erode
District.
7.00
11 Construction of Gauging
Section Office at
Thanjavur Taluk in
Thanjavur District.
7.00
12 Construction of Section
Office building at
Orathanadu in Orathanadu
Taluk of Thanjavur
District.
7.00
72
13 Construction of Section
Officer's quarters for River
Conservation Section at
Kumbakonam in
Kumbakonam Taluk of
Thanjavur District.
12.00
14 Construction of Twin Type
Irrigation Assistant
Quarters at Ayyavadi
Village in Kumbakonam
Taluk of Thanjavur
District.
10.00
15 Construction of Section
office building for
Valangaiman Section at
M.K. Head in Nallur village
in Valangaiman Taluk of
Tiruvarur District.
8.07
16 Construction of Assistant
Engineer quarters at
Peralam in Nannilam Taluk
of Tiruvarur District.
15.00
17 Conversion of Roof into
RCC for the Assistant
Engineer quarters Door
No. 42 in PWD Campus at
Palladam in Palladam
Taluk of Tiruppur District.
9.00
18 Conversion of Roof into
RCC for the Junior
Engineer quarters Door
No. 43 in PWD Campus at
Palladam in Palladam
Taluk of Tiruppur District.
7.50
73
19 Conversion of Roof into
RCC for the Sub Division
Office in P.W.D. Campus
at Palladam Taluk of
Tiruppur District.
6.00
20 Conversion of Roof into
RCC Dormitory quarters
Door No. 17 to 24 in
P.W.D. Campus at
Palladam Taluk of Tiruppur
District.
28.00
21 Conversion of Roof into
RCC for the Head Mazdoor
quarters Door No. 12 to
16, 29 to 38 and 46 to 53
in P.W.D. Campus at
Palladam Taluk of Tiruppur
District.
40.00
22 Conversion of Roof into
RCC for the Clerk quarters
in Door No. 26 to 27 & 44
to 45 in P.W.D. Campus at
Palladam Taluk of Tiruppur
District.
20.00
23 Improvements to the
Lower Bhavani Basin Sub
Division No.1 Office
Building at Erode in Erode
Taluk and District.
10.00
24 Construction of Section
Officers quarters at
Modakurichi in Erode Taluk
and District.
7.00
74
25 Conversion of AC sheet
roofing into RCC roof in
Assistant Executive
Engineer quarters No. II in
Officers Colony at
Thirumurthy Nagar in
Udumalaipet Taluk of
Tiruppur District.
11.00
26 Conversion of AC sheet
roofing into RCC roof in
Assistant Executive
Engineer quarters No.V
(Project House No.1) in
Officers Colony at
Thirumurthy Nagar in
Udumalaipet Taluk of
Tiruppur Distric.
12.00
27 Conversion of Mangalore
tiled roof in to RCC Roof
for sub Division Office
Building in PAP Colony at
Pongalur in Palladam Taluk
of Tiruppur District.
11.50
28 Rehabilitation and
Improvements to
Inspection Bungalow at
Uthamapalayam in
Uthamapalayam Taluk of
Theni District.
25.00
75
29 Reconstruction of Office
building in Periyar Vaigai
basin Sub Division No.I,
Madurai, Irrigation Section
No.1 and Irrigation Section
No.2, Madurai, Nilaiyur
section and Vaigai Section
of Periyar Vaigai Basin
Sub Division No.2,Madurai
in PWD Campus at
Tallakulam in Madurai
North Taluk of Madurai
District.
30.00
30 Rehabilitation and
Improvements to Section
office at Kuppanampatti in
Usilampatti Taluk of
Madurai District.
7.00
31 Rehabilitation and
Improvements to Assistant
Engineer/ Junior Engineer
quarters at Kuppanampatti
in Usilampatti Taluk of
Madurai District.
8.00
32 Construction of Inspection
Bunglow for WRD at
Rameshwaram in
Rameshwaram Taluk of
Ramanathapuram District.
35.00
33 Reconstruction of Sub
Division Office Building at
Srivaikuntam in
Srivaikuntam Taluk of
Tirunelveli District.
20.00
76
34 Reconstruction of Section
Office Building at
Panankulam in Nanguneri
Taluk of Tirunelveli
District.
7.00
35 Reconstruction of
Kannadiankalvai Section
Officers Quarters at
Cheranamahadevi in
Ambasamudram Taluk of
Tirunelveli District.
10.00
36 Improvements to
Inspection Bungalow at
Cheranmahadevi in
Ambasamudram Taluk of
Tirunelveli District.
10.00
37 Reconstruction of
Inspection Bungalow at
Panankulam in Nanguneri
Taluk of Tirunelveli
District.
18.00
38 Reconstruction of
Inspection Bungalow at
Kalakadu in Nanguneri
Taluk of Tirunelveli
District.
15.00
39 Construction of Bridge
across L.B.P Main canal @
mile 65-6-200 of
Vadamugam Vellode
village in Perundurai Taluk
of Erode District.
60.00
77
40 Purchase of 14 Nos.
Mahindra & Mahindra
Bolero jeep to the field
officers (Executive
Engineers / Assistant
Executive Engineers) of
Water Resources
Organisation of Public
Works Department.
76.25
Total 684.32
11. FLOOD MITIGATION SCHEMES
Devastation by floods is a recurrent
annual phenomenon. Certain areas in
Tamil Nadu are very vulnerable to
floods and there is a great risk of
damage to life and property of the
people and to the States assets like
irrigation infrastructures, roads, etc.
To alleviate the difficulties, flood
mitigation schemes have been
identified and are taken up with the
assistance of Government of India
and NABARD.
11.1. Cleaning of Chennai City Drains
Based on the critical situations faced
by Chennai City during the floods, it is
essential to carry out certain works
like desilting and removal of shoals,
silt, floating material wastes and other
78
obstructions in the important water
ways of the Chennai City. Hence, it is
proposed to execute 57 essential
works at an estimated cost of
Rs.361.75 lakhs before the on-set of
North East Monsoon 2011 as a
precautionary measure to allow for
free flow of water to avoid inundation
in city.
11.2. Schemes taken up with NABARD
Assistance
Sl.
No.
Name of
Scheme
Estimate
Amount
(Rs.in
crore)
Stage
1. RIDF XIII-23 Nos.
of Flood
Protection Works
to Cauvery and
Coleroon river
banks in Karur,
Trichy, Ariyalur
and Perambalur
Districts.
207.54 Total 23
works
Completed
15
works in
Progress8
2. RIDF XIII-2 Nos.
of Flood
protection works
in Madurai city.
(Sellur tank &
Sathaiyar Odai)
12.91 Total 2 works
Completed1
work in
Progress 1
79
3 RIDF XV - Flood
Protection Works
in Kudamurutti
river and
Uyyakondan
channel in Trichy
district.
45.60 Out of 4 works,
1 work
completed,
2 work is in
progress and
1 work namely
High level
bridge will be
executed by
the Highways
Department.
11.3. Flood Management Programme
taken up with Central Assistance
The Flood Management programme
(FMP) is a Central State shared
Scheme implemented in Tamil Nadu
at a ratio of 75:25. Out of 7 schemes
for a value of Rs.657.16 crore sent to
Ministry of Water Resources,
Government of India, the Government
have cleared 5 schemes as
detailed below for an amount of
Rs.635.54 crore, for which the
Government of Tamil Nadu have
accorded Administrative Sanction. The
works are in various stages of
implementation and scheduled to be
completed before March 2012. Other
80
2 schemes are under consideration of
Government of India.
11.3.1. Works in Progress
(Rs.in crore)
Sl.
No
Name of Scheme Estimate
Amount
1. Flood Protection works to
Araniyar river at upstream
and downstream of
A.N.Kuppam Anicut and
downstream of Lakshmipuram
Anicut to Pulicat creek in
Tiruvallur District.
12.41
2. Flood Protection Works in
Kollidam (Coleroon) River in
Thanjavur, Nagapattinam and
Cuddalore Districts.
375.90
3. Flood Protection Works to
Vellar Basin in Cuddalore and
Villupuram Districts.
164.32
4. Flood Protection Works to
Panruti and Cuddalore Towns
from rivers Pennaiyar,
Gadilam, Uppanar, Paravanar
and South Malattar rivers in
Cuddalore District.
68.41
81
5. Flood Protection Works to
Kosasthalaiyar river from
Napalayam to sea mouth in
Tiruvallur District.
14.50
Total 635.54
11.3.2. Schemes under consideration of
Government of India
Sl.
No
Name of Scheme Estimate
Amount
(Rs.in
crore)
Stage
1. Flood Protection
Works in Khan Sahib
Drainage Channel to
protect Chidambaram
town of Cuddalore
District. 7.50
Techno -
Economic
clearance by
Central Water
Commission has
been accorded
and Investment
clearance of
Planning
Commission is
awaited
2. Flood Protection
works in Adyar river
near NH4 (Road
connecting Kathipara
Junction and
Poonamalee Road)
near Nandambakkam
bridge between LS
12200m to 12700 m
in Kancheepuram
District.
14.12
Scheme under
consideration of
Central Water
Commission
82
12. TAMIL NADU IRRIGATED
AGRICULTURE MODERNISATION
AND WATER - BODIES
RESTORATION AND
MANAGEMENT (TN IAMWARM)
PROJECT
12.1. Scope:
The IAMWARM project is being
implemented in four phases with an
outlay of Rs.2,547 crore. The Project
period is for of six years to benefit
6.16 lakh hectares in the selected
60 sub-basins of Tamil Nadu,
involving Water Resources
Department and seven other line
Departments including Tamil Nadu
Agriculture University.
12.2. Aims of the Project/ Key
Components
The project aims to improve the
service delivery of irrigation systems
and to increase the productivity of
irrigated agriculture with effective
integrated water resources
management in a sub-basin
framework.
83
The key components of the
Project i.e. i. Irrigation systems
modernization and ii. Agricultural
Intensification and Diversification, aim
to rehabilitate and modernize the
irrigation infrastructures and to
increase the productivity of
agriculture-related activities through
agricultural intensification and
diversification of crops, micro
irrigation and allied activities as in
Animal Husbandry and Fisheries.
Water Resources Management is the
another key component of the Project.
12.3. Project Implementation: (2007-
2013):
Water Resources Department:
The phase-wise scheme
implementation for WRD are as
detailed below
Phase No. of
Sub
basins
Year of
implementation
Irrigated
Ayacut in
Hectare
I 9 2007-2008 289498.50
II 16 2008-2009 67206.21
III 30 2009-2010 and
2010-2011
182119.18
84
Phase - I (9 Sub Basins)
Under Phase-I, 1634 tanks,
233 anicuts and supply channels for a
length of 3067.66 km were proposed
for rehabilitation. Out of which
1600 tanks, 222 anicuts and supply
channel for a length of 2971.65 km
have been completed. The remaining
works are in progress.
Phase - II (16 Sub Basins)
Under Phase-II, 757 tanks,
165 anicuts and supply channels for a
length of 1091.61 km were proposed
for rehabilitation. Out of which
625 tanks, 142 anicuts and supply
channel for a length of 832.96 km
have been completed. The remaining
works are in progress.
Phase - III (30 Sub Basins)
Under Phase-III, 1696 tanks,
265 anicuts and supply channels for a
length of 2677.87 km were proposed
for rehabilitation. Out of which
7 tanks, 1 anicut and supply channel
for a length of 54.30 km have been
85
completed. The remaining works are
in progress.
12.4. Phase IV (5 Basins)
During 2011-2012, in the Phase IV,
5 sub basins namely Cooum, Adayar,
Cheyyar-Kiliyar, Paralayar and
Kayalkudiyar covering an extent
of 0.770 lakhs hectare spreading
in Tiruvallur, Kancheepuram, Vellore,
Thiruvannamalai, Virudhunagar,
Ramanathapuram and Sivaganga
districts are proposed to be taken
up. Thereby modernization of
761 tanks, rehabilitation of 5 anicuts
and improvement of 1056 km length
of supply channel are to be taken up
with an outlay of Rs.172.61 crore.
12.5. Formation of Water Users
Association:
Under Participatory Irrigation
Management in Phase I, II and III,
elections for 2320 Water Users
Associations were conducted. For the
remaining 41 associations, elections
will be conducted by Water Resources
Department shortly.
86
Water Walks, IAMWARM Days with all
line Departments and Workshops are
being conducted by the Water
Resources Department to ensure
convergence, participation of officers
the farmers to identify their problems
and propose solutions. Further,
Change Management is being
proposed amongst Water Resources
Department Engineers and line
Departments to ensure better service
delivery and management of scarce
water.
Other Line Departments like
Agriculture, Horticulture, Agricultural
Engineering, Tamil Nadu Agriculture
University, Agricultural Marketing,
Animal Husbandry and Fisheries
involved in convergence under the
Project to increase the water
productivity and get more income per
drop of water so as to uplift the
economic status of the stakeholders.
13. JAWAHARLAL NEHRU NATIONAL
URBAN RENEWAL MISSION.
(JNNURM)
To avoid flooding in Chennai city, a
comprehensive Master Plan on
improvements to micro drainages
87
such as storm water drains, and
macro drainages like Buckingham
canal, Otteri Nullah, Virugambakkam
Arumbakkam drain, Cooum and
Adyar river has been proposed under
this scheme. This is a Centre-State
shared scheme for a period of
3 years. The scheme commenced
from 2010.
The Central Sanctioning and
Monitoring Committee (CSMC)
approved the total cost of the
proposal for macro drain as approved
by the State Level Steering
Committee is Rs.1447.91 crore. Out
of the total project cost of
Rs.1447.91 crore, the amount
pertaining to Water Resources
Department is Rs.633.03 crore and
the balance amount Rs.814.88 crore
rests with Corporation of Chennai as
mentioned below.
(Rs. in crore)
Sl.
No.
Name of
Basin
Proposal
Cost
WRD
Component
Corporation
of
Chennai
Component
1. Northern
Basin
359.86 82.69 277.17
2. Central
Basin
345.00 83.89 261.11
88
3. Eastern
Basin
444.07 303.67 140.40
4. Southern
Basin
298.98 162.78 136.20
Total 1447.91 633.03 814.88
Out of Rs.633.03 crore, 35% of the
amount will be in the form of grant
from Central Government, 15% of the
amount will be State Governments
share. Remaining, 50% will be i.e
share of Urban Local Body will also be
borne by the State Government. The
status of works are as detailed below;
Pkg
Name of
Rehabilitation
Drains/Tanks
No
of
Works
Estimate
Amount
(Rs.in
crore)
Present
status
I Kodungaiyur Drain,
Kolathur tank,
Otteri Nullah
4 63.05 Works are
in Progress
II Maduravoyal tank,
Virugambakkam -
Arumbakkam Drain
3 83.89 Works are
in Progress
III North Buckingham
canal
1 110.05 Work is in
Progress
IV Central Buckingham
canal (from 10500m
to 23500m) REACH
III
1 68.62 Revised
Estimate is
under
preparation
V South Buckingham
canal (from 0m
to10500m) REACH I
& II
2 46.86 Works are
in Progress
89
VI South Buckingham
canal (from 0m to
10500m) REACH III
1 78.14 Work is in
Progress
VII a) Veerangal
Odai
Drainage
Course
b) short cut
drainage
channel for
Velachery tank
surplus
2 82.05 Works are
in Progress
VIII Ambattur Tank 1 19.63 Work is in
Progress
IX Porur Tank 1 26.97 Preliminary
works in
progress.
X Diversion drainage
channel from
Buckingham Canal
Okkiam maduvu to
sea
1 53.77 Works to
be taken up
Total 17 633.03
14. ARTIFICIAL RECHARGE SCHEME
Artificial Recharge Scheme is one of
the approach to bring water
withdrawals into balance which aims
at augmentation of the ground water
potential, effective utilization of
surplus water in the rivers and
90
streams and avoiding sea water
intrusion into the land.
14.1. Artificial Recharge through Check
Dams
A Master Plan for Artificial Recharge to
Ground Water through check dams,
ground water shafts, percolation
ponds etc., at a cost of Rs.550 crore
over a period of 3 years is under
implementation from 2008-2009. The
State Ground and Surface Water
Resources Data Centre is the nodal
agency and the implementation of the
scheme is being carried out by Water
Resources Department, Agriculture
Engineering Department, Tamil Nadu
Water Supply and Drainage Board and
Forest Department. The Project period
has been extended by 2 years
(2011-2012 and 2012-2013).
The Forest Department and
Agriculture Engineering Department
have completed all the works
sanctioned under this Scheme. In
respect of Tamil Nadu Water Supply
and Drainage Board, 56 works are in
progress. In respect of Water
Resources Department, 43 works are
in progress.
91
15. PARTICIPATORY IRRIGATION
MANAGEMENT (PIM)
Tamil Nadu is one among the
Pioneering States in promoting
Participatory Irrigation Management.
The Tamil Nadu Farmers
Management of Irrigation systems
Act, 2000 (TN Act 7/2001) was
enacted and the Rules 2002 and the
Election Rules 2008 thereon were
framed. The Act has been brought
into force in the State except the
Nilgiris and Chennai Districts, where
there are no ayacut. The Act
envisages for constitution of farmers
organizations in the entire command
area of all irrigation systems under
the management of Water Resources
Department, as follows:
(i) Water Users Association
at the primary level
consisting of all the water
users.
(ii) Distributory committee at
secondary level.
(iii) Project committee at the
project level.
92
In the Water Resources Consolidation
Project, implemented command areas
of about 6.0 lakh hectare, the election
was conducted in 2004 for
constituting the managing Committee
of Water Users Association. Election
to Distributory Committees and
Project Committees were held in
2008.
The five year and six months of the
term of their office (amended by the
Tamil Nadu Farmers Management of
Irrigation systems (Amendment) Act,
2009 (Act No. 1/2009) ended during
June 2009. Therefore, election to
reconstitute the managing committees
of 1566 Water Users Association was
orgainsed in 2009.
1536 Presidents and 7315 Territorial
Constituency members have been
elected and assumed their offices.
157 Distributory Committees and
9 Project Committees have also been
reconstituted. Fresh election to the
left out posts in the managing
committees is to be organized.
2361 Water Users Association have
been delineated in the IAMWARM
Project command areas dividing the
93
Water Users Association areas
into 10810 Territorial Constituencies.
2320 Presidents and 10185 Territorial
Constituency members have been
elected in 2008, 2009 and 2010.
Fresh election to the leftout posts in
the Managing Committees has to be
organized.
2896 newly elected presidents of
Water Users Association have been
benefitted so far. Two day orientation
training programme was organized by
the Irrigation Management Training
Institute.
To fulfill the training needs of the
Water Users Association,
procurement of support organizations
is under process, who would
undertake the capacity building
programme for the Water Users
Association.
The Participatory Irrigation
Management Programme, has
improved the participation of farmers
in the irrigation management and
there are positive changes taking
place.
94
16. LINKING OF RIVERS WITHIN
THE STATE
Three links have been identified for
interlinking of Rivers within Tamil
Nadu to primarily serve as flood
carriers and to divert the flood flows
to reach the drought prone areas.
16.1. Construction of Kattalai Barrage
across the Cauvery River at
Mayanur Village in Karur District
As a first stage of Linking of the River
Cauvery with Agniyar, South Vellar
and Pambar the Construction of
Barrage across the Cauvery River
below 250 m from the existing
Kattalai Bed Regulator in Karur
District was sanctioned for
Rs.189 crore from State fund. This
proposal will be sent to Government
of India for Environmental Clearance
and financial assistance. The Works
are proposed to be completed
by November 2011. A sum of
Rs.107.23 crore has been spent so
far.
95
16.2. Formation of a Flood Carrier Canal
from Kannadian Channel
to drought prone areas of
Sathankulam and Thisaiyanvilai
by Interlinking Thamirabarani,
Karumeniyar and Nambiyar rivers
in Thirunelveli and Thoothukudi
Districts of Tamil Nadu
This scheme envisages to divert the
dependable portion of surplus from
the Kannadian channel to the drought
prone areas of Sathankulam,
Thisaiyanvilai upto M.L.Theri sand
dunes, stabilizing the water starved
ayacuts of Manimuthar channel in III
and IV reaches and interlinks the
Tributaries of Thamirabarani River
namely, Pachaiyar, Kodumudiyar
besides interlinking Karumeniyar and
Nambiyar River basins.
This project was sanctioned at a cost
of Rs.369 crore for implementation in
4 stages.
96
A sum of Rs.117.70 crore has been
spent so far. Land Acquisition for
stage I and II works are also in
progress.
36 packages of the third and fourth
stages are to be taken up. By
implementing this scheme an extent
of 23040 hectare of land will be
benefited including a new ayacut of
17002 hectare The ground water level
in the nearby wells will also be
recharged.
Stage No. of
Packages
Administrative
Sanction
(Rs. in crore)
Present
Stage
I 18 107.62 Completed
-1
In progress
-17
II 18 98.23 In progress
18
Total 36 205.85
97
16.3. Excavation of link canal to
interconnect Pennaiyar River with
Palar river through Cheyyar River
and augmenting supply to Nandan
Canal in Thiruvannamalai District
This proposal has been formulated for
linking of the Pennaiyar River in
Tiruvannamalai District with Cheyyar
River, a Tributary of the River
Palar through a link canal. By
implementing this scheme an extent
of 18237.01 hectare land will be
stabilized and a gap of 414.38 hectare
of land will be bridged. The ayacut
under the Nandan canal will also be
benefited.
Detailed Project Report for this
scheme has been prepared for an
amount of Rs.174 crore and sent to
Government of India for seeking
assistance under Accelerated
Irrigation Benefits Programme (AIBP).
98
17. REPAIRS, RENOVATION AND
RESTORATION OF WATER
BODIES IN THE 51 DROUGHT
PRONE BLOCKS IN TAMIL NADU
The Project Proposal for
338 tanks benefitting an ayacut of
31357.56 hectares coming under
51 Drought Prone Blocks has been
prepared at an estimated cost of
Rs.220 crore. The proposal on
obtaining clearance from Technical
Advisory Committee will be sent to
the Ministry of Water Resources
Government of India, for getting
necessary approval. The funding
pattern between the Centre and State
would be in the ratio of 90:10.
18. IRRIGATION MANAGEMENT
TRAINING INSTITUTE (IMTI)
18.1. The Irrigation Management Training
Institute was established in the year
1984 to impart training to all those
involved in irrigated agriculture.
Training Programmes on Participatory
Irrigation Management (PIM),
Computer applications in
Irrigation Management, Geographical
Information System (GIS), Remote
sensing, AUTOCAD and Human
99
Resources Development are
conducted by the Institute. In
addition, farmers are exposed to
modern irrigation techniques and
action research programmes are
encouraged.
18.2. Modern irrigation management
techniques covered irrigation
scheduling, on-farm water budgeting,
flow measurement, Operation and
Maintenance of irrigation systems,
flood and drought management, crop
water requirement and operation
plan, etc., Efficient agricultural
practices such as System of Rice
Intensification (SRI), Precision
Farming and Organic Farming and
Integrated water resources Planning
and Management are also covered in
the training programmes.
18.3. Study tours to other States such as
Andhra Pradesh, Gujarat,
Maharashtra, Madhya Pradesh and
Orissa are also organised for the
officers and farmers to gain
knowledge of the systems and
practices that are adopted. Special
training programmes based on the
needs of organisations such as Water
Resources Department, Agricultural
100
Engineering Department, District
Rural Development Agency, State
Planning Commission and Horticulture
Department are also conducted.
Under the World Bank assisted
IAMWARM project, special training
programmes are conducted. Training
to the Presidents of the Water Users
Associations are also conducted.
18.4. During the year 2010-2011,
132 training programmes and
52 courses were conducted. In the
year 2011-2012, it is programmed to
conduct 112 training programmes
covering 3000 officials and
500 farmers.
19. STATE GROUND AND SURFACE
WATER RESOURCES DATA
CENTRE
19.1. This centre is engaged in periodic
multidisciplinary investigation studies
on ground water by maintaining and
observing statewide monitoring
network for ground water, surface
water and water quality. In addition,
the following activities are undertaken
by the centre.
101
a) Providing consultancy services
to general public, farmers,
public undertakings, other
Government Departments etc.,
in locating favourable area for
ground water exploration on
scientific basis.
b) Dissemination of the data
generated to the organizations
and public based on their needs.
19.2. Micro Water Shed Study
Based on the approval of state level
committee for Re-estimation of
Ground Water Assessment, it is
proposed to take up ground water
assessment based on micro
watershed basis in which micro water
shed will have an area of
50 to 100 Sq.Kms. There are about
1552 micro watersheds in the hard
rock part of the State and 3 major
water sheds viz., Cauvery, Vennar
and New Delta in Cauvery delta area.
This study will help to identify the
potential pocket within the blocks,
categorized as critical and over
exploited with regard to groundwater
status by other techniques.
102
19.3. Hydrology Project II
This is a project assisted by the World
Bank at a total cost of Rs.25.27crore
for a period of six years (2006-2012).
The main components of this project
are:
19.3.1. Institutional Strengthening:
It covers the scope of general support
works like upgrading the
infrastructure created in Hydrology
Project-I and general awareness
raising programmes.
19.3.2. Decision Support System for
Planning (DSS):
Decision Support Systems are
developed for the integrated planning
of the water resources in the
Tamarabarani, Vaippar and Agniyar
river basins. They are useful for the
dynamic assessment of the surface
water and groundwater resources
across the river basin and to allocate
them among different demand sectors
like drinking, agriculture and
industrial with pre-defined priorities.
It helps assess the impact of adopting
103
various cropping pattern and the
impacts of climate change on the
water resources of a river basin.
19.3.3. Hydrological Design Aids:
Hydrological Design Aids are
computer based GIS models which are
developed for all river basins of the
State. It will help standardize the
methodology of assessment of water
availability and Design Flood in all the
rivers of Tamil Nadu for the benefit of
all the water using agencies. It is
instrumental in the construction of
safe and economic design of hydraulic
structures like Dams and bridges.
20. INSTITUTE FOR WATER STUDIES
This institute was established in the
year 1974 to assist the department in
planning, assessing and managing the
water resources by taking up
necessary studies. The institute has a
pool of talent from the field of
engineering, hydro geology, geo
physics, geo chemistry, environment,
photo-geology, remote sensing and
agro economics. The on-going
activities of this institute are detailed
below:
104
20.1. Micro Level Studies
Out of the 17 river basins in the
State, micro level studies have been
completed in 16 river basins except
Cauvery basin. Re-appraisal studies
for Kodaiyar and Vaippar river basins
have been completed. At present, the
re-appraisal study of the Vaigai basin
is in progress.
20.2. State Water Resources
Management Agency (SWaRMA)
Under the IAMWARM Project on
Water Resources Management, the
formation of SWaRMA was
emphasized.
An Estimate for Rs.271 lakh has been
sanctioned by the Government for the
establishment of office and to provide
amenities and incremental operating
cost to SWaRMA for a period of
3 years upto March 2013 under
IAMWARM Project.
The office of SWaRMA is started
functioning from June 2011 in the
campus of Institute for Water Studies,
Tharamani, Chennai.
105
20.3. Consultancy for Development of
Decision Support System for
Integrated Water Resources
Management in Tamil Nadu River
Basins
The Government have accorded
administrative sanction for
Rs.12.60 crore for this consultancy.
The objectives of this consultancy is
to develop a Decision Support System
for integrated management of water
resources in the following four basins:
(1) Vellar
(2) Gundar
(3) Pambar & Kottakkaraiyar
and
(4) Parambikulam & Aliyar
The Request for Expression of Interest
for the above consultancy was
published in the Newspapers on
23.09.2010. Further works are in
progress.
106
20.4. Remote Sensing and GIS Activities
Preparation of thematic maps for
re-appraisal study of Vaigai basin
like Geology, Geomorphology, Land
in use, waste land, Lineament,
Drainage, Village, Index, water
level, Water quality, Geophysical
resistivity, Contours and depth of
bed rock are under progress.
As a pilot study the digitized water
bodies maps for Kodaiyar basin has
been prepared and for the
remaining area, a detailed proposal
is under consideration.
107
20.5. WATER RESOURCES RESEARCH
FUND (WRRF):
At present the following two research
studies have been taken up under
WRRF.
1. Estimation of Transmission
loss in Sathanur system
through Anna University.
2. Flood as hazard, disaster
proneness, vulnerability in
North Chennai through
University of Madras.
21. DIRECTORATE OF BOILERS
The Directorate of Boilers, Tamil Nadu
is the enforcing authority of the
Boilers Act, 1923, a Central Act
administered by the State for the safe
operation of the Boilers and to ensure
the safety of public life and property.
The Directorate of Boilers plays a
crucial role in the phenomenal
development of Boilers and Boiler
Ancillary Industries in the State of
Tamil Nadu which is a pioneer in the
field of Boiler manufacturing,
Foundries, Forge Shops, Tubes and
108
Pipes manufacturing units, etc. The
Directorate of Boilers is incharge of
implementing the provisions of the
Tamil Nadu Boiler Attendants Rules,
1964 and Tamil Nadu Boiler Operation
Engineers Rules, 1965 to ensure that
the Boilers used in the user industries
are operated by certified Boiler
Attendants or Boiler Operation
Engineers. The Directorate of Boilers
conducts Tamil Nadu Boiler
Attendants Examination for I-Class,
II-Class and III-Class certificate of
competency and the Tamil Nadu
Boiler Operation Engineers
Examination certificate of proficiency.
The Directorate of Boilers conduct
tests to high pressure welders
employed in Boiler manufacturing
units and Boiler Ancillary Units, Boiler
Erectors and Repairers organizations
and issues competency certificates to
the successful candidates. The
Directorate of Boilers is responsible
for detecting and curbing the
operation of the unregistered and
uncertified Boilers. The Directorate of
Boilers ensures that the Boiler and
Boiler components, piping and its
fittings, Viz., Valves, Tees Reducers,
Elbows etc., are designed and
manufactured as per the provisions of
109
the Indian Boiler Regulations, 1950 by
approving the design for the various
components and by carrying out
inspection at a various stages of
manufacturing from approving the
basic raw materials to the final
product is tested and certified for
quality.
By its efficient functioning, the
Directorate of Boilers plays a pivotal
role in the industrial growth in the
Boilers and Boiler related field of the
State.
In a nutshell, this Directorate as a
custodian of the Boilers Act 1923, a
Central act implemented by the State
is responsible for the entire activity in
Boilers and its connected pipeline and
equipments, right from the
manufacturing to the end use and in
use to ensure safety of the public life
and property.
110
22. PROVIDING LAST MILE
CONNECTIVITY THROUGH WIDE
AREA NETWORK CONNECTIONS
TO WATER RESOURCES
DEPARTMENT.
It is proposed to take up institutional
strengthening and capacity building of
Water Resources Department by
creating an environment for
collaborative, computing and
electronic data information exchange.
To achieve this all the, Local Area
Network offices are proposed to be
connected by Wide Area Network
(WAN) under Tamil Nadu State Wide
Area Network (TNSWAN) for
55 selected offices under
stage-I through ELCOT at a cost of
Rs.168.50 lakh.
K.V.RAMALINGAM
MINISTER FOR PUBLIC WORKS